HomeMy WebLinkAbout08 APPROVE PLANS AND SPECS FOR ANNUAL ROADWAY REHAB CIP NO. 70019441
r74-,
AGENDA
REPORT
�..
8 IP
MEETING DATE: FEBRUARY 4, 2020
TO: MATTHEW S. WEST, CITY MANAGER
Agenda Item
8
Reviewed:
City Manager
Finance Director
FROM: DOUGLAS S. STACK, DIRECTOR OF PUBLIC WORKS/CITY ENGINEER
SUBJECT: APPROVE PLANS AND SPECIFICATIONS AND AUTHORIZE
ADVERTISEMENT FOR BIDS FOR THE ANNUAL ROADWAY REHABILITATION
AND CITYWIDE SIDEWALK REPAIR PROJECT CIP NO. 70019
SUMMARY
The plans and specifications for the Annual Roadway Rehabilitation and Citywide Sidewalk Repair
Project (CIP No. 70019) have been prepared and the project is now ready for bid.
RECOMMENDATION
It is recommended that the City Council
Adopt Resolution No. 20-08 approving the plans and specifications for the Annual
Roadway Rehabilitation and Citywide Sidewalk Repair Project (CIP No. 70019), and
authorize the City Clerk to advertise to receive bids.
2. Approve an additional appropriation of $470,000 from Measure M2 — Fair Share (Fund
139) for sidewalk removal and replacement.
FISCAL IMPACT
Funding in the amounts of $1,600,000 has been appropriated from the General Fund — Capital
Improvement Program (Fund 200) and $200,000 from the Measure M2 Fund (Fund 139) in the Fiscal
Year 2019-2020 Capital Improvement Program for the Annual Roadway Rehabilitation and Citywide
Sidewalk Repair Project, CIP No. 70019. The project is part of the City's on-going Maintenance of
Effort (MOE) obligation to maintain eligibility for Measure M2 funding. The total engineer's estimate
is $2,230,000. Additional costs of materials testing are estimated at $40,000 for a total project cost
of $2,270,000. Also included in this project is the construction of median breaks for fire access on
Tustin Ranch Road and Edinger, as well as an increased amount of sidewalk repair. This work
requires an additional appropriation of $470,000 from the Measure M2 Fund (Fund 139).
CORRELATION TO THE STRATEGIC PLAN
Rehabilitation of roadways and repair of sidewalks contributes to the fulfillment of the City's Strategic
Plan Goal B: Public Safety and Protection of Assets. Specifically, the project implements Strategy
#5, which among other items, is to ensure continuous maintenance and improvement of
transportation facilities.
DISCUSSION AND BACKGROUND
The Annual Roadway Rehabilitation and Citywide Sidewalk Repair Project CIP No. 70019 for Fiscal
Year 2019-2020 includes asphalt concrete pavement repair, asphalt concrete overlay, slurry sealing,
and traffic striping on various streets throughout the City within Zone 1 of the City's Pavement
Annual Roadway Rehabilitation and Citywide Sidewalk Repair Project
February 4, 2020
Page 2
Management Program. The City is divided into seven pavement management zones with one zone
targeted each year for pavement maintenance. Through a rolling seven year cycle, this program is
intended to maintain the integrity of City streets. The current phase, Zone 1 (see attached map), is
generally bounded by Fairhaven Avenue to the north, Newport Avenue to the east, Irvine Boulevard
to the south, and Costa Mesa Freeway (SR -55) to the west.
Effective July 1, 2017, the Measure M2 Ordinance (Ordinance No. 3) requires each City to maintain a
minimum level of local streets and roads expenditures from the City's General Fund regarding the
Maintenance of Effort (MOE). The City's FY 2019-20 MOE benchmark is $1,455,691. The scope of
work has been established to ensure final expenditures are above this benchmark and that the City's
eligibility to receive Measure M2 funding is not compromised.
CIP No. 70019 also includes the Annual Sidewalk Repair Project which focuses on removal and
replacement of damaged sidewalk at numerous locations throughout the City based on an annual
field survey conducted by the Engineering Division. The field survey identifies and evaluates
locations where tree roots are causing sidewalk and curb and gutter damage. Under the project,
some of these trees will be removed and replaced with trees of an acceptable species more suitable
to the parkway area as recommended by the City's Certified Arborist. This project also provides
improvements throughout the City to comply with the Americans with Disabilities Act (ADA). These
locations are typically requested by citizens or are identified by City staff to provide for completion of
missing segments of sidewalk and curb ramps to improve pedestrian access.
The tentative schedule for construction of this project is as follows:
• Authorization to Advertise for Bids .............
• First Legal Advertisement ..........................
• Second Legal Advertisement .....................
• Bid Opening ...............................................
• Award of Contract .......................................
• Start Construction .......................................
• Complete Construction ................................
........................................ 02/04/2020
............................ I ........... 02/13/2020
........................................ 02/20/2020
........................................ 03/03/2020
........................................ 03/17/2020
.................................. April/May 2020
......................................August 2020
Since this project involves the replacement and repair of existing facilities with minor modifications,
it is Categorically Exempt under California Environmental Quality Act (CEQA) requirements. A
Notice of Exemption has been prepared for the project, and will be recorded with the County of
Orange.
DoulyasA. Stack, P.E.
_ dektd of Public Works/City Engineer
Attachment 1: Resolution No. 20-08
Attachment 2: Location Map
S:\City Council Items\2020 Council Items\02-04-2020\Approve P&S for Roadway Rehab and Sidewalk Repair (CIP 70019)\Approval of
P&S Roadway Rehab & Sidewalk Repair (CIP 70019) draft.docx
ATTACHMENT 1
Resolution No. 20-08
RESOLUTION NO. 20-08
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUSTIN, CALIFORNIA
APPROVING PLANS AND SPECIFICATIONS FOR THE ANNUAL ROADWAY
REHABILITATION AND CITYWIDE SIDEWALK REPAIR PROJECT CIP NO. 70019
AND AUTHORIZING ADVERTISEMENT FOR BIDS
WHEREAS, it is the intention of the City Council of the City of Tustin, California to
contract for the construction of the Annual Roadway Rehabilitation and Citywide Sidewalk
Repair Project CIP No. 70019, FY 2019-2020; and
WHEREAS, the City Engineer has presented plans and specifications for the
construction of said work; and
WHEREAS, the CIP No. 70019 project is categorically exempt from the requirements of
the California Environmental Quality Act (CEQA); Class 1, Section 15301: Existing Facilities;
and
NOW, THEREFORE, BE IT RESOLVED that the plans and specifications presented by
the City Engineer are hereby approved as the plans and specifications for:
FY 2019-2020 Annual Roadway Rehabilitation and Citywide Sidewalk Repair Project
CIP No. 70019
BE IT FURTHER RESOLVED that the City Clerk is hereby authorized and directed to
advertise as required by law for the receipt of sealed bids or proposals for the performance of
the work specified in the aforesaid plans and specifications;
PASSED AND ADOPTED at a regular meeting of the City Council of the City of Tustin
held on the 4th day of February, 2020.
Dr. Allan Bernstein, Mayor
ATTEST:
Erica N. Yasuda
City Clerk
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) SS
CITY OF TUSTIN )
I, Erica N. Yasuda, City Clerk and ex -officio Clerk of the City Council of the City of Tustin,
California, do hereby certify that the whole number of the members of the City Council is five;
that the above and foregoing Resolution No. 20-08 was duly and regularly passed and adopted
at a regular meeting of the City Council held on the 4th day of February, 2020 by the following
vote:
COUNCILMEMBER AYES:
COUNCILMEMBER NOES:
COUNCILMEMBER ABSTAINED:
COUNCILMEMBER ABSENT:
ERICA N. YASUDA
City Clerk
ATTACHMENT 2
Location Map
H
0
U
IC
k
ILME
MORI
tiam
h
6