HomeMy WebLinkAboutSigned ZA Agenda Report May 5 2020 AGENDA REPORT MEETING DATE: MAY 5, 2020 TO: ZONING ADMINISTRATOR FROM: COMMUNITY DEVELOPMENT DEPARTMENT SUBJECT: CONDITIONAL USE PERMIT 2020-0005 APPLICANT: NATASHA MOLLA CHEVRON ENVIRONMENTAL MGMT. CO. 145 S. STATE COLLEGE BLVD. STE. 400 BREA, CA 92821 CONSULTANT: CORY J. DAVIS ARCADIS U.S. INC. 320 COMMERCE, SUITE 200 IRVINE, CA 92602 PROPERTY OWNER: JOHN YEGINIAN VALERO AUTO SERVICE CENTER 14501 RED HILL AVENUE TUSTIN, CA 92780 LOCATION: 14501 RED HILL AVENUE GENERAL PLAN: RED HILL AVENUE SPECIFIC PLAN (RHASP) ZONING: RED HILL AVENUE SPECIFIC PLAN 13 (SP 13) ENVIRONMENTAL STATUS: THIS PROJECT IS CATEGORICALLY EXEMPT (CLASS 30) PURSUANT TO SECTION 15330 OF THE CALIFORNIA ENVIRONMENTAL QUALITY ACT. REQUEST: AUTHORIZATION TO INSTALL A SOIL VAPOR EXTRACTION (SVE) REMEDIATION SYSTEM AT 14501 RED HILL AVENUE FOR THREE (3) YEARS. ITEM #1 DocuSign Envelope ID: FF0843A4-0B2C-4DDF-A7F9-FC6776F81E67 Zoning Administrator May 5, 2020 CUP 2020-0005 Page 2 RECOMMENDATION That the Zoning Administrator adopt Zoning Administrator Action (ZAA) No. 20-006 approving Conditional Use Permit (CUP) 2020-0005 to install a soil vapor extraction (SVE) remediation system at 14501 Red Hill Avenue. APPROVAL AUTHORITY Pursuant to Tustin City Code (TCC) Section 9299(b)(4)(a), the Zoning Administrator is authorized to consider development applications for soil remediation activities subject to a CUP. BACKGROUND Project Site and Surrounding Uses The project site is located within an active Valero gasoline service station located on the west corner of the intersection at Red Hill Avenue and Walnut Avenue (Figure 1 – Area Map & Project Site). There are commercial shops to the south and north west of the project site, single-family homes and multi-family units to the north, and a few residences and an orchard on the northeast. The properties to the east and southeast of the project site are single family homes with rear yards facing towards the site. Figure 1 – Area Map & Project Site M M Project site: 14501 Red Hill Avenue DocuSign Envelope ID: FF0843A4-0B2C-4DDF-A7F9-FC6776F81E67 Zoning Administrator May 5, 2020 CUP 2020-0005 Page 3 Project Description On behalf of Chevron Environmental Management Company (CEMC), Arcadis U.S. Incorporated (Arcadis) has prepared the upgraded SVE installation workplan for the project site located at an active Valero gasoline service station at 14501 Red Hill Avenue. The subject property currently consists of two (2) 15,000-gallon underground storage tanks (UST), with one (1) UST containing gasoline and the other UST containing two (2) compartments with an 8,000-gallon and 7,000-gallon compartment for gasoline and diesel respectively. The site also contains four (4) dispenser islands, an aboveground 250-gallon waste oil tank, and a service station building. The rectangular site is located at an elevation of approximately ninety-five (95) feet above sea level. The topography of the site is generally flat with a gentle slope to the south. An active groundwater production well (State Well No. 05S09W21B, City of Tustin designation T-WALN) owned and operated by the City of Tustin Water Services is located approximately 115 feet southeast of the site which is the primary driver warranting the continued operation of active remediation equipment. The applicant proposes to install a new upgraded SVE remediation system into an existing block walled and fenced compound behind an operating gas and automobile service station. The outdated SVE remediation system was removed from the existing onsite compound utilizing a crane and flatbed truck on June 27, 2019 to accommodate for the upgraded SVE system. The upgraded SVE system employs a compact design that is mounted on a six (6) foot by six (6) foot metal skid size frame with mounting lugs. The compact, single unit design will allow for the upgraded remediation system to be transported to the site on a flatbed truck, and the new upgraded SVE system will be placed into the existing compound utilizing a crane. The fuel source for the new system will be updated from an above ground propane tank to a natural gas line. Aesthetically, the new remediation system will not alter the appearance of the existing remedial compound and the view from the street will remain unchanged. The upgraded SVE remediation system will draw air from the existing well network into a catalytic oxidizer utilizing a blower and will result in minimal noise produced during operation. The SVE remediation system will operate in compliance with the South Coast Air Quality Management District (SCAQMD). Upon approval of the project, the upgraded SVE remediation system will be installed within 90 (ninety) days and the remedial activities are expected to occur for three (3) years after the initial start-up. Noise The City’s noise ordinance limits exterior noise at all commercial properties to sixty (60) dB(A) at any time. Per Condition No. 2.4, the applicant shall obtain a decibel reading of the equipment (upon installation) to verify that it produces no more than sixty (60) decibels of noise. If the reading exceeds the threshold, the Community Development Director may require the applicant to provide mitigation measures and install additional sound insulation materials. DocuSign Envelope ID: FF0843A4-0B2C-4DDF-A7F9-FC6776F81E67 Zoning Administrator May 5, 2020 CUP 2020-0005 Page 4 Environmental Analysis Pursuant to Section 15330 (Class 30) of the Guidelines to the California Environmental Quality Act (CEQA), minor actions to prevent, minimize, stabilize, mitigate, or eliminate the release or threat of release of hazardous waste or hazardous substances which are small actions costing $1 million dollars or less are categorically exempt from the provisions of CEQA. The exemption specifically includes small SVE and treatment systems which have been permitted by the SCAQMD. The proposed project falls within the categorical exemption for such cleanup actions. FINDINGS In determining whether to approve the CUP for the soil remediation activities, the Zoning Administrator must determine whether or not the proposed use will be detrimental to the health, safety, morals, comfort, or general welfare of the persons residing or working in the neighborhood, nor be injurious or detrimental to the property and improvements in the neighborhood of the subject property, or to the general welfare of the City of Tustin. A decision to approve this request may be supported by the following findings: 1) The proposed placement and operation of the SVE system is necessary to facilitate soil remediation as required by the Orange County Health Care Agency (OCHCA) and Santa Ana Regional Water Quality Control Board (SARWQCB). 2) The approval for an updated remediation system is valid for three (3) years. At time of expiration, the site shall be restored to the original condition. 3) Removing contaminates from the soil and groundwater would benefit the environment and protect the health, safety, morals, comfort, and general welfare of persons residing or working in the neighborhood and improve the condition of the property. 4) The entire updated remediation system, including soil vapor well and equipment, shall be minimally visible from the public right-of-way. Said equipment shall be located within an existing enclosure which consists of an existing six (6) foot high block wall on three (3) sides and an existing six (6) foot high chain-link fence with plastic slates and gate. The applicant shall maintain the existing chain link fence and screening at all times. 5) The equipment is required to comply with the Tustin Noise Ordinance. As conditioned, the noise levels may be verified prior to final inspection and the applicant is required to install additional sound insulation materials as deemed necessary by the Community Development Director. 6) As conditioned, the use would require approval by the City of Tustin and monitored by OCHCA, SARWQCB, and the SCAQMD and any other required agencies. DocuSign Envelope ID: FF0843A4-0B2C-4DDF-A7F9-FC6776F81E67 Zoning Administrator May 5, 2020 CUP 2020-0005 Page 5 Staff recommends that the Zoning Administrator adopt ZAA No. 20-006 approving CUP 2020-0005 to authorize soil remediation activities located at 14501 Red Hill Avenue. Mary Salman Code Enforcement Officer Attachments: A. Location Map B. Land Use Fact Sheet C. Submitted Plans D. Zoning Administrator Action No. 20-006 DocuSign Envelope ID: FF0843A4-0B2C-4DDF-A7F9-FC6776F81E67 04/14/20 ATTACHMENT A LOCATION MAP DocuSign Envelope ID: FF0843A4-0B2C-4DDF-A7F9-FC6776F81E67 Location Map 14501 Redhill Avenue, Tustin CA 92780 Project # CUP - 2020 - 0005 300 ft 1,000 ft 300 ft, 500 ft, and 1,000 ft Radius Map 500 ft DocuSign Envelope ID: FF0843A4-0B2C-4DDF-A7F9-FC6776F81E67 ATTACHMENT B LAND USE FACT SHEET DocuSign Envelope ID: FF0843A4-0B2C-4DDF-A7F9-FC6776F81E67 LAND USE APPLICATION FACT SHEET 1. LAND USE APPLICATION NUMBER(S): CUP 2020-0005 2. LOCATION: RED HILL AVENUE SPECIFIC PLAN (SP 13) 3. ADDRESS: 14501 Red Hill Avenue, Tustin, CA, 92780 4. APN(S): 432-171-07 5. PREVIOUS OR CONCURRENT APPLICATION RELATING TO THIS PROPERTY: N/A 6. SURROUNDING LAND USES: NORTH: Residential SOUTH: Residential EAST: Residential WEST: Residential 7. SURROUNDING ZONING DESIGNATION: NORTH: Multiple Family Residential (R 3) SOUTH: Suburban Residential (R 4) EAST: Planned Community Residential (PC RES) WEST: Multiple Family Residential (R 3) 8. SURROUNDING GENERAL PLAN DESIGNATION: NORTH: High Density Residential SOUTH: High Density Residential EAST: Planned Community Residential WEST: High Density Residential 9. SITE LAND USE: EXISTING PROPOSED Use: Automobile Service Station No Change Zoning: Red Hill Avenue Specific Plan (SP13) No Change General Plan: Red Hill Avenue Specific Plan No Change DEVELOPMENT FACTS: EXISTING PROPOSED 10. LOT AREA: 0.52 ac. No change 11. OTHER UNIQUE CONDITIONS ASSOCIATED TO THE PROPERTY (I.E. SPECIAL STUDY ZONES, EASEMENTS, ETC.) N/A DocuSign Envelope ID: FF0843A4-0B2C-4DDF-A7F9-FC6776F81E67 ATTACHMENT C SUBMITTED PLANS DocuSign Envelope ID: FF0843A4-0B2C-4DDF-A7F9-FC6776F81E67 90422 Upgraded Remediation System Installation Workplan Ms. Erica Demkowicz City of Tustin Planning Division 300 Centennial Way Tustin, California 92780 Subject: Upgraded Remediation System Installation Workplan Former Chevron Service Station No. 90422 14501 Red Hill Avenue, Tustin, California OCHCA Case No. 99UT054 Dear Ms. Demkowicz: On behalf of Chevron Environmental Management Company (CEMC), Arcadis U.S., Inc. (Arcadis) has prepared this Upgraded Remediation System Installation Workplan (Workplan) at Chevron Service Station No. 90422 (the Site), located at 14501 Red Hill Avenue in Tustin, California. On July 27th, 2019, Arcadis oversaw the removal of the Site’s obsolete soil vapor extraction (SVE) remediation system with plans to install a new, upgraded SVE remediation system in its place initially proposed by Leidos, Inc. (Leidos), the previous consultant, in the Revised Corrective Action Plan dated January 19, 2018. Subsequent concurrence of the upgraded remediation system by the Orange County Health Care Agency (OCHCA) was received in a letter dated August 2, 2018. Correspondence related to the upgraded remediation system installation is available in Attachment A. SITE HISTORY AND BACKGROUND The site is an active branded Valero gasoline service station located on the west corner of the intersection of Red Hill Avenue and Walnut Avenue in Tustin, California (Figure 1). The subject property currently consists of two 15,000-gallon underground storage tanks, one UST containing gasoline and the other UST containing two compartments with an 8,000-gallon and 7,000-gallon compartment for gasoline and diesel, respectively. The site also contains four dispenser islands, an aboveground 250-gallon waste oil tank, and a service station building. The rectangular site is located at an elevation of approximately 95 feet above mean sea level. The topography of the site is generally flat with a gentle slope to the south. An active groundwater production well (State Well No. 05S09W21B, City of Tustin designation T-WALN) owned and operated by the City of Tustin Water Services is located approximately 115 feet southeast of the site which is the primary driver warranting the continued operation of active remediation equipment (Figure 2). Arcadis U.S., Inc. 320 Commerce Suite 200 Irvine California 92602 Tel 714.730.9052 Fax 714.730.9345 www.arcadis.com ENVIRONMENT Date: March 10, 2020 Contact: Cory Davis Phone: 714.909.5066 Email: Cory.Davis@arcadis.com Our ref: 30043659 DocuSign Envelope ID: FF0843A4-0B2C-4DDF-A7F9-FC6776F81E67 90422 Upgraded Remediation System Installation Workplan Ms. Erica Demkowicz March 10, 2020 Page: 2/3 INSTALLATION OF UPGRADED REMEDIATION SYSTEM Arcadis proposes to install a new, upgraded SVE remediation system into an existing block walled and fenced compound behind an operating gas and automobile service station. The outdated SVE remediation system was removed from the existing onsite compound utilizing a crane and flatbed truck on June 27, 2019 to accommodate for the upgraded SVE system. The upgraded SVE system employs a compact design that is mounted on a 6-foot by 6-foot metal skid size frame with mounting lugs. The compact, single unit design will allow for the upgraded remediation system to be transported to the site on a flatbed truck. The new, upgraded SVE system will be placed into the existing compound utilizing a crane and connected to existing utility infrastructure (electrical and natural gas). Aesthetically, the new remediation system will not alter the appearance of the existing remedial compound and the view from the street will remain unchanged. The SVE remediation system will draw air from the existing well network into a catalytic oxidizer utilizing a blower. Minimal noise will be produced during operation. The SVE remediation system will operate in compliance with a South Coast Air Quality Management District (SCAQMD) - Permit to Operate. The remediation system specific designs, instrument schematics, and compound elevation details are provided in Figures 3 through 6. Schedule Upon acceptance of this work plan, the upgraded SVE remediation system will be installed within 90 days. The remedial activities are expected to occur for three years after initial start-up. If you have any questions or comments regarding the content of this letter, please contact Cory Davis at 714.909.5066. Sincerely, Arcadis U.S., Inc. Cory Davis Environmental Scientist DocuSign Envelope ID: FF0843A4-0B2C-4DDF-A7F9-FC6776F81E67 90422 Upgraded Remediation System Installation Workplan Ms. Erica Demkowicz March 10, 2020 Page: 3/3 Figures: Figure 1 – Site Location Map Figure 2 – Site Plan Figure 3 – Manifold Process and Instrumentation Diagram Figure 4 – Cat/Ox Process and Instrumentation Diagram Figure 5 – Groundwater Piping and Instrument Diagram Figure 6 – Compound Enclosure/Block Wall Elevations Attachments: Attachment A – Correspondence Attachment B – Compound Photographs DocuSign Envelope ID: FF0843A4-0B2C-4DDF-A7F9-FC6776F81E67 FIGURES DocuSign Envelope ID: FF0843A4-0B2C-4DDF-A7F9-FC6776F81E67 A P P R O X I M A T E S C A L E : 1 i n . = 2 , 0 0 0 f t . 0 2 , 0 0 0 ' 4 , 0 0 0 ' S I T E L O C A T I O N C A L I F O R N I A S I T E L O C A T I O N M A P 1 F I G U R E IMAGES: Tustin,CA.jpg CITY:EMERYVILLE, CA DIV/GROUP:ENVCAD DB:A.REYES C:\Users\nb8986\BIM 360\Arcadis\ANA - CHEVRON CORPORATION\Project Files\90442 - TUSTIN\2020\30009309\01-DWG\GWM-Fig1-SLM.dwg LAYOUT: 1 SAVED: 1/22/2020 11:59 AM ACADVER: 23.1S (LMS TECH) PAGESETUP: ---- PLOTSTYLETABLE: PLTFULL.CTB PLOTTED: 1/22/2020 11:59 AM BY: N, BALA A R E A L O C A T I O N R E F E R E N C E : B A S E M A P U S G S 7 . 5 . M I N . T O P O . Q U A D . , T U S T I N , C A , 2 0 1 8 . N C H E V R O N S E R V I C E S T A T I O N N O . 9 0 4 2 2 1 4 5 0 1 R E D H I L L A V E N U E T U S T I N , C A L I F O R N I A D o c u S i g n E n v e l o p e I D : F F 0 8 4 3 A 4 - 0 B 2 C - 4 D D F - A 7 F 9 - F C 6 7 7 6 F 8 1 E 6 7 N5 0 ^ 0 0 ' 4 2 " W 1 5 0 . 0 0 ' N4 0 ^ 3 2 ' 5 5 " W - 1 5 2 . 0 6 ' DRIV E W A Y MUT U A L EAS E M E N T DRIV E W A Y PLA N T E R DISPENSER ISLANDS CANOPY STA T I O N B U I L D I N G LINE PROPERTY PLA N T E R 10' W I D E S T O R M D R A I N E A S M E N T DR I V E W A Y LINES RECOVERY & VAPORPRODUCT TANK 250 GAL. USED OIL VENT LINE (ABANDONED) (ABANDONED)USED OIL LINE VENT LINES D R I V E W A Y S50 ^ 0 0 ' 4 2 " E 1 2 3 . 0 0 ' S04 ^ 5 9 ' 4 4 " E 3 8 . 1 7 ' UNLEAD E D SUPER PLUS S40^ 0 1 ' 1 3 " W 1 2 3 . 0 0 ' PLA N T E R N40^ 0 1 ' 1 3 " E 1 5 0 . 0 0 ' N51 ^ 5 5 ' 4 1 " W - 1 5 0 . 0 9 ' 25.00 ' RED H I L L A V E N U E W A L N U T A V E N U E C R O S S W A L K FORMER WES T F A L L R O A D 10 , 0 0 0 GA L . 10 , 0 0 0 GA L . 5,0 0 0 G A L . UNDERGROUND FORMER 3 - 10,000 GAL. STORAGE TANKS MW-15 MW-17 MW-02 MW-18 MW-16 MW-28 MW-26 MW-27 MW-23 MW-13 MW-24 MW-05 MW-12 MW-21 MW-20 MW-25 MW-02B MW-01B DW-01 MW-06 MW-10 MW-22R MW-01 MW-07 MW-08 MW-09 MW-11 MW-03 B-16 B-14 T-WALN MW-03B MW-04 MW-14 LEGEND: FIGURE SITE PLAN 2 IM A G E S : XR E F S : X - B a s e PR O J E C T N A M E : -- - - CIT Y : E M E R Y V I L L E , C A D I V / G R O U P : E N V C A D D B : A . R E Y E S C:\ U s e r s \ n b 8 9 8 6 \ B I M 3 6 0 \ A r c a d i s \ A N A - C H E V R O N C O R P O R A T I O N \ P r o j e c t F i l e s \ 9 0 4 4 2 - T U S T I N \ 2 0 2 0 \ 3 0 0 0 9 3 0 9 \ 0 1 - D W G \ G W M - F i g 2 - S i t e p l a n . d w g L A Y O U T : 2 S A V E D : 1/ 2 2 / 2 0 2 0 1 2 : 1 4 P M A C A D V E R : 23 . 1 S ( L M S T E C H ) P A G E S E T U P : --- - P L O T S T Y L E T A B L E : PL T F U L L . C T B P L O T T E D : 1/ 2 2 / 2 0 2 0 1 2 : 1 4 P M BY : N, B A L A APPROXIMATE SCALE : 1 in. = 40 ft. 0 40'80' N UST APPROXIMATE PROPERTY BOUNDARY EXISTING WELL SCREENED IN "UPPER WATER-BEARING ZONE" EXISTING DUAL-PHASE EXTRACTION WELL SCREENED IN "UPPER WATER-BEARING ZONE" EXISTING WELL SCREENED IN "LOWER WATER-BEARING ZONE" GROUNDWATER PRODUCTION WELL (CITY OF TUSTIN WATER SERVICES) DESTROYED GROUNDWATER MONITORING WELL SOIL BORING UNDERGROUND STORAGE TANK 1st. GENERATION CONFIGURATION 2nd. GENERATION CONFIGURATION CURRENT UST CONFIGURATION CURRENT ABOVE GROUND CONFIGURATION CHEVRON SERVICE STATION No. 90422 14501 RED HILL AVENUE TUSTIN, CALIFORNIA MW-02 MW-10 MW-01B T-WALN MW-14 B-16 Existing Compound DocuSign Envelope ID: FF0843A4-0B2C-4DDF-A7F9-FC6776F81E67 TYPICAL INDIVIDUAL WELL SAMPLING LOCATION, FLOW, VACUUM, PID READINGS, AND VAPOR SAMPLES COLLECTED AT THIS LOCATION 2" HOSE (TYP) SCHD 80 PVC TPE LINE ABOVE GRADE GRADE SCHD 40 PVC TPE LINE BELOW GRADE TWO PHASE WELL, SEE DETAIL BELOW LOCATE WELL SUMP OFFSET FROM WELL CASING TO ACCOMMODATE HOSES 2" PVC SCH 40 TPE LINE, USE SWEEPS 2" PVC TO 1 1/2" RIB PVC BRAIDED VACCUM HOSE 2" SCHD 40 PVC FOR GROUND WATER AND SVE RETURN LINE REDUCING BUSHING OR REDUCING TEE PENETRATION BOOT PENETRATION BOOT WELL SUMP OR TYPICAL 4" WELL CASING VAPOR TIGHT WELL SEAL 1 1/2" PVC STINGER 1 1/2" RIB PVC BRAIDED VACUUM HOSE SEE STANDARD DRAWING C-4 FOR TRAFFIC MANHOLE DETAILS PLAN CONCRETE APRON SPARE SPARE SPARE SPARE SPARE 2" S C H D 8 0 P V C SV E F L U I D D I S C H A R G E GRADE PO S I T I V E S H U T D O W N - C O N T R O L P A N E L E M E R G E N C Y S H U T O F F SW I T C H S H A L L C O I N C I D E W I T H O X I D I Z E R E M E R G E N C Y S H U T O F F SW I T C H ABBREVIATIONS F FILTER H HIGH HH HIGH HIGH L LOW LSH LEVEL SWITCH HIGH LSL LEVEL SWITCH LOW PI PRESSURE INDICATOR PL PRESSURE LOW PH PRESSURE HIGH PS PRESSURE SWITCH Tl TEMPERATURE INDICATOR TS TEMPERATURE SWITCH UV ULTRA VIOLET VFD VARIABLE FREQUENCTY INDICATOR VI VACUUM INSTRUMENT SOIL VAPOR EXTRACTION LINE (SHEETS 2 TO 4) GROUNDWATER EXTRACTION LINE (SHEETS 2 TO 4) ELECTRICAL LINE (SHEETS 2 TO 4) PRIMARY EQUIPMENT SYMBOLS TRANSFER PUMP SUMP PUMP OIL-LESS COMPRESSOR SOLENOID (NORMALLY CLOSED=NC; NORMALLY OPEN=NO) VALVE SYMBOLS GATE (NORMALLY OPEN) GATE (THROTTLED) BALL (NORMALLY CLOSED) SPRING CHECK AUTOMATIC DRAIN PRESSURE REGULATOR MISCELLANEOUS SYMBOLS SAMPLE/PRESSURE PORT LOCALLY MOUNTED INSTRUMENT/SENSOR CONTROL PANEL MOUNTED INSTRUMENT ELECTRICAL INTERLOCK ("AND" OR "OR" LOGIC) EQUIPMENT GROUND OPERATING DEVICE (CP = CONTROL PANEL, M = MOTOR, S = SOLENOID) VACUUM RELIEF PRESSURE RELIEF BOSS FITTINGS PRESSURE/ VACUUM RELIEF THERMAL/CATALYTIC OXIDIZER P& ID PROVIDED BY ENGINEER SEE SHEET P-2 2" S C H D 4 0 P V C C A P P E D 2" S C H D 4 0 P V C 2" S C H D 4 0 P V C 2" S C H D 4 0 P V C C A P P E D 2" S C H D 4 0 P V C 2" S C H D 4 0 P V C 2" S C H D 4 0 P V C 2" S C H D 4 0 P V C C A P P E D 2" S C H D 4 0 P V C 2" S C H D 4 0 P V C 2" S C H D 4 0 P V C 2" S C H D 4 0 P V C 2" S C H D 4 0 P V C 2" S C H D 4 0 P V C 2" S C H D 4 0 P V C 2" S C H D 4 0 P V C 2" S C H D 4 0 P V C ELEVATION TWO PHASE WELL DETAIL 2" S C H D 4 0 P V C C A P P E D 2" S C H D 4 0 P V C C A P P E D 2" S C H D 4 0 P V C C A P P E D MW-03 MW-07 MW-09 MW-11 MW-10 MW-02 VW-1 MW-08 VW-2MW-06 MW-22 VW-3MW-08A SLOPE: 1/16" PER/FT MIN. 3" SCHD 80 PVC LID GROUNDWATER EXTRACTION SYSTEM P & ID PROVIDED BY ENGINEER SEE SHEET P-3 29 27 10 21 5 6 36 27 27 222222222222222222222222222222222222222222 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 231S/P231S/P231S/P231S/P231S/P231S/P231S/P231S/P231S/P231S/P231S/P231S/P231S/P231S/P231S/P231S/P231S/P231S/P231S/P231S/P 4V14V14V14V14V14V14V14V14V14V14V14V14V14V14V14V14V14V14V14V1 S/P SPARE SPARE 23 1 S/P LEGEND 9 TAG TAG TAG TAG TAG TAG TAG TAG TAG TAG TAG TAG TAG TAG TAG TAG TAG TAG TAG TAG Professional Engineer's No. State Professional Engineer's Name Drawn byDesigned by Date Signed THIS DRAWING IS THE PROPERTY OF THE ARCADIS ENTITY IDENTIFIED IN THE TITLE BLOCK AND MAY NOT BE REUSED OR ALTERED IN WHOLE OR IN PART WITHOUT THE EXPRESS WRITTEN PERMISSION OF SAME. ARCADIS 590 WEST CENTRAL AVENUE, SUITE I BREA, CALIFORNIA 92821 30043659 MARCH 2020 IM A G E S : 1 . P N G XR E F S : X - B D R - C - L D ARCADIS Project No. Date No.Date Revisions By Project Mgr. Checked by USE TO VERIFY FIGURE REPRODUCTION SCALE THIS BAR REPRESENTS ONE INCH ON THE ORIGINAL DRAWING: Ckd P-1 CHEVRON SERVICE STATION NO. 9-0422 14501 RED HILL AVENUE TUSTIN, CALIFORNIA ARCADIS OF MICHIGAN, LLC.CI T Y : S Y R A C U S E - N Y D I V / G R O U P : E N V D B : A . S A N C H E Z L D : A L S P I C : ( O p t ) P M : ( R e q d ) T M : ( O p t ) L Y R : ( O p t ) O N = * ; O F F = * R E F * C: \ U s e r s \ c t i 0 1 0 1 2 \ B I M 3 6 0 \ A r c a d i s \ A N A - C H E V R O N C O R P O R A T I O N \ P r o j e c t F i l e s \ 9 - 0 4 2 2 - T u s t i n \ 2 0 2 0 \ 3 0 0 4 3 6 5 9 . 4 4 6 0 \ 0 1 - D W G \ S h e e t P - 1 . d w g L A Y O U T : P- 1 S A V E D : 3/ 4 / 2 0 2 0 1 1 : 1 1 A M A C A D V E R : 23 . 1 S ( L M S T E C H ) P A G E S E T U P : -- - - P L O T S T Y L E T A B L E : -- - - P L O T T E D : 3/ 4 / 2 0 2 0 2 : 2 7 P M B Y : TH O R W A T H , C H A N D R A K A N T H MANIFOLD PROCESS AND INSTRUMENTATION DIAGRAM DocuSign Envelope ID: FF0843A4-0B2C-4DDF-A7F9-FC6776F81E67 PROCESS AIR FLOW SWITCH MANUAL FLOW SWITCH BYPASS MANUAL DILUTION AIR AUTO DILUTION AIR VAPOR/LIQUID SEPARATOR 500 GAL ACCESS PORT 3-INCH, PROCESS INLET (SEE SHEET P-1) (2)PROGRESSIVE CAVITY PUMPS, MOYNO, GRANGER# 3P569 CAT#330--4529--000 HP=0.5, RPM=1725, 4.5GPM @ 10 PSI SINGLE PHASE TO TANK T-01 (SEE SHEET P-3) EARTHQUAKE VALVE NORMALLY OPEN CONTROL PANEL MASTER CONTROL RELAY EXTERNAL EMERGENCY SHUT-OFF SWITCH FLAME ARRESTOR HEAT EXCHANGER CATALYSTLEL SENSOR LIQUID RING OIL TANK DEKKER LIQUID RING PUMP, VMAX 0453K A1-01 SERIAL# G18285 WITH VFD 25HP, 150 SCFM @18"HG VFD SPILL CONTAINMENT AREA BLOCKING SOLENOIDS NFPA FUEL TRAIN CONTROL VALVE MAXON MODEL 400 BLOWER 1/2 HP EMERGENCY STOP SWITCH - SHUTS DOWN THERMAL OXIDIZER SYSTEM. VALVE SYMBOLS LEGEND PRIMARY EQUIPMENT SYMBOLS CAP (THREADED) PLUG (THREADED) REDUCER UNION FLANGED JOINT CAM LOCK FITTING VACUUM RELIEF PRESSURE RELIEF SOLENOID (NORMALLY CLOSED; FAIL CLOSED) PRESSURE REGULATOR PRESSURE/ VACUUM RELIEF SPRING CHECK CRITICAL DEVICES SAMPLE PRESSURE PORT EQUIPMENT GROUND P-TRAP FLEXIBLE HOSE OR CONNECTOR OIL-LESS COMPRESSORVACUUM BLOWER CATALYST ACCESS DOOR EFFLUENT SAMPLING PORT EXHAUST STACK INFLUENT CONCENTRATION SAMPLING PORT AFTER KO POT.N SYSTEM FLOW AND VACUUM, & VOC READINGS & SAMPLES COLLECTED AT THIS LOCATION 12 9 10 11 6 5 7 3 4 1 2 8 13 14 S/P TC TC UV PS LSHH - PSPI S/P VI F F H PI VI TS TI F S/P PITOT TUBE TI S/P HH PL PH VR L HIGH-HIGH WATER LEVEL KNOCK-OUT SWITCH - SHUTS SVE SYSTEM OFF WHEN KNOCK-OUT TANK IS FULL. AUTOMATIC QUENCH VALVE (AIR DILUTION CONTROL VALVE - OPENS ON HIGH TEMP ON CATALYST EXIT. FLOW SWITCH - DISABLE HEATING ELEMENT IF NO FLOW, SHUTS DOWN SVE SYSTEM. UV FLAME SAFETY DEVICE - IF BURNER DOES NOT LIGHT, SVE WILL SHUT DOWN. HIGH TEMP CONTROL & ALARM - WILL ALARM & SHUT SVE SYSTEM OFF WHEN SVE TEMP IS ABOVE SPECIFIED LEVELS. LOW GAS PRESSURE SENSOR AND SHUTOFF VALVE - CLOSES WHEN GAS PRESSURE DROPS BELOW 5 PSI. ECLIPSE VALVE - GAS TRAIN CLOSES WHEN OXIDIZER SHUTS DOWN -SHUTTING OFF GAS. LEVEL SWITCH HIGH HIGH: TURNS OFF THERMAL OXIDIZER AND GROUNDWATER SYSTEM. EARTHQUAKE VALVE: VALVE CLOSES TO THE PROPANE TANK DURING AN EARTHQUAKE. EMERGENCY STOP SWITCH: TURNS OFF THERMAL OXIDIZED AND GROUNDWATER TREATMENT SYSTEMS. EXTERNAL EMERGENCY STOP SWITCH: TURNS OFF THERMAL OXIDIZER AND GROUNDWATER TREATMENT SYSTEM. VACUUM RELIEF VALVE - WILL OPEN ABOVE SPECIFIED LEVELS. FLAME ARRESTOR - PREVENT UPSTREAM PROPAGATION OF FLAME. MISCELLANEOUS SYMBOLS SVE SYSTEM P&ID CRITICAL DEVICE GATE (NORMALLY OPEN) GATE (THROTTLED) BALL (NORMALLY OPEN) BALL (NORMALLY CLOSED) BUTTERFLY (TROOTTLED) FITTINGS SYMBOLS S/P 1 2 3 4 5 6 7 8 9 10 11 12 13 14 1 LSL - LSH - Professional Engineer's No. State Professional Engineer's Name Drawn byDesigned by Date Signed THIS DRAWING IS THE PROPERTY OF THE ARCADIS ENTITY IDENTIFIED IN THE TITLE BLOCK AND MAY NOT BE REUSED OR ALTERED IN WHOLE OR IN PART WITHOUT THE EXPRESS WRITTEN PERMISSION OF SAME. ARCADIS 590 WEST CENTRAL AVENUE, SUITE I BREA, CALIFORNIA 92821 30043659 MARCH 2020 IM A G E S : 2 . P N G XR E F S : X - B D R - C - L D ARCADIS Project No. Date No.Date Revisions By Project Mgr. Checked by USE TO VERIFY FIGURE REPRODUCTION SCALE THIS BAR REPRESENTS ONE INCH ON THE ORIGINAL DRAWING: Ckd P-2 CHEVRON SERVICE STATION NO. 9-0422 14501 RED HILL AVENUE TUSTIN, CALIFORNIA ARCADIS OF MICHIGAN, LLC.CI T Y : S Y R A C U S E - N Y D I V / G R O U P : E N V D B : A . S A N C H E Z L D : A L S P I C : ( O p t ) P M : ( R e q d ) T M : ( O p t ) L Y R : ( O p t ) O N = * ; O F F = * R E F * C: \ U s e r s \ c t i 0 1 0 1 2 \ B I M 3 6 0 \ A r c a d i s \ A N A - C H E V R O N C O R P O R A T I O N \ P r o j e c t F i l e s \ 9 - 0 4 2 2 - T u s t i n \ 2 0 2 0 \ 3 0 0 4 3 6 5 9 . 4 4 6 0 \ 0 1 - D W G \ S h e e t P - 2 . d w g L A Y O U T : P- 2 S A V E D : 3/ 4 / 2 0 2 0 1 1 : 1 1 A M A C A D V E R : 23 . 1 S ( L M S T E C H ) P A G E S E T U P : -- - - P L O T S T Y L E T A B L E : -- - - P L O T T E D : 3/ 4 / 2 0 2 0 2 : 3 1 P M B Y : TH O R W A T H , C H A N D R A K A N T H CAT/OX PROCESS AND INSTRUMENTATION DIAGRAM DocuSign Envelope ID: FF0843A4-0B2C-4DDF-A7F9-FC6776F81E67 CAP (THREADED) PLUG (THREADED) REDUCER P-TRAP UNION FLAGGED JOINT VENT PIPE SEAL LOOP IF REQ'D ANTISPHON VALVE V-02 CARBON VESSEL V-02 CARBON VESSEL V-01 CARBON VESSEL HOSE TYP V-01,02 & 03 CARBON VESSELS FLOW. 50 GPM PRESS. 25 LBS TEMP. 140°F MAX. POUNDS GAC 6000 CONTROL PANEL F-01 & 02 FILTERS FLOW: 180 GPM MAX. PRESS.: 150# HAYWARD #2 FLOWLINE SERIES P-01 (2) TRANSFER PUMP BRAND: DAYTON MODEL #: 4TU33 1.5 HP, 47 GPM @40 FT HEAD T-01 SURGE TANK CAPACITY: 500 GAL AUTO DRAIN VALVE LOW PRESSURE SWITCH OIL FILTER MOISTURE FILTER PARTICUALTE FILTER AIR COMPRESSOR AIR COMPRESSOR TANK AIR MUFFLER MASTER CONTROL RELAY CYCLE COUNTER EXTRERNAL EMEGENCY SHUT-OFF SWITCH WELL HEAD WELL VAULT FLOAT SWITCH 2" SCHD 80 PVC TO SYSTEM COMPOUND 2" SCHD 80 PVC DPE WELL HIGH PRESSURE SWITCH F-02 FILTER F-01 FILTER P-01 TRANSFER PUMP HIGH PRESSURE SWITCH 2" SCHD 80 PVC T-01 SURGE TANK VENT 2" SCHD 80 PVC FOR PROBE DEPTH LOCATION SEE DETAILS C-5, SHEET 10 2" SCHD 80 PVC P-02 SUMP PUMP SPILL CONTAINMENT AREA NOTE: MINIMUM DISTANCE FROM ELBOWS TO TOTALIZER IS 5 PIPE DIAMETER @ LONG TOTALIZER FROM THERMAL CATALYTIC OXIDIZER VAPOR/LIQUID SEPARATOR (SEE P-2 SEWER DISCHARGE GROUNDWATER P&ID CRITICAL DEVICE LEVEL SWITCH ALARM HIGH HIGH: TURNS OFF TRANSFER PUMP, SUMP PUMP, OXIDIZER, AND ACTIVATES SOLENOID VALVES ON AIR LINE TO PURGE AIR OUT FROM PNEUMATIC PUMP LEVEL SWITCH ALARM HIGH HIGH: TURNS OFF TRANSFER PUMP, SUMP PUMP, OXIDIZER, AND ACTIVATES SOLENOID VALVES ON AIR LINE TO PURGE AIR OUT FROM PNEUMATIAC PUMP PRESSURE SWITCH HIGH: ACTIVATES WHEN HIGH WATER PRESSURE OCCURS AT 18.5 PSI, ACTIVATES ALARM SHUTDOWN OF THERMAL OXIDIZER AND GROUNDWATER TREATMENT SYSTEMS. EMERGENCY SHUTOFF SWITCH - MANUALLY ACTIVATED AND SHUTS OFF AIR COMPRESSOR. EMERGENCY SHUTOFF SWITCH - MANUALLY ACTIVATED AND SHUTS DOWN BOTH THE SVE AND GROUNDWATER SYSTEM. LOCATED INSIDE SYSTEM COMPOUND. EMERGENCY SHUTOFF SWITCH - MANUALLY ACTIVATED AND SHUTS DOWN BOTH THE SVE AND GROUNDWATER SYSTEM. LOCATED OUTSIDE SYSTEM COMPOUND. PRESSURE TRANSMITTER SWITCH ALARM LOW: SHUTS DOWN GWET AND SVE SYSTEMS IF PRESSURE IS 40 PSI OR LESS. FLOAT SWITCH HIGH: TURNS OFF AIR TO THE PNEUMATIC PUMP. PRESSURE SWITCH HIGH: ACTIVATES WHEN HIGH WATER PRESSURE OCCURS AT 18 PSI, ACTIVATES ALARM SHUTDOWN OF THERMAL OXIDIZER AND GROUNDWATER TREATMENT SYSTEMS. PRESSURE RELIEF VALVE - ACTIVATED WHEN PRESSURE ON TANK EXCEEDS 140 PSI. LEGEND PRIMARY EQUIPMENT SYMBOLS AIR COMPRESSORVACUUM BLOWER FLEXIBLE HOSE OR CONNECTOR CAM LOCK FITTING VALVE SYMBOLS GATE ( NORMALLY OPEN) GATE (THROTTLED) BALL ( NORMALLY OPEN) BALL (NORMALLY CLOSED) PRESSURE / VACCUM RELIEF SPRING CHECK CRITICAL DEVICES SAMPLE/PRESSURE PORT EQUIPMENT GROUND MISCELLANEOUS SYMBOLS PRESSURE RELIEF VACUUM RELIEF PRESSURE REGULATOR SOLENOID (NORMALLY CLOSED; FAIL CLOSED) SOLENOID (NORMALLY OPEN; FAIL OPEN) 10 10 102 2 1 2 22 1 2 2 2 37 2 12 12 24 2 S/P 1 2 2 S/P 1 14 14 2 LSHH 16 17 18 LSL LSH LSHH 15 16 PIPI 24 17 S/PS/P 1 2 2 2 19 21 18 24 20 11 2 242424 PI PI PI 37 FQI 2 2 2 2 1S/P 23 17 2 8 PR 2 S S 15 1" B R A I D E D H O S E FITTING SYMBOLS Professional Engineer's No. State Professional Engineer's Name Drawn byDesigned by Date Signed THIS DRAWING IS THE PROPERTY OF THE ARCADIS ENTITY IDENTIFIED IN THE TITLE BLOCK AND MAY NOT BE REUSED OR ALTERED IN WHOLE OR IN PART WITHOUT THE EXPRESS WRITTEN PERMISSION OF SAME. ARCADIS 590 WEST CENTRAL AVENUE, SUITE I BREA, CALIFORNIA 92821 30043659 MARCH 2020 IM A G E S : 3 . P N G XR E F S : X - B D R - C - L D ARCADIS Project No. Date No.Date Revisions By Project Mgr. Checked by USE TO VERIFY FIGURE REPRODUCTION SCALE THIS BAR REPRESENTS ONE INCH ON THE ORIGINAL DRAWING: Ckd P-3 CHEVRON SERVICE STATION NO. 9-0422 14501 RED HILL AVENUE TUSTIN, CALIFORNIA ARCADIS OF MICHIGAN, LLC.CI T Y : S Y R A C U S E - N Y D I V / G R O U P : E N V D B : A . S A N C H E Z L D : A L S P I C : ( O p t ) P M : ( R e q d ) T M : ( O p t ) L Y R : ( O p t ) O N = * ; O F F = * R E F * C: \ U s e r s \ c t i 0 1 0 1 2 \ B I M 3 6 0 \ A r c a d i s \ A N A - C H E V R O N C O R P O R A T I O N \ P r o j e c t F i l e s \ 9 - 0 4 2 2 - T u s t i n \ 2 0 2 0 \ 3 0 0 4 3 6 5 9 . 4 4 6 0 \ 0 1 - D W G \ S h e e t P - 3 . d w g L A Y O U T : P- 3 S A V E D : 3/ 4 / 2 0 2 0 1 1 : 1 1 A M A C A D V E R : 23 . 1 S ( L M S T E C H ) P A G E S E T U P : -- - - P L O T S T Y L E T A B L E : -- - - P L O T T E D : 3/ 4 / 2 0 2 0 2 : 2 8 P M B Y : TH O R W A T H , C H A N D R A K A N T H GROUNDWATER PIPING AND INSTRUMENTATION DIAGRAM DocuSign Envelope ID: FF0843A4-0B2C-4DDF-A7F9-FC6776F81E67 COMPOUND ELEVΑTION NORTH EΑST FΑCE DETΑIL COMPOUND STRUCTURE OVERHEAD VIEW GRADE COMPOUND ELEVATION SOUTH WEST FACE DETAIL GRADE NOTES: 1.FIELD VERIFY GATE AND HINGE DIMENSIONS. 2.CMU TO BE REINFORCED BLOCK WITH COLOR TO MATCH SURROUNDING STRUCTURES. 3.GATE JAMBS TO BE IMBEDDED IN CONCRETE FOOTINGS. 4.SURGE TANK: 550 GAL, WHITE POLYETHYLENE, 48"X75". 5.CARBON VESSELS: US FILTER SCRUB 2000, WHITE PAINTED STEEL, 48"X95". 6.CATALYTIC OXIDIZER: BAKER 250 LIQUID RING, LIGHT BLUE PAINTED STEEL, 7'X10' STACK= 13'-6" COMPOUΝD ELEVΑTIOΝ SOUTH EΑST FΑCE DETΑIL GRADE 8" X 6' CONCRETE BLOCK WALL (SLUMP BLOCK TYPE, COLOR PER CITY REQ.) 2" X 6' CHAINLINK FENCING (36" CHAINLINK FENCING ACCESS GATE) 8"X8"X16" CMU BLOCKS (GROUT SOLID) COLOR AND TEXTURE TO MATCH EXISTING. CARBON VESSELS DIA: 48" H: 95" 550 GAL POLYETHYLENE SURGE TANK DIA: 48" H: 75" EXHAUST STACK (CATALYTIC OXIDIZER) DIA: 24" H: 13'-6" GUARD POSTS 5' SPACING BUMPER POST 4' OC 1" X 6' PLASTIC SLATES (WHITE) FOR PRIVACY IN CHAINLINK FENCE 2"X2" CHAINLINK FENCING 3' ACCESS GATE CARBON VESSELS DIA: 48" H: 95" EXHAUST STACK (CATALYTIC OXIDIZER) DIA: 24" H: 13'-6" BUMPER POST 4' OC BUMPER POST 4' OC 550 GAL POLYETHYLENE SURGE TANK DIA: 48" H: 75" EXHAUST STACK (CATALYTIC OXIDIZER) DIA: 24" H: 13'-6" CARBON VESSELS DIA: 48" H: 95" 32'-0" 14'-0" 9'-0" 18'-0" 6'-0" 13'-0"13'-0" 6'-0"6'-0" CHEVRON SERVICE STATION 90422 14501 REDHILL AVE. TUSTIN, CALIFORNIA FIGURE 6 IM A G E S : XR E F S : PR O J E C T N A M E : -- - - CIT Y : ( R e q d ) D I V / G R O U P : ( R e q d ) D B : ( R e q d ) L D : ( O p t ) P I C : ( O p t ) P M : ( R e q d ) T M : ( O p t ) L Y R : ( O p t ) O N = * ; O F F = * R E F * C:\ U s e r s \ d k i 0 0 6 5 3 \ B I M 3 6 0 \ A r c a d i s \ A N A - C H E V R O N C O R P O R A T I O N \ P r o j e c t F i l e s \ 9 0 4 2 2 - T U S T I N \ 2 0 2 0 \ 3 0 0 0 9 3 0 9 \ 0 1 - D W G \ F I G 4 A - C O M P - B L O C K - W A L L . d w g L A Y O U T : 4A S A V E D : 2/2 1 / 2 0 2 0 3 : 3 7 P M A C A D V E R : 23 . 1 S ( L M S T E C H ) P A G E S E T U P : --- - P L O T S T Y L E T A B L E : -- - - P L O T T E D : 2/2 1 / 2 0 2 0 5 : 4 4 P M BY : KA M B L E , D E V E S H COMPOUND ENCLOSURE BLOCK WALL ELEVATIONS A A B B DocuSign Envelope ID: FF0843A4-0B2C-4DDF-A7F9-FC6776F81E67 Attachment A – Correspondence DocuSign Envelope ID: FF0843A4-0B2C-4DDF-A7F9-FC6776F81E67 DocuSign Envelope ID: FF0843A4-0B2C-4DDF-A7F9-FC6776F81E67 DocuSign Envelope ID: FF0843A4-0B2C-4DDF-A7F9-FC6776F81E67 Attachment B – Compound Photographs DocuSign Envelope ID: FF0843A4-0B2C-4DDF-A7F9-FC6776F81E67 PHOTOGRAPH LOG Chevron Site: 90422 14501 Red Hill Avenue, Tustin, California arcadis.com 1 Photograph: 1 Description: Existing block wall and fenced compound. NOTE: Old SVE system stack visible in photograph Location: 14501 Red Hill Avenue, Tustin, California DocuSign Envelope ID: FF0843A4-0B2C-4DDF-A7F9-FC6776F81E67 ATTACHMENT D ZONING ADMINISTRATOR ACTION NO. 20-006 DocuSign Envelope ID: FF0843A4-0B2C-4DDF-A7F9-FC6776F81E67 ZONING ADMINISTRATOR ACTION 20-006 CONDITIONAL USE PERMIT 2020-0005 14501 RED HILL AVENUE The Zoning Administrator of the City of Tustin does hereby resolve as follows: I. The Zoning Administrator finds and determines as follows: A. That a proper application for Conditional Use Permit (CUP) 2020-0005 was filed by Cory Davis of Arcadis U.S. Inc. for Chevron Environmental Management Company (CEMC), on behalf of the property owners, Mr. John Yeginian (Valero Auto Service Center) requesting authorization to install and operate a soil vapor extraction (SVE) remediation system at an existing compound for three (3) years located at 14501 Red Hill Avenue. B. That the property is zoned Red Hill Avenue Specific Plan 13 (SP 13) and designated by the General Plan as Red Hill Avenue Specific Plan (RHASP) Pursuant to TCC Section 9291, installation of a soil remediation system requires approval of a Conditional Use Permit. C. In accordance with Tustin City Code (TCC) Section 9299(b)(4)(a), the Zoning Administrator is authorized to consider specified development applications for soil remediation activities subject to a CUP. D. The project has been determined to be consistent with the Air Quality Sub- element of the City of Tustin General Plan in that Policy 1.6 of the Sub- element encourages cooperation and participation in regional air quality management plans, programs, and enforcement measures; and E. That the establishment, maintenance, and operation of the use applied for will not, under the circumstances of this case, be detrimental to the health, safety, morals, comfort, or general welfare of the persons residing or working in the neighborhood nor be injurious or detrimental to the property and improvements in the neighborhood of the subject property, nor to the general welfare of the City of Tustin as evidenced by the following findings: 1) The proposed placement and operation of the SVE system is necessary to facilitate soil remediation as required by the Orange County Health Care Agency (OCHCA) and Santa Ana Regional Water Quality Control Board (SARWQCB). 2) The installation and operation of extraction and treatment equipment would be temporary for a period up to three (3) years and will be removed and the site restored at that time or earlier upon completion of the process. DocuSign Envelope ID: FF0843A4-0B2C-4DDF-A7F9-FC6776F81E67 3) Removing contaminates from the soil and groundwater would benefit the environment and protect the health, safety, morals, comfort, and general welfare of persons residing or working in the neighborhood and improve the condition of the property. 4) The entire updated remediation system, including soil vapor well and equipment, shall be minimally visible from the public right-of-way. Said equipment shall be located within an existing enclosure which consists of an existing six (6) foot high block wall on three (3) sides and an existing (6) foot high chain-link fence with plastic slates and gate. The applicant shall maintain the existing chain link fence and screening at all times. 5) The equipment is required to comply with the Tustin Noise Ordinance. Sound attenuation blankets will also be utilized for sound attenuation. As conditioned, the noise levels may be verified prior to final inspection and the applicant is required to install additional sound insulation materials as deemed necessary by the Community Development Director. 6) As conditioned, the use would be approved by the City of Tustin and monitored by the OCHCA, SARWQCB, and the South Coast Air Quality Management District (SCAQMD) and any other required agencies. F. That this project is categorically exempt pursuant to Section 15330, Article 19, Class 30 of Title 14, Chapter 3 of the California Code of Regulations (Guidelines for the California Environmental Quality Act). G. That a public hearing was duly called, noticed, and held on said application on May 5, 2020, by the Zoning Administrator. II. The Zoning Administrator hereby approves CUP 2020-0005 authorizing the installation and operation of a SVE remediation system at 14501 Red Hill Avenue, subject to the conditions contained within Exhibit A attached hereto. PASSED AND ADOPTED by the Zoning Administrator of the City of Tustin at a regular meeting held on the 5th day of May, 2020. ELIZABETH A. BINSACK ZONING ADMINISTRATOR VERA TISCARENO RECORDING SECRETARY DocuSign Envelope ID: FF0843A4-0B2C-4DDF-A7F9-FC6776F81E67 STATE OF CALIFORNIA ) COUNTY OF ORANGE ) CITY OF TUSTIN ) I, VERA TISCARENO, the undersigned, hereby certify that I am the Recording Secretary of the Zoning Administrator of the City of Tustin, California; that Zoning Administrator Action No. 20-006 passed and adopted at a regular meeting of the Tustin Zoning Administrator, held on the 5th day of May, 2020. ______________________________ VERA TISCARENO RECORDING SECRETARY DocuSign Envelope ID: FF0843A4-0B2C-4DDF-A7F9-FC6776F81E67 EXHIBIT A POTENTIAL CONDITIONS OF APPROVAL CONDITIONAL USE PERMIT 2020-0005 14501 RED HILL AVENUE GENERAL (1) 1.1 The proposed project shall substantially conform with the submitted plans for the project date stamped May 5, 2020, on file with the Community Development Department, as herein modified, or as modified by the Director of Community Development in accordance with this Exhibit. The Director of Community Development may also approve subsequent minor modifications to plans during plan check if such modifications are consistent with provisions of the Tustin City Code (TCC). (1) 1.2 This approval shall become null and void unless the use is established within twelve (12) months of the date of this Exhibit. Time extensions may be granted if a written request is received by the Community Development Department within thirty (30) days prior to expiration. (1) 1.3 Unless otherwise specified, the conditions contained in this Exhibit shall be complied with as specified, subject to review and approval by the Community Development Department. (1) 1.4 Approval of Conditional Use Permit (CUP) 2020-0005 is contingent upon the applicant and property owner signing and returning to the Community Development Department a notarized "Agreement to Conditions Imposed" form and the property owner signing and recording with the County Clerk- Recorder a notarized "Notice of Discretionary Permit Approval and Conditions of Approval" form. The forms shall be established by the Director of Community Development, and evidence of recordation shall be provided to the Community Development Department. (1) 1.5 Any violation of any of the conditions imposed is subject to issuance of an administrative citation pursuant to TCC 1162(a). (1) 1.6 The applicant shall be responsible for costs associated with any necessary code enforcement action, including attorney’s fees, subject to the applicable notice, hearing, and appeal process as established by the City Council by ordinance. (1) 1.7 As a condition of approval of CUP 2020-0005, the applicant shall agree, at its sole cost and expense, to defend, indemnify, and hold harmless the City, its officers, employees, agents, and consultants, from any claim, action, or proceeding brought by a third party against the City, its officers, agents, and employees, which seeks to attack, set aside, challenge, void, or annul an DocuSign Envelope ID: FF0843A4-0B2C-4DDF-A7F9-FC6776F81E67 approval of the City Council, the Planning Commission, or any other decision-making body, including staff, concerning this project. The City agrees to promptly notify the applicant of any such claim or action filed against the City and to fully cooperate in the defense of any such action. The City may, at its sole cost and expense, elect to participate in defense of any such action under this condition. USE RESTRICTIONS (1) 2.1 The approval for an updated remediation system is valid for three (3) years. At time of expiration, the site shall be restored to the original condition. (1) 2.2 The entire updated remediation system, including soil vapor well and equipment, shall be minimally visible from the public right-of-way. Said equipment shall be located within an existing enclosure which consists of an existing six (6) foot high block wall on three (3) sides and an existing (6) foot high chain-link fence with plastic slates and gate. The applicant shall maintain the existing chain link fence and screening at all times. (1) 2.3 The applicant shall obtain approval from affected easement holders of temporary construction activities in any easement area at least ten (10) days prior to commencement of construction in the easement area. (1) 2.4 Prior to final inspection of the equipment, the applicant shall obtain a decibel reading of the soil remediation equipment to evaluate that the equipment produces no more than sixty (60) decibels of noise in compliance with TCC Section 4614. If the reading determines that noise thresholds are exceeded, the Community Development Director may require the applicant provide mitigation measures and install additional sound insulation materials. The applicant shall bear all associated costs. (1) 2.5 Contaminated material may not leave the site except as described in Condition No. 4.4. All necessary precautions and preventative measures shall be in place to prevent material from being washed away by surface waters or blown by wind. These controls shall be in accordance with SCAQMD Rule 1166. (1) 2.6 All necessary precautions and preventive measures such as Best Management Practices shall be implemented to prevent the flow of contaminated water off-site. Contaminated water includes any water from leaking wells or soil laden water from on-site construction activity. DocuSign Envelope ID: FF0843A4-0B2C-4DDF-A7F9-FC6776F81E67 PLAN SUBMITTAL (1) (5) 3.1 All construction shall comply with 2019 California Building Code, California Mechanical Code, California Electrical Code, California Plumbing Code, California Green Code and California Energy Code. (1) 3.2 The applicant shall obtain any necessary permits including, but not limited to, electrical and mechanical permits. (3) 3.3 Prior to any work in the public right-of-way, an Encroachment Permit shall be obtained from and applicable fees paid to the Public Works Department. This includes, but not limited to the soil boring proposed on Westfall Road. (1) 3.5 Construction and Demolition Waste Recycling and Reduction Plan (WRRP). The applicant/contractor is required to submit a WRRP to the Public Works Department. The WRRP must indicate how the applicant will comply with the City’s requirement (TCC Section 4351, et al) to recycle at least sixty-five (65) percent of the project waste material or the amount required by the California Green Building Standards Code. a. The applicant will be required to submit a fifty-dollar ($50.00) application fee and a cash security deposit. Based on the review of the submitted Waste Management Plan, the cash security deposit in the amount of five (5) percent of the project’s valuation as determined by the Building Official, rounded to the nearest thousand. The deposit amount will be collected in accordance with the TCC. b. Prior to issuance of any permit, the applicant shall submit the required security deposit in the form of cash, cashier’s check, personal check, or money order made payable to the “City of Tustin”. (1) 3.7 Any damage done to existing public street improvements and/or utilities shall be repaired to the satisfaction of the City Engineer. OUTSIDE AGENCIES (1) 4.1 The applicant shall obtain all necessary permits from the SCAQMD, related to the operation, installation, and monitoring of the subject site and equipment. DocuSign Envelope ID: FF0843A4-0B2C-4DDF-A7F9-FC6776F81E67 (1) 4.2 The applicant shall obtain all necessary permits and approvals from the Orange County Fire Authority, the OCHCA or the Santa Ana Regional Water Quality Control Board related to operation, installation, and monitoring of the subject site and equipment, if applicable. (1) 4.3 The applicant shall obtain all necessary clearances from the State Department of Occupational Safety and Health Administration and the Department of Toxic Substances Control, if applicable. (1) 4.4 All contaminated material being transported must be manifested and may only be carried by a waste hauler licensed to transport the material being hauled. A copy of the appropriate waste hauler permit shall be provided to the City prior to transportation of hazardous material off-site. Transportation of contaminated material and hazardous materials shall be in accordance with the regulations of the following agencies: • United States Department of Transportation; • United States Environmental Protection Agency; • California Environmental Protection Agency; and, • California Division of Occupational Safety and Health Administration FEES (1) 5.1 Within forty-eight (48) hours of approval of the subject project, the applicant shall deliver to the Community Development Department, a cashier’s check payable to the COUNTY CLERK in the amount of fifty dollars ($50.00) to enable the City to file the appropriate environmental documentation for the project. If within such forty-eight (48) hour period the applicant has not delivered to the Community Development Department the above-noted check, the statute of limitations for any interested party to challenge the environmental determination under the provisions of the California Environmental Quality Act could be significantly lengthened. (1) 5.2 Prior to issuance of any permits, payment shall be made of all applicable fees, including but not limited to, the following: a. Building, Planning and Public Works plan check and permit fees. b. Orange County Health Care agency (Environmental Health). DocuSign Envelope ID: FF0843A4-0B2C-4DDF-A7F9-FC6776F81E67