Loading...
HomeMy WebLinkAbout05 PLANS AND SPECS FOR PEPPERTREE PARK CIP 20085DocuSign Envelope ID: D10F3CFA-DA04-4C49-B181-OAA6143AEC8D Agenda Item 5 AGENDAREPORT RCty Manager _ m5W Finance Director �Q MEETING DATE: MAY 19, 2020 TO: MATTHEW S. WEST, CITY MANAGER FROM: DOUGLAS S. STACK, DIRECTOR OF PUBLIC WORKS/CITY ENGINEER SUBJECT: APPROVE PLANS AND SPECIFICATIONS AND AUTHORIZE ADVERTISEMENT FOR BIDS FOR THE PEPPERTREE PARK IMPROVEMENTS PROJECT CIP NO. 20085 SUMMARY The plans and specifications for the Peppertree Park Improvements Project (CIP No. 20085) have been prepared and the project is now ready for bid. RECOMMENDATION It is recommended that the City Council: Adopt Resolution No. 20-31 approving the plans and specifications for the Peppertree Park Improvements Project (CIP No. 20085); and 2. Authorize the City Clerk to advertise to receive bids. FISCAL IMPACT Funding in the amount of $564,000 is being provided through the Community Development Block Grant Program (CDBG) and intended to satisfy the timely uses of funds. The remainder will be requested through the Park Development Fund (Fund 131) and included in the FY 2020/2021 Capital Improvement Program appropriation. The engineer's estimate for the project is $1,418,000. CORRELATION TO THE STRATEGIC PLAN The Peppertree Park Project contribute to the fulfillment of the City's Strategic Plan Goal B: Create a plan to protect the City's public assets. Specifically, the project implementation of Strategy 5, which among other items, is to improve turf and landscape conditions for all community parks. BACKGROUND Peppertree Park is a highly utilized park for a variety of enjoyable community activities, including Concerts in the Park, Movies in the Park, Lobster Fest, and Chili Cook -Off. The park is located adjacent to the Tustin Area Senior Center with frontage along First, B and C Streets. The improvements will include restroom renovations, new landscaping, irrigation, turf, senior center community garden, playground equipment, rubberize playground surfacing, infield renovation and a series of accessibility improvements in accordance with the Americans with Disabilities Act (ADA). Replacing the landscape, turf and irrigation will improve coverage, enhance growth and efficiency, thereby, improving long term maintenance and operations. The ADA improvements include those that pertain to the play equipment as well as the walking paths and seating/picnic areas in and around the park. 68 DocuSign Envelope ID: D10F3CFA-DA04-4C49-B181-OAA6143AEC8D The typical service life for an irrigation system is 25-30 years and Peppertree Park was built in 1972. Several individual projects have been completed over the years requiring multiple modifications to the irrigation system to accommodate each project accordingly. These projects include: • 2000 restroom renovation, band shell, picnic shelter replaced, dugout renovation, playground Improvements • 2001 new backstop, upgrade electrical, hardscape in front of band shell • 2012 Park Lighting LED Conversion • 2014 Bocce Ball Court • 2017 Additional Park LED Perimeter Lighting The new irrigation design accounts for the amenities within the park and corrects problems associated with the construction of the projects listed above. In addition, renovating the turf areas and re -sodding will improve durability, grade, drainage and enhance long term turf development. The tentative schedule for construction of the project is as follows: Authorization to Advertise for Bids 05/19/2020 First Legal Advertisement 05/21/2020 • Second Legal Advertisement 05/28/2020 • Bid Opening 06/25/2020 • Tentative Award of Contract 07/21/2020 •' Tentative Start Construction 08/15/2020 • Estimated Completion of Construction 05/01/2021 The plans and specifications for the Peppertree Park Project (CIP No. 20085) have been prepared and the project is now ready for bid. Do �� . Stack, P.E. e of 4Public Works/City Engineer Attachment(s) : 1. Resolution No. 20-31 SXityC—il Ilems\2020C—1 U-105-19 2096pp—P&S for Peppertme PaWAgenda Report Pepperl me Parc CIP20085dou 69 DocuSign Envelope ID: D10F3CFA-DA04-4C49-B181-OAA6143AEC8D RESOLUTION NO. 20-31 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUSTIN, CALIFORNIA APPROVING PLANS AND SPECIFICATIONS FOR THE PEPPERTREE PARK PROJECT CIP NO. 20085 AND AUTHORIZING ADVERTISEMENT FOR BIDS WHEREAS, it is the intention of the City Council of the City of Tustin, California to contract for the construction of the Peppertree Park Project CIP (No. 20085), FY 2020-2021; and WHEREAS, the City Engineer has presented plans and specifications for the construction of said work; and WHEREAS, the CIP No. 20085 project is categorically exempt from the requirements of the California Environmental Quality Act (CEQA); Class 1, Section 15301: Existing Facilities; and NOW, THEREFORE, BE IT RESOLVED that the plans and specifications presented by the City Engineer are hereby approved as the plans and specifications for: Peppertree Park Project CIP No. 20085 BE IT FURTHER RESOLVED that the City Clerk is hereby authorized and directed to advertise as required by law for the receipt of sealed bids or proposals for the performance of the work specified in the aforesaid plans and specifications; PASSED AND ADOPTED at a regular meeting of the City Council of the City of Tustin held on the 19th day of May, 2020. DR. ALLAN BERNSTEIN, Mayor ATTEST: ERICA N. YASUDA, City Clerk 70 DocuSign Envelope ID: D10F3CFA-DA04-4C49-B181-OAA6143AEC8D STATE OF CALIFORNIA ) COUNTY OF ORANGE ) SS CITY OF TUSTIN ) I, Erica N. Yasuda, City Clerk and ex -officio Clerk of the City Council of the City of Tustin, California, do hereby certify that the whole number of the members of the City Council is five; that the above and foregoing Resolution No. 20-31 was duly and regularly passed and adopted at a regular meeting of the City Council held on the 19th day of May, 2020 by the following vote: COUNCILMEMBER AYES: COUNCILMEMBER NOES: COUNCILMEMBER ABSTAINED: COUNCILMEMBER ABSENT: ERICA N. YASUDA, City Clerk 71