Loading...
HomeMy WebLinkAbout08 NOC ALTADENA PED 12-5-05 City Manager Finance Director ~ 1£ AGENDA REPORT Agenda Item Reviewed: MEETING DATE: DECEMBER 5, 2005 WILLIAM A. HUSTON, CITY MANAGER TO: FROM: PUBLIC WORKS DEPARTMENT/ENGINEERING SUBJECT: ACCEPTANCE OF PUBLIC IMPROVEMENTS AND AUTHORIZATION TO FILE THE NOTICE OF COMPLETION FOR THE AL TADENA DRIVE/PASADENA AVENUE PEDESTRIAN ENHANCEMENTS PROJECT (CIP NO. 4063) SUMMARY Construction of the Altadena Drive/Pasadena Avenue Pedestrian Enhancements Project (CIP No. 4063) has been completed to the satisfaction of the City Engineer and is now ready for City Council acceptance. RECOMMENDATION It is recommended that the City Council adopt Resolution No. 05-114 accepting the Altadena Drive/Pasadena Avenue Pedestrian Enhancements Project (CIP No. 4063), and authorizing the recordation of the Notice of Completion, and direct the City Clerk to: 1. Release the Labor and Materials Bond not sooner than thirty-five (35) days after the date of recordation of the Notice of Completion; and 2. Release the Faithful Performance Bond not sooner than one year after the date of recordation of the Notice of Completion; and Assuming no claims or stop payment notices are filed, it is further recommended that thirty- five (35) days after the date of recordation of the Notice of Completion, the City Council authorize payment of the final 10% retention in the amount of $16,355.83 to Elite Bobcat Service, Inc. The total final construction contract cost for the project is $163,558.28. FISCAL IMPACT The final construction contract cost for the Altadena Drive/Pasadena Avenue Pedestrian Enhancements Project is $163,558.28. The project was funded by a grant from the Caltrans Safe Route to School Program, Measure "M" Turnback funds, and Community Development Block Grant (CDBG) funds. Project construction, along with design and construction management, has increased the City's infrastructure assets by $173,395. The increased infrastructure valuation will be added to the City's infrastructure inventory as required by Statement 34 of the Governmental Accounting Standards Board (GASB 34). Detailed cost information is shown on the attached GASB 34 Infrastructure Inventory Valuation Form. Acceptance of Public Improvements and Authorization to File the Notice of Completion for the Altadena Drive/Pasadena Avenue Pedestrian Enhancements Project (CIP No. 4063) December 5, 2005 Page 2 BACKGROUND AND DISCUSSION The Altadena Drive/Pasadena Avenue Pedestrian Enhancements Project (CIP No. 4063) was completed on October 31, 2005. This project provided for the installation of an in-pavement lighted crosswalk system at the existing school crosswalk across the north leg of Pasadena Avenue at Altadena Drive. The flashing lights are activated by pedestrians and serve to provide additional warning to drivers that pedestrians are using the crosswalk. Additionally, curb extensions (bump-outs) reduce the walking distance across Pasadena Avenue. All of the work for this project has been completed to the satisfaction of the City Engineer, and is now ready for City Council acceptance. ~. rÞd- Tim D. Serlet Director of Public Works/City Engineer =,¿. ¿~ Engineering Services Manager Attachments: Resolution No. 05-114 Location Exhibit GASB 34 Infrastructure Inventory Valuation Form S:\City Councilltems\2005 Councilltems\NQC AIIadena at Pasadena Ped Enhancements & Reso 05-114.doc RESOLUTION NO. 05-114 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUSTIN, CALIFORNIA, ACCEPTING THE WORKS OF IMPROVEMENT AND AUTHORIZING THE RECORDATION OF THE NOTICE OF COMPLETION FOR THE CONSTRUCTION OF THE ALTADENA DRIVE/PASADENA AVENUE PEDESTRIAN ENHANCEMENTS PROJECT (CIP NO. 4063) WHEREAS, Elite Bobcat Service, Inc., having a contract with the City of Tustin to construct the hereinafter described public works and improvement; and WHEREAS, the City Engineer has duly certified to the construction and completion of said public improvement hereinafter mentioned in a manner satisfactory to the City Council of the City of Tustin; and WHEREAS, the City Council finds that said contractor has completed said public improvement hereinafter more particularly described in accordance with the provisions of the contract documents and the Notice of Completion, and acceptance of said public works and improvement should be filed and payment of the balance due said contract authorized in accordance with the contract documents; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Tustin that said public works and improvement is found to be complete, and the same is hereby accepted. Said public works and improvement is more particularly described as follows: Altadena Drive/Pasadena Avenue Pedestrian Enhancements Project (CIP No. 4063) BE IT FURTHER RESOLVED that the City Engineer of the City of Tustin is hereby authorized to execute and file a Notice of Completion for the acceptance of said public works and improvement described herein as required by law. PASSED AND ADOPTED at a regular meeting of the City Council of the City of Tustin held on the 5th day of December 2005. Mayor ATTEST: City Clerk S:\City Councilltems\2005 Councilltems\NOC AIIadena at Pasadena Ped Enhancements & Reso 05-114.doc " " " ", ", ", " " ~', " ~+'" ", ~-1';'.>, "', 111"'", , " , " " ",-.5:// , ""'" I- Z """~ / ~. "'- 0 ~/ '?- , 0 -./ 'Nl =--:--35~ "im, ~ a:~g:s I SSI1A / ~~) / :::::> ',I / ./ I- -J .,J / LL '- " -- .PI .' ~ =--~V~NjGVSVd- q , i fi 0 ~ Wi \ ( \\ \'" ,/ ".. ~(,,) ~"') ..J "" '---.." <J: -==---: ~~-------........ I --===---=--- _11_11_11- _I._..~~ -- ÜJ _II_II NILsnLI~~II_II_II_1I AYM331f:l YS3W III_II_II:S dO ÁLl" -- ------------------ -- '""'-_.c.---_c~<~ I œ! ;¡>-, 0 ' Þyfy', . )~, . V() ":; / / / / / / ~/// ~O/ / ,. / /;::,~ ~~/// .;¡. C!:)/ / ~~ //~ / / / / / ", ..(.l~" '170 " ~A.. " ..,~+ ... YJ.SO:) 'S!NISI ...... C') <0 ~ 0 Z Q.. <3 '-" ~ W ~ W 0 Z <t I Z W z <t ~ w 0 W Q.. « Z W 0 <t (f) a: - <t z w 0 <t ~ <t W ~ <t z Õ w a a: Q.. CITY OF TUSTIN GASe 34 INFRASTRUCTURE INVENTORY VALUATION FORM Department: Public Works Prepared by: Jon Drauaelis Date Prepared: November 29. 2005 Division: Enaineerina Phone/Extension: (714) 573-3164 Description of the Asset: Altadena Drive/Pasadena Avenue Pedestrian Enhancements (CIP No. 4063) Date: D Acquired ~ Constructed D Removed: October 31,2005 Basis of Valuation: (Please check one) ~ D Actual Cost (should include design, construction mgmt, fees, transportation, etc.) Estimated Cost If Estimated Cost, describe the method used: Quantity: Description Quantitv Total Amount Traffic Signal Sidewalk Curb & Gutter 1 EA 3,153 SF 523 LF $77,408 $55,350 $40,637 $173,395 TOTAL Source of Document ¡Information: Actual Contract Cost Total Valuation Amount I $173,395 S:\GASB\GASB - CIP 4063,doc