0 Agenda
AGENDA REPORT Reveweldm
City Manager 5W
Finance Director �a
MEETING DATE: JUNE 2, 2020
TO: MATTHEW S. WEST, CITY MANAGER
FROM: DOUGLAS S. STACK, DIRECTOR OF PUBLIC WORKS/CITY ENGINEER
SUBJECT: ADOPT RESOLUTION NO. 20-32 TO ACCEPT IMPROVEMENTS FOR THE
FISCAL YEAR 2018-19 ROADWAY REHABILITATION AND SIDEWALK REPAIR
PROJECT, CIP NO. 70018 AND AUTHORIZE THE CITY ENGINEER TO FILE A
NOTICE OF COMPLETION
SUMMARY
Construction of the Fiscal Year (FY) 2018-19 Roadway Rehabilitation and Sidewalk Repair Project,
(CIP No. 70018), has been completed to the satisfaction of the City Engineer and is now ready for
City Council acceptance.
RECOMMENDATION
It is recommended that the City Council take the following actions:
1. Adopt Resolution No. 20-32 accepting the construction of the Fiscal Year (FY) 2018-19
Roadway Rehabilitation and Sidewalk Repair Project (CIP No. 70018); and
2. Authorize the City Engineer to execute and file the Notice of Completion with the Orange
County Recorder's Office.
FISCAL IMPACT
The final construction cost for the Fiscal Year (FY) 2018-19 Roadway Rehabilitation and Sidewalk
Repair Project (CIP No. 70018) is $1,698,867.48 including authorized contract change orders in the
total amount of $54,779.60. The contract change order comprised of additional spandrel and cross
gutter work at Newport Ave and Del Amo and additional fees related to the removal of an unforeseen
existing petromat layer in asphalt. Sufficient funds were budgeted and appropriated in the Capital
Improvement Program. The project is part of the City's ongoing Maintenance of Effort (MOE)
obligation to maintain eligibility for Renewed Measure M (M2) funding and is funded through a
combination of General Fund, Measure M2 Fair Share, and Gas Tax.
CORRELATION TO THE STRATEGIC PLAN
Rehabilitation of roadways and repair of sidewalks contribute to the fulfillment of the City's Strategic
Plan Goal B: Public Safety and Protection of Assets. Specifically, the project implements Strategy
#5, which among other items, is to ensure continuous maintenance and improvement of public
facilities.
DISCUSSION
On June 18, 2019, the City Council authorized the award of construction contract to Onyx Paving
Company Inc. The FY 2018-19 Roadway Rehabilitation and Sidewalk Repair Project (CIP No.
70018) consisted of asphalt concrete pavement repair, asphalt concrete overlay, slurry sealing,
traffic striping, and removal and replacement of curb ramps to meet current federal Americans with
DocuSign Envelope ID:017DC25D-E48F-4BC4-930A-CECD4686EE94
Notice of Completion Fiscal Year 2018-19 Roadway Rehabilitation and Sidewalk Repair Project, CIP No. 70018
June 2, 2020
Page 2
Disabilities Act (ADA) requirements on various streets within Zone 7 of the City's Pavement
Management Program. The City is divided into seven pavement zones with one zone targeted each
year for pavement maintenance. Through a rolling seven-year cycle, this Zone 7 (attached map),
generally bounded by Edinger Avenue to the north, Tustin Ranch Road to the east, Barranca
Parkway/Warner Avenue to the south, and Costa Mesa Freeway (SR-55) to the west. The project
also includes citywide sidewalk repair which focuses on removal and replacement of damaged
sidewalk at numerous locations throughout the City based on an annual field survey conducted by
the Engineering Division.
Dougfas V. Stack, P.E.
Di dtVbf Public Works/City Engineer
Attachment(s):
1. Resolution No. 20-32
2. Location Map
S:\Cily Counol le-Q020 Council Item i06-02-202MNOC-FY 18-19 Roadway Rehab and Sidewalk Repair(CIP 70018)INOC staff report-Annual Main(CIP 70018)-Onyx draft.docx
DocuSign Envelope ID:017DC25D-E48F-4BC4-930A-CECD4686EE94
RESOLUTION NO. 20-32
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUSTIN,
CALIFORNIA, ACCEPTING THE WORKS OF IMPROVEMENT AND
AUTHORIZING THE RECORDATION OF THE NOTICE OF
COMPLETION FOR THE FY 2018-19 ROADWAY REHABILITATION
AND SIDEWALK REPAIR PROJECT (CIP NO. 70018)
WHEREAS, Onyx Paving Company, Inc., having a contract with the City of
Tustin to construct the hereinafter described public works and improvement; and
WHEREAS, the City Engineer has duly certified to the construction and
completion of said public improvement hereinafter mentioned in a manner satisfactory
to the City Council of the City of Tustin; and
WHEREAS, the City Council finds that said contractor has completed said public
improvement hereinafter more particularly described in accordance with the provisions
of the contract documents and the Notice of Completion, and acceptance of said public
works and improvement should be filed and payment of the balance due said contract
authorized in accordance with the contract documents;
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Tustin
that said public works and improvement is found to be complete, and the same is
hereby accepted. Said public works and improvement is more particularly described as
follows:
FY 2018-19 Roadway Rehabilitation and Sidewalk Repair Project (CIP NO. 70018)
BE IT FURTHER RESOLVED that the City Engineer of the City of Tustin is
hereby authorized to execute and file a Notice of Completion for the acceptance of said
public works and improvement described herein as required by law.
PASSED AND ADOPTED at a regular meeting of the City Council of the City of
Tustin held on the 2nd day of June 2020.
DR. ALLAN BERNSTEIN,
Mayor
ATTEST:
ERICA N. YASUDA,
City Clerk
Resolution 20-32
Page 1 of 2
DocuSign Envelope ID:017DC25D-E48F-4BC4-930A-CECD4686EE94
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) SS
CITY OF TUSTIN )
I, Erica N. Yasuda, City Clerk and ex-officio Clerk of the City Council of the City of
Tustin, California, do hereby certify that the whole number of the members of the City
Council is five; that the above and foregoing Resolution No. 20-32 was duly and
regularly passed and adopted at a regular meeting of the City Council held on the 2nd
day of June, 2020 by the following vote:
COUNCILMEMBERS AYES:
COUNCILMEMBERS NOES:
COUNCILMEMBERS ABSTAINED:
COUNCILMEMBERS ABSENT:
ERICA N. YASUDA,
City Clerk
Resolution 20-32
Page 2 of 2
DocuSign Envelope ID:017DC25D-E48F-4BC4-930A-CECD4686EE94
City of Tustin, CA
Citywide Zones
1 > r
1
1 VE EE T O ,
FIE j
1 � �
�NANNAFOR ,
¢ < .1 •I o
•WARREN qy
AMA SET WV O.._._' r j •� �� a
r
RVINE BLVD I RVJ6I6B""
r•'E.I'IIST ¢ RST S F~ '•• �. �' A T Z
I LL
CON ? 2 j
.A•••_ INT t IRDS
4�.•�4T AI 9� !� I•• A J�
ti� OG9
' SIF T a P q,� �•• Z� O
1 < ryisSpryRom s Fo O •` r o mo��
�?G
a 0�'� O O O� OB NSON DR
Mc DEN AU
1 'L R Fyy
j� A c q ovy a
O 'I'Gl �` � •�` 1'OR 5 F
o ya o 0
24' P� O PO
L O`SrR �� S �� y!!S ••�.•
/• 4p
/ �9 P 5 O
j• qL J� P�
C J
P 99L �ryCSR �� �
LEN— SL
F�9`S��O C OOH
GP q 9
2 `F
�O
�y
Legend
o ..
Zone
2
N
L........e 4
1........_:
L._.._.._1 7
S Centerline
City of Tustin , CA
ArcGIS
Citywide Zones Map July201°'B❑D nam&Ass°plates
July 2013
Source:City of Tustin AutoCAD Dwg
Created in ArcGIS 10.1 using ArcMap