FROM: DOUGLAS S. STACK, DIRECTOR OF PUBLIC WORKS/CITY ENGINEER
SUBJECT: ADOPT RESOLUTION NO. 20-36 TO ACCEPT IMPROVEMENTS FOR THE
MEDIAN LANDSCAPE REHABILITATION PROJECT, CIP NO. 10074, AND
AUTHORIZE THE CITY ENGINEER TO FILE A NOTICE OF COMPLETION
SUMMARY
Construction of the Median Landscape Rehabilitation Project, CIP No. 10074, has been completed
to the satisfaction of the City Engineer and is now ready for City Council acceptance.
RECOMMENDATION
It is recommended that the City Council take the following actions:
1. Adopt Resolution No. 20-36 accepting the construction of the Median Landscape
Rehabilitation Project, CIP No. 10074; and
2. Authorize the City Engineer to execute and file the Notice of Completion with the Orange
County Recorder's Office.
FISCAL IMPACT
The final construction cost for the Median Landscape Rehabilitation Project, CIP No. 10074, is
$2,835,391.85, which includes authorized contract change orders in the amount of $145,840.61
that the City and contractor negotiated and mutually agreed upon. The City was not able to reach
an amicable resolution of some extra work items with the contractor and therefore to facilitate
project acceptance and closeout, the City issued a final change order unilaterally to the contractor
in the amount of $39,445.65, paying the contractor the reasonable value for undisputed extra work
performed on the project. In addition, due to the lack of a final formal payment request, a final
progress payment was issued unilaterally for $11,623.90, less retention respectively.
Sufficient funds were budgeted and appropriated in the Capital Improvement Program. The project
is funded through a combination of sources that include Gas Tax (Fund 130), Measure M2 Fair
Share (Fund 139), Measure M2 Environmental Cleanup Program Grant (Fund 139), and MCAS
Land Sale Proceeds (Fund 189).
CORRELATION TO THE STRATEGIC PLAN
The project contributes to the fulfillment of the City's Strategic Plan Goal B: Public Safety and
Protection of Assets, to ensure Tustin is an attractive, safe, and well-maintained community in
which people feel pride. Specifically, the project implements Strategy #3, which among other
items, is to ensure continuous maintenance and improvement of public facilities.
DocuSign Envelope ID:017DC25D-E48F-4BC4-930A-CECD4686EE94
Median Landscape Rehabilitation Project, CIP No. 10074
June 2, 2020
Page 2
DISCUSSION
On November 7, 2017, the City Council authorized the award of a construction contract to
California Landscape & Design, Inc. In compliance with the State of California Governor's
Executive Orders B-29-15 and B-37-16, imposing strict water use restrictions to mitigate the effects
of severe drought conditions that continued to persist throughout the state at the time, the project
removed dead median turf along Irvine Boulevard between the SR-55 Freeway and Old Irvine
Boulevard, along First Street between the SR-55 Freeway and Newport Avenue, and along
Newport Avenue between Wass Street and McFadden Avenue, and replaced with drought tolerant
plant material and water efficient irrigation systems. Also included in the project were removal of
existing substandard height median curbs and replacement with full height curbs, installation of
median pavers and decorative hardscape, and utility relocations.
Construction has been completed to the satisfaction of the City Engineer and is now ready for City
Council acceptance .
OD�q (gas Stack, P.E.
r of Public Works/City Engineer
Attachment(s):
1. Resolution No.20-36
2. Location Map
S:\City Council Iterns\2020Council Items\0602-2020\NOC-Median 1 andscape Rehab(CIP 10074)\NOC staff report-Medan 1 andsr.ape Rehab(CIP 10074).DOCX
DocuSign Envelope ID:017DC25D-E48F-4BC4-930A-CECD4686EE94
RESOLUTION NO. 20-36
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUSTIN,
CALIFORNIA, ACCEPTING THE WORKS OF IMPROVEMENT AND
AUTHORIZING THE RECORDATION OF THE NOTICE OF
COMPLETION FOR THE MEDIAN LANDSCAPE REHABILITATION
PROJECT, CIP NO. 10074
WHEREAS, California Landscape & Design, Inc., having a contract with the City
of Tustin to construct the hereinafter described public works and improvement; and
WHEREAS, the City Engineer has duly certified to the construction and
completion of said public improvement hereinafter mentioned in a manner satisfactory
to the City Council of the City of Tustin; and
WHEREAS, the City Council finds that said contractor has completed said public
improvement hereinafter more particularly described in accordance with the provisions
of the contract documents and the Notice of Completion, and acceptance of said public
works and improvement should be filed and payment of the balance due said contract
authorized in accordance with the contract documents;
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Tustin
that said public works and improvement is found to be complete, and the same is
hereby accepted. Said public works and improvement is more particularly described as
follows:
Median Landscape Rehabilitation Project, CIP NO. 10074
BE IT FURTHER RESOLVED that the City Engineer of the City of Tustin is
hereby authorized to execute and file a Notice of Completion for the acceptance of said
public works and improvement described herein as required by law.
PASSED AND ADOPTED at a regular meeting of the City Council of the City of
Tustin held on the 2nd day of June 2020.
DR. ALLAN BERNSTEIN,
Mayor
ATTEST:
ERICA N. YASUDA,
City Clerk
Resolution 20-36
Page 1 of 2
DocuSign Envelope ID:017DC25D-E48F-4BC4-930A-CECD4686EE94
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) SS
CITY OF TUSTIN )
I, Erica N. Yasuda, City Clerk and ex-officio Clerk of the City Council of the City of
Tustin, California, do hereby certify that the whole number of the members of the City
Council is five; that the above and foregoing Resolution No. 20-36 was duly and
regularly passed and adopted at a regular meeting of the City Council held on the 2nd
day of June, 2020 by the following vote:
COUNCILMEMBERS AYES:
COUNCILMEMBERS NOES:
COUNCILMEMBERS ABSTAINED:
COUNCILMEMBERS ABSENT:
ERICA N. YASUDA,
City Clerk
Resolution 20-36
Page 2 of 2
DocuSign Envelope ID:017DC25D-E48F4BC4-930A-CECD4686EE94
CITYOFTUSTIN
r 29 U LJ
� � NESTBURY Ix. y�j � A
Ff >
WLLFA CCL
TUIN STIN
REWJOD
iTREET u�i IRMNE I QQW4&VARD I PARK
111 �� PARK N.
�- t;
z E. STREET `
f PD PROJE
I V,g- � <I � ?
secaRo sr. _
� q OCA
�AxAti sEcano sr. - fl- � Q�'
rosrrx� � s' �❑ � PD 9,p} ?
s sDCJD� Erro o ""
LIB
W. MAIN STREEIf M N S
a
Lid
SIXTH ST. 4
w Sr PINE "G�. •
TREE
PARK
TISRH Mss C/�S .
Qk
auAa wr. oni Rp �SqN ''
Tq qNA
tlR o.AV.
w n MC--- AVENUE
ap-74 Md..Ianmcapo fth—ltm—1,
PROJECT NAME:MEDIAN LANDSCAPE REHABILITATION(CIP N0.10074)