SUBJECT: ADOPT RESOLUTION NO. 20-57 TO ACCEPT IMPROVEMENTS FOR THE
TRAFFIC SIGNAL INSTALLATION PROJECTS AT LANSDOWNE
ROAD/VALENCIA AVENUE AND PARKCENTER LANE/BRYAN AVENUE
INTERSECTIONS, CIP NOS. 40090 AND 40091 AND AUTHORIZE THE CITY
ENGINEER TO FILE A NOTICE OF COMPLETION
SUMMARY
Construction of the Traffic Signal Installation Projects at Lansdowne Road/Valencia Avenue and
Parkcenter Lane/Bryan Avenue Intersections, (CIP Nos. 40090 and 40091), has been completed to
the satisfaction of the City Engineer and is now ready for City Council acceptance.
RECOMMENDATION
It is recommended that the City Council take the following actions:
1. Adopt Resolution No. 20-57 accepting the construction of the Traffic Signal Installation
Projects at Lansdowne Road/Valencia Avenue and Parkcenter Lane/Bryan Avenue
Intersections, (CIP NOS. 40090 and 40091); and
2. Authorize the City Engineer to execute and file the Notice of Completion with the Orange
County Recorder's Office.
FISCAL IMPACT
The final construction cost for the Traffic Signal Installation Projects at Lansdowne Road/Valencia
Avenue and Parkcenter Lane/Bryan Avenue Intersections, (CIP Nos. 40090 and 40091) is
$692,163.25 including an authorized contract change order in the amount of $21,663.25. The
contract change order comprised of additional potholing, conduit re-routing, and material design
changes including a larger traffic signal standard and mast arm at Parkcenter Lane/Bryan Avenue
due to utility conflicts. Sufficient funds were budgeted and appropriated in the Capital Improvement
Program. The traffic signal at Lansdowne Road/Valencia Avenue was partially funded with
developer contribution provided by the South Orange County Community College District(SOCCCD)
in the amount of$75,000.
CORRELATION TO THE STRATEGIC PLAN
The project contributes to the fulfillment of the City's Strategic Plan Goal B: Public Safety and
Protection of Assets. Specifically, the project implements Strategy #5, which among other items, is
to ensure continuous maintenance and improvement of traffic control and transportation facilities.
DISCUSSION
On December 18, 2018, the City Council authorized the award of construction contract to Sturgeon
Electric California, LLC. The Traffic Signal Installation Projects at Lansdowne Road/Valencia
DocuSign Envelope ID:AC3DC8B6-AED5-40F9-A7F7-A746C5D01 F1 E
Notice of Completion for Traffic Signal Installation Projects at Lansdowne/Valencia and Parkcenter/Bryan
August 18,2020
Page 2
Avenue and Parkcenter Lane/Bryan Avenue Intersections, (CIP Nos. 40090 and 40091) consisted
of traffic signal installation and traffic striping. These traffic signals provide the assignment of right-
of-way to pedestrians, bicyclists, and vehicles.
Douglas S. Stack, P.E.
Director of Public Works/City Engineer
Attachment(s):
1. Resolution No. 20-57
2. Location Maps
C:\Users\swevas\AppData\Local\Temp\a811-303-V28-c080.dou
DocuSign Envelope ID:AC3DC8B6-AED5-40F9-A7F7-A746C5D01 F1 E
ATTACHMENT 1
RESOLUTION NO. 20-57
DocuSign Envelope ID:AC3DC8B6-AED5-40F9-A7F7-A746C5D01 F1 E
RESOLUTION NO. 20-57
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUSTIN,
CALIFORNIA, ACCEPTING THE WORKS OF IMPROVEMENT AND
AUTHORIZING THE RECORDATION OF THE NOTICE OF
COMPLETION FOR THE TRAFFIC SIGNAL INSTALLATION PROJECTS
AT LANSDOWNE ROAD/VALENCIA AVENUE AND PARKCENTER
LANE/BRYAN AVENUE INTERSECTIONS (CIP NOS. 40090 AND 40091)
WHEREAS, Sturgeon Electrical California, LLC, having a contract with the City of
Tustin to construct the hereinafter described public works and improvement; and
WHEREAS, the City Engineer has duly certified to the construction and
completion of said public improvement hereinafter mentioned in a manner satisfactory
to the City Council of the City of Tustin; and
WHEREAS, the City Council finds that said contractor has completed said public
improvement hereinafter more particularly described in accordance with the provisions
of the contract documents and the Notice of Completion, and acceptance of said public
works and improvement should be filed and payment of the balance due said contract
authorized in accordance with the contract documents;
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Tustin
that said public works and improvement is found to be complete, and the same is
hereby accepted. Said public works and improvement is more particularly described as
follows:
Traffic Signal Installation Projects at Lansdowne Road/Valencia Avenue and
Parkcenter Lane/Bryan Avenue Intersections (CIP Nos. 40090 and 40091)
BE IT FURTHER RESOLVED that the City Engineer of the City of Tustin is
hereby authorized to execute and file a Notice of Completion for the acceptance of said
public works and improvement described herein as required by law.
PASSED AND ADOPTED at a regular meeting of the City Council of the City of
Tustin held on the 18th day of August 2020.
DR. ALLAN BERNSTEIN,
Mayor
ATTEST:
ERICA N. YASUDA,
City Clerk
Resolution 20-57
Page 1 of 2
DocuSign Envelope ID:AC3DC8B6-AED5-40F9-A7F7-A746C5D01 F1 E
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) SS
CITY OF TUSTIN )
I, Erica N. Yasuda, City Clerk and ex-officio Clerk of the City Council of the City of
Tustin, California, do hereby certify that the whole number of the members of the City
Council is five; that the above and foregoing Resolution No. 20-57 was duly and
regularly passed and adopted at a regular meeting of the City Council held on the 18th
day of August, 2020 by the following vote:
COUNCILMEMBERS AYES:
COUNCILMEMBERS NOES:
COUNCILMEMBERS ABSTAINED:
COUNCILMEMBERS ABSENT:
ERICA N. YASUDA,
City Clerk
Resolution 20-57
Page 2 of 2
DocuSign Envelope ID:AC3DC8B6-AED5-40F9-A7F7-A746C5D01 F1 E
ATTACHMENT 2
LOCATION MAPS
DocuSign Envelope ID:AC3DC8B6-AED5-40F9-A7F7-A746C5D01 F1 E
LOCATION MAP
Traffic Signal Installation at
k Lansdowne Road and
I Valencia Avenue
> g
� g
a
y
d + TUSTIN
+eqN, bti RANCH
,k r
'k
TUSTIN LEGACY
^^ " p NO SCALE
PROJECT LOCATION Fo��cF
Traffic Signal Installation at
Lansdowne Rd/Valencia Ave
(CIP No. 40090)
Z
W
VALENCIA
PROJECT
LOCATION 9�"GF
f-
'QO,q�
�O
O
FILE: CIP-40090 Lansdowne/Valencia TS.dwg \ GF ��°
DocuSign Envelope ID:AC3DC8B6-AED5-40F9-A7F7-A746C5D01 F1 E
LOCATION MAP
Traffic Signal Installation at
k Parkcenter Lane and
I Bryan Avenue
> g
� g
y
d + TUSTIN
+E1pI, bti RANCH
TUSTIN LEGACY
^^ p NO SCALE
PROJECT LOCATION O
Traffic Signal Installation at
Parkcenter Lane/Bryan Ave PROJECT_
(CIP No. 40WI) LOCATION
J� �R LANE
�o
0 C
9��GF OPO
FILE: CIP-40091 Parkcenter/Bryan TS.dwg