Loading...
HomeMy WebLinkAbout04 ACCEPT IMPROVEMENTS FOR THE TRAFFIC SIGNAL INSTALLATION PROJECT DocuSign Envelope ID:AC3DC8B6-AED5-40F9-A7F7-A746C5D01 F1 E # Agenda Item 4 - AGENDA REPORT Reviewed: m5W City Manager Finance Director MEETING DATE: AUGUST 18, 2020 TO: MATTHEW S. WEST, CITY MANAGER FROM: DOUGLAS S. STACK, DIRECTOR OF PUBLIC WORKS/CITY ENGINEER SUBJECT: ADOPT RESOLUTION NO. 20-57 TO ACCEPT IMPROVEMENTS FOR THE TRAFFIC SIGNAL INSTALLATION PROJECTS AT LANSDOWNE ROAD/VALENCIA AVENUE AND PARKCENTER LANE/BRYAN AVENUE INTERSECTIONS, CIP NOS. 40090 AND 40091 AND AUTHORIZE THE CITY ENGINEER TO FILE A NOTICE OF COMPLETION SUMMARY Construction of the Traffic Signal Installation Projects at Lansdowne Road/Valencia Avenue and Parkcenter Lane/Bryan Avenue Intersections, (CIP Nos. 40090 and 40091), has been completed to the satisfaction of the City Engineer and is now ready for City Council acceptance. RECOMMENDATION It is recommended that the City Council take the following actions: 1. Adopt Resolution No. 20-57 accepting the construction of the Traffic Signal Installation Projects at Lansdowne Road/Valencia Avenue and Parkcenter Lane/Bryan Avenue Intersections, (CIP NOS. 40090 and 40091); and 2. Authorize the City Engineer to execute and file the Notice of Completion with the Orange County Recorder's Office. FISCAL IMPACT The final construction cost for the Traffic Signal Installation Projects at Lansdowne Road/Valencia Avenue and Parkcenter Lane/Bryan Avenue Intersections, (CIP Nos. 40090 and 40091) is $692,163.25 including an authorized contract change order in the amount of $21,663.25. The contract change order comprised of additional potholing, conduit re-routing, and material design changes including a larger traffic signal standard and mast arm at Parkcenter Lane/Bryan Avenue due to utility conflicts. Sufficient funds were budgeted and appropriated in the Capital Improvement Program. The traffic signal at Lansdowne Road/Valencia Avenue was partially funded with developer contribution provided by the South Orange County Community College District(SOCCCD) in the amount of$75,000. CORRELATION TO THE STRATEGIC PLAN The project contributes to the fulfillment of the City's Strategic Plan Goal B: Public Safety and Protection of Assets. Specifically, the project implements Strategy #5, which among other items, is to ensure continuous maintenance and improvement of traffic control and transportation facilities. DISCUSSION On December 18, 2018, the City Council authorized the award of construction contract to Sturgeon Electric California, LLC. The Traffic Signal Installation Projects at Lansdowne Road/Valencia DocuSign Envelope ID:AC3DC8B6-AED5-40F9-A7F7-A746C5D01 F1 E Notice of Completion for Traffic Signal Installation Projects at Lansdowne/Valencia and Parkcenter/Bryan August 18,2020 Page 2 Avenue and Parkcenter Lane/Bryan Avenue Intersections, (CIP Nos. 40090 and 40091) consisted of traffic signal installation and traffic striping. These traffic signals provide the assignment of right- of-way to pedestrians, bicyclists, and vehicles. Douglas S. Stack, P.E. Director of Public Works/City Engineer Attachment(s): 1. Resolution No. 20-57 2. Location Maps C:\Users\swevas\AppData\Local\Temp\a811-303-V28-c080.dou DocuSign Envelope ID:AC3DC8B6-AED5-40F9-A7F7-A746C5D01 F1 E ATTACHMENT 1 RESOLUTION NO. 20-57 DocuSign Envelope ID:AC3DC8B6-AED5-40F9-A7F7-A746C5D01 F1 E RESOLUTION NO. 20-57 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUSTIN, CALIFORNIA, ACCEPTING THE WORKS OF IMPROVEMENT AND AUTHORIZING THE RECORDATION OF THE NOTICE OF COMPLETION FOR THE TRAFFIC SIGNAL INSTALLATION PROJECTS AT LANSDOWNE ROAD/VALENCIA AVENUE AND PARKCENTER LANE/BRYAN AVENUE INTERSECTIONS (CIP NOS. 40090 AND 40091) WHEREAS, Sturgeon Electrical California, LLC, having a contract with the City of Tustin to construct the hereinafter described public works and improvement; and WHEREAS, the City Engineer has duly certified to the construction and completion of said public improvement hereinafter mentioned in a manner satisfactory to the City Council of the City of Tustin; and WHEREAS, the City Council finds that said contractor has completed said public improvement hereinafter more particularly described in accordance with the provisions of the contract documents and the Notice of Completion, and acceptance of said public works and improvement should be filed and payment of the balance due said contract authorized in accordance with the contract documents; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Tustin that said public works and improvement is found to be complete, and the same is hereby accepted. Said public works and improvement is more particularly described as follows: Traffic Signal Installation Projects at Lansdowne Road/Valencia Avenue and Parkcenter Lane/Bryan Avenue Intersections (CIP Nos. 40090 and 40091) BE IT FURTHER RESOLVED that the City Engineer of the City of Tustin is hereby authorized to execute and file a Notice of Completion for the acceptance of said public works and improvement described herein as required by law. PASSED AND ADOPTED at a regular meeting of the City Council of the City of Tustin held on the 18th day of August 2020. DR. ALLAN BERNSTEIN, Mayor ATTEST: ERICA N. YASUDA, City Clerk Resolution 20-57 Page 1 of 2 DocuSign Envelope ID:AC3DC8B6-AED5-40F9-A7F7-A746C5D01 F1 E STATE OF CALIFORNIA ) COUNTY OF ORANGE ) SS CITY OF TUSTIN ) I, Erica N. Yasuda, City Clerk and ex-officio Clerk of the City Council of the City of Tustin, California, do hereby certify that the whole number of the members of the City Council is five; that the above and foregoing Resolution No. 20-57 was duly and regularly passed and adopted at a regular meeting of the City Council held on the 18th day of August, 2020 by the following vote: COUNCILMEMBERS AYES: COUNCILMEMBERS NOES: COUNCILMEMBERS ABSTAINED: COUNCILMEMBERS ABSENT: ERICA N. YASUDA, City Clerk Resolution 20-57 Page 2 of 2 DocuSign Envelope ID:AC3DC8B6-AED5-40F9-A7F7-A746C5D01 F1 E ATTACHMENT 2 LOCATION MAPS DocuSign Envelope ID:AC3DC8B6-AED5-40F9-A7F7-A746C5D01 F1 E LOCATION MAP Traffic Signal Installation at k Lansdowne Road and I Valencia Avenue > g � g a y d + TUSTIN +eqN, bti RANCH ,k r 'k TUSTIN LEGACY ^^ " p NO SCALE PROJECT LOCATION Fo��cF Traffic Signal Installation at Lansdowne Rd/Valencia Ave (CIP No. 40090) Z W VALENCIA PROJECT LOCATION 9�"GF f- 'QO,q� �O O FILE: CIP-40090 Lansdowne/Valencia TS.dwg \ GF ��° DocuSign Envelope ID:AC3DC8B6-AED5-40F9-A7F7-A746C5D01 F1 E LOCATION MAP Traffic Signal Installation at k Parkcenter Lane and I Bryan Avenue > g � g y d + TUSTIN +E1pI, bti RANCH TUSTIN LEGACY ^^ p NO SCALE PROJECT LOCATION O Traffic Signal Installation at Parkcenter Lane/Bryan Ave PROJECT_ (CIP No. 40WI) LOCATION J� �R LANE �o 0 C 9��GF OPO FILE: CIP-40091 Parkcenter/Bryan TS.dwg