HomeMy WebLinkAboutCC RES 86-091RESOLUTION NO. 86- 91 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUSTIN, CALIFORNIA, APPROVING PLANS AND SPECIFICATIONS FOR THE CONSTRUCTION OF ASSESSMENT DISTRICT 85-1 (PHASE V-A) AND ASSESSMENT DISTRICT 85-1 (PHASE V-B) AND DIRECTING THE CITY CLERK TO ADVERTISE FOR FOR BIDS WHEREAS,-it ~s the intention of the City Council of the City of Tustin, Calif. ornia to construct certain flood control improvements and appurtenant work designated as Assessment District 85-1 (Phase V-A) and Assessment District 85-1 (Phase V-B); and WHEREAS, the City Engineer has presented plans and specifications for the construction of said work; _ NOW THEREFORE, BE IT RESOLVED that the plans and specifications presented by the City Engineer be and are hereby approved as the plans and specifications for the construction of Assessment District 85-1 (Phase V-A) and Assessment District 85-1 (Pha~e V-B). BE IT-FURTHER RESOLVED that the City Clerk is hereby authorized and directed to advertise as required by law for the receipt of sealed bids or proposals for the doing of the work specified in the aforesaid plans and specifications which said advertisement shall be substantially in the fol 1 owing work and fi gures to-wit' 15 "NOTICE TO CONTRACTORS" 17 SEALED PROPOSALS will beI received at the office of the City Clerk, Tustin City Hall, 300 Centennial Way, Tustin, California, until 10'00 A.M. on 18 the 29th day of J.uly, 1986, at which time they will be publicly opened and read, for performing work as follows- 19 ASSESSMENT DI STRICT 8.5-1 ( PHASE V-A) FO7 CHANNEL IMPROVEMENTS FROM I-5 FREEWAY TO 100' NORTHERLY OF BRYAN AVENUE AND ASSESSMENT DISTRICT 85-1 (PHASE V-B) FO7 CHANNEL IMPROVEMENTS FROM 100' NORTHERLY OF BRYAN AVENUE TO 400' EASTERLY OF BROWNING AVENUE Bids are required for the entire work described herein- 2? 28 . A-1 ,i 10 11 13 15 16 17 19 20 21 23 ~5 ITEM NO. 1.(A) 2.(A) 3.(A) 4.(A) 5.(A) 6.(A) 7.(A) 8.(A) 9.(A) 10. (A) 11. (A) 12. (A) 13. (A) 14. (A) 15. (A) 16.(A) 17. (A) 18. (A) 19. (A) 20.(A) UNIT .Cub i c Ya rd Each Lin. Ft. Lin. Ft. Each Lin. Ft. Lin. Ft. Tons Each Lin. Ft. Lin. Ft. Each Each Lin. Ft. Lin. Ft. Lump Sum Each Cub i c Ya rd Lin. Ft. Each SCHEDULE OF WORK ITEMS (PH'ASE ~'~A') - QUANT, ITy 354 DESCRIPTION Place salvage rip-rap 30" thick RC outlet transition structure per Sheet No. 12. ~ 150 RC trap. channel bridge section per Sheet No. 13. 381 16 RC channel rectangular section per Sheet No. 8. Channel cut-off wall per Sheet No. 11. 2,31.0 2,283 Guard cable fence per OCEMA Std. No. 413. RC channel trapezoidal section per Sheet No. 11. 4,318 Six inch thick aggregate base. Bridge pier debris wall per Sheet No. 9. 28 RC trapezoidal channel per Sheet No.'s 11 and 12. 57 24" dia. RCP- 1750D. Inlet Type V per OCEMA Std. No. 305. Pipe inlet to rectangular channel per Sheet No. 9. 153 18" dia. RCP-1500D. 163 8" canyon subdrain per OCEMA Std'. No. 323. RC maintenance ramp per Sheet No. 9. RC trapezoidal to rectangular transition structure per Sheet No. 11 and 12. 340 30" thick grouted ri p-rap wi th salvage rip-rap per Sheet No. 11. 4,910 Chain link fence per OCEMA Std. No. 412. 16' dble. swing gate per OCEMA Std. No. 412. 10 11 151 17 18 19 20 21 25 27 ITEM NO. 2I.(A) 21A. (A) 22. (A) 23. (A) 24.(A) 25. (A) 26. (A) 27.(A) 28.(A) · 29. (A) 30.(A) 31.(A) 32. (A) 33. (A) 34.(A) 35. (A) 36.(A) 37.(A) 38. (A) 39. (A) UNIT Tons Tons · Lin. Ft. Each Lin. Ft. Lin. Ft. Each Each Lin. Ft. Lin. Ft. Lump Sum Lump Sum Lump Sum Lin. Ft. Lump Sum Lump Sum Lump Sum Cubic Ya rd Each Lump Sum SCHEDULE OF WORK ITEMS (CONTINUED) ...... (PF[AisE' V-'A)_ QUANTITY DESCRIPTION ~ , · _ , _ 37O 4" thick asphalt concrete. 1,110 12" thick aggregate base. 940 Remove and install existin§ chain link fence. RC pipe collar per OCEMA Std. No. 317. 30 RC endwall per SheetlNO. 12. 119 RC confluence structure per ~;heet No.'s 10 and 12. RC inlet to trapezoidal channel Iper Sheet No. 2. Brick and mortar pipe plug. 145 48" dia. RCP- 1500D. 90 60" dia. RCP - 1400D. Remove and dispose 500 S.F. existing PCC channel. Remove and dispose 200 L.F. existing pipe and wi re revetment. Remove and dispose existing PCC drop structure. 101 Remove and relocate existing 24" RCP. Remove 600 C.Y. + existing grouted rip-rap wi er stru--cture and salvage. Remove and dispose 100 L.F. existing 24" CMP and 3 inlets. Remove and dispose 45 L.F. existing 15" CMP and I inlet.. 1,250 Remove and salvage existing loose rip-rap. Automatic 24" dia. fl apgate. Remove and dispose 2 L.F. existing 30" RCP. A-3 ,i i. ii 10 17 18 19 20 23 25 ITEM NO. UNIT 40. (A) Lump Sum 41. (A) Lump Sum 42.(A) Each 43.(A) Lin. Ft. 44. (A) Lump Sum 45. (A) Lin. Ft. 46. (A) De 1 eted 47.(A) Lin. Ft. 48.(A) Lin. Ft. 49. (A) Lump Sum 50. (A) Lump Sum SCHEDULE_. OF WORK, I.TEMS (.C..ONTI.NUEDJ_ ,( PHASE. V-A) QUANTITY 33 280 DESCRIPTION Remove and dispose 30 L.F. 18" CMP and PCC inlet. Remove and dispose 87 L.F. 8" PVC and salvage fl apgate. RC flapgated outlet structure per Sheet No. 10. 36" dia. RCP ~ 1500D. Remove and replace existing RC grated retarding basin inlet structure. 72" dia. RCP- 1400D. 144 97 Remove and salvage exi sting 48" RCP. 60" dia. CMP- 12 gauge. Shoring. Shoring at I-5 Freeway bridge. A-4 . . i, · . i- 10 11 15 17 18 19 20 25 27 ITEM NO. 2.(B) 3,(B) 4.(B) 5.(B) 6. (B.) 7.(B) 8.(B) 9.(B) 11.(B) 12. (B) 13. (B) 14. (B) 15. (B) 16. (B) 17. (B) 18. (B) 19. (B) 20.(B) UNIT · Lin. Ft. Each Each Lin. Ft. Lin. Ft. Tons Each Each Each Each Each Lin. Ft. Each Lin. Ft. Lin. Ft. Lin. Ft. Lin. Ft. Each Each ii Each i. · . · .. .. :- . .. m m .' .... · . ...... .,. .. .... · .,- . SCHEDULE OF WORK ITEMS .... ~(?HAS.E .V.L-B)~ - QUANTITY 613 2,534 1,539 1,779 55 84 175 220 130 DESCRIPTION RC rectangular channel per Sheet No. 6. Trapezoidal channel cut-off wall per Sheet No. 9. Rectangular channel cut-off wall per Sheet No. 9. Guard cable fence per OCEMA Std. Plan No. 413. RC trapezoidal channel per Sheet No. 9. 6" thick aggregate base road surface. Debris wall per Sheet No. 2. RC rectangular to trapezoidal transition structure per Sheet No. 9. RC trapezoidal to rectangular transition structure per Sheet No. 8. RC rectangular to trapezoidal transition structure per Sheet No. 8. RC trapezoidal to rectangular transition structure per Sheet No. 8. 18" dia. RCP- 1750D. RC collar per OCEMA Std. Plan No. 317. 102" dia. RCP - 1500D. 8.5' X 8.5' RC box culvert per Sheet No. 10. Triple 16.5' X 10.5' RCB per Sheet No. 7. Triple 16.5' X 15.25' RCB per Sheet No. 7. J.S. Type V per OCEMA Std. Plan No. 314. Two course brick and mortar plug for 8.5' X 8.5' RCB. Pipe to trapezoidal channel J.S. per Sheet No. 11. A-5 ,i ._ · . .i iI 10 11 12 13 15 17 18 19 20 21 22 23 24 25 26 27 28 ITEM NO. 21.(B) 22.(B) 23.(B) 24.(B) 25. (B) 26.(B) 27.(B) 29. (B) S~CHEDU.L,E OF WORK ITEMS, (CONTI, N~UED) ())H'A'SE' V--B) UNIT QUANTITY Each 2 Lin. Ft. 200 Lump Sum I Lin. Ft. 135 Lin. Ft. 2,444 Lump Sum 1 Lump Sum 1 Lin. Ft. 5,374 Each 8 30. (B) Tons 590 30A. (B) Tons 1,769 31.(B) 32.(B) 33. (B) 34.(B) 35. (B) 36. (B) 37.(B) Each 3 Each I Lump Sum I Lump Sum I Lump Sum I Lump Sum I Lump Sum I Lump Sum I Cubic Yard 470 38.(B) 39.(B) DESCRIPTION ....... 8.5' X 8.5' RCB to channel J.S. per Sheet No. 10. Tubular metal guard railing per Sheet No. 13. RC maintenance ramp per Sheet No. 8. PCC "V" gutter per Sheet No. 8. 8' dia. canyon subdrain per OCEMA Std. Plan No. 323. Join to existing channel expansion joint per OCEMA Std. Plan No. 318. Join to existing RCB per OCEMA Std. Plan No. 318. Chain link fence per OCEMA Std. Plan No. 412. 16' wi de double swing gate per OCEMA Std. Plan No. 412 and Sheet No. 8. 4" thick asphalt concrete. 12" thick aggregate base. Parapet wall per Sheet No. 10. RCB to pipe transition per Sheet No. 9. Remove and dispose existing RC transition structure and apron. · Remove and dispose 36" and 24" CMP and headwa 11. Remove and dispose 12" CMP. Remove and dispose 24" CMP and concrete headwa 11. Remove and dispose pipe and wire revetment. Remove and dispose RC chute transition structure. Remove and salvage 1 oose ri p-rap. A-6 o. ITEM NO. 2 40. (B) ~ 41. (B) 5 42. (B) 43. (B) 8 44. (B) 9 45. (B) 10 46. (B) 11 47. (B) 12 48. (B) 12 49. (B). 14 15 16 17 50.(B) 51. (B) 52. (B) 18 53. (B) 19 20 21 54.(B) 55.(B) 22 56. (B) 23 57. (B) 58.(B) 26 59. (B) 27 28 UNIT Deleted 'Lump Sum Each Tons Sq. Ft. Lin. Ft. Lin. Ft. Lin. Ft. Each Lin. Ft. Lin. Ft. Each Tons Lump Sum Cubic Yard Each Each Lin. Ft. Lump Sum SCHEDU.L_E..._OF WORK !_TENS (CONT I NU_ED)_ (PHASE V-B)_ QUANTITY (Blank) DESCRIPTION ,,,,_ · , , Remove and dispose 8 L.F. 18" CMP. Reinforced concrete collar per Sheet No. 11. 420 Grouted rip-rap per OCEMA Std. Plan No. 803 and Sheet No. 12. 5,195 134 Remove and replace in kind AC pavement. 24" dia. 1/4" thick steel casing. 1,550 28" dia. 1/4" thick steel casing. (Blank) 212 36" RCP - 1750D. Remove and dispose RC storm drain outlet structure. ~ 18 96" CMP 2 2/3" X 1/2" corrugated 8 gauge. 66" CMP 8 gauge. 66" CMP riser 8 gauge per OCEMA Std. Plan No. 327 and Sheet No. 12. 144 Clean and place salvaged rip-rap per OCEMA Std. Plan No. 809. CMP end plate per Sheet No. 12. 3,840 Remove and dispose of silt from exist. 16.5' X 10.5' triple cell RCB. 18 Brick and mortar pipe plug. Pipe to rectangular channel J.S. per Sheet No. 11. 60 Triple 16.27' X 14.5' RCB per Sheet No. 7o Shoring. A-7 10 11 15 17 18 19 20 27 The foregoing quantities are approximate only, being given as a basis for the comparison of bids, and the Cit~ of Tustin does not, expressl~ or by implication, agree that the actual amount of work will correspond therewith, but reserves the right to increase o.r decrease the amount of an~ class or portion of the work, or to omit portions of the work as may be deemed necessar~ or advisable b~ the Engineer. Plans specifications and proposal forms to be used for bidding on this project can only be obtained by prospective bidders at the office of the City Clerk, Tustin City Hall, 300 Centennial Way, Tustin, California, 92680, upon payment of $25.00 per set,' which amount shall be non-refundable. Plans and specifications will be mailed out upon payment of $40.00 per set, which amount shall be non-refundable. ~ In conformance with Section 37931 of the Government Code, all bids shall be presented under sealed cover on the proposal form provided and accompanied by one of the roi-lowing forms of bidder's security- a. Cash ~ b. Cashier's checklmade payable to the City of Tustin. c. Certified check made payable to the City of Tustin. d. Bidder's bond executed by an accredited surety insurer, made payable to the City of Tustin. The security shall be in an amount equal to at least ten percent (10%) of the amount of the bid. A bid shall not be considered unless one of the forms of bidder's security is enclosed therewith. A Security Bond for payment of labor and materials will be required in the amount of fifty percent (50%) of the estimated total contract price and a Faithful Performance Bond in the amount of one hundred percent (100%) of the estimated total contract price lin the form attached to the contract documents. Said bonds shall be issued by a Surety Company rated Grade A or better and Class I'X or better by the latest edition of Best's Key Rating Guide. City of Tustin reserves the right to reject any or all bids, and/or waive any informality on a bid. No bidder may withdraw his bid for a period of thirty (30) days after the date set for the opening thereof. The contract will be awarded to the lowest qualified bidder. Provisions of the State Contract Act are not applicable, and prospective bidders will not be required to be prequalified. This project is a cash contract and is designated as an Assessment District for internal financing purposes only. A-8 .i m , - , - . , . , Il ' L i ] il U . iii ................................ I I _ ' ___ i ..... J I .... E ..... I . ' I ~. . ~l ...jm __ i m ~ ~ 10 l? 18 19 20 27 All work to be done under the direct supervision of the City Engineer, City of Tusti n. All work..to be paid for at the unit prices bid from appropriated monies. Pursuant to 'California Government Code Section 4590, the contractor will be entitled to post approved securities with the City or an approved financial institution in order to have the City release funds retained by the City to insure performance of the contract. · The City Council of the City of Tustin has obtained from the Director of Industrial Relations the general prevailing rate of per diem wages and the general prevailing rate for legal holiday and overtime work in the locality in which the work is to be performed for each craft or type of work needed and a copy of the same is on file in the office of the City Clerk. Not less than said prevailing rates shall be paid to workers employed on this public works contract by Labor Code Sections 1771 and 1774 of the State of Cal i forni a.. this PASSED AND ADOPTED by the City Council of the City of Tustin, California, 14th day of July , 1986. ATTEST. · Adverti se i n the Tusti n News' July 17, 1986 J~y_ 24, 1986' A-9 · .o STATE OF CALIFORNIA ) '=''COUNTY OF ORANGE ) § CITY OF TUSTIN ) MARY E. WYNN, City Clerk Tustin, California, does the City Council of the Resol uti on No. 86-~1 was adjourned regul~'r meeting by the following vote. AYES · NOES · ABSENT- COUNC ILPERSONS. COUNCILPERSONS. COU NC I LPERSONS. and ex-officio Clerk of the City Council of the City of hereby certify that the whole number of the members of City of Tustin is five; that the above and foregoing duly and regularly introduced, passed and adopted at an of the City Council held on the 1..4th day of Ju_.~, 1986, Edgar, None None Hoesterey, Kelly, Kennedy, Saltarel li