HomeMy WebLinkAboutPC RES 4431 DocuSign Envelope ID:ADA19961-C46A-4CBE-890D-05608D758B02
RESOLUTION NO. 4431
A RESOLUTION OF THE PLANNING COMMISSION
OF THE CITY OF TUSTIN FINDING THE
PROPOSED FISCAL YEAR 2021-2022 CAPITAL
IMPROVEMENT PROGRAM IN CONFORMANCE
WITH THE GENERAL PLAN PURSUANT TO
SECTION 65401 OF THE GOVERNMENT CODE
The Planning Commission does hereby resolve as follows:
I. The Planning Commission finds and determines as follows:
A. The Planning Commission of the City of Tustin has reviewed, as required
by Section 65401 of the Government Code, a list of projects being
planned or constructed in the 2021-2022 Fiscal Year (FY) by the Capital
Improvement Program (CIP) for conformity with the General Plan.
B. All projects, as listed in Exhibit A — General Plan Conformance Matrix, are
located in the City of Tustin or within the City of Tustin Water Service area
and are consistent with policies of the City.
C. All legal prerequisites to the adoption of this Resolution have occurred.
D. The 2021-2022 FY CIP as contained in the Draft Seven-Year CIP has
been reviewed with particular regard to its conformity with the General
Plan.
E. Said 2021-2022 FY CIP is in conformity with the General Plan, pursuant to
Section 65401 of the Government Code. The proposed CIP has been
found to serve the implementation of various goals and policies of the
General Plan as specifically outlined within Exhibit A.
F. This Resolution shall constitute this Commission's report and
recommendation to the City Council as required by the Government Code.
G. The Secretary of this Commission shall certify to the adoption of this
Resolution and forthwith transmit a certified copy to the City Council, as
the report required to meet California Government Code 65401 .
II. The Planning Commission hereby finds the proposed FY 2021-2022 CIP, the
projects that are referenced herein as Exhibit A, in conformance with the
General Plan pursuant to Section 65401 of the Government Code.
DocuSign Envelope ID:ADA19961-C46A-4CBE-890D-05608D758B02
Resolution No. 4431
Page 2
PASSED AND ADOPTED by the Planning Commission of the City of Tustin at a regular
meeting held on the 25th day of May, 2021 .
DocuSigned by:
D327386D898A43D...
AMY MASON
DocuSigned by: Chairperson
�u. . C_�. K)U&04W
ED45DA2623854A5...
JUSTINA L. WILLKOM
Planning Commission Secretary
STATE OF CALIFORNIA )
COUNTY OF ORANGE )
CITY OF TUSTIN )
I, Justina L. Willkom, the undersigned, hereby certify that I am the Planning Commission
Secretary of the City of Tustin, California; that Resolution No. 4431 was duly passed and
adopted at a regular meeting of the Tustin Planning Commission, held on the 25th day of
May, 2021.
PLANNING COMMISSIONER AYES: Chu, Higuchi, Kozak, Mason, Mello (5)
PLANNING COMMISSIONER NOES:
PLANNING COMMISSIONER ABSTAINED:
PLANNING COMMISSIONER ABSENT:
DocuSigned by:
ED45DA2623854A5...
JUSTINA L. WILLKOM
Planning Commission Secretary
DocuSign Envelope ID:ADA19961-C46A-4CBE-890D-05608D758B02
EXHIBIT A GENERAL PLAN CONFORMANCE MATRIX
2021-2022 CAPITAL IMPROVEMENT PROGRAM
CIP No. DESCRIPTION LAND USE CIRCULATION CONSERVATION/OPEN PUBLIC SAFETY NOISE GROWTH
SPACE/RECREATION MANAGEMENT
FLOOD CONTROL FACILITIES
50043 ICitywide Storm Drain Improvements 8.5,8.8
PARK FACILITIES
20054 Annual Major Park Maintenance 8.8 14.1
20086 Tustin Sports Park Playground Renovation 8.8 14.1
20087 Pinetree Park Improvements 8.8 14.1,17.2
TBA Tustin Sports Park Turf Renovation 8.8 14.1,17.2
TBA Laurel Glen and Camino Real Park Shade Structures 18.8 114.1
TBA Centennial Park Renovations 18.8 14.1,17.2
PUBLIC FACILITIES
10032 Annual Major Building Maintenance 8.8 14.1
10069 Civic Center Alternate Power Source Improvements 8.8 9.2
TBA Tustin Family &Youth Center Courtyard 8.8 16.2,16.4, 16.6, 16.11
TBA Police Department Facility Improvements 8.8 6.1, 6.2, 8.1, 9.1, 9.2
TRAFFIC CONTROL FACILITIES
40080 Traffic Signal Controller Equipment Upgrades & Replacement 8.8 4.1
40086 Seventeenth Street Signal Synchronization 8.8 4.1
40093 Red Hill Avenue Signal S nchronizaiton 8.8 4.1
TBA First Street Signal Synchronization 8.8 4.1
TRANSPORATION FACILITIES MAINTENANCE
70020 Annual Roadway& Public Infrastructure Maintenance Program 8.8 1.1,2.2
70244 Newport Avenue Rehabilitation between 1-5 Freeway and Holt Avenue 8.8 1.1,2.2
70245 Newport Avenue Rehabilitation between Sycamore and 1-5 Freeway 8.8 1.1,2.2
70236 Citywide Pedestrian Oriented Accessibility Improvement Program 8.8 6.3
70249 Del Amo Avenue and Newport Avenue Improvements 8.8 1.6,1.12,1.14,1.16.8.2
70252 Red Hill Median Improvements 8.8 1.5,1.14
70220 Red Hill Avenue Rehabilitiation Between San Juan and First Street 8.8 1.1,2.2
TBA Red Hill Avenue Rehabilitiaton Between Walnut Avenue and 1-5 8.8 1.1,2.2
TBA Old Town Improvements 18.8, 10.3
Page 1 of 2
DocuSign Envelope ID:ADA19961-C46A-4CBE-890D-05608D758B02
EXHIBIT A GENERAL PLAN CONFORMANCE MATRIX
2021-2022 CAPITAL IMPROVEMENT PROGRAM
CIP No. DESCRIPTION LAND USE CIRCULATION CONSERVATION/OPEN PUBLIC SAFETY NOISE GROWTH
SPACE/RECREATION MANAGEMENT
TRANSPORTATION FACILITIES CAPACITY ENHANCEMENTS
None.
TUSTIN LEGACY FACILITIES
10076 South Hangar Rehabilitation - Phase 1 6.5,13.6 12.1,12.3
70243 Tustin Ranch Road Pedestrian Bridge 5.11,6.3,8.8,13.1,13.2,13. 1.12,6.1,6.12 2.6
70246 Neighborhood D South Backbone Infrastructure Construction 13.1,13.2,13.5,13.10 1.2,1.6,1.9,1.12,1.14,1.16,
1.17
70250 Neighborhood D South Non-Backbone Infrastructure Construction 13.1,13.2,13.5,13.10 1.2,1.6,1.9,1.12,1.14,1.16,
1.17
TBA Neighborhood D South Infrastructure Construction - Phase 2 13.1,13.2,13.5,13.10 1.2,1.6,1.9,1.12,1.14,1.16,
1.17
20083 Tustin Legacy Linear Park Between Armstrong Avenue and Warner 1.11,13.2 6.1,6.4 5.1,5.3,5.5,7.2,7.3,8.14,14.1,14.2,14.3,14.1,
Avenue 14.9,16.11,17.1,17.2,17.3,17.5
5.1,5.3,5.5,7.2,7.3,8.14,14.1,14.2,14.3,14.1,
20084 Alley Grove 1.11,13.2 6.1,6.4 14.9,16.11,17.1,17.2,17.3,17.5
WATER FACILITIES
60114 Simon Ranch Reservoir, booster Pump Station and Pipeline 6.2,8.8
Re Iacement project
60165 Conjunctive Use Well at Beneta Well Site 6.2,8.8
Page 2 of 2