RESOLUTION NO 21-35
RESOLUTION ADOPTING A LIST OF PROJECTS FOR FISCAL YEAR 2021-22
FUNDED BY SB 1 : THE ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017
WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017
(Chapter 5, Statutes of 2017) was passed by the Legislature and Signed into law by the
Governor in April 2017 in order to address the significant multi-modal transportation funding
shortfalls statewide; and
WHEREAS, SB 1 includes accountability and transparency provisions that will
ensure the residents of the City are aware of the projects proposed for funding in our
community and which projects have been completed each fiscal year; and
WHEREAS, the City must adopt by resolution a list of all projects proposed to receive
fiscal year funding from the Road Maintenance and Rehabilitation Account (RMRA), created
by SB 1 , which must include a description and the location of each proposed project, a
proposed schedule for the project's completion, and the estimated useful life of the
improvement; and
WHEREAS, the City will receive an estimated $1,590,332 in RMRA funding in Fiscal
Year 2021-22 from SB 1 ; and
WHEREAS, this is the fifth year in which the City is receiving SB 1 funding and will
enable the City to continue essential road maintenance and rehabilitation projects, safety
improvements, repairing and replacing aging bridges, and increasing access and mobility
options for the traveling public that would not have otherwise been possible without SB 1;
and
WHEREAS, the City used a Pavement Management Plan (PMP) and Capital
Improvement Program to develop the SB 1 project list to ensure revenues are being used
on the most high-priority and cost-effective projects that also meet priorities for
transportation investment; and
WHEREAS, the funding from S131 will enable the City to rehabilitate 1.8 miles of
roadway this fiscal year; and
WHEREAS, the 2018 California Statewide Local Streets and Roads Needs
Assessment found that the City's streets and roads are in good condition and this revenue
will help us maintain the current condition over the next decade; and
WHEREAS, the City's PMP has been developed to assist City personnel by providing
current data on the City's street network and to develop cost-effective maintenance
strategies to maintain a desirable level of pavement performance on a network scale, while
optimizing the expenditure of limited fiscal resources; and
Resolution 21-35
Page 1 of 3
DocuSign Envelope ID: F41 D5931-CA55-4C2F-B857-CA3F4944C6D8
WHEREAS, the City's weighted pavement condition index (PCI) for the entire
network is 84.8; and
WHEREAS, system sustainability can only be achieved through proactive scheduling
and the implementation of cost-efficient pavement applications; and
WHEREAS, restoring roads before they fail reduces construction costs and
successive years of collecting pavement condition data has shown that it is far more
economical to preserve roads than to delay repairs; and
WHEREAS, the SB 1 project list and overall investment in our local streets and roads
infrastructure with a focus on basic maintenance and safety, investing in complete streets
infrastructure, and using cutting-edge technology, materials and practices, will have
significant positive co-benefits statewide.
NOW, THEREFORE, BE IT RESOLVED that:
1 . The foregoing recitals are true and correct; and
2. The previously approved and adopted projects on the attached Exhibit A may utilize
Fiscal Year 2021-22 Road Maintenance and Rehabilitation Account revenues in
their delivery. With the re-listing of these projects in the adopted fiscal year
resolution, the City is reaffirming to the public and the State its intent to fund these
projects with Road Maintenance and Rehabilitation Account revenues.
PASSED AND ADOPTED at a regular meeting of the City Council of the City of Tustin
held on the 1 st day of June 2021.
DocuSigned by:
E-F 15YOLF(3"a� ...
LETITIA CLARK,
Mayor
ATTEST:
5DocuSigned by:
`LV, qxs,�.-
ERICA . A,
City Clerk
Resolution 21-35
Page 2 of 3
DocuSign Envelope ID: F41 D5931-CA55-4C2F-B857-CA3F4944C6D8
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) SS
CITY OF TUSTIN )
I, Erica N. Yasuda, City Clerk and ex-officio Clerk of the City Council of the City of Tustin,
California, do hereby certify that the whole number of the members of the City Council of
the City of Tustin is five; that the above and foregoing Resolution No. 21-35 was duly passed
and adopted at a regular meeting of the Tustin City Council, held on the 1St day of June
2021 , by the following vote:
COUNCILMEMBER AYES: Clark, Lumbard, Gallagher, Gomez (4)
COUNCILMEMBER NOES: (0)
COUNCILMEMBER ABSTAINED: (0)
COUNCILMEMBER ABSENT: Cooper (1)
DocuSigned by:
`LV'iCa (�aStti�,a
o-r�eerJ, •o-ae®..
ERICA N. YASUDA,
City Clerk
Resolution 21-35
Page 3 of 3
DocuSign Envelope ID:F41 D5931-CA55-4C2F-B857-CA3F4944C6D8
Exhibit A
City of Tustin
Senate Bill(SB)1 Local Streets and Roads Program List of Previously Approved/Re-listed Projects for FY 2021-22
Project Title Project Type Description Location Components Project Est Start Est Est State State Est Total
Status and Completion Useful Assembly Senate Project
FY Life District District Cost
Newport Avenue Road Repave/resurface 0.63 miles of road,including localized Sycamore Construction In Progress 06/2021 12/2021 20-30 68 37 $700,000
Rehabilitation Maintenance& removal and repair of asphalt concrete pavement failure Avenue to 20/21
Rehabilitation areas,repair of sidewalk and curb&gutter,reconstruction of Interstate 5
curb ramps to be ADA compliant,cold plane existing asphalt, Freeway
construction of asphalt concrete overlay,traffic signal detector
loops,and traffic striping.
Newport Avenue Road Repave/resurface 0.80 miles of road,including localized Interstate 5 Construction In Progress 06/2021 12/2021 20-30 68 37 $900,000
Rehabilitation Maintenance& removal and repair of asphalt concrete pavement failure Freeway to 20/21
Rehabilitation areas,repair of sidewalk and curb&gutter,reconstruction of Holt Avenue
curb ramps to be ADA compliant,cold plane existing asphalt,
construction of asphalt concrete overlay,traffic signal detector
loops,and traffic striping.
Red Hill Avenue Road Repave/resurface 0.31 miles of road,including localized San Juan St. Pre- Forecasted 10/2021 03/2023 20-30 68 37 $600,000
Rehabilitation Maintenance& removal and repair of asphalt concrete pavement failure to First St. Construction 21/22
Rehabilitation areas,repair of sidewalk and curb&gutter,reconstruction of and
curb ramps to be ADA compliant,cold plane existing asphalt, Construction
construction of asphalt concrete overlay,traffic signal detector
loops,and traffic stripin I
Red Hill Avenue Road Repave/resurface 0.47 miles of road,including localized Walnut Ave.to Pre- Forecasted 03/2022 08/2023 20-30 68 37 $550,000
Rehabilitation Maintenance& removal and repair of asphalt concrete pavement failure Interstate 5 Construction 22/23
Rehabilitation areas,repair of sidewalk and curb&gutter,reconstruction of Freeway and
curb ramps to be ADA compliant,cold plane existing asphalt, Construction
construction of asphalt concrete overlay,traffic signal detector
loops,and traffic striping.
Jamboree Road Road Repave/resurface 1.6 miles of road,including localized Barranca Pre- Forecasted 09/2023 03/2025 20-30 68 37 $1,300,000
Rehabilitation Maintenance& removal and repair of asphalt concrete pavement failure Parkway to Construction 23/24
Rehabilitation areas,repair of sidewalk and curb&gutter,reconstruction of SCRRA and
curb ramps to be ADA compliant,cold plane existing asphalt, Railroad Construction
construction of asphalt concrete overlay,traffic signal detector
loops,and traffic striping.