AGENDA REPORT
MEETING DATE: APRIL 3, 2006
TO: WilLIAM A. HUSTON, CITY MANAGER
FROM: PATRICK SANCHEZ, DIRECTOR, PARKS & RECREATION SERVICES
SUBJECT:
APPROVAL OF AMENDMENT NO.1 TO CONSULTANT SERVICES
AGREEMENT WITH RJM DESIGN GROUP FOR ADDITIONAL
PROFESSIONAL SERVICES FOR CITRUS RANCH PARK CIP NO. 2046
SUMMARY
Approval of Amendment No.1 to the Consultant Services Agreement with RJM Design
Group, Inc. for additional professional services for the Citrus Ranch Park Project (CIP
No. 2046). Additional civil engineering services are required in the preparation of
construction documents. The requirement to provide an additional street improvement
plan for work at the intersection of Allen and Portola Parkway, including grades,
horizontal control and traffic engineering, which includes traffic signalization, signing,
striping and traffic control specifications, preparation of legal descriptions, and a change
in the scope of work regarding park phasing, re-design of the knoll, and the walkway
lighting have resulted in a significant increase in engineering work effort to
accommodate the increase in site development.
RECOMMENDATION
It is recommended the City Council approve a change order in the amount of $59,100
for the first amendment to the Consultant Services Agreement between RJM Design
Group, Inc. and the City for Additional Design Services for the Citrus Ranch Park
Project (CIP NO. 2046) and authorize the City Manager and the Director of Parks and
Recreation to execute the amended Consultant Services Agreement on behalf of the
City, subject to City Attorney approval.
FISCAL IMPACT
The City's Capital Improvement Program Budget for FY 2005-06 provides $4,700,000
for the project (CIP No. 2046). The total cost for the proposed additional professional
services is $59,100. The proposed adjustment will increase the existing contract
amount of $328,515.00 to $387,615.00.
Page 2
BACKGROUND
The City originally entered into a Consultant Services Agreement with RJM Design
Group on July 29, 2004, for design services, construction drawings and specifications
for the 17-acre Citrus Ranch Park project. In February, 2006, the City received from
RJM Design Group a request for additional engineering expenses related to preparation
of the retaining wall on the east side of the project, additional electrical requirements for
the knoll walkway lighting as part of Phase 3 of the project. In addition, Phases 1 and 2
of the original three phases of work were budgeted in the original Capital Improvement
Program for FY 2005-06. Since that time, those phases have changed to build Phases
1 and 3, and not Phase 2. This has resulted in additional construction drawings
required. The street improvement plan also required additional engineering services.
The Orange County Department of Harbors, Beaches and Parks requires the City to
provide modifications to the trail surrounding the park, which include additional
architectural services. In March 2006, RJM Design Group issued a memorandum
summarizing their cost estimates for the new, additional contract work.
In compliance with Article 2 COMPENSATION, Section 2.3 Changes in the original
Consultant Services Agreement, the parties hereto are required to execute an
addendum to the agreement for additional consultant fees.
It is expected that a request for Authorization to Bid for the project and the
Environmental Determination will be done at a City Council meeting in May. The
Project Schedule would indicate the bidding process to be completed by July 2006, with
a notice to proceed with construction by September 2006.
Respectfully submitted,
Patrick Sanchez
Director, Parks and Recreation Services
ecreation Services
AMENDMENT NO.1
to
CONSULTANT SERVICES AGREEMENT
between
THE CITY OF TUSTIN
and
RJM DESIGN GROUP, INC.
for
CONSTRUCTION ENGINEERING DESIGN I BID SPECIFICATIONS I
CONSTRUCTION DRAWINGS
DRAFT
The City of Tustin (herein "CITY") and RJM Design Group, Inc., (herein
"CONSULTANT"- ENTERED INTO AN Agreement on July 29, 2004, (herein
"Agreement") for Engineering Services for Citrus Ranch Park Project, CIP No.
2046 (herein "Project"). Effective April 4, 2006, CITY and CONSULTANT wish to
enter this Amendment No.1 as follows:
SECTION 1.
PURPOSE
CITY has directed CONSULTANT to prepare an additional street
improvement plan for the work at the intersection of Allen and Portola Parkway;
modify the electrical redesign of the knoll walkway lighting; provide structural
redesign for the park entrance retaining wall; and provide additional construction
document preparation to include specifications for the phasing of improvements
at Citrus Ranch Park.
SECTION 2.
SCOPE OF CONSULTANT'S SERVICES
CONSULTANT agrees to furnish to CITY those services which have been
included within the CONSULTANT'S proposal, dated January 26, 2006, and
included herein as Exhibit "A"
SECTION 3.
TIME FOR COMPLETION
CONSULTANT agrees to endeavor to complete the proposed additional
services by July 30, 2006
SECTION 4.
COMPENSATION
Compensation for the proposed services shall not exceed 59,100.00 as
set forth in Exhibit "A," and progress payments will be made as set forth in
Section 4 of the original Agreement.
All other terms and conditions of the Agreement shall remain unchanged
and in full force and effect.
IN WITNESS WHEREOF, the parties hereto have caused this
Amendment No.1 to be executed the date first above written.
By: William A Huston, City Manager
City of Tustin
By: Patrick Sanchez, Parks and Recreation Director
City of Tustin
By: Larry Ryan, Principal
RJM Design Group, Inc.
DRAFT
RJM
DESIGN GROUP, INC.
PLANNING AND LANDSCAPE ARCHITECTURE
January 26,2006
Pat Sanchez
Director of Parks & Recreation
City of Tustin
300 Centennial Way
Tustin, CA 92780
RE:
ADDITIONAL PROFESSIONAL SERVICES CITRUS RANCH PARK
Dear Pat:
Per our discussion we are submitting this request for additional Design fees to cover the
additional Landscape Architectural services that we have been requested to provide. These
services include additional design/coordination meetings, and the preparation of construction
documents for items made possible by the increase in the construction budget for the park.
A detailed explanation of these additional services include:
I. Our original scope of work provided for a total of 6 design progress meetings. As of
January 26, 2006, we have attended a total of eleven (11) additional City requested
meetings. We anticipate an additional three (3) meetings to finalize the bid packaging.
2. As described in our original proposal our indicated fee was based upon a phase one
construction budget of $3.2 million dollars. Our original fee of $265,298.00 was based on
that anticipated scope of work. That fee represents approximately 8% of the construction
budget. Since that time the scope of work has been increased to include an anticipated
construction budget of$6.3 million dollars. This has resulted in a significant increase in
the work effort to accommodate the increase in site development.
An itemization of compensation for the above requested additional services, is as follows:
A. Preparation for and attendance at (14) Additional Meetings $ 7,280.00
B. Additional Construction Document Preparation to include the $ 51.800.00
increase in the scope of the project
Requested Additional Compensation $ 59,080.00
DRAFT
Also due to the increase in the scope of work and associated volume of construction drawings we
also need to request that you allocate additional funding in the amount of$5,000.00 to the
reimbursable allowance section.
Thank you for your assistance. Should you have any questions or comments please contact our
office.
Sincerely,
RJM DESIGN GROUP, INC.
Approved by:
CITY OF TUSTIN
Larry P. Ryan,
Principal
By:
Date:
Ranch Pork. Additiona]
2