HomeMy WebLinkAbout15 NOP METRO EAST 04-03-06
AGENDA REPORT
MEETING DATE: APRIL 3, 2006
TO: WILLIAM A. HUSTON, CITY MANAGER
FROM: COMMUNITY DEVELOPMENT DEPARTMENT
SUBJECT: CITY OF TUSTIN RESPONSE TO CITY OF SANTA ANA NOTICE OF
PREPARATION (NOP) FOR THE METRO EAST MIXED USE OVERLAY ZONE
DRAFT EIR
SUMMARY
City Council authorization is requested for the City of Tustin's response to the Notice of
Preparation (NOP) of a Draft Environmental Impact Report (DEIR) prepared for a General
Plan Amendment and Zoning Code Amendment to allow for the development of higher
density mixed-use and/or residential land uses within an overlay zone of 200 acres. The
proposed Overlay Zone is located directly adjacent to the City of Tustin, west of Tustin
Avenue, south of East Sixth Street, and between Interstate 5 and State Route 55 in the
City of Santa Ana (location Map - Attachment A).
The Draft EIR is proposed to include a program level document (Volume One) to analyze
the potential environmental impacts of implementing the 200-acre Overlay Zone that would
allow development up to 23 stories and an overall 3.0 floor area rato and two project level
documents (Volumes Two and Three) to analyze two project-specific developments
currently proposed within the Overlay Zone. These developments include the "Santa Ana
Residential Village" and the "First and Cabrillo Tower" projects. Combined, the two
specific projects propose approximately 893 residential units in buildings with up to 23
stories and about 24,000 square feet of commercial space.
RECOMMENDATION:
That the City Council authorize staff to forward the attached response letter to the City of
Santa Ana.
FISCAL IMPACT:
There are no direct fiscal impacts associated with this action.
City Council Report
NOP for Santa Ana DEIR
April 3, 2006
Page 2
BACKGROUND AND DISCUSSION:
The proposed project includes a General Plan Amendment and Zoning Code
Amendment to allow for the development of mixed-use and/or residential land uses within
an overlay zone of 200 acres located directly adjacent to the City of Tustin. (Location Map
- Attachment A). The program level analysis of the Draft EIR will study the potential
environmental impacts resulting from the rezoning and the associated higher density
development that could be built within the proposed Overlay Zone.
Two project-specific developments currently proposed within the Overlay Zone include the
Santa Ana Residential Village and the First and Cabrillo Tower projects. Combined, these
projects propose approximately 893 residential units in buildings with up to 23 stories and
about 24,000 square feet of commercial space.
The proposed project would generally increase the maximum General Plan Floor Area
Ratio for the 200-acre Overlay Zone from 2.0 to 3.0. A floor area ratio of 3.0 is a relatively
high density for this area and would allow for the construction of high rise buildings. The
proposed increase in development intensity may have significant traffic impacts to arterial
streets in the City of Tustin. In addition to traffic impacts, there is a potential for aesthetic,
noise, land use, and aircraft overflight impacts to the City of Tustin.
The letter also addresses an issue with respect to potential development at 900 West
First Street (the former Revere House site) within the City of Tustin and the site
immediately to the west of 900 West First Street. It is staff's understanding that the City
of Santa Ana may be considering a development proposal or proposals affecting
property in areas immediately adjacent to the project area and that a developer, NDC,
has or is in the process of purchasing property generally located at 900 West First
Street in the City of Tustin and the site immediately to the west of 900 West First and
which is in the City of Santa Ana. This developer has contacted the City of Santa Ana
and has indicated a desire to pursue a future mixed use development. To the extent
such development is proposed for property within the City of Tustin, such development
will be subject to review and approval by the City of Tustin. Notwithstanding the fact
that such development may occur in the City of Tustin, it may be prudent to include any
such development proposal within the scope of the EIR for the Project, subject to a full
review of the environmental consequences of such development and included in the
cumulative effects analysis of the EIR. However, we would expect the City of Tustin to
be afforded all appropriate review, comment, and decision making authority associated
with and provided to a responsible agency under CEQA In addition, we would also
expect the developer to submit a General Plan Amendment, Zone Change, and all
associated entitlement requests to the City of Tustin that would be required for any
development proposed on the Tustin site.
The Community Development and Public Works Departments have reviewed the
subject Notice of Preparation. Staff believes that it is in the City's interest to be on
City Council Report
NOP for Santa Ana DEIR
April 3, 2006
Page 3
record regarding this matter and has prepared correspondence expressing the City's
concerns regarding the Notice of Preparation document (see Attachment B). Staff
requests that the Tustin City Council review and consider these comments and, if
acceptable, authorize their formal transmission to the City of Santa Ana.
Scott Reekstin
Senior Planner
Elizabeth A. Binsack -
Community Development Director
Attachments:
A. Location Map
B. Draft Comment Response Letter
C. Notice Of Preparation
S:ICddICCReportsINOP Santa Ana Metro East OVe~ay.doc
ATTACHMENT A
Location Map
,
;
EIP-
FIGURE 1
Regional and Vicinity Map
1,0950.0;
NORTH
NOTTO SCALE
I
City of Santa Ana I
ATTACHMENT B
Draft Comment Response Letter
April 4, 2006
City of Santa Ana
Planning and Building Agency
Attn: Sergio Klotz
20 Civic Center Plaza
Costa Mesa, CA 92702
SUBJECT:
REVIEW OF NOP FOR THE CITY OF SANTA ANA METRO EAST MIXED USE
OVERLAY ZONE DRAFT EIR
Dear Mr. Klotz:
Thank you for the opportunity to provide comments on the Notice of Preparation (Nap) prepared
for the Draft Environmental Impact Report (DEIR) for a General Plan Amendment and Zoning
Code Amendment to allow for the development of higher density mixed-use and/or residential
land uses (up to 23 stories and an overall 3.0 floor area ratio) within a 20O-acre overlay zone
generally located west of Tustin Avenue, south of East Sixth Street, and between Interstate 5 and
State Route 55 in the City of Santa Ana (Project).
Two project-specific developments currently proposed within the Project include the Santa Ana
Residential Village and the First and Cabrillo Tower projects. Combined, these projects propose
approximately 893 residential units in buildings up to 23 stories and approximately 24,000 square
feet of commercial space.
The City of Tustin has identified the following concerns and issues that we request be addressed
in the Draft Environmental Impact Report.
Traffic
1. All development within the Project should be required to fully mitigate, including the
acquisition of necessary right of way and construction of all requisite public
improvements, any negative impact that may affect any other property, regardless of
jurisdictional boundaries. We believe that there will be a significant increase in traffic,
circulation, noise and parking impacts on property within the City of Tustin, so the
Project must contain conditions of approval to address all Project impacts, including
cumulative impacts.
2. Given this specific project area, there are significant traffic operational issues that
should be considered in the DEIR. The required operational analyses should
supplement standard intersection evaluations. The traffic operational issues should
include potential freeway ramp operation impacts on the arterial roadways related to
ramp metering, the spacing of intersections including the freeway interchange
intersections, lane utilization related to accessing the freeway, and impacts due to
limited east-west and north-south arterials as a result of freeway crossings.
Mr. Sergio Klotz
Santa Ana Metro East Nap
April 4, 2006
Page 2
3. Some of the traffic concerns related to this area are highlighted by the recent 1-5/SR-55
weaving/merging study by the OCT A. There are identified impacts at the interchange
which need to be considered in the analyses.
4. The uncertainty associated with the extension of Measure M funding places increased
reliance on the arterial street system. An evaluation should be provided, whereby all
potential impacts without Measure M funding on the City of Tustin are addressed.
Realistic assessment of the use of the arterial roadways as a bypass to the freeway
system should be considered.
5. There should be a complete and thorough discussion of the traffic model assumptions,
such as ramp metering assumptions, TOM credits, and freeway congestion, etc.
6. The DEIR should utilize a select zone model run to identify where the Project traffic will
travel on the surrounding roadways, including those roadways in the City of Tustin.
7. Given the proposed changes in land uses, the analyses should consider the potential
"worst case" traffic impacts and required mitigations associated with build out of the
averlay Zone before the individual projects are considered. Essentially the ultimate
conditions need to be evaluated to assure adequate infrastructure can be provided to
support the averlay Zone project and that each individual project provides its "fair share"
of the ultimate infrastructure needs.
8. There is a significant amount of new development approved in the City of Irvine that will
likely use arterials roadways, including Irvine Boulevard, First Street, Bryan Avenue,
Main Street, and EI Camino Real. These volumes should be considered in the DEIR.
9. The DEIR should clearly identify the methodology for the selection of the study area and
traffic analysis locations. There are no preliminary trip generation calculations provided
in the Nap, so it is difficult to estimate potential impacts to the City of Tustin. There is a
need to evaluate all locations that would experience significant traffic impacts, both
cumulative and project related. For locations within the City of Tustin, the traffic
analyses must be consistent with City of Tustin criteria and methodologies.
Furthermore, the traffic analyses for the proposed projects should be based on traffic
forecasts derived from a traffic model that includes the Tustin Legacy Project. As there
are no traffic analyses provided as a part of the Nap, the City of Tustin may have
additional comments once these materials are provided for review.
10. The Nap provides descriptions of the Project land uses/sizes and MPAH road system
changes. The DEIR will need to detail the effects of the assumed road system changes
and as the effects of the traffic generated by the proposed project.
11. From a land use and traffic perspective the definition of the Project is critical and should
be clearly defined in the DEIR. The analysis needs to consider the land use changes,
the road system changes and what conditions will be considered as the "baseline"
regarding identification of Project related impacts.
Mr. Sergio Klotz
Santa Ana Metro East Nap
April 4, 2006
Page 3
12. There are different traffic projections dependent on whether a toll or non-toll operation is
assumed for the Transportation Corridors. There should be analyses of the worst case,
which is anticipated to be the "with toll" conditions.
Noise
13. The DEIR should include a full analysis of any potential impacts to the flight paths to
John Wayne Airport. It must be assured that the proposed high rise buildings do not
impact the flight paths for aircraft and potentially increase noise impacts for Tustin
residents or increase the number of flights over the City of Tustin due to a diversion of
flights farther to the east.
14. The DEIR should include a complete analysis of potential long-term traffic related noise
impacts to receptors along First Street, Irvine Boulevard, Yorba Street, and Pacific
Street in the City of Tustin and along any other arterials that that may be impacted by
"cut-through" traffic.
Land Use
15. Because of the potential noise, traffic, and aesthetic impacts to adjacent uses, the DEI R
should identify how a buffer zone will be implemented along the eastern and southern
boundaries of the averlay Zone. The DEIR should specifically identify the general
range of proposed outright permitted and conditionally permitted uses within these
buffer areas.
16. It should be explained in the DEIR whether the transfer of development rights will be
permitted in the averlay Zone and what type of process would be required to obtain a
transfer of development rights.
17. The DEIR should analyze whether the proposed averlay Zone would justify the need for
new on-ramps and/or off-ramps to the SR-55 Freeway at First Street. If the
improvements are justified, the Draft EIR must identify the significant potential impacts
associated with such improvements.
18. It is our understanding that the City of Santa Ana may be considering in the near future
a development proposal or proposals affecting property in areas immediately adjacent to
the project area. Specifically, it is our understanding that a developer, NDC, has or is in
the process of purchasing property generally located at 900 West First Street in the City
of Tustin and the site immediately to the west of 900 West First and which is in the City
of Santa Ana. This developer has contacted the City of Santa Ana and has indicated a
desire to pursue a future mixed use development. abviously, to the extent such
development is proposed for property within the City of Tustin, such development will be
subject to review and approval by the City of Tustin. Notwithstanding the fact that such
development may occur in the City of Tustin, we believe it would be prudent to include
any such development proposal within the scope of the EIR for the Project, subject to a
full review of the environmental consequences of such development and included in the
cumulative effects analysis of the EIR. We would of course expect the City of Tustin to
be afforded all appropriate review, comment, and decision making authority associated
Mr. Sergio Klotz
Santa Ana Metro East Nap
April 4, 2006
Page 4
with and provided to a responsible agency under CEQA. In addition, we would also
expect the developer to submit a General Plan Amendment, Zone Change, and all
associated entitlement requests to the City of Tustin that would be required for any
development proposed on the Tustin site.
Aesthetics
19. The DEIR should include a detailed view analysis which focuses on proposed or
potential views from the various sensitive land uses in the vicinity toward the averlay
Zone.
General
20. Portions of the proposed averlay Zone are directly adjacent to, or in close proximity to,
portions of the City of Tustin. af significant concern are the potential aesthetic and
noise impacts to the sensitive uses to the south and east of the overlay area, which
include St. Jeanne de Lestonnac School, the Briarcliff residential community, Old Town
Tustin, and other residential neighborhoods. The DEIR should specifically analyze the
potential impacts to these sensitive uses.
21. The DEIR should identify which types of outreach programs will be utilized to
disseminate information and gather input from the various residential and business
groups that have an interest in the portions of Tustin which are located directly south
and east of the proposed Overlay Zone.
I would appreciate receiving a copy of the Draft EIR, or in the event the Tustin property is included
in the Project, the Screen Check copy of the Draft EIR, including the detailed traffic analysis,
when it becomes available. Prior to such time, we expect that you will consult with us in a timely
manner in full compliance with CEQA during the document preparation and project review
process. If you have any questions regarding the City's comments, please call Scott Reekstin,
Senior Planner, at (714) 573-3016 or Terry Lutz, Principal Engineer, at (714) 573-3263.
Sincerely,
Scott Reekstin
Senior Planner
cc:
William A. Huston
Elizabeth A. Binsack
Tim Serlet
Dana Kasdan
Dana agdon
Doug Anderson
Terry Lutz
ATTACHMENT C
Notice of Preparation
RECE!VED
MAR 1 3 2006
COMMUNITY DEVELOPMEN
NOTICE OF PREPARATION
DRAFT ENVIRONMENTAL IMPACT REPORT
March 9, 2006
PRaJECT TITLE:
Merro East Mixed U5e OveIlay Zone
LEAD AGENCY:
Gry of Santa Ana
COUNTY:
Orange Counry
PROJECT LOCATION
Mixed Use OveIlay Zone (Overlay Area)
The propo5ed Merro Ea5t lvli.'l:ed Use Overlay Zone
(Overlay Area) is located generally in the area west of
Tustin Avenue, south of east Sixth Street, and
between 1-5 and SR-55 in the City of Santa Ana in
Orange County (See Figure 1).
Santa Ana Residential Village
The proposed development project site is within the
Overlay Area and is bound by Fourth Street to the
south, Cabrillo Park Drive to the east, Park Court
Place to the north, and 1-5 to the west (See Figure 1).
First and Cabrillo Tower
The proposed development project site is withirl the
Overlay "1.rea and is bound by First Street to the
south, and Cabrillo Park Drive to the west. (See
Figure 1).
DESCRIPTION OF THE PROJECT
Program Level
The City of Santa Ana proposes the creation of a mL'l:ed-use overlay zone. hereafter referred to ac
the Overla" Area, over a portion of the City- The Overlay Area 1S comprised of over 200 acres of
land that is des1gnated in the City's General Plan for Professional and ,1.dminisrrarive Office, and is
currcndy developed wl(h conmlercia] and office uses. It should bt noted dut several larile vacam
properties are ]ocared along the western bounda!\' of the Overla, Area. The areas surrounding the
Overlay Area are a !IlL'; of residential and commercial properties. indudlllg a slllgle-famih residential
neighborhood to the north, and a private school and mula-family residential properties to the south.
Metro East Mj,,<ed Use Overlay Zone
Notice of Preparation
March 9. 2006
The averlay Area, as shown in Figure 1, is located immediately east of the Santa Ana Freeway
(Interstate 5 or 1-5) and immediately west of State Route 55 (SR-55) in the City of Santa Ana in
Orange County. The junction of 1-5 and SR-55 is located approximately 0.2 mile to the southeast.
The Overlay Area is bounded by the Santa Ana Freeway (1-5) on the west and south; Tustin Avenue
on the east; and East 6th Street on the north. Several roadways provide access to properties within
the Overlay Area, including East First Street, East Fourth Street, Cabrillo Park Drive, Park Court
Place, East Sixth Street, Parkcenter Drive, and North Golden Circle Drive.
The purpose of the overlay zone is to allow for the development of mixed-use and/ or residentiill
land uses within the Overlay Area. To accommodate this objective, the City will need to amend the
current General Plan to permit these new land uses, and amend the Zoning Code to establish
development standards that implement the City's vision for the development of mixed-use and/or
residenllill projects within the Overlay Area. These amendments will allow the City to encourage a
more active commercial and residential community, provide an e"'l'anded economic base, maximize
property and sales tax revenues, and improve the jobs/housing balance within the City. Creation of
this Overlay Area will also allow the City to consider subsequent actions consistent with these
updates in the General Plan and Land Use designations.
Project Specific
Two project-specific developments, consistent with the objectives of the proposed overlay zone
designation, are currendy being proposed within the Overlay Area.
S al2ta Ana Residen.tia/ Village
The [1!st development, hereafter refened to as the Santa Ana Residential Village, is located on
approximately 8.36 acres of land in the northwestern portion of the Overlay Area. The applicant for
this development, Shea Homes, is proposing the development of a mixed-use residential
community, including approximately 573 residential units, 3,800 square feet (sf) of residential
amenity space, and 7.800 sf of commercial and retail space. The proposed development would be
separated into four building structures, with the commercia] and retail space located along d1e
eastern boundary of the site. The four structUres would range in height from 4 to 20 stories. This
project would potentially provide for approximately 50 employees, 10 of which would be located on
site to maintain and operate the activities associated with the proposed residential units.
Add1tionally. a subterranean parking structure ",-ith approximately 1.318 parking spaces would be
provided for resIdents, employees, and vIsitors, with access from the proposed internal roadway.
The entrance to the Santa Ana Residenllil] Village would be from Cabrillo Park Drive, wld,
secondary access along Park Court Place. Pedestrian access will be provided along Fourth Street.
The proposed project would also include utility infrastrUcrnre improvements, mher water
quality¡wate,' ,.uppl1 facilities. and physical amemties such as " pool. ConsIstent with the Cln of
Santa """na's ob)ecave for the Overlay Area, tills proposed development would create a lugb-quality,
comprehensive, and inteh'1:ated open air commercial, retail, and housing development that would be
distinctive, include retail opportunities, and constitute IT public space for area residents and visitors
No demolition would be required based on the curreni vacant cond1tlOI1 of the site. COnSITllctiun
actJvities would be scheduled to begm in March of 2007, and would be completed within 42 months
Page 2
Metro East Mi."œd Use Overlay Zone
Notice of Preparation
March 9, 2006
of the initiation of construction. Construction activities will consist of grading and excavation,
building erection and general construction, architectural coatings and paintings, and paving.
First and Cabri//o Tower
The second development, hereafter referred to as the First and Cabrillo Tower, is located on
approximately 5 acres of land in the central portion of the averlay Area. The applicant for this
development, NDC Development, is proposing the development of commercial and residential
space located along First Street and Cabrillo Park Drive. The development includes approximately
726,000 square feet (sf) of development area, including approximately 500,000 square feet of
residential areas, approximately 16,000 sf of retail/commercial areas, and approximately 210,000 sf
of existing strucrured parking area. The residential units will be accommodated by a 23-story high-
rise tower with approximately 200 units, and tWo six-story mid-rise towers with approximately 120
units, including one-bedroom units, tWo-bedroom units, and townhomes. The First and Cabrillo
Tower site will also include a pool, courtyard, garden, and activity center.
As the First and Cabrillo Tower site is currendy developed, some demolition would be required,
although the existing parking structure would be renovated and incorporated into the new site
design. Following demolition, the entire site would be graded and compacted, followed by
completion of necessary trenching (e.g., for utility hookups to buildings). The building foundation,
buildings, and utilities would then be constructed. Finally, the area surrounding the buildings would
be covered with concrete and asphalt; curb-breaks and driveways would be added; sidewalks would
be improved; and landscaping, site fencing, and any fmal work would be completed. Construction
activities are scheduled to begin in March of 2007, and would be completed within 48 months.
The proposed Draft Envirorunental Impact Report (EIR) will have three volumes. Volume One
(program ErR) will evaluate, at a programmatic level, the potential envirorunental effects of
implementing a mi."ed-use overlay zone (Overlay Area) over a portion of the Clty of Santa Ana.
Volume Two of the EIR will evaluate the potentia] environmental effects of the proposed project-
specific de,-elopment of the Santa },na Residennal Village, and Volume Three will evaluate the
potential environmental effects of the proposed project-specific development of the First and
Cabrillo Tower.
PROBABLE ENVIRONMENTAL EFFECTS
Potential' envllonmental effects of the proposed prolect for which detailed analysis ",¡jl be
conducred as part of the Draft EIR, include: (refer to Attachment 1 for further clanfrcatlOn)
Aesthetics
Air Quality
BIOlogical Resources
Cultural Resources
Geology and Soils
Hazards and Hazardous
Materials
Hvdrology and Warer Quality
Page 3
Land L'se and Planning
NOIse
Popubuon and !-loUSl11g
Public ServIces
Transportation and TraffIc
Utilities and Service
Systems
Metro East Mixed Use averlay Zone
Notice of Preparation
March 9, 2006
The proposed project was determined to have no potential environmental effects with respect to
two California Environmental Quality Act (CEQA) issue areas (Agricultural Resources and Mineral
Resources), as explained further in Attachment 1. As such, these areas will not be analyzed further in
the EIR. In compliance with the State guidelines for implementation of CEQA, this Notice of
Preparation (NOP) is hereby sent to you to infonn you that the City of Santa Ana is preparing an
EIR on the aforementioned project. As Lead Agency, the City of Santa Ana needs ro know the
views of your agency as to the scope and content of the environmental infonnation which is
gennane to your agency's statutory responsibilities in connection with the proposed project. Written
comments may be submitted via mail to the following address:
City of Santa Ana
Planning and Building Agency
20 Civic Center Plaza
Santa Ana, CA 92702
Attn: Sergio Klotz
Due to the time limits mandated by State Law, your response must be sent at the earliest possible
date, but no later than 30 days after receipt of this Notice. A public information and EIR scoping
meeting will be scheduled in the near future and will be advertised in local newspapers and by direct
mailing to notify interested individuals and agencies. In d1e meantime, please feel free to call Sergio
KJotz, Senior Planner, at (714) 667-2700 with any questions.
Sincerely,
~A--1iLJ~
¡o,~ I<:.aren Haluza, j,ICP
Planning Manager
Attachment 1:
Attachment 2:
Potential Environmental Issues
Figure 1 - Regional and Vicinity Map
cc:
Airport Land Use CommissIOn
California All: Resources Board
California Department ofFish and Game
Caìifonua Departmem of Toxic Subsrance, Control
California Depanmem of Transporration
California Departmem of Water Resources
California Office of Historic Preservation
City of Costa Mesa
CitV of Fountain "Valley
CIty of Garden Grove
Page 4
Metro East Mixed Use Overlay Zone
Notice of Preparation
March 9, 2006
City of Irvine
City of Orange
City of Tustin
City ofWestrninster
County of Orange
Native American Heritage Commission
Orange County Fire Authority
Orange County Sanitation District
Orange County Transportation Authority
Santa Ana Public Library
Santa Ana Regional Water Quality Control Board
South Coast Air Quality Management District
Southern Califorru.. Association of Governments
Tustin Unified School District
U.S. Fish and Wildlife Service
Page 5
ATTACHMENT 1
POTENTIAL ENVIRONMENTAL ISSUES
Program LeveL, Mixed-Use Overlay Zone (Overlay Area)
P"!J'ect Specific: Santa Ana Residential Village and the First and Cabrillo Tower
Aesthetics
Program Level
Potential effect on scenic resources, including historic buildings or trees
Potential alterations to visual character or quality within the Overlay Area
Potential changes in sources of light and glare
Project Specific
Santa Ana Rtsidentia/ Village and the First and Cabn//o Tower Sites
Potential alterations to visual characteristics, including shade and shadows generated by the
proposed development, which includes buildings ranging from 4 to 23 stories in height
Potential light impacts from new commercial and residential building activities and security lighting
Potential changes in sources of glare
A."o:ricultural Resources
According to the California Department of Conservation Farmland Mapping and Monitoring
Program and based on observations of the Overlay Area, there are no current agriculrural operations
nor any designated areas of Prime Farmland, Farmland of Statewide Importance, or Unique
Fannland in the Overlay Area. Therefore, there would be no impacts to agriculrural resources at the
program or project-specific levels, and this issue will not be addressed in the Draft EIR.
Air Quality
ProgIam Level
Consistency with adopted all: quality plans
Short-term emissions from construction within the Overlay Area
Long-term operation emissions from mobile and stationary sources within the Overlav AIea
Potential all: quality effeers on sensltive receptOrs
Proiect Specific
Santa Ana Rtsidentia/ ¡/dlage and the First and Cabn//o Tower Sites
Consistency "lith adopted air quality plans
Short-term emissions from construction of the proposed project
Long-term operanon emissions from project-generated mobile and stanonar\' sources
Potential all: qualirv effects on sensitive receptOrs
Biological Resources
Program Leve]
PotennaJ efte"", on bloìugical resources mcluding trees and migratory buds
Consistency wtth local policies. ordinances. and plans 1Il place to protte¡ blOlof'1ca) reSOUIces.
including the C11:"" Conservation Element
Page 6
Project Specific
Santa Ana Rtsidentia/ Vii/age Site
As the Shea Homes site is vacant, there aIe no potential effects to biological resources at this
project-level analysis.
First and Cab"llo Tower Site
Potential effects on biological resources including trees and migratory birds
Consistency with local policies, ordinances, and plans in place to protect biological resources,
including the City's Conservation Element
Cultural Resources
Program Level
Potential effects to the historic and architectural qualities in the Overlay Area
Potential effects to archeological and paleontological resources
Consistency with the City's Conservation Element
Project Specific
Santa Ana Rtsidmtia/ Village Site
Potenllitl effects to archeological and paleontological resources during excavation of the proposed
project
First and Cab"I/, Tower SIte
Potential effects to archeological and paleontological resources during excavation of the proposed
project
Consistency with the City's Conservation Element
Geology and Soils
Program Level
Potential effect of surface ruptures, groundshaking, and ground failure
Seismic considerations in the siting and design of future development
Suitability of soils for future development
Extent of grading and export of earth materials that may result In potential erosion impacts
Seismic shaking impacts and liquefaction impacts
Consistency with the City's Seismic Safety Element
Project Specific
Santa Alia RtJidcntia/ ViI/age and tbe First and Cab,,!lo Tower 5iteJ
Seismic consideratIons in the siting and design of the proposed developments
Extent of grading and export of earth materials that may result in potential erosion lmpacts
Seismic shaking impacts and liquefaction impacts
Consistency with the City's Seismic Safety Element
Page 7
Hazards and Hazardous Marerials
Pro¡>1:a1n Level
Potential effects of the use, transport, and disposal of hazardous materials
Potential toxic emissions or wastes from potential future operational and construction activities
Consistency with emergency response plans
Project Specific
Santa Ana fuJidentia! VzJlage and the First and Cabn//o Tower Sites
Potential radio wave interference by the proposed 20- and 23- st°ty buildings
Potential toxic emissions or wastes from construction activities
Consistency with City emergency response plans
Hydrology and Water Quality
Pro¡'Iam Level
Potential effect of siltation during construction-related earthmoving activities
Potential change in amount and quality of storm water runoff and effect on drainage system
Potential alteration of drainage patterns
Consistency with adopted water quality standards or waste discharge requirements
Potential exposure of people to flooding from the Santa Ana River
Project Specific
Sal1taAna fusidentia/ VzJ/age and tbe First and Cabn/lo Tower Sites
Potential for siltation during consttuction-related earthmoving activities
Potential effect on the rate and/or volume of surface runoff from increases in impervious surfaces
Proposed effect of runoff on water quality
Potential alteratio~ of drainage patterns
Consistency with adopted water quality standards or waste discharge requirements
Potential exposure of people to flooding from the Santa Ana River
Land Use and Planning
Pro¡,>ram Level
Compatibility ,,-ith adjacent land uses both in and out of d1e Overlay Area
Consistency with the City's Land Use Element, Urban Design Element, and Development Intensity
Standards
Proiect Specific
Santa Ana Residential Village and tbe First and Cabn//v Tower SItes
Compatibility with adjacent land uses
Consistency of the proposed project with plafl11illg principles of the Overlay Area
Page f
Mineral Resources
According to the USGS Geologic Survey, there are no minernl resources in the Overlay Area or
project specific sites considered locally or regionally important. Therefore, the ErR for the project
will not evaluate the potential loss of important mineral resources at the program or project-specific
level.
Noise
Program Level
Potential increase in long-term noise in the Overlay Area that may affect local sensitive receptors
Short-term construction related noise and vibration
Compliance with the City's Environmental Health and Safety Element
Project Specific
Santa Ana Residential Village and the First and Cabrillo TowerSites
Potential increase in long-term noise from the project sites that may affect local sensitive receptors
Short-term construction-related noise and vibration at the project sites
Compliance with the City's Environmental Health and Safety Element
Population and Housing
Pro['!am Level
Potential effect of displacing existing housing
Potential impact on population growth in Overlay Area
Potential impact on housing demand
Consistency with the City's Housing and Economic Development Elements
Project Snecific
Santa Ana ReJidentia/ Village and the First and Cabril/o Tower Sites
Potential direct effect on population growth of the proposed project
Consistency with the City's Housing and Economic Development Elements
Public Services
Pro¡:ram Level
Potential effect on fire and police protection services
Potential effect on schools
Potentia] effect on existing parks serving the area
Project Specific
Santa Ana Re.lidentza/ ¡"¡¡/age and the f'zrJt and Cabri/lo Tower SiteJ
Potentia] effect on Ene and police protection services
Potentia] effect on schools through increase in residential units
Potentia] effect on eXIsting parks sen-ing the area through porenm] illcrease 111 po}lUbnon
Recreation
I:m..oram Level
Potential impact of increased demand for recreational facilities
Consistency with the Open Space and Recreation Element
Page 9
Project Specific
Santa Ana Residential Village and the First and Cabrilf¡¡ Tower Sites
Potencial impact of increased demand for recreational facilities in and out of the project sites
Transportation and Traffic
Program Level
Long-tenn operational effects on access, parking, and circulation
Potencial impacts from vehicle trips on local intersections and the regional highway netWork
Potencial effects on the demand for parking
Consistency with the City's Circulation Element and Growth Management Element
Project Specific
Santa Ana Residential Village and the First and Cabrillo Tower Sites
Potencial for short-term construction effects on vehicle queuing, access, parking and circulation
Long-term operational effects on access, parking, and circulation
Potencial impacts from vehicle trips on local intersections and the regional highway netWork
Potencial effects on the demand for parking
Utilities and Service Systems
Pro¡>Lam Level
Potencial effects of increased development on utility conveyance systems, including: wastewater and
water treatment, water supply, storm water drainage facilities, solid waste disposal, electricity and
natural gas
Proiect Specific
Santa Ana Residential Vii/age and the First and Cabnllo Tower Sites
Potencial effects of utility infrastructure improvements and physical amenities, such as a pool, and
other water quality /water supply facilities.
Potencial effects of incremental extensions of water and wastewater infrastructure
Potencial effects of altering the existing drainage pattern at the site and additional runoff that could
exceed the capacity of existing storm water systems
Potencial effect of increased water demands resulting from new residential and commerCIal uses (A
warer supply assessment pursuant to SB 610 will be prepared in connection with the Draft ErR.)
Page 10
ATTACHMENT 2
FIGURE 1- REGIONAL AND VICINITY MAP
Page 11
EIP
I FIGURE 1
I Reaional and Vicinitv MaD
\ 109S:.0; .,
---...-.....
NORTH
NOTTO SCALE
City of Santa Ana