ZONING ADMINISTRATOR ACTION 94-004
DESIGN REVIEW 94-020
JUNE 20, 1994
The Zoning Administrator of the City of Tustin does
4 hereby resolve as follows:
5 I.
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
The Zoning Administrator finds and determines as
follows:
A. That a proper application, Design Review 94-
020, was filed by Alton Geoscience on behalf
of Mobil oil Corporation to permit the
location of soil remediation equipment at the
gasoline service station located at 17241
Irvine Boulevard.
B. That establishment, maintenance, and operation
of the use applied for will not, under the
circumstances of this case, be detrimental to
the health, safety, morals, comfort, or
general welfare of the persons residing or
working in the neighborhood of such proposed
use, nor to the general welfare of the city of
Tustin as evidenced by the following findings:
1. The removal and treatment of contaminated
vapors in the soil from the property
located at 17241 Irvine Boulevard is a
necessary process required by public
health care agencies. Removing
contaminates from the soil will benefit
the environment, thus enhancing the
health, safety, morals, comfort, or
general welfare of the persons residing
or working in the neighborhood of the
temporary soil remediation equipment.
2 . The installation of the extraction and
treatment equipment to be located on the
subject site is temporary and will be
removed upon completion of the process.
The temporary equipment will be located
approximately 240 feet from the nearest
residentially zoned property. Potential
adverse impacts related to aesthetic,
noise or general safety of the temporary
location of the equipment will be
mitigated by Conditions of Approval
referred to herein as Exhibit A. The
installation and operation of the soil
remediation equipment is subject to
monitoring by the Orange County Health
Care Agency, the South Coast Air Quality
Zoning Administrator Action 94-004
Page 2
1
2
Management District, and the Orange
County Fire Department.
3
C.
That the proposed project is categorically
exempt (Class 1) pursuant to the California
Environmental Quality Act 15301.
4
5 II. The Zoning Administrator hereby approves Design
Review 94-020 to permit the location of soil
6 remediation equipment at the gasoline service
station located at 17241 Irvine Boulevard, subject
7 to the conditions contained in Exhibit A, attached
hereto.
8
PASSED AND ADOPTED at a regular meeting of the Tustin
9 Zoning Administrator, held on the 20th day of June, 1994.
10
12
13
14 BARBARA RE~
15
16 Recording Secretary
17 STATE OF CALIFORNIA )
COUNTY OF ORANGE )
18 CITY OF TUSTIN )
CHRISTINE A. SHI
Zoning Administ
11
19 I, BARBARA REYES, the undersigned, hereby certify that I
am the Recording Secretary of the Zoning Administrator of
20 the city of Tustin, California; that Zoning Administrator
Action No. 94-004 was duly passed and adopted at a
21 regular meeting of the Tustin Zoning Administrator, held
on the 20th day of June, 1994.
22
:: ~~yt!r--
Recording Secretary
25
26
27
28
EXH:IB:IT A
ZON:ING ADM:IN:ISTRATOR ACT:ION 94-004
CONDITIONS OF APPROVAL
DESIGN REVIEW 94-020
JUNE 20, 1994
GENERAL
(1) 1.1 The proposed project shall substantially conform with the
submitted plans dated stamped June 20, 1994 on file with
the Community Development Department as herein modified
or as modified by the Director of Community Development
in accordance with this Exhibit.
(1) 1.2 Unless otherwise specified, the conditions contained in
the Exhibit shall be complied with prior to the issuance
of any building permits for the project, subject to
review and approval by the Community Development
Department.
(1) 1.3 Design review approval shall become null and void unless
all building permits are issued within eighteen (18)
months of the date of this Exhibit.
(1) 1.4 The applicant shall sign and return an Agreement to
Conditions Imposed form prior to issuance of building
permits.
(1) 1.5 The applicant and property owner shall hold harmless and
defend the City of Tustin for all claims and liabilities
arising out of the city's approval of the entitlement
process for this project.
(1) 1.6 All equipment related to the vapor extraction process
shall be removed within thirty days of completion of the
extraction and treatment process. This permit shall be
valid for a period of time not to exceed 12 months from
the date that building permits are issued. An extension
may be granted by the Zoning Administrator should the
extraction process require additional time. said
extension request shall be made to the Community
Development Department at least 30 days prior to the
expiration of the terms of this Design Review.
SOURCE CODES
(1) STANDARD CONDITION
(3) UNIFORM BUILDING CODE/S
(5) RESPONSIBLE AGENCY
(7) PC/CC POLICY
*** EXCEPTION
(2) CEQA MITIGATION
(4) DESIGN REVIEW
(6) LANDSCAPING GUIDELINES
Exhibit A - Zoning Administrator Action 94-004
Design Review 94-020
Page 2
(3)
(3)
(5)
PLAN SUBMITTAL
2.1 At building plan check submittal:
A.
structural calculations and details for the support
of the 500 gallon vertical propane tank.
B.
Preliminary technical detail and plans for all
utility installations including water and
electricity. Additionally, a note on plans shall
be included stating that no field changes shall be
made without corrections submitted to and approved
by the Building Official. Requirements of the
Uniform Building Plumbing, Mechanical and
Electrical Codes shall be complied with as approved
by the Building Official.
C.
Information to ensure compliance with Articles 79
and 82 of the Uniform Fire Code and all
requirements of the Orange County Fire Department
pertaining to treatment and handling of flammable,
volatile and/or hazardous substances, including but
not limited to the following:
1. Soil remediation tanks shall be self-contained
in design to accommodate 100% of contents in
event of a leak/spill.
2 . All dispensing systems shall be secure and
meet Fire Marshall standards.
3. All pumps shall be U.L. approved.
4. The applicant shall provide the following
written notifications:
a. Anticipated start-up and completion
dates, prior to commencement of
operations; and
b. Actual completion of operations.
5. The applicant shall obtain applicable permits
for hazardous operations.
6. The applicant shall file all applicable
hazardous material disclosure statements with
the Fire and Health Departments.
Exhibit A - Zoning Administrator Action 94-004
Design Review 94-020
Page 3
(5)
The six (6) crash poles surrounding the 500 gallon
vertical propane tank shall be six inches (6") in
diameter, and shall be a minimum of four feet
(4')above grade with an additional four feet (4')
deep -footing.
SITE AND BUILDING CONDITIONS
D.
(2) 3.1 Note on plans that all openings in the fence enclosure
(4) shall be locked.
(2) 3.2 The 500 gallon vertical propane tank shall be painted
white.
(2) 3.3 The applicant shall install muffling devices to meet City
Noise Ordinance requirements prior to operation of the
soil remediation equipment. Immediately upon
installation the applicant shall perform a 24 hour noise
test to verify that the muffled equipment complies with
the City's Noise Ordinance requirements for commercially
zoned property of 60 dBa at any time (Section 4614(a)).
since the equipment will be approximately 240 feet from
residential properties, the applicant shall be required
to meet the Ci ty' s Noise Ordinance requirements for
residentially zoned property of 55 dBa during the day and
50 dBa at night in the event of complaints from nearby
property owners and/or tenants. Prior to operation of
the soil remediation equipment, the applicant shall post
a deposit of $250 to cover the cost of one additional
noise test by the City Noise Consultant. The cost of
further testing shall be absorbed by the applicant.
*** 3.4 A minimum 24 inch X 24 inch sign noting a telephone
number wi th hours of operation for complaints on the
vapor recovery extraction system shall be provided on the
existing fence enclosure proposed for the equipment.
(4) 3.5 The chain link fence with white slats shall be increased
to 8' 0" in height to visually screen the soil remediation
equipment.
Exhibit A - Zoning Administrator Action 94-004
Design Review 94-020
Page 4
FEES
(1) 4.1 All building permit and plan check issuance fees shall be
paid to the Community Development Department prior to
building permit issuance.
(1) 4.2 within 48 hours of approval of the subject project, the
applicant shall deliver to the Community Development
Department, a cashiers check payable to the COUNTY CLERK,
in the amount of $25.00 to enable the city to file with
the County Clerk, the appropriate environmental
documentation pursuant to the California Environmental
Quality Act. If within such 48 hours period, the
applicant has not delivered to the Community Development
Department the above noted check, the approval for the
project granted herein shall be considered automatically
null and void.