The Zo:ning Administrator of the City of Tustin does
4 hereby'resolve as follows:
5 I.
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
The Zoning Administrator finds and determines as
follows:
A. That a proper application, Design Review 94-
036, was filed by Delta Environmental
Consultants, Inc. on behalf of Exxon
Corporation to permit the location of soil
remediation equipment at the gasoline service
station located at 14082 Redhill Avenue.
B. That establishment, maintenance, and operation
of the use applied for will not, under the
circumstances of this case, be detrimental to
the health, safety, morals, comfort, or
general welfare of the persons residing or
working in the neighborhood of such proposed
use, nor to the general welfare of the City of
Tustin as evidenced by the following findings:
1. The removal and treatment of contaminated
vapors in the soil from the property
located at 14082 Redhill Avenue is a
necessary process required by public
health care agencies. Removing
contaminates from the soil will benefit
the environment, thus enhancing the
health, safety, morals, comfort, or
general welfare of the persons residing
or working in the neighborhood of the
temporary soil remediation equipment.
2 . The installation of the extraction and
treatment equipment to be located on the
subj ect site is temporary and will be
removed upon completion of the process.
Potential adverse impacts related to
aesthetic, noise or general safety of the
temporary location of the equipment will
be mitigated by Conditions of Approval
referred to herein as Exhibit A. The
installation and operation of the soil
remediation equipment is subject to
monitoring by the Orange County Health
Care Agency, the South Coast Air Quality
Management District, and the Orange
County Fire Department.
Zoning Administrator Action 94-019
Page 2
1
c.
That the proposed project is categorically
exempt (Class 1) pursuant to the California
Environmental Quality Act 15301.
2
3
D.
That this project has been reviewed for
consistency with the Air Quality Sub-Element
of the ci ty of Tustin General Plan and has
been determined to be consistent or has been
conditioned to be consistent with the Air
Quality Sub-Element.
4
5
6
7 II. The Zoning Administrator hereby approves Design
Review 94-036 to permit the location of soil
8 r~mediation equipment at the gasoline service
station located at 14082 Redhill Avenue, subject to
9 the conditions contained in Exhibit A, attached
hereto.
10
PASSED
11 Zoning
1994.
12
13
14
15
16
AND ADOPTED at a regular meeting of the Tustin
Administrator, held on the 5th day of December,
CHRISTINE A. SHIN
Zoning Administr
17 ~d~ il - ~
18 BARBARA REYE:~-
Recording Secretary
19
STATE OF CALIFORNIA
20 COUNTY OF ORANGE
CITY OF TUSTIN
21
26
I, BARBARA REYES, the undersigned, hereby certify that I
am the Recording Secretary of the Zoning Administrator of
the City of Tustin, California; that Zoning Administrator
Action No. 94-019 was duly passed and adopted at a
regular meeting of the Tustin Zoning Administrator, held
on the 5th day of December, 1994.
~<~~
BARBARA REYES
Recording Secretary
22
23
24
25
27
28
EXHIBIT A
ZONING ADMINISTRATOR ACTION 94-019
CONDITIONS OF APPROVAL
DESIGN REVIEW 94-036
DECEMBER 5, 1994
GENERAL
(1) 1.1 The proposed project shall substantially conform with the
submitted plans dat~ stamped December 5, 1994 on file
with the Community Development Department as herein
modified or as modified by the Director of Community
Development in accordance with this Exhibit.
(1) 1.2 Unless otherwise specified, the conditions contained in
the Exhibit shall be complied with prior to the December
9, 1994 expiration of the Temporary Use Permit for the
vapor extraction equipment, subject to review and
approval by the Community Development Department.
(1) 1.3 The applicant shall sign and return an Agreement to
Conditions Imposed form prior to the December 9, 1994
expiration of the Temporary Use Permi t for the vapor
extraction equipment.
(1) 1.4 The applicant and property owner shall hold harmless and
defend the City of Tustin for all claims and liabilities
arising out of the City's approval of the entitlement
process for this project.
(1) 1.5 All equipment related to the vapor extraction process
shall be removed within thirty days of completion of the
extraction and treatment process. This approval shall be
valid for a period of time not to exceed 12 months from
the date of this Exhibit. An extension may be granted by
the Zoning Administrator should the extraction process
require additional time. Said extension request shall be
made to the Community Development Department at least 30
days prior to the expiration of the terms of this Design
Review.
(1) 1.6 All required approvals shall be obtained from the Orange
County Health Care Agency, .Fire Department, South Coast
Air Quality Management District and the California Water
Quality Control Board.
SOURCE CODES
(1)
(3)
(5)
(7)
***
STANDARD CONDITION
UNIFORM BUILDING CODE/S
RESPONSIBLE AGENCY
PC/CC POLICY
EXCEPTION
(2)
(4)
(6)
CEQA MITIGATION
DESIGN REVIEW
LANDSCAPING GUIDELINES
Exhibit A - .Zoning Administrator Action 94-019
Design Review 94-036
Page 2
SITE AND BUILDING CONDITIONS
(2) 2.1 A note shall be provided on the plans submitted to plan
(4) check that "all openings in the fence enclosure shall be
locked."
(2) 2.2 If necessary, the applicant shall install muffling
devices to meet City Noise Ordinance requirements prior
to operation of the soil remediation equipment.
Immediately upon installation the applicant shall perform
a 24 hour noise test to verify that the equipment
complies wi th the ci ty' s Noise Ordinance requirements for
commercially zoned property of 60 dBa at any time
(Section 4614(a)). Since the equipment will be
approximately fifty (50) feet from residential property,
the applicant shall be required to meet the City's Noise
Ordinance requirements for residentially zoned property
of 55 dBa during the day and 50 dBa at night in the event
of complaints from nearby property owners and/ or tenants.
The previously posted deposit of $250 shall be held by
the City to cover the cost of one additional noise test
by the ci ty Noise Consul tant, if needed. The cost of any
further testing shall be absorbed by the applicant.
*** 2. 3 A minimum 24 inch X 24 inch sign noting a telephone
number wi th hours of operation for complaints on the
vapor recovery extraction system shall be provided on the
existing fence enclosure proposed for the equipment.
(4) 2.4 A chain link fence with tan slats shall be maintained to
a height of 6'0" to visually screen the soil remediation
equipment.
FEES
(1) 3.1 Within 48 hours of approval of the subject project, the
applicant shall deliver to the Community Development
Department, a cashiers check payable to the COUNTY CLERK,
in the amount of $25.00 to enable the City to file with
the County Clerk, the appropriate environmental
documentation pursuant to the California Environmental
Quality Act. If within such 48 hours period, the
applicant has not delivered to the Community Development
Department the above noted check, the approval for the
project granted herein shall be considered automatically
null and void.