AG E N DA R E P O RT Ree eweld m os
City Manager Ub
Finance Director L:L4
MEETING DATE: OCTOBER 19, 2021
TO: MATTHEW S. WEST, CITY MANAGER
FROM: DOUGLAS S. STACK, DIRECTOR OF PUBLIC WORKS/CITY ENGINEER
SUBJECT: ADOPT RESOLUTION NO. 21-90 TO ACCEPT IMPROVEMENTS FOR THE
FISCAL YEAR 2020-2021 ROADWAY REHABILITATION AND SIDEWALK
REPAIR PROJECT, ZONE 2, CIP NO. 70020 AND AUTHORIZE THE CITY
ENGINEER TO FILE A NOTICE OF COMPLETION
SUMMARY
Construction of the Fiscal Year 2020-2021 Roadway Rehabilitation and Sidewalk Repair Project,
Zone 2 (CIP No. 70020), has been completed to the satisfaction of the City Engineer and is now
ready for City Council acceptance.
RECOMMENDATION
It is recommended that the City Council take the following actions:
1. Adopt Resolution No. 21-90 accepting the construction of the Fiscal Year 2020-2021
Roadway Rehabilitation and Sidewalk Repair Project, Zone 2 (CIP No. 70020); and
2. Authorize the City Engineer to execute and file the Notice of Completion with the Orange
County Recorder's Office.
FISCAL IMPACT
The final construction cost for the Fiscal Year 2020-2021 Roadway Rehabilitation and Sidewalk
Repair Project, Zone 2 (CIP No. 70020) is $1,727,004.29, including a change order for $66,004.29
for additional street rehabilitation and sidewalk added to the scope of work. Sufficient funds were
budgeted and appropriated in the Capital Improvement Program. The project is part of the City's
ongoing Maintenance of Effort (MOE) obligation to maintain eligibility for Renewed Measure M (M2)
funding and is funded through a combination of General Fund, Measure M2 Fair Share, and Gas
Tax.
CORRELATION TO THE STRATEGIC PLAN
Rehabilitation of roadways and repair of sidewalks contribute to the fulfillment of the City's Strategic
Plan Goal B: Public Safety and Protection of Assets. Specifically, the project implements Strategy
#5, which among other items, is to ensure continuous maintenance and improvement of public
facilities.
DISCUSSION
On April 6, 2021, the City Council authorized the award of a construction contract to Onyx Paving
Company. The Fiscal Year 2020-2021 Roadway Rehabilitation and Sidewalk Repair Project, Zone
2 (CIP No. 70020) consisted of asphalt concrete pavement repair, asphalt concrete overlay, slurry
sealing, traffic striping, and removal and replacement of curb ramps to meet current federal
DocuSign Envelope ID:4ABF8B99-456E-4E76-BAA2-3644DBA66AA4
Notice of Completion Fiscal Year 2020-2021 Roadway Rehabilitation and
Sidewalk Repair Project,Zone 2, CIP No. 70020
October 19, 2021
Page 2
Americans with Disabilities Act (ADA) requirements on various streets within Zone 2 of the City's
Pavement Management Program. The City is divided into seven pavement zones with one zone
targeted each year for pavement maintenance. The current phase, Zone 2 (see attached map), is
generally bounded by Irvine Boulevard to the north, Newport Avenue to the east, OCTA/SCRRA
railroad to the south, and City boundary to the west. The project also includes citywide sidewalk
repair which focuses on removal and replacement of damaged sidewalk at numerous locations
throughout the City based on an annual field survey conducted by the Engineering Division.
Vectowpublic
tack, P.E.
Works/City Engineer
Attachment(s):
1. Resolution No. 21-90
2. Location Map
DocuSign Envelope ID:4ABF8B99-456E-4E76-BAA2-3644DBA66AA4
ATTACHMENT 1
Resolution No. 21-90
DocuSign Envelope ID:4ABF8B99-456E-4E76-BAA2-3644DBA66AA4
RESOLUTION NO. 21-90
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUSTIN,
CALIFORNIA, ACCEPTING THE WORKS OF IMPROVEMENT AND
AUTHORIZING THE RECORDATION OF THE NOTICE OF
COMPLETION FOR THE FY 2020-21 ROADWAY REHABILITATION
AND SIDEWALK REPAIR PROJECT, ZONE 2 (CIP NO. 70020)
WHEREAS, Onyx Paving Company, having a contract with the City of Tustin to
construct the hereinafter described public works and improvement; and
WHEREAS, the City Engineer has duly certified to the construction and
completion of said public improvement hereinafter mentioned in a manner satisfactory
to the City Council of the City of Tustin; and
WHEREAS, the City Council finds that said contractor has completed said public
improvement hereinafter more particularly described in accordance with the provisions
of the contract documents and the Notice of Completion, and acceptance of said public
works and improvement should be filed and payment of the balance due said contract
authorized in accordance with the contract documents;
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Tustin
that said public works and improvement is found to be complete, and the same is
hereby accepted. Said public works and improvement is more particularly described as
follows:
FY 2020-21 Roadway Rehabilitation and Sidewalk Repair Project, Zone 2
(CIP NO. 70020)
BE IT FURTHER RESOLVED that the City Engineer of the City of Tustin is
hereby authorized to execute and file a Notice of Completion for the acceptance of said
public works and improvement described herein as required by law.
PASSED AND ADOPTED at a regular meeting of the City Council of the City of
Tustin held on the 19th day of October, 2021 .
LETITIA CLARK
Mayor
ATTEST:
ERICA N. YASUDA,
City Clerk
Resolution 21-90
Page 1 of 2
DocuSign Envelope ID:4ABF8B99-456E-4E76-BAA2-3644DBA66AA4
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) SS
CITY OF TUSTIN )
I, Erica N. Yasuda, City Clerk and ex-officio Clerk of the City Council of the City of
Tustin, California, do hereby certify that the whole number of the members of the City
Council is five; that the above and foregoing Resolution No. 21-90 was duly and
regularly passed and adopted at a regular meeting of the City Council held on the 19th
day of October, 2021 by the following vote:
COUNCILMEMBERS AYES:
COUNCILMEMBERS NOES:
COUNCILMEMBERS ABSTAINED:
COUNCILMEMBERS ABSENT:
ERICA N. YASUDA,
City Clerk
Resolution 21-90
Page 2 of 2
DocuSign Envelope ID:4ABF8B99-456E-4E76-BAA2-3644DBA66AA4
ATTACHMENT 2
Location Map
DocuSign Envelope ID:4ABF8B99-456E-4E76-BAA2-3644DBA66AA4
City of Tustin, CA
Citywide Zones
1 >
4 ` W z 1 r+ AV
-rr
qNo BERG LN
/
HEM Mf /
1 � /
1 � •1 �HANNAF OR �/
I O
i ¢¢ WARRENAV
j4MAG SE�WyT °'•—•—; r i j p
c /
1
RVINE BLVD IRYJGF 94Yfl %" @ST 3I O
f••E.FI STS Q RSTS ?� C `.. ,� \• AT Q.
CONLL I
< q
AIN .� IN
Slx I T P 9�,0 �' • �Zy O
NrsgGN
• � � ¢ Rom ,c �@ 1�.v4 �°P � P�0
o
Mc DEN A P OB SON DR
o@ih-
•
I @qR1-9�( 9 GT ( E •gyp �"O q F
OR , RF
P y P
Io
Gy, F e o"F
o
,I• y � TRW 0 s 2� <<Fo .•�� P`S
O Fp
IENCIAAV �` p
Oo L�
�o
�5
P�
Legend
e c
Zone
B°BEER
�o 2
�� •` P
N i._.._.._i 4
i._.._. 1 5
W E 1._.._.._i 6
i._.._.._i 7
S Centerline
City of Tustin , CA
Citywide Zones Map JulyArcGIS 10.1 Bucknam&Associates
July 2013
Source:City of Tustin AutoCAD Dwg
Created in ArcGIS 10.1 using ArcMap