ZONING ADMINISTRATOR ACTION 99-006
DESIGN REVIEW 99-010
3
The Zoning Administrator of the City of Tustin does hereby resolve as follows:
4
I.
5
6
7
8
9
10
II
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
The Zoning Administrator finds and determines as follows:
A.
That a proper application for Conditional Use Permit 99-010 was filed by
PairGain Technologies, Inc., requesting authorization to temporarily locate
five module structures in the parking lot on the south side of the building at
the property located at 14352 Franklin Avenue for a maximum of six
months.
B.
Pursuant to City Code Section 9299b(3), the Zoning Administrator has the
authority to approve a temporary use not to exceed six months through a
conditional use permit.
C.
That a public hearing was duly called, noticed and held on said application
on June 21, 1999 by the Zoning Administrator.
D.
That the establishment, maintenance and operation off the use applied for
will not, under the circumstances of this case, be detrimental to the health,
safety, morals, comfort, or general welfare of the persons residing or
working in the neighborhood of such proposed use, nor be injurious or
detrimental to the property and improvements in the neighborhood of the
subject property, or to the general welfare of the City of Tustin, as
evidenced by the following findings:
1 )
The proposed temporary use, as conditioned, will not be
detrimental to the surrounding properties in that placement of
the modular structures will incorporate City standards
ensuring proper screening and vehicular and pedestrian
circulation.
2)
As conditioned, the use will not have a negative effect on the
surrounding property owners, or impact the availability of off-
street parking in that the required parking will be satisfied by
the off-street parking on-site and at the parking lot at 14381
Franklin Avenue. The temporary elimination of fifteen (15) on-
site parking spaces would not impact the site or surrounding
properties.
E.
That this project is Categorically Exempt from the requirements of the
California Environmental Quality Act, pursuant to Section 15301 (Class 1).
F.
That the project has been reviewed for consistency with the Air Quality Sub-
element of the City of Tustin General Plan and has been determined to be
consistent with the Air Quality Sub-element.
Zoning Administrator Action 99-006
Conditional use Permit 99-010
June 21, 1999
Page 2
2
3
II.
The Zoning Administrator hereby approves Conditional Use Permit No. 99-010
authorizing the temporary location of five modular structures in the parking lot
south of the building at the property located at 14352 Franklin Avenue for a period
of six months, subject to the conditions contained within Exhibit A, attached hereto.
4
5
6
7
PASSED AND ADOPTED by the Zoning Administrator of the City of Tustin at a regular
meeting held on the 21't day of June, 1999.
8
9
&i'rJ4~~~
ELIZABETH A. BINSACK
Zoning Administrator
10
11
12
~~ ??bd:J
KATH ARTIN
Recording Secretary
13
14
15
STATE OF CALIFORNIA)
COUNTY OF ORANGE )
CITY OF TUSTIN )
16
17
I, KATHY MARTIN, the undersigned, hereby certify that I am the Recording Secretary of
the Zoning Administrator of the City of Tustin, California; that Zoning Administrator Action
No. 99-006 passed and adopted at a regular meeting of the Tustin Zoning Administrator,
held on the 21 st day of June, 1999.
18
19
20~
21 ~~/
KATH A TIN
22 Recording Secretary
23
24
25
26
27
28
29
EXHIBIT A
ZONING ADMINISTRATOR ACTION 99-006
CONDITIONS OF APPROVAL
CONDITIONAL USE PERMIT 99-010
GENERAL
(1) 1.1 The proposed use shall substantially conform with the submitted plans for
the project date stamped June 21, 1999, on file with the Community
Development Department, except as herein modified, or as modified by the
Director of Community Development in accordance with this Exhibit. The
Director of Community Development may also approve minor modifications
to plans during plan check if such modifications are to be consistent with the
provisions of the Tustin City Code and other applicable codes.
(1) 1.2 Unless otherwise specified, the conditions contained in this Exhibit shall be
complied with as specified or prior to the issuance of any building permits
for the project, subject to review and approval by the Community
Development Department.
(1) 1.3 The Conditional Use approval shall become null and void within twelve (12)
months of the date of this exhibit. Time extensions may be granted by the
Zoning Administrator if a written request is received by the Community
Development Department within thirty (30) days prior to expiration.
(1) 1.4 Approval of Conditional Use Permit 99-010 is contingent upon the applicant
signing and returning an "Agreement to Conditions Imposed" form as
established by the Director of Community Development.
(1) 1.5 The applicant shall hold harmless and defend the City of Tustin from all
claims and liabilities arising out of a challenge of the City's approval of this
project.
PLAN SUBMITTAL
(3) 2.1 At building plan check, submit four (4) sets of construction plans. The
construction plans shall include a dimensioned site plan showing all existing
and proposed improvements. The construction plans shall also include
specifications and materials call-outs on all elevations with applicable
details and notes added. No field changes shall be made without
corrections submitted to and approved by the Community Development
Department.
SOURCE CODES
(1)
(2)
(3)
(4)
STANDARD CONDITION
CEQA MITIGATION
UNIFORM BUILDING CODE/S
DESIGN REVIEW
(5)
(6)
(7)
***
RESPONSIBLE AGENCY REQUIREMENT
LANDSCAPING GUIDELINES
PC/CC POLICY
EXCEPTION
Exhibit A
Conditions of Approval
Conditional use Permit 99-010
June 21, 1999
Page 4
(1) 2.2 At the time of building permit application, the plans shall comply with the
most currently adopted Uniform Building Code, other related codes, City
Ordinances, and State and Federal laws and regulations.
USE RESTRICTIONS
(1) 3.1 This Conditional Use Permit shall expire six (6) months from June 28, 1999.
The applicant shall remove the five modular structures by December 29,
1999.
(1) 3.2 Only office activities shall be permitted within the modular structures.
(1) 3.3 All construction operations, including engine warm-up and deliveries of
materials and equipment, shall be subject to the provisions of the Tustin
Noise Ordinance and shall take place only between the hours of 7:00 a.m.
and 6:00 p.m., Monday through Friday, and between 9:00 a.m. and 5:00
p.m. on Saturday, unless otherwise determined by the Building Official.
FEES
(1) 4.1 Prior to the issuance of any building permits, payment shall be made of all
applicable building and Orange County Fire Authority plan check and permit
fees to the Community Development Department, based on the most
current fee schedule.
(1,5) 4.2 Within forty eight (48) hours of approval of the subject project, the
applicant shall deliver to the Community Development Department, a
cashier check payable to the COUNTY CLERK in the amount of $38.00
(thirty eight dollars) to enable the City to file the appropriate environmental
documentation for the project. If within such forty eight (48) hours period
that applicant has not delivered to the Community Development
Department the above noted check, the statute of limitations for any
interested party to challenge the environmental determination under the
provisions of the California Environmental Quality Act could be
significantly lengthened.