Loading...
HomeMy WebLinkAbout13 SPECS & BID PASADENA AVE 07-17-06AGENDA REPORT MEETING DATE: JULY 17, 2006 TO: WILLIAM A. HUSTON, CITY MANAGER FROM: PUBLIC WORKS DEPARTMENT/ WATER SERVICES DIVISION SUBJECT: APPROVAL OF SPECIFICATIONS AND AUTHORIZATION TO SOLICIT BIDS FOR DRILLING OF PASADENA AVENUE WELL (CIP No. 6130) SUMMARY The proposed project would pump local groundwater to meet a portion of the domestic retail water demands within Tustin's water service area. Specifications for the drilling phase of the Pasadena Avenue Well (CIP No. 6130) have been prepared; the project is now ready to be bid. RECOMMENDATION It is recommended that the City Council adopt Resolution No. 06-88, approving specifications for drilling the Pasadena Avenue Well (CIP No. 6130), and authorizing/directing the City Clerk to advertise and solicit bids from qualified firms to drill a new well. FISCAL IMPACT The Fiscal Year 2006-07 Water Capital Improvement Program (WCIP) provides $2,132,184 for the drilling and construction/equipping phases of the Pasadena Avenue Well Project (CIP No. 6130). The estimated cost for the drilling phase is $800,200.00. Council authorization to solicit bids for the construction and equipping of the Pasadena Well will be requested by staff after the drilling phase Is completed. BACKGROUND The proposed project involves two phases i.e., drilling and constructing/equipping a new well and related appurtenances to pump groundwater that will satisfy part of Tustin's domestic water demands. The well will be housed in a 1 ,450 square foot structure surrounded by landscaped grounds. A Mitigated Negative Declaration for the project has been adopted by the City Council per the California Environmental Quality Act. The two phases include: 1) Drillina Phase -This phase involves drilling a hole into the ground until the aquifer is penetrated. The new well would be drilled to a depth of 1,200 feet. The drilled hole is stabilized with alternating sections of solid and perforated stainless steel casing. The perforations maintain the integrity of the hole while allowing water to flow through it. The well is then tested to determine its pumping capacity. The test data is used to design the pump and other ancillary equipment installed during the construction phase. 2) Construction and Eauiooina Phase - This phase includes construction of a block building to secure the well and reduce noise associated with well operation. This phase also includes the installation of various equipment including the well pump, electrical motor, disinfection system, well discharge and drain piping, electrical, instrumentation and emergency generator. Project site landscaping would be installed as well during this phase. The tentative schedule for the project drilling phase is as follows: Authorization to Advertise for Bids....................................................... 07/17/06 First Legal Advertisement....................................................................08/03/06 Second Legal Advertisement............................................................... 08/10/06 Bid Opening.......................... ............................................. .............. .... 09/07/06 Award of Drilling Contract.................................................................... 09/18/06 Start Drilling........................... ........ ........ .............................................. 11120/06 Complete Drilling .................................................................... .............02103/07 Tim D. Serlet Director of Public Works/City Engineer , RESOLUTION NO. 06-88 A RESOLUTION OF THE CITY COUNCil OF THE CITY OF TUSTIN, CALIFORNIA APPROVING SPECIFICATIONS FOR DRilLING OF PASADENA AVENUE WEll (CIP NO. 6130) AND AUTHORIZING ADVERTISEMENT FOR BIDS WHEREAS, it is the intention of the City Council of the City of Tustin, California to contract for the drilling of Pasadena Avenue Well (CIP No. 6130); and WHEREAS, the City Engineer has presented technical specifications for the drilling said work; and WHEREAS, on July 17, 2006, the Tustin City Council adopted Resolution No. 06-79 which approved the Final Mitigated Negative Declaration for Pasadena Avenue Well Site Project (CIP 6130) and adopted a Mitigation Monitoring and Reporting Program pursuant to the California Environmental Quality Act; and NOW, THEREFORE, BE IT RESOLVED that the specifications presented by the City Engineer and hereby approved as the drilling specifications for; Pasadena Avenue Well Project (CIP No. 6130) BE IF FURTHER RESOLVED that the City Clerk is hereby authorized and directed to advertise as required by law for the receipt of sealed bids or proposals for the performance of the work specified in the aforesaid specifications; PASSED AND ADOPTED at a regular meeting of the City Council of the City of Tustin held on the 1ih day of July 2006. Doug Davert, Mayor ATTEST: City Clerk