Loading...
HomeMy WebLinkAbout13 APPROVE A NEGOTIATED CHANGE ORDER AND AUTHORIZE THE REMAINING PROJECT BUDGETED APPROPRIATION AS ADDITIONAL CONTINGENCY FOR THE NEWPORT AVENUE PAVEMENT REHABILITATION PROJECTDocuSign Envelope ID: 79268796-7620-44CD-A6D2-5682707D1ADA REPORT Reveweld m 13 AGENDA City Manager nB Finance Director Sa MEETING DATE: JUNE 7, 2022 TO: MATTHEW S. WEST, CITY MANAGER FROM: DOUGLAS S. STACK, DIRECTOR OF PUBLIC WORKS/CITY ENGINEER SUBJECT: APPROVE A NEGOTIATED CHANGE ORDER AND AUTHORIZE THE REMAINING PROJECT BUDGETED APPROPRIATION AS ADDITIONAL CONTINGENCY FOR THE NEWPORT AVENUE PAVEMENT REHABILITATION PROJECT BETWEEN 1-5 AND HOLT AVENUE (CIP NO. 70244) AND SYCAMORE AVENUE AND 1-5 (CIP NO. 70245) SUMMARY Staff is requesting the City Council approve a negotiated contract change order in the amount of $152,158 and authorize the remaining budgeted appropriation in excess of ten percent (10%) of the contract amount as additional contingency for the Newport Avenue Pavement Rehabilitation Project between 1-5 and Holt Avenue (CIP No. 70244) and Sycamore Avenue and 1-5 (CIP No. 70245). RECOMMEN ATION It is recommended that the City Council: 1. Approve a negotiated contract change order in the amount of $152,158 with R.J Noble Company; and 2. Authorize the remaining project budgeted appropriation in excess of ten percent (10%) above the contract amount as additional contingency. FISCAL IMPACT Sufficient funds in the amount of $1,900,000 have been appropriated for this project in the FY 2021- 22 Capital Improvement Program budget. Funding is provided through the State Senate Bill 1 (SB1) Local Streets and Roads Program. In a previous action, the City Council awarded a construction contract in the amount of $1,349,811.85 with a project contingency of ten percent. This action will approve a negotiated change order in the amount of $152,158, which is $17,177 above the Council authorized contract contingency and set aside the remaining budgeted appropriation of $398,030 as additional contingency for potential unforeseen conditions that may arise necessary to complete the work within the approved project scope and budget. Upon completion of the work, all remaining funds will be returned to fund balance. CORRELATION TO THE STRATEGIC PLAN Rehabilitation of roadways and repair of sidewalks contributes to the fulfillment of the City's Strategic Plan Goal B: Public Safety and Protection of Assets. Specifically, the project implements Strategy #5, which among other items, is to ensure continuous maintenance and improvement of transportation facilities. ISCUSSION The project covers a 1.43 mile segment of Newport Avenue between Sycamore Avenue and Holt Avenue and includes localized removal and replacement of asphalt concrete pavement failure areas; DocuSign Envelope ID: 79268798-7820-44CD-A6D2-5682707D1ADA Newport Avenue Pavement Rehabilitation Project, CIP Nos. 70244 and 70245 June 7, 2022 Page 2 removal and replacement of damaged curb & gutter and sidewalks; reconstruction of curb ramps to be in compliance with the current federal Americans with Disabilities Act (ADA) requirements; grinding of existing asphalt paving; construction of a new asphalt rubber hot mix (ARHM) overlay; replacement of traffic signal detector loops; replacement of striping and pavement markings; and adjustment of manhole rims and valve boxes to grade. A portion of the work is within Caltrans' right- of-way, requiring work to be performed at night with closure of the southbound 1-5 offramp. On May 18, 2021, the City Council awarded a contract to R.J. Noble Company, Inc. in the amount of $1,349,811.85, at which time an Encroachment Permit Application had already been in process with Caltrans for approximately six months. It was anticipated that approval and issuance of a permit was imminent but that did not occur for another seven months, occurring in the winter when weather and temperatures are not conducive to asphalt paving. Work is ready to commence at this time. However, there have been significant cost escalations in the price of asphalt since the time the contract was awarded over a year ago, primarily due to high crude oil prices. Staff has negotiated a contract change order to adjust the contract unit costs of conventional asphalt concrete and asphalt rubber hot mix (ARHM) in the amount of $152,158.00, based on the estimated quantity of 6,700 tons to be used on the project. All other stipulated bid pricing remains unchanged. The authorized project contingency is $134,981, leaving an unauthorized amount of $17,177 to finalize this change order and a zero balance for contingency. Therefore, it is recommended that the City Council approve the negotiated contract change order in excess of the authorized contingency and authorize the remaining budgeted appropriation for additional contingency thereby utilizing available SB1 Local Streets and Roads program funding specific to this project. [Jou/Stack, P.E. Oicerbt&�of Public Works/City Engineer Attachment: Location Map DocuSign Envelope ID: 79268796-7620-44CD-A6D2-5682707D1ADA CITY OF TUSTIN W Z W —iJ LANE Z o = FIRST STREET Q P� Z W F U Q� �Q0 e'S'y MAIN STREE_�T MAIN STREET 0 Q PROJECT LOCATION J W 6th STREET ��J q Q� QO F� c FFwq y 9< {� SgNTq q nib I� McFADDEN AVENUE WI=I Q I a, — PROJECT (W� LOCATION z! I i> c <I S yc 9���Gco PROJECT NAME: NEWPORT AVENUE PAVEMENT REHABILITATION BETWEEN SYCAMORE AVENUE AND HOLT AVENUE (CIP NOS. 70244 AND 70245)