Agenda Item 8
DS
Reviewed By.A G"" E N ru" yr��ZIJ
City Manager
Finance Director
MEETING DATE: DUNE 20, 2023
TO. MATTHEW S. WEST, CITY MANAGER
FROM: DOUGLAS S. STACK, DIRECTOR OF PUBLIC WORKS/CITY ENGINEER
SUBJECT: APPROVE PLANS AND SPECIFICATIONS AND AUTHORIZE
ADVERTISEMENT FOR BIDS FOR THE RED HILL AVENUE PAVEMENT
REHABILITATION PROJECT BETWEEN SAN JUAN STREET AND MELVIN
WAY, CIP NO. 70220
SUMMARY
The plans and specifications for the Red Hill Avenue Pavement Rehabilitation Project between San
Juan Street and Melvin Way (CIP No. 70220) have been prepared and the project is now ready for
bid.
RECOMMENDATION
It is recommended that the City Council:
Adopt Resolution No. 23-35 approving the plans and specifications for the Red Hill Avenue
Pavement Rehabilitation Project between San Juan Street and Melvin Way (CIP No. 70220)
and;
2. Authorize the City Clerk to advertise to receive bids.
FISCAL IMPACT
Funding in the amount of $1,700,000 has been budgeted and appropriated in the Capital
Improvement Program for construction of the project using SB1 funds (Fund 140) . The total
engineer's estimate is $1,505,274. The project includes an improvement to the pedestrian crossing
at Oiwyn Drive. This component will be funded by AB 2766 Motor Subvention Funds (Fund 133).
Staff will request the City Council appropriate funding at the time the construction contract is
awarded.
CORRELATION TO THE STRATEGIC PLAN
Rehabilitation of roadways and repair of sidewalks contributes to the fulfillment of the City's Strategic
Plan Goal B: Public Safety and Protection of Assets. Specifically, the project implements Strategy
#5, which among other items, is to ensure continuous maintenance and improvement of
transportation facilities.
DISCUSSION AND BACKGROUND
The proposed pavement rehabilitation on Red Hill Avenue includes localized removal and
replacement of asphalt concrete pavement failure areas; removal and replacement of damaged curb
& gutter and sidewalks; reconstruction of curb ramps to be in compliance with the current federal
Americans with Disabilities Act (ADA) requirements; grinding of existing asphalt paving along edge
of roadway; construction of a new asphalt rubber hot mix (ARHM) overlay; replacement of traffic
DocuSign Envelope ID: C4132333-6D58-4518-A322-B70AAF2BOE8F
Red Hill Avenue Pavement Rehabilitation Project
June 20, 2023
Page 2
signal detector loops; replacement of striping and pavement markings; adjustment of manhole rims
and valve boxes to grade; and installation of a pedestrian activated traffic control device at the Olwyn
Drive crosswalk. This project finishes the work along this segment of Red Hill Avenue following the
recently completed median improvements.
The tentative schedule for construction of this project is as follows:
• Authorization to Advertise for Bids.......................................................06/20/2023
® First Legal Advertisement.....................................................................06/22/2023
® Second Legal Advertisement ................................ ............................... 06/29/2023
® Bid Opening......................................................................................... 07/25/2023
® Tentative Award of Contract.................................................................08/22/2022
® Tentative Start Construction............................................................. October 2023
® Tentative Complete Construction..................................................... January 2024
Since this project involves the replacement and repair of existing facilities with minor modifications,
it is Categorically Exempt under California Environmental Quality Act (CEQA) requirements. A
Notice of Exemption has been prepared for the project and will be recorded with the County of
Orange.
§! Stack, P. E.
of Public Works/City Engineer
Attachment(s):
1. Resolution No. 23-35
2. Location Map
DocuSign Envelope ID: C4132333-6D58-4518-A322-B70AAF2BOE8F
ATTACHMENT 1
Resolution No. 23-35
DocuSign Envelope ID: C4132333-6D58-4518-A322-B70AAF2BOE8F
RESOLUTION NO. 23-35
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUSTIN, CALIFORNIA
APPROVING PLANS AND SPECIFICATIONS FOR THE RED HILL AVENUE
PAVEMENT REHABILITATION PROJECT BETWEEN SAN JUAN STREET AND
MELVIN WAY, CIP NO. 70220, AND AUTHORIZING ADVERTISEMENT FOR BIDS
WHEREAS, it is the intention of the City Council of the City of Tustin, California to contract
for the construction of the Red Hill Avenue Pavement Rehabilitation Project between San Juan
Street and Melvin Way, CIP No. 70220; and
WHEREAS, the City Engineer has presented plans and specifications for the construction
of said work; and
WHEREAS, the CIP No. 70220 project is categorically exempt from the requirements of
the California Environmental Quality Act (CEQA); Class 1, Section 15301: Existing Facilities; and
NOW, THEREFORE, BE IT RESOLVED that the plans and specifications presented by
the City Engineer are hereby approved as the plans and specifications for:
Red Hill Avenue Pavement Rehabilitation Project between San Juan Street and Melvin Way
CIP No. 70220
BE IT FURTHER RESOLVED that the City Clerk is hereby authorized and directed to
advertise as required by law for the receipt of sealed bids or proposals for the performance of the
work specified in the aforesaid plans and specifications;
PASSED AND ADOPTED at a regular meeting of the City Council of the City of Tustin
held on the 20t" day of June, 2023.
AUSTIN LUMBARD
Mayor
ATTEST:
ERICA N. YASUDA
City Clerk
DocuSign Envelope ID: C4132333-6D58-4518-A322-B70AAF2BOE8F
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) SS
CITY OF TUSTIN )
I, Erica N. Yasuda, City Clerk and ex-officio Clerk of the City Council of the City of Tustin,
California, do hereby certify that the whole number of the members of the City Council is five; that
the above and foregoing Resolution No. 23-35 was duly and regularly passed and adopted at a
regular meeting of the City Council held on the 2011 day of June, 2023 by the following vote:
COUNCILMEMBER AYES:
COUNCILMEMBER NOES:
COUNCILMEMBER ABSTAINED:
COUNCILMEMBER ABSENT:
ERICA N. YASUDA
City Clerk
DocuSign Envelope ID: C4132333-6D58-4518-A322-B70AAF2BOE8F
ATTACHMENT 2
Location Map
DocuSign Envelope ID: C4132333-6D58-4518-A322-B70AAF2BOE8F
CITY OF TUSTIN
-ji --I
- L-� /Z<�
r RED HILL
LUTHERAN CHURCH
P
�y
syyr ��
9
sy
9
�9
�� 10
0 SCALE
(( a
PROJECT NAME: RED HILL AVENUE PAVEMENT REHABILITATION FROM SAN JUAN STREET TO MELVIN WAY (CIP NO. 70220)