HomeMy WebLinkAboutTustin Water Service 7 Year CIP - Item 9Water Enterprise Capital Planning October 3, 2023 Water Service Overview 2 City of Tustin served by Irvine Ranch Water District City limits served by Tustin Water (approx. 60% of service area) Unincorporated County area served by Tustin Water (approx. 40% of service area) •Population Served: 66,600 •Avg. Production 9.3 MGD •183 Miles of water main •9 Active groundwater wells •7 Storage Reservoirs (13.8 MG) •5 Booster pump stations •7 Imported water connections •5 Inter-agency emergency connections Previous Investments in Water CIP YEAR FACILITY PROJECT DESCRIPTION COST 2008 Pasadena Well New 3000 gpm groundwater production well $4,400,000 2013 Edinger Well New 2000 gpm groundwater production well $7,500,000 2015 Rawlings Reservoirs Replacement of existing reservoir with two (2) prestressed concrete water tanks. Total storage capacity 6 MG $13,700,000 2022 Simon Ranch Reservoir/Booster Pump Station Replacement of existing reservoir with 1.1 MG storage reservoir and 4000 gpm booster pump station and associated pipeline improvements $17,400,000 2023 Beneta Well No. 2 New 1000 gpm groundwater production well ($1.5M grant funding)$6,200,000 est. TOTAL $49,200,000 Investment in Operational and Emergency Storage •6 MG Rawlings Reservoir •1.1 MG Simon Ranch Reservoir •4000 gpm Simon Ranch Booster Pump Station •Total of 7.1 MG operational and emergency storage added Investment in Local Groundwater Pasadena Ave Well •3000 gpm groundwater well •Completed 2008 ($4.4M) Edinger Ave. Well •2000 gpm groundwater well •Completed 2013 ($7.5M) Beneta Ave. Well •1000 gpm groundwater well •Under construction est. completion Q2 ‘24 7-Year Capital Plan – Funding Plan 6 $250,000 $- $100,000 $1,100,000 $1,600,000 $900,000 $100,000 $2,730,551 $650,000 $500,000 $3,000,000 $100,000 $500,000 $600,000 FY2024 FY2025 FY2026 FY2027 FY2028 FY2029 FY2030 Distribution Production Storgae $3.1M $1.15M $1.2M $4.1M $1.6M $0.9M $0.1M 7-Year CIP Projects OC-43 Improvements Replacement of import water connection near Walnut Ave. and Newport Ave. East Orange County Water District lead agency. Approved reimbursement agreement for City owned pipeline and valves within project. Construction complete ($250K) Main Line Replacement Program A continuous maintenance effort to replace main line that has reached the end of its useful life. Program involves design and construction in alternating fiscal years. FY 2026 – Design ($100,000) FY 2027 – Construction ($900,000) FY 2028 – Design ($100,000) FY 2029 – Construction ($900,000) FY 2030 – Design ($100,000) FY 2031 – Construction ($900,000) Mardick Road Main Line Replacement Design and construct a new water main on Mardick Road between Red Hill Avenue and Beverly Glen Drive. - Existing steel pipe with multiple leaks -Difficult access including easements across private property -Project identified in Master Plan included surrounding improvements FY 2027 – Design ($200,000) FY 2028 – Construction ($1,500,000) Beneta Well No. 2 •Construction of a new 1000 gpm groundwater well at the existing Beneta Well Site. •Phase I – Well Drilling: Complete ($2.5M) •Phase II – Well Equipping: Under Construction ($3.5M) •Received $1.5M in grant funding •Anticipated completion: April 2024 Well Rehabilitation Program A continuous maintenance effort to rehabilitate wells. 3 wells identified in fiscal years FY 2024- 26. Others to be determined based on operational needs. o FY 2024 – Vandenberg Well ($350,000) o FY 2025 – Main St. Well #3 ($350,000) o FY 2026 – Pasadena Well ($500,000) o FY 2027 – TBD 17th St. Treatment Facility Electrical Replacement Constructed in 1996, consisting of 2 mgd reverse osmosis process to remove Nitrate, Perchlorate and Total Dissolved Solids from groundwater. The electrical switchgear, MCC’s, VFD’s and general control system are predominantly original and no longer supported. FY2025 - Design ($300K) FY2026 - Construction ($3M) John Lyttle Reservoir Improvements Constructed in 1976, the John Lyttle Reservoir is the sole Zone 3 storage reservoir. Rehabilitation plans include: -Reservoir interior and exterior recoating -Installation of new access ladder, safety railing and roof vent -Flexible coupling at inlet/outlet and overflow connection -Cathodic protection improvements FY 2024 – Design ($100K) FY 2025 – Construction ($500k) Newport Reservoir Improvements The Newport Reservoir was constructed in 1926. Reservoir has met end of useful life and is recommended for replacement. FY 2026 Analysis / Feasibility Study / Design ($600K) TBD – Construction Possible improvements include demo and reconstruction of new reservoir. 2023 Water Master Plan (WMP) Objective: •Evaluate current and future water supply and demand needs •Define average, max and peak water demands •Emergency preparedness and operational scenarios •Develop, update and calibrate hydraulic water model •Optimization of operations and maintenance programs •Evaluate infrastructure, provide condition assessment and capital improvement planning •Deliver Capital Improvement Plan for 20-year planning window 2023 WMP Capital Improvement Plan High Priority Facility Improvements identified in WMP: •5 Total projects ($6.6M) •Pasadena Well Improvements •Vandenberg Well Rehab •Newport Reservoir Phase 1 •Lyttle Reservoir •17th St. Treatment Plan Electrical Improvements *Planned funding directly in the current 7-year CIP Plan 2023 WMP Capital Improvement Plan High Priority Pipe and Fire Hydrant Improvements identified in WMP: •21 Total projects ($8.7M) •16 of 21 projects are small hydrant specific projects at various locations to improve fire flow conditions •5 pipeline projects to improve fire flow protection and operational hydraulics *Planned funding directly or indirectly in current 7-year CIP Plan A comprehensive WMP presentation will be presented at a future City Council Meeting Questions