Loading...
HomeMy WebLinkAboutNAVY NORTH HANGAR STATUS REPORT Navy Hangar, 2024 th Presentation Jan 16 OperationsRecovery •(IMT)Incident Management Team community.location and throughout the and remediation both at the incident operations with inspections recoveryresponse and continues to maintainThe Incident Management Team Significant Milestones cleared of debris.of Edinger Ave and Red Hill Avenue was 1 mile of railway line from the intersection •, 2023 th December 9 Significant Milestones. th December 11and was completed on th began on December 7North Hangar Doors Controlled lowering of •, 2023 th December 11 Significant Milestones•, 2023 th December 16 Significant Milestones to doors and pillboxesStrength Glue) applied Tackifier (Industrial •, 2023 th December 19 Significant Milestones–Dec 4th •Legacy Sports Park–Dec 12th•All City of Tustin Parks reopened.•, 2023 th December 12 Significant Milestones 100% cleared.Public Right of Ways •, 2023 st December 1 Significant Milestones. th reopened Dec 20Legacy Magnet •.th reopened Dec 19•regular campuses.students returned to School District All Tustin Unified •, 2023 th December 20 Significant Milestones Additional tackifier applied to debris.•, 2024 th January 15 Current Operations Hangar site.Navy North Air monitoring & surveillance continues around the •submitted requests are completed.all Residential inspection and remediation will continue until•. th Residential Area Clearance 92% complete as of January 16• Future Operations Secure Debris–Navy Hangar Site This will remain in place until U.S. Navy commences debris removal.•nylon sheeting this week.The base structure of Navy North Hangar will be encased in plastic • Future Operations Debris Removal-Navy Hangar Site operation.Air monitoring & surveillance will increase for the duration of this •removal operation.The Public will be notified well in advance of the U.S. Navy debris •removal from the Navy North Hangar Site.The U.S. Navy has not yet communicated a timeline or plan for debris •North Hangar Site itself. The U.S. Navy is responsible for the removal of debris from the Navy • Future Operations Exterior Soil & Interior Air/Dust Study outside of the affected area.and compared to a control group of residences and locations residences and locations inside the impacted area will be sampled To ensure scientific validity, a statistically representative group of •community.environmental regulators to address lingering concerns in the received and reviewed by local state, and federal health & Air/Dust Study to go above and beyond testing data currently has commissioned an Exterior Soil & Interior City of TustinThe• Future Operations Exterior Soil & Interior Air/Dust Study Analysis & Reporting of Sampling Results.4.Testing of Residences and Locations.3.up and Sample Group Enrollment.-Residential Volunteer Sign2.Orange County Health Care Agency.•South Coast Air Quality Management District.•US Environmental Protection Agency.•n consultation with:Plan iDevelopment of Scientific Methodology & Operational Implementation 1.Step Process:-The Study will Consist of a 4• Future Operations Exterior Soil & Interior Air/Dust Study up details.-the community, including volunteer signPublic Webinar will be held to share more information with Once approved, a •Center for Toxicology & Environmental Health.•Orange County Health Care Agency.•South Coast Air Quality Management District.•US Environmental Protection Agency.•which is comprised of:review by the Environmental Health GroupAn initial Scientific Methodology & Operational Implementation Plan is under •