HomeMy WebLinkAboutNAVY NORTH HANGAR STATUS REPORT - 02.06.2024Navy I angar
Recovery
Operations
significant Milestones
• January 19, 2024
• Base structure of Navy North
Hangar encased in re -enforced
plastic nylon sheeting.
• This will remain in place until U.S.
Navy commences debris
removal.
significant Milestones
• January 31, 2024
• Exterior Soil & Interior Air/Dust
Study informational webinar
posted to website and mailers
released to control and study
groups
3
Geosyntec
consultm-its
I sCieR[bsts I iflliOmum
u HORUH HG�H
EaHCDZHUP�L ]H
sf
lz%R 1P
EOUN
Current/Future Operations
• Air Monitoring and Surveillance: Continues around the hangar and data
reports collected do not show, according to environmental health agencies,
any elevated risk of harm to the public.
• Secure Debris: Residential inspection and remediation will continue
until all submitted requests are completed.
• Debris Removal: North Navy Hangar Site debris removal timeline and plan
remains unknown from the US Navy.
• Exterior Soil& Interior Air/Dust Study: Remaining objectives include
o Residential Volunteer Sign-up and Sample Group Enrollment.
o Testing of Residences and Locations.
o Analysis & Reporting of Sampling Results.