Loading...
HomeMy WebLinkAboutNAVY NORTH HANGAR STATUS REPORT - 02.06.2024Navy I angar Recovery Operations significant Milestones • January 19, 2024 • Base structure of Navy North Hangar encased in re -enforced plastic nylon sheeting. • This will remain in place until U.S. Navy commences debris removal. significant Milestones • January 31, 2024 • Exterior Soil & Interior Air/Dust Study informational webinar posted to website and mailers released to control and study groups 3 Geosyntec consultm-its I sCieR[bsts I iflliOmum u HORUH HG�H EaHCDZHUP�L ]H sf lz%R 1P EOUN Current/Future Operations • Air Monitoring and Surveillance: Continues around the hangar and data reports collected do not show, according to environmental health agencies, any elevated risk of harm to the public. • Secure Debris: Residential inspection and remediation will continue until all submitted requests are completed. • Debris Removal: North Navy Hangar Site debris removal timeline and plan remains unknown from the US Navy. • Exterior Soil& Interior Air/Dust Study: Remaining objectives include o Residential Volunteer Sign-up and Sample Group Enrollment. o Testing of Residences and Locations. o Analysis & Reporting of Sampling Results.