HomeMy WebLinkAbout07 NOTICE OF COMPLETION FOR THE FY22-23 ROADWAY AND SIDEWALK REPAIR PROJECTDocuSign Envelope ID: F5B9B721-6016-49F9-9B8B-4ED6E5B475C9
Agenda Item 7
AGENDA REPORT Reviewed: n�
City Manager
Finance Director
MEETING DATE: FEBRUARY 20, 2024
TO: NICOLE BERNARD, ACTING CITY MANAGER
FROM: MICHAEL GRISSO, ACTING DIRECTOR OF PUBLIC WORKS
SUBJECT: ADOPT RESOLUTION NO. 24-10 TO ACCEPT IMPROVEMENTS FOR THE
FISCAL YEAR 2022-2023 ROADWAY REHABILITATION AND SIDEWALK
REPAIR PROJECT - ZONE 4, CIP NO. 70022 AND AUTHORIZE THE CITY
ENGINEER TO FILE A NOTICE OF COMPLETION
SUMMARY
Construction of the Fiscal Year 2022-2023 Roadway Rehabilitation and Sidewalk Repair Project -
Zone 4 (CIP No. 70022), has been completed to the satisfaction of the City Engineer and is now
ready for City Council acceptance.
RECOMMENDATION
It is recommended that the City Council take the following actions:
Adopt Resolution No. 24-10 accepting the construction of the Fiscal Year 2022-2023
Roadway Rehabilitation and Sidewalk Repair Project - Zone 4 (CIP No. 70022); and
2. Authorize the City Engineer to execute and file the Notice of Completion with the Orange
County Recorder's Office.
FISCAL IMPACT
The final construction cost for the Fiscal Year 2022-2023 Roadway Rehabilitation and Sidewalk
Repair Project - Zone 4 (CIP No. 70022) is $4,835,229.11 including change order work. Sufficient
funds were budgeted and appropriated in the Capital Improvement Program, using Measure M2
Fair Share (Fund 139) and Gas Tax (Fund 130).
CORRELATION TO THE STRATEGIC PLAN
Rehabilitation of roadways and repair of sidewalks contribute to the fulfillment of the City's Strategic
Plan Goal B: Public Safety and Protection of Assets. Specifically, the project implements Strategy
#5, which among other items, is to ensure continuous maintenance and improvement of public
facilities.
DISCUSSION
The City is divided into seven pavement zones with one zone targeted each year for pavement
maintenance. The current phase, Zone 4 (see attached map), is generally bounded by Interstate
Freeway 5 to the north, Tustin Ranch Road to the east, Edinger Avenue to the south and Newport
Avenue to the west.
DocuSign Envelope ID: F5B9B721-6016-49F9-9B8B-4ED6E5B475C9
Roadway Rehabilitation and Sidewalk Repair Project — Zone 4, CIP No. 7022
February 20, 2024
Page 2
On April 4, 2023, the City Council authorized the award of a construction contract to Onyx Paving
Company. The Annual Roadway Rehabilitation and Sidewalk Repair Project - Zone 4 (CIP No.
70022) consisted of asphalt concrete pavement repair, asphalt concrete overlay, slurry sealing,
traffic striping, and removal and replacement of curb ramps to meet current federal Americans with
Disabilities Act (ADA) requirements on various streets within Zone 4 of the City's Pavement
Management Program.
Also, within Zone 4 boundaries six (6) concrete catch basin lids were improved via the Citywide
Storm Drain Catch Basin Improvement Project, CIP No. 50043, and additional sidewalk
improvements at 6th Street and B Street were included within the contractor's scope of work.
Z��-
Michael Grisso
Acting Director of Public Works
Attachment(s):
1. Resolution No. 24-10
2. Location Map
DocuSign Envelope ID: F5B9B721-6016-49F9-9B8B-4ED6E5B475C9
ATTACHMENT 1
Resolution No. 24-10
DocuSign Envelope ID: F5B9B721-6016-49F9-9B8B-4ED6E5B475C9
RESOLUTION NO. 24-10
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUSTIN,
CALIFORNIA, ACCEPTING THE PUBLIC WORKS AND IMPROVEMENT AND
AUTHORIZING THE RECORDATION OF THE NOTICE OF COMPLETION FOR
THE FY 2022-23 ROADWAY REHABILITATION AND SIDEWALK REPAIR
PROJECT - ZONE 4 (CIP NO. 70022)
WHEREAS, Onyx Paving Company, having a contract with the City of Tustin to
construct the hereinafter described public works and improvement; and
WHEREAS, the City Engineer has duly certified to the construction and completion
of said public improvement hereinafter mentioned in a manner satisfactory to the City
Council of the City of Tustin; and
WHEREAS, the City Council finds that said contractor has completed said public
improvement hereinafter more particularly described in accordance with the provisions of
the contract documents and the Notice of Completion, and acceptance of said public
works and improvement should be filed and payment of the balance due said contract
authorized in accordance with the contract documents.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Tustin
that said public works and improvement is found to be complete, and the same is hereby
accepted. Said public works and improvement is more particularly described as follows:
FY 2022-23 Roadway Rehabilitation and Sidewalk Repair Project - Zone 4
CIP NO. 70022
BE IT FURTHER RESOLVED that the City Engineer of the City of Tustin is hereby
authorized to execute and file a Notice of Completion for the acceptance of said public
works and improvement described herein as required by law.
PASSED AND ADOPTED at a regular meeting of the City Council of the City of
Tustin held on the 20t" day of February, 2024.
AUSTIN LUMBARD,
Mayor
ATTEST:
ERICA N. YASUDA,
City Clerk
Resolution 24-10
Page 1 of 2
DocuSign Envelope ID: F5B9B721-6016-49F9-9B8B-4ED6E5B475C9
APPROVED AS TO FORM:
FD
ocuSigned by:
,:,y
DA 8EF31"41DIG,
City Attorney
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) SS
CITY OF TUSTIN )
I, ERICA N. YASUDA, City Clerk and ex-officio Clerk of the City Council of the City of
Tustin, California, do hereby certify that the whole number of the members of the City
Council is five; that the above and foregoing Resolution No. 24-10 was duly and regularly
passed and adopted at a regular meeting of the City Council held on the 20t" day of
February, 2024 by the following vote:
COUNCILMEMBER AYES:
COUNCILMEMBER NOES:
COUNCILMEMBER ABSTAINED:
COUNCILMEMBER ABSENT:
COUNCILMEMBER RECUSED:
ERICA N. YASUDA,
City Clerk
Resolution 24-10
Page 2 of 2
/T71 SCl/
DocuSign Envelope ID: F5B9B721-6016-49F9-9B8B-4ED6E5B475C9
ATTACHMENT 2
Location Map
DocuSign Envelope ID: F5B9B721-6016-49F9-9B8B-4ED6E5B475C9 CITY OF TU ST I N
\ ���T C ,
SFKA
wam �cl
v ....0.-�� �..�.
WI/mil/���/OMNI
PROJECT NAME: FY 2022-23 ROADWAY REHABILITATION & SIDEWALK REPAIR PROJECT - ZONE 4 (CIP NO. 70022)