Loading...
HomeMy WebLinkAbout10 APPROVE PLANS AND SPECS AND AUTHORIZE ADVERTISEMENT FOR BIDS FOR THE CIVIC CENTER ALTERNATE POWERDocuSign Envelope ID: FEB221E4-DB85-410A-94CA-4DD2CBB8D33F NY O MEETING DATE: TO: FROM: SUBJECT: AGENDA REPORT MARCH 5, 2024 NICOLE BERNARD, ACTING CITY MANAGER Agenda Item 10 Reviewed: os City Manager os nB Finance Director MICHAEL GRISSO, ACTING DIRECTOR OF PUBLIC WORKS APPROVE PLANS AND SPECIFICATIONS AND AUTHORIZE ADVERTISEMENT FOR BIDS FOR THE CIVIC CENTER ALTERNATE POWER SOURCE PROJECT, CIP NO. 10069 SUMMARY The plans and specifications for the Civic Center Alternate Power Source Project (CIP No. 10069) have been prepared and the project is now ready for bid. RECOMMENDATION It is recommended that the City Council: Adopt Resolution No. 24-17 approving the plans and specifications for the Civic Center Alternate Power Source Project (CIP No. 10069); and 2. Authorize the City Clerk to advertise to receive bids. FISCAL IMPACT The engineer's estimate for this project is $3,868,914. Sufficient funds in the amount of $4,431,932 have been appropriated in the FY 2023/24 budget for the construction this project. A portion of this funding was sponsored by Senator Min and made available through an appropriation of $1.5M in the FY 22/23 California State Budget. CORRELATION TO THE STRATEGIC PLAN Civic Center Alternate Power Source Project contributes to the fulfillment of the City's Strategic Plan Goal B: Public Safety and Protection of Assets, Strategy 5; Create and implement a plan to protect the City's public assets. Specifically, the project implementation of Strategy 5a, which among other items, is for the improvement of public facilities. BACKGROUND In the event of a power outage, the existing generator does not have the electrical capacity to meet the needs of the entire Civic Center. Approximately 70% of Police Department and 10% of City Hall are energized with the existing generator during a power outage. The new generator has been designed to handle the entire electrical load of the Civic Center complex. The project scope of work consists of removing the existing 250 kW unit, the installation of a new 563 kW emergency generator, construction of a new generator building in the back of City Hall and site security improvements to the parking structure, among other incidental work required to complete the project in accordance with the contract documents. DocuSign Envelope ID: FEB221 E4-DB85-410A-94CA-4DD2CBB8D33F Civic Center Generator Plans and Specs, CIP 10069 March 5, 2024 Page 2 The tentative schedule for construction of the project is as follows: • Authorization to Advertise for Bids ...................................................... 03/05/2024 • First Legal Advertisement................................................................... 03/14/2024 • Second Legal Advertisement..............................................................03/21/2024 • Bid Opening........................................................................................04/16/2024 • Award of Contract...............................................................................05/07/2024 • Notice to Procure................................................................................06/03/2024 • Start Construction..............................................................................07/01/2024 • Complete Construction.......................................................................03/01/2025 The plans and specifications for the Civic Center Alternate Power Source Project (CIP No. 10069) have been prepared and the project is now ready for bid. Michael risso Acting Director of Public Works Attachment: Resolution No. 24-17 DocuSign Envelope ID: FEB221 E4-DB85-410A-94CA-4DD2CBB8D33F RESOLUTION NO. 24-17 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUSTIN, CALIFORNIA APPROVING PLANS AND SPECIFICATIONS FOR THE CIVIC CENTER ALTERNATE POWER SOURCE PROJECT, CIP NO. 10069 AND AUTHORIZING ADVERTISEMENT FOR BIDS WHEREAS, it is the intention of the City Council of the City of Tustin, California to contract for the construction of the Civic Center Alternate Power Source Project CIP No. 10069; and WHEREAS, the City Engineer has presented plans and specifications for the construction of said work; and WHEREAS, the CIP No. 10069 project is categorically exempt from the California Environmental Quality Act (CEQA) pursuant to CEQA Guidelines Section 15301 (Class 1, Existing Facilities). NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of Tustin as follows: Section 1. The plans and specifications presented by the City Engineer are hereby approved as the plans and specifications for: Civic Center Alternate Power Source Project CIP No. 10069 Section 2. The City Clerk is hereby authorized and directed to advertise as required by law for the receipt of sealed bids or proposals for the performance of the work specified in the aforesaid plans and specifications. APPROVED AND ADOPTED at a regular meeting of the City Council of the City of Tustin on the 5t" day of March, 2024. AUSTIN LUMBARD, Mayor ATTEST: ERICA N. YASUDA, City Clerk Resolution 24-17 Page 1 of 2 DocuSign Envelope ID: FEB221 E4-DB85-410A-94CA-4DD2CBB8D33F APPROVED AS TO FORM: DS DocuSigned by: 7RRd E3ZEF1��'I d�(` DAVID E. KENDIG, City Attorney STATE OF CALIFORNIA ) COUNTY OF ORANGE ) SS CITY OF TUSTIN 1 CERTIFICATION FOR RESOLUTION NO. 24-17 I, Erica N. Yasuda, City Clerk and ex-officio Clerk of the City Council of the City of Tustin, California, do hereby certify that the whole number of the members of the City Council of the City of Tustin is five; that the above and foregoing Resolution No. 24-17 was duly passed and adopted at a regular meeting of the Tustin City Council, held on the 51" day of March, 2024, by the following vote: COUNCILMEMBER AYES: COUNCILMEMBER NOES: COUNCILMEMBER ABSTAINED: COUNCILMEMBER ABSENT: COUNCILMEMBER RECUSED: ERICA N. YASUDA, City Clerk Resolution 24-17 Page 2 of 2