HomeMy WebLinkAboutNavy North Hangar Status UpdateQ I EMO
Navy North
Ilangar Status
Update
Response/Recover
• Ground inspection and
remediation operations continue
across all divisions as residential
requests for assistance are
received and completed.
2
ponse/f
• Base structure of Navy North
Hangar remains encase in re -
enforced plastic nylon sheeting
to continue to protect against
inclement weather events.
• This will remain in place until U.S.
Navy commences debris
removal.
3
ponse/Recovery Update
• Testing for control and study
area participants continues
and is projected to be
completed by the end o
week.
f this
tlk- -1�11
arW.e.w.. a:
Current/Future Operations
• Air Monitoring and Surveillance: Continues around the hangar and data
reports collected do not show, according to environmental health agencies,
any elevated risk of harm to the public.
• Secure Debris: Residential inspection and remediation will continue
until all submitted requests are completed.
• Debris Removal: North Navy Hangar Site debris removal timeline and plan
remains unknown from the US Navy.
• Exterior Soil & Interior Air/Dust Study: Remaining objectives include:
o Testing of Residences and Locations.
o Analysis & Reporting of Sampling Results.
5