Navy North
Ilangar Statu
Response/Recovery
• Ground inspection and
remediation operations continue
across all divisions as residential
requests for assistance are
received and completed.
• 100% of all residential requests
have been fulfilled.
2
ponse/Recovery Update
q�_
is Applied additional coating of
tackifier (industrial strength glue).
• Navy North Hangar base structure
remains encased in reinforced
plastic nylon sheeting to continue
to protect the site against
inclement weather.
• Safeguards will remain in place
until U.S. Navy removes debris;
Navy has not yet provided its plan
nor timeline for clean-up.
.y
saw
N
\�� �'���f mot• ` ��.- i �. L l Y �.. ��
owl
;.
.Mr
AO
p on s e/ Re c overy
• Testing completed on schedule
for randomly- selected
participants in control and
study areas.
• Sampling analysis underway.
• Results are expected in late
April pending review by
environmental experts.
Finance Update
• At U.S. Navy"s request, the City
undertook emergency response and
recovery efforts for the Navy North
Hangar Fire.
• City costs to address onsite & offsite
fire impacts now exceed $79 million.
• Contractual obligations for ongoing
activities currently exceed $90 million.
$52.570.475
r91
LA
Finance Update
Breakdown
Debris Clearance
Air Monitoring, Analytical &Community Outreach
Consulting, Project Management &legal
Agency Costs
Hangar Door Deconstruction
Residential Air/Dust &Outdoor Soil Sampling
Supplies, Equipment, &Security
Total
$5215701475
$171128,413
$516421048
$210791922
$8541251
$8001000
$503,228
$79,578,337
�F
Current/Future Operations
• Air Monitoring and Surveillance: Continues around the hangar and data
reports collected do not show, according to environmental health agencies,
any elevated risk of harm to the public.
• Secure Debris: Residential inspection and remediation will continue.
• Debris Removal: North Navy Hangar Site debris removal timeline and plan
remains unknown from the U.S. Navy.
• Exterior Soil & Interior Air/Dust Study: Remaining objectives include:
o Analysis & Reporting of Sampling Results.
7