AGENDA REPORTAgenda
Reveweldm
a5
City Manager
��
Finance Director
MEETING DATE: JUNE 18, 2024
TO: ALDO E. SCHINDLER, CITY MANAGER
FROM: MICHAEL GRISSO, ACTING DIRECTOR OF PUBLIC WORKS
SUBJECT: APPROVE THE ANNUAL OC GO (MEASURE M2) ELIGIBILITY SUBMITTAL
PACKAGE, FISCAL YEAR 2024-2025
SUMMARY
In order to maintain eligibility to receive OC Go (also known as Orange County Measure M2 Program)
funding, the City is required to annually submit a compliance package to the Orange County
Transportation Authority (OCTA).
RECOMMENDATION
It is recommended that the City Council take the following actions:
1. Adopt the attached Measure M2 Seven -Year Capital Improvement Program (CIP) (Fiscal Year
2024-2025 through Fiscal Year 2030-2031, Attachment "B" of the M2 Eligibility Package); and
2. Authorize the Director of Public Works to submit the City of Tustin's Measure M2 eligibility
package to the OCTA.
FISCAL IMPACT
The City has successfully secured Comprehensive Transportation Funding Program (CTFP)
competitive funds under the current Measure M2 Program and met required match funding
contributions towards various projects over the years. The City's annual local jurisdiction
apportionment, known as "Fair Share" under Measure M2, is estimated at $2.359M for Fiscal Year
2024-2025. From the inception of Measure M in 1991 and Renewed Measure M2 in 2006, the City
has received approximately $60.6M, with $22.8M of that amount from the Renewed Measure M2
since 2011 for such projects as the Tustin Ranch Road Extension, Warner Avenue Extension, Tier
1/II Environmental Water Quality, Red Hill Avenue Widening and Raised Median Improvements, and
traffic signal synchronization projects along Tustin Ranch Road, Red Hill, 171" Street, First Street,
Tustin Avenue and Edinger Avenue corridors.
CORRELATION TO THE STRATEGIC PLAN
Maintaining eligibility for funding under Measure M2 and use of that funding to improve transportation
infrastructure contributes to the fulfillment of the City's Strategic Plan Goal B: Public Safety and
Protection of Assets. Specifically, the project implements Strategy #1, which among other items, is
to ensure continuous maintenance and improvement of public transportation facilities.
BACKGROUND AND DISCUSSION
Since the inception of Measure M in 1991, the City has submitted annual documentation to the OCTA
in order to maintain eligibility for competitive and Local Fair Share (LFS) funding. In November 2006,
the voters of Orange County approved Renewed Measure M (M2), a 30-year extension of the original
DocuSign Envelope ID: EFEBA85B-0515-43D5-BCC9-D47CFOD221 FO
Annual Measure M2 Eligibility Submittal Fiscal Year 2024-2025
June 18, 2024
Page 2
20-year Measure M program which had established a one-half (1/2) cent sales tax for local and
regional transportation improvements throughout Orange County.
The Measure M2 program provides for a new slate of projects and planned programs. These include
improvements to the Orange County freeway system and road network, expansion of the Metrolink
system, enhanced transit services for seniors and those with disabilities, funding for protection and
cleanup of roadway storm water runoff, and funding for local traffic signal synchronization programs.
The LFS and CTFP funds have enabled the City to undertake significant capital projects that improve
the transportation and circulation system in Tustin.
This year's eligibility package includes the following documentation:
• Attachment "A" - Measure M2 Eligibility Checklist (OCTA APPENDIX D).
• Attachment "B" - The City's Measure M2 Seven -Year CIP, OCTA's "OC Fundtracker" CIP
report, for Fiscal Year 2024-2025 through Fiscal Year 2030-2031 is attached.
• Attachment "C" - A copy of the City's CIP Budget sections is attached, beginning with FY
2024-25, as it relates to Measure M2 funding.
• Attachment "D" - Maintenance of Effort (MOE) Report Form is attached, plus a statement
certifying that the City of Tustin has budgeted and will meet its MOE benchmark requirement
based on dollar value for Fiscal Year 2024-25.
• Attachment "E" - The City, through its General Plan, considers land use planning strategies
that accommodate transit and non -motorized transportation. A letter documenting these
strategies is attached.
These items demonstrate to the OCTA that Tustin has been and will continue to fulfill its responsibility
to implement the requirements of Measure M2. Moreover, compliance with the requirements of
Measure M2 will ensure the City's continued eligibility for the various Fair Share and competitive
program funds.
V\-"A ., Q, —
Michael Grisso
Acting Director of Public Works
Attachment(s):
1. Measure M2 Eligibility Package FY 2024-25
DocuSign Envelope ID: EFEBA85B-0515-43D5-BCC9-D47CFOD221FO
CITY OF TUSTIN
ANNUAL OC GO
(MEASURE M2)
ELIGIBILITY
PACKAGE
FY 2024-25
DocuSign Envelope ID: EFEBA85B-0515-43D5-BCC9-D47CFOD221 FO
City of Tustin
LIST OF ATTACHMENTS
A. Measure M Eligibility Checklist
B. Seven -Year CIP (OC Fundtracker CIP Report)
C. Excerpts from City's Seven -Year CIP Budget
D. Maintenance of Effort (MOE) Reporting Form
E. Transit - Non -Motorized Land Use Planning Strategies Letter
DocuSign Envelope ID: EFEBA85B-0515-43D5-BCC9-D47CFOD221 FO
Attachment "A"
Measure M Eligibility Checklist
DocuSign Envelope ID: EFEBA85B-0515-43D5-BCC9-D47CFOD221 FO
MOCTA (X)0_0
G O
Local Tax Dollars at Work
Jurisdiction: CITY OF TUSTIN
APPENDIX D
Eligibility Checklist
Capital Improvement Program (CIP)
YES
NO
1.
Did you submit your draft or adopted M2 seven-year CIP to OCTA by June 28?
®
❑
a. Did you utilize the required OCTA OC Fundtracker CIP database?
®
❑
b. Have you included projects required to demonstrate compliance with signal
synchronization, pavement maintenance, the Congestion Management Program,
and environmental clean-up commitments?
M
❑
c. Are there any non -transportation related projects included in your M2 CIP? (Note:
Projects funded through ECP are considered transportation -related)
❑
d. Did you include all projects that are partially, fully, or potentially funded by M2 Net
Revenues?
®
❑
e. The City Council/Board of Supervisors approval date* to adopt the final 7-Year CIP is: 6/18/2024
*Must be prior to July 31
Maintenance of Effort (MOE)
YES
NO
2.
Did you submit the MOE certification form (Appendix I) to OCTA by June 30?
®
❑
a. Did you provide supporting budget documentation?
®
❑
b. Has the MOE Reporting form been signed by the Finance Director or appropriate
designee?
®
❑
Pavement Management Plan (PMP)
YES
NO
3.
Are you required to submit a PMP update to OCTA for this eligibility cycle? Refer to Exhibit
3 for PMP submittal schedule.
❑
a. If yes, did you use the current PMP Submittal Template (Appendix F)?
❑
❑
b. If yes, is the adopted PMP consistent with the OCTA Countywide Pavement
Management Plan?
❑
❑
4.
If you answered "No" to question 3, did you submit a PMP Update to OCTA through the
previous eligibility cycle by June 30?
®
❑
Resolution of Master Plan of Arterial Highways (MPAH) Consistency
YES
NO
5.
Did you submit a resolution indicating conformance with the MPAH?
N/A
N/A
a. Have you enclosed an exhibit showing roadway designations that represent your
most current circulation element?
N/A
N/A
Local Signal Synchronization Plan (LSSP)
YES
NO
6.
Did you submit an update to the LSSP as part of the current cycle?
N/A
N/A
a. Is your LSSP consistent with the Regional Traffic Signal Synchronization Master
Plan?
N/A
N/A
DocuSign Envelope ID: EFEBA85B-0515-43D5-BCC9-D47CFOD221 FO
1s
OCTA (XG0
Local Tax Dollars at Work
APPENDIX D
Eligibility Checklist
Time Limits for Use of Net Revenues
YES
NO
7.
Has your jurisdiction complied with the three-year time limit for the use of Net Revenues
over the last year per the requirements outlined in the Ordinance?
®
❑
a. If no, has a time extension been requested through the semi-annual review
process for funds subject to expiration?
❑
❑
Supplanting of Developer Commitments
YES
NO
8.
Has your jurisdiction ensured they have not supplanted developer commitments for
transportation projects and funding with M2 funds?
®
❑
Mitigation Fee Program (MFP)
YES
NO
9.
Does your jurisdiction currently have a defined development impact MFP in place?
®
❑
10.
Has an update to the MFP occurred since the last reporting period?
❑
11.
If yes to 10, has your jurisdiction submitted one or more of the supporting documents
outlined in chapter 2.7 of the Eligibility Guidelines?
❑
❑
Planning Strategies
YES
NO
12.
Does your jurisdiction consider as part of its General Plan, land use planning strategies
that accommodate transit and non -motorized transportation?
®
❑
13.
Have you provided a letter identifying land use planning strategies that
accommodate transit and non -motorized transportation consideration in the General
Plan?
®
❑
Traffic Forums
YES
NO
14.
Did representatives of your jurisdiction participate in the regional traffic forum(s)?
®
❑
a. If you answered yes, provide date(s) of attendance: 9/26/2023, 2/6/2024, Select date
Congestion Management Program (CMP)
YES
NO
:15. :[Has
your jurisdiction completed the required CMP checklist? (Appendix C)
N/A
N/A
Ken Nishikawa, P.E.
Deputy Director of Public Works/
City Enginner
Si nature 6ate
DocuSign Envelope ID: EFEBA85B-0515-43D5-BCC9-D47CFOD221 FO
Attachment "6"
Seven -Year CIP (OC Fundtracker CIP Report)
DocuSign Envelope ID: EFEBA85B-0515-43D5-BCC9-D47CFOD221 FO
Orange County Transportation Authority
FY 2024/25 - FY 2030/31 Capital Improvement Program
Local Project Number:
Project Title
Additional Project IDs:
Annual Pavement Maintenance and Sidewalk Repair Project - CIP No. 70023
Type of Work: Road Maintenance
Project Description
Type of Work Description: Road Maintenance -
Annual maintenance of roadways, public alleys, and public infrastructure at various citywide
Rehabilitation of roadway
locations, including pavement rehabilitation measures such as crack sealing, slurry seal, AC
overlay, sidewalk repairs, signing and striping. [Zone 51
Limits
FISCAL TOTAL
FUND TYPE ENG ROW CON/IMP O&M TOTAL
YEAR ESCALATED
Citywide - Various locations
Project Notes
2025 Gas Tax $0 $0 $1,800,000 $0 $1,800,000 $1,854,000
FY 2024/25 Planned Annual Pavement
2025 Local Streets and Roads $0 $0 $1,600,000 $0 $1,600,000 $1,648,000
Maintenance and Sidewalk Repair Project. Other
apportionments
Potential Funding: M2 LFS
Totals: $0 $0 $3,400,000 $0 $3,400,000 $3,502,000
Total Programmed: $3,400,000
Local Project Number:
Project Title
Additional Project IDs:
Annual Pavement Maintenance and Sidewalk Repair Project - CIP No. 70024
Type of Work: Road Maintenance
Project Description
Type of Work Description: Road Maintenance - Annual maintenance of roadways, public alleys, and public infrastructure at various citywide
AC
Rehabilitation of roadway
locations, including pavement rehabilitation measures such as crack sealing, slurry seal,
overlay, sidewalk repairs, signing and striping. [Zone ]
Limits
FISCAL TOTAL
YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL ESCALATED
Citywide -Various locations
Project Notes
2025 Measure M2 Local $100,000 $0 $315,000 $0 $415,000 $424,450
Fairshare
Planned Annual Pavement Maintenance and
M2 Local asure
MeMe ure
Sidewalk Repair Project.
2026 $0 $0 $2,000,000 $0 $2,000,000 $2,121,800
Fais
Local Project Number:
Additional Project IDs:
Type of Work: Bridge
Type of Work Description: Bridge -
Rehabilitation of existing pavement/structure
Limits
Citywide various locations
Project Notes
Planned project. Othe Potential Funding: M2-
LFS, GF, SB1
Totals: $100,000 $0 $2,315,000 $0 $2,415,000 $2,546,250
Total Programmed: $2,415,000
Project Title
Bridge Deck Improvements - CIP No. TBA
Project Description
Design and construct improvements to various bridges
FISCAL FUND TOTAL
ENG ROW CON/IMP O&M TOTAL
YEAR TYPE ESCALATED
2025 Gas Tax $300,000 $0 $0 $0 $300,000 $300,000
2026 Gas Tax $0 $0 $3,000,000 $0 $3,000,000 $3,182,700
Totals: $300,000 $0 $3,000,000 $0 $39300,000 $39482,700
Total Programmed: $3,300,000
DocuSign Envelope ID: EFEBA85B-0515-43D5-BCC9-D47CFOD221 FO
Local Project Number: N/A
Project Title
Additional Project IDs:
Citywide Pedestrian Oriented ADA
Improvements - CIP No. 70236
Type of Work: Pedestrian
Project Description
Type of Work Description: Pedestrian -
Reconstruction of pedestrian infrastructure and installation of equipment to make pedestrian travel
Reconstruction or rehabilitation of sidewalk
thru the City more accessible to persons with disabilities.
Multi -Year project.
Limits
FISCAL YEAR FUND TYPE
ENG ROW CON/IMP
O&M TOTAL
TOTAL ESCALATED
Citywide - Various locations
2025 Gas Tax
$0 $0 $50,000
$0 $50,000
$51,500
Project Notes
2026 Gas Tax
$0 $0 $50,000
$0 $50,000
$53,045
Funding: General Fund, Gas Tax and/or M2
2027 Gas Tax
$0 $0 $50,000
$0 $50,000
$54,636
Anticipated Expenditures till 06/30/2024
2028 Gas Tax
$0 $0 $50,000
$0 $50,000
$56,275
$961,905- (GF - $845,325- and Gas Tax
2029 Gas Tax
$0 $0 $50,000
$0 $50,000
$57,964
2030 Gas Tax
$0 $0 $50,000
$0 $50,000
$59,703
2031 Gas Tax
$0 $0 $50,000
$0 $50,000
$61,494
Local Project Number:
Additional Project IDs:
Type of Work: Other
(Type of Work Description: Other - Other
Limits
—750 lineal feet along El Camino Real near Red
Hill Avenue
Project Notes
Under a reimbursement agreement, the City is
responsible for design and construct water main
relocations. Design expenditures till 06/30/2024
$40,000. Reimbursement may include M2 funds
for eligible Street improvements.
Local Project Number: 21-SNTA-TSP-4002
Additional Project IDs:
Type of Work: Traffic Signals
Type of Work Description: Traffic Signals -
Coordinate signals within project limits
Limits
First Street from Tustin Avenue to Newport
Avenue [Project limits within the City of Tustin]
Project Notes
Regional RTSSP project in collaboration with
Cities of Santa Ana, Huntington Beach,
Westminster, and County of Orange. City of
Tustin's M2 LFS budget to cover City share of
20% O&M Local Match. M2-LFS: Anticipated
O&M expenditures till 06/30/2022 $615- M2-LFS:
FY 2022/23 O&M budget $200,000- [includes
$50k new + $150k CO from prior yr.] M2-LFS: FY
2023/24 O&M budget $95,280- CO from prior
yrs. M2-LFS: O&M expenditures all 06/30/2024
$48,915-, FY 2024-25 O&M budget $156,624-
CO from prior yrs.
Totals: $0 $0 $350,000 $0 $350,000 $394,617
Total Programmed: $350,000�
Project Title
El Camino Real Water Main Line Relocation & Street Improvements [CIP No. TBA]
Project Description
Relocation/reconstruction of --750' lineal feet 8" Water Main Line to accommodate OCTA/Caltrans I-
5 Widening Project between Yale Ave in Irvine to SR-55 including improvements to NB off -ramp at
Red Hill Ave.
FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED
2025 Other $0 $0 $500,000 $0 $500,000 $515,000
Totals: $0 $0 $500,000 $0 $500,000 $515,000
Total Programmed: $500,000�
Project Title
First Street / Bolsa Avenue Regional Traffic Signal Synchronization Project [City CIP No. 40094]
Project Description
Traffic studies, install new signal equipment and implement new timing to synchronize signals along
First Street and Bolsa Avenue. Regional RTSSP project managed by OCTA.
FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED
Totals: $0 $0 $0 $0 $0 $0
Total Programmed: $0
DocuSign Envelope ID: EFEBA85B-0515-43D5-BCC9-D47CFOD221 FO
Local Project Number: Project Title
Additional Project IDs: Intersection Improvements at Jamboree Road and Irvine Boulevard [CIP No. TBA]
Type of Work: Intersection Project Description
Type of Work Description: Intersection - Other Analyze feasibility, design and construct mitigation improvements as identified in Irvine's North
Irvine Transportation Mitigation (NITM) Program at Jamboree Rd/Irvine BI Intersection.
Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED
Intersection of Jamboree Rd & Irvine Blvd 2026 Another City $0 $0 $2,000,000 $0 $2,000,000 $2,121,800
Project Notes
Another City (or GF City of Irvine
Reimbursement. FY23/24 $200k budget CO to Totals: $0 $0 $2,000,000 $0 $2,000,000 $2,121,800
FY24/25. Other potential funding: GF, M2-LFS,
SB1, Gas Tax etc
Total Programmed: $2,000,000
Local Project Number:
Project Title
Additional Project IDs:
Irvine Boulevard Storm Drain between Holt Avenue and Prospect Avenue (Phase 1) [CIP No. TBA]
Type of Work: Safety
Project Description
Type of Work Description: Safety - Improve
New storm drain, catch basin and junction structures
roadway drainage
Limits
FISCAL TOTAL
FUND TYPE ENG ROW CON/IMP O&M TOTAL
YEAR ESCALATED
Irvine Boulevard from Holt Avenue to Prospect
Avenue
2028 Unfunded/Unknown $300,000 $0 $0 $0
$300,000 $300,000
Project Notes
2029 Unfunded/Unknown $0 $0 $3,600,000 $0
$3,600,000 $4,173,387
Unfunded/Unknown: Uncertain funding - M2 LFS,
GF, Gas Tax, SB1 or other funds.
Totals: $300,000 $0 $3,600,000 $0
$3,900,000 $4,473,387
Total Programmed: $3,900,OOO
Local Project Number: N/A Project Title
Additional Project IDs: Irvine Boulevard Storm Drain between Prospect Avenue and SR-55 (Phase II) [CIP No. TBA]
Type of Work: Safety Project Description
Type of Work Description: Safety - Improve New storm drain, catch basins and junction structures.
roadway drainage
Limits FISCAL TOTAL
FUND TYPE ENG ROW CON/IMP O&M TOTAL
Irvine Boulevard from Prospect Avenue to SR-55 YEAR ESCALATED
Project Notes 2029 Unfunded/Unknown $300,000 $0 $0 $0 $300,000 $300,000
Unfunded/Unknown: Uncertain funding - M2 LFS, 2030 Unfunded/Unknown $0 $0 $3,600,000 $0 $3,600,000 $4,298,588
GF, Gas Tax, SB1 or other funds.
Totals: $300,000 $0 $3,600,000 $0 $3,900,000 $4,598,588
Total Programmed: $3,900,OOO
DocuSign Envelope ID: EFEBA85B-0515-43D5-BCC9-D47CFOD221 FO
Local Project Number: N/A
Project Title
Additional Project IDs:
Jamboree Road Pavement Rehabilitation between Barranca Pkwy and OCTA/SCRRA [CIP No.
TBA]
Type of Work: Road Maintenance
Project Description
Type of Work Description: Road Maintenance
- Removal and deep lift repairs of AC pavement failure areas, cold plane, construction of AC
Rehabilitation of roadway
resurfacing, traffic loops and traffic striping.
Limits
FISCAL TOTAL
FUND TYPE ENG ROW CON/IMP O&M TOTAL
YEAR ESCALATED
Between Barranca Parkway and OCTA/SCRRA
Project Notes
2025 Local Streets and Roads $100,000 $0 $0 $0 $100,000 $100,000
Other Funding Source: GF, M2-LFS, Gas Tax.
apportionments
2026 Local Streets and Roads $0 $0 $1,200,000 $0 $1,200,000 $1,273,080
apportionments
Totals: $100,000 $0 $1,200,000 $0 $1,300,000 $1,373,080
Total Programmed: $1,300,000�
Local Project Number: N/A Project Title
Additional Project IDs: Jamboree Road Widening between Tustin Ranch Rd and North City Limits [CIP NO. TBA]
Type of Work: Road Widening Project Description
Type of Work Description: Road Widening - Widen to 6-lane major arterial standards, decreasing the existing median width.
Add 2 lanes to existing roadway in project limits
Limits FISCAL
Jamboree Road between Tustin Ranch Road and YEAR
North City Limits 2029
Project Notes 2030
Developer: Developer Contribution (or City GFs) 2030
for E Phase and C Phase. Unfunded/Unknown:
Uncertain Funding - Construction Phase.
Potential funding:, M2, M2-LFS.
Local Project Number: N/A
Additional Project IDs:
Type of Work: Safety
Type of Work Description: Safety - Install
guard rails, curbs or other safety barriers along
road
Limits
Main St between Newport Ave and Prospect Ave.
Project Notes
AB2766 (AQMD): 2018/19 $198k Includes prior
Yr PE phase expenditures, sub -total project
expenditures till 06/30/2019. M2 LFS: 2018/19
$188,393- includes prior yr expenditures, sub-
total project expenditures till 06/30/2019. Other
funding: Previously CMAQ & Matching M2-LFS
funds. Other Funding: Local - MCAS Land sale
proceeds, FY 2023/24 budget of $3.9M CO from
prior yrs. [or City GFs) CO to FY24/25. M2-LFS:
2023/24 budget of $26,860- CO from prior yrs.
FY24/25 Other: MCAS Land Sale Proceeds.
FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL
ESCALATED
Developer $400,000 $0 $0 $0 $400,000 $400,000
Developer $0 $0 $1,000,000 $0 $1,000,000 $1,194,052
Unfunded/Unknown $0 $0 $1,400,000 $0 $1,400,000 $1,671,673
Totals: $400,000 $0 $2,400,000 $0 $2,800,000 $3,265,725
Total Programmed: $2,800,OOO
Project Title
Main Street Improvements [CIP No. 400871
Project Description
Main Street improvements including installation of raised medians, in -pavement cross -walk lighting,
traffic striping with addition of buffered Class -II bike lanes, enhanced landscaping and widening of
sidewalks. CO Project.
FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED
2025 Other $0 $0 $1,700,000 $0 $1,700,000 $1,751,000
Totals: $0 $0 $1,700,000 $0 $1,700,000 $1,751,000
Total Programmed: $1,700,OOO
DocuSign Envelope ID: EFEBA85B-0515-43D5-BCC9-D47CFOD221 FO
Local Project Number:
Additional Project IDs:
Type of Work: Other
Type of Work Description: Other - Other
Limits
Legacy Area generally bounded by Warner Ave,
Tustin Ranch Rd, Moffett Dr and Armstrong Ave.
Project Notes
FY 2023/24 Other Funds: City Fund 189 - MCAS
Land Sale Proceeds Other Potential Funding
Sources: Gas Tax, SB1-RMRA, M2-LFS etc. for
eligible Street infrastructure Improvements. FY
24/25 includes CO $3,620,425.00 CO from prior
yr. Expenditures till 06/30/2024 $149,575.00 FY
25/26 Other Funding: City Fund 187 MCAS
Backbone Fees and City Fund 189 MCAS Land
Sale Proceeds.
Local Project Number:
Additional Project IDs:
Type of Work: Other
Type of Work Description: Other - Other
Limits
Tustin Legacy area bounded by Tustin Ranch
Rd, Warner Ave, Barranca Pkwy and Armstrong
Ave.
Project Notes
Other funding: MCAS land Sale Proceeds.
Anticipated expenditures till 06/30/2023 of
$468,925- of MCAS Land Sale Proceeds. Other
potential funding sources: SB1, GT, M2-LFS etc.
for eligible Street infrastructure Improvements.
Expenditures till 06/30/2024: $3,900,000- [MCAS
Land Sale Proceeds City Fund 1891 for
design+Construction Other FY 24/25 funds: City
fund 189, MCAS Land Sale Proceeds. Plus CO
from prior Yr.
Local Project Number:
Additional Project IDs:
Type of Work: Other
Type of Work Description: Other - Other
Limits
Legacy Area generally bounded by Edinger Ave,
Tustin Ranch Rd, Moffett Dr and Jamboree Rd.
Project Notes
FY 2023/24 Other Funds: City Fund 189 - MCAS
Land Sale Proceeds Other Potential Funding
Sources: Gas Tax, SB1-RMRA, M2-LFS etc. for
eligible Street infrastructure Improvements. FY
24/25 funds CO from prior yr. FY 2025/26 Other
Funds: City Fund 189 - MCAS Land Sale
Proceeds
Project Title
Neighborhood D North Infrastructure - Phase 1 [City CIP No. 70259]
Project Description
Design and construction of Infrastructure within Neighborhood D North (Phase 1) in the Tustin
Legacy Area generally bounded by Warner Ave, Tustin Ranch Rd, Moffett Dr and Armstrong Ave.
FISCAL FUND TOTAL
YEAR TYPE ENG ROW CON/IMP O&M TOTAL ESCALATED
2025 Other $30,000 $0 $0 $0 $30,000 $30,000
2026 Other $0 $0 $25,000,000 $0 $25,000,000 $26,522,500
Totals: $30,000 $0 $25,000,000 $0 $25,030,000 $26,552,500
Total Programmed: $25,030,OOO
Project Title
Neighborhood D South Infrastructure - Phase 2 [City CIP No. 70256]
Project Description
Non -backbone Street improvements within Neighborhood D South (Phase 2) in Tustin Legacy area
generally bounded by Tustin Ranch Road, Warner Avenue, Barranca Parkway and Armstrong Ave.
FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED
2025 Other $0 $0 $3,969,000 $0 $3,969,000 $4,088,070
Totals: $0 $0 $3,969,000 $0 $3,969,000 $4,088,070
Total Programmed: $3,969,OOO
Project Title
Neighborhood G Infrastructure - Phase 1 [City CIP No. 70258]
Project Description
Design and construction of Infrastructure within Neighborhood G (Phase 1) In the Tustin Legacy
Area generally bounded by Edinger Ave, Tustin Ranch Rd, Moffett Dr and Jamboree Rd.
FISCAL TOTAL
FUND TYPE ENG ROW CON/IMP O&M TOTAL
YEAR ESCALATED
2026 Other $0 $0 $35,052,108 $0 $35,052,108 $37,186,781
2026 Unfunded/Unknown $0 $0 $14,947,892 $0 $14,947,892 $15,858,219
Totals: $0 $0 $50,000,000 $0 $50,000,000 $53,045,000
Total Programmed: $50,000,OOO
DocuSign Envelope ID: EFEBA85B-0515-43D5-BCC9-D47CFOD221 FO
Local Project Number:
Additional Project IDs:
Type of Work: New Facility
Type of Work Description: New Facility -
New 6 lane roadway between project limits
Limits
From current terminus to south of Edinger
Avenue
Project Notes
Unfunded/Unknown: Uncertain funding. Prior
project expenditures include M-Turn back
($219,892-), CDBG and General Funds
totaling $4,700,493- for Prelim design and
ROW..
Local Project Number: N/A
Additional Project IDs:
Type of Work: Other
Type of Work Description: Other - Other
Project Title
Newport Avenue Extension, N/O Edinger Avenue - Phase II [CIP No. 70131]
Project Description
Extension of Newport Avenue from current terminus to south of Edinger Ave, constructing R/R
underpass, widening of Newport Ave from Tustin Grove Drive to Myrtle Avenue and safety
improvements. Realignment of flood control channel.
FISCAL TOTAL
FUND TYPE ENG ROW CON/IMP O&M TOTAL
YEAR ESCALATED
2028 Unfunded/Unknown $1,000,000 $0 $0 $0 $1,000,000 $1,000,000
2029 Unfunded/Unknown $0 $10,000,000 $0 $0 $10,000,000 $11,592,741
2030 Unfunded/Unknown $0 $0 $40,000,000 $0 $40,000,000 $47,762,092
Limits
Various Locations - City of Tustin Old Town Area
Project Notes
Other Funds FY 2021/22 - MCAS Land Sale
Proceeds, Construction funds of $735,000- CO to
FY 2022/23. Potential other funds: Federal,
State, M2-LFS, SB1, GT and/or City funds. Other
Funds FY 2024/25 - City Fund 189, MCAS Land
Sale Proceeds & CO funding from prior years.
Expenditures till 06/30/2024: $251,773-
Local Project Number:
Additional Project IDs:
Type of Work: Other
Type of Work Description: Other - Other
Limits
Red Hill Avenue between El Camino Real and
230' N/O San Juan Street
Project Notes
Construction phase unfunded - Potential Funding
source: GF, SB1, M2-LFS. Expenditures till
06/30/2024 $7,308-
Totals: $1,000,000 $10,000,000 $40,000,000 $0 $51,000,000 $60,354,833
Total Programmed: $51,000,000
Project Title
Old Town Improvements [CIP No. 70254]
Project Description
Design and Construct enhancements to improve outdoor connectivity, mobility, walkability, traffic
calming and way finding within the public right-of-way, with emphasis on safety and circulation.
FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED
2025 Other $0 $0 $3,465,000 $0 $3,465,000 $3,568,950
Totals: $0 $0 $3,465,000 $0 $3,465,000 $3,568,950
Total Programmed: $3,465,OOOI
Project Title
Red Hill Avenue - Utility & Roadway Improvements - CIP No. 70255
Project Description
Red Hill Avenue utility undergrounding and roadway improvements.
FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED
2025 Gas Tax $4,000 $0 $0 $0 $4,000 $4,000
Totals: $4,000 $0 $0 $0 $4,000 $4,000
Total Programmed: $4,000�
DocuSign Envelope ID: EFEBA85B-0515-43D5-BCC9-D47CFOD221 FO
Local Project Number: 19-OCTA-TSP-3939 Project Title
Additional Project IDs: Red Hill Avenue Corridor TSSP [City CIP No. 40093]
Type of Work: Traffic Signals Project Description
Type of Work Description: Traffic Signals - Provide timing analysis studies, install new signal equipment and synchronization. Project Managed
Interconnect traffic signals to improve coordination by OCTA as lead agency. City of Tustin to provide match for project within it's City limits.
and communications
Limits FISCAL
YEAR
TOTAL
FUND TYPE ENG ROW CON/IMP O&M TOTAL
ESCALATED
Multi agency project - City of Tustin Segment
Limits from Bryan Ave to Carnegie Ave. 2025
General Fund $0 $0 $0 $351,260 $351,260 $351,260
Project Notes 2025
Measure M2 Local $0 $0 $0 $75,000 $75,000 $75,000
City of Tustin: 20% City match for TSSP
Fairshare
Improvements within City Limits - M2-LFS FY
2021 funds CO from prior Yr M2 TSSP: 2019 M2
RTSSP Call Primay Implementation Funds
Totals: $0 $0 $0 $426,260 $426,260 $426,260
[OCTA Allocation No. 19-OCTA-TSP-39391 M2
TSSP: 2019 M2 RTSSP Call O&M funds City of
Tustin O&M match M2-LFS: $40,504-
expenditures anticipated till 06/30/2022, CO
Balance of $214,496- to FY 2022/23. City of
Tustin 23/24 O&M match M2-LFS: budget of
61,886- CO from prior yrs City of Tustin 24/25
O&M match M2-LFS budget $75k CO from prior
yrs.
Total Programmed: $426,260
Local Project Number: Project Title
Additional Project IDs: Red Hill Avenue Rehabilitation from Walnut Av and San Juan St [CIP No. TBA]
Type of Work: Road Maintenance Project Description
Type of Work Description: Road Maintenance - R&R of failed AC areas, repair of sidewalks, C&G, ramp reconstruction, cold plane pavement and
Rehabilitation of roadway AC resurfacing, traffic loops and striping.
Limits FISCAL TOTAL
FUND TYPE ENG ROW CON/IMP O&M TOTAL
Red Hill Avenue from Walnut Avenue to San YEAR ESCALATED
Juan St 2025 Local Streets and Roads $50,000 $0 $1,000,000 $0 $1,050,000 $1,080,000
Project Notes apportionments
Funding: LSR-RMRA (SB1). Other potential
funds - GF and/or M2 FY 2020/21 Design funds CO to FY 2022/23 Prior yrs Design funds CO to Totals: $50,000 $0 $1,000,000 $0 $1,050,000 $1,080,000
GY 2023/24 Prior yrs Construction funds CO to
FY 2023/24 + Added $1 M in 2023/24 FY 2024/25
added funds in design and construction.
Local Project Number:
Additional Project IDs:
Type of Work: Road Widening
Type of Work Description: Road Widening -
Widen width of existing traffic lanes
Limits
Red Hill Avenue from Melvin Way to 200 feet
southerly
Project Notes
Unfunded/Unknown: Uncertain Funding.
Total Programmed: $1,050,OOO
Project Title
Red Hill Avenue Widening between Melvin Way and 200 feet southerly [CIP No. 701961
Project Description
Street widening on the easterly side within the City boundary and drainage improvements
FISCAL TOTAL
FUND TYPE ENG ROW CON/IMP O&M TOTAL
YEAR ESCALATED
2029 Unfunded/Unknown $200,000 $0 $0 $0 $200,000 $200,000
2030 Unfunded/Unknown $0 $100,000 $800,000 $0 $900,000 $1,074,647
Totals: $200,000 $100,000 $800,000 $0 $1,100,000 $1,274,647
Total Programmed: $1,100,OOO
DocuSign Envelope ID: EFEBA85B-0515-43D5-BCC9-D47CFOD221 FO
Local Project Number: Project Title
Additional Project IDs: San Juan Street Storm Drain Improvements [CIP No. - TBA]
Type of Work: Safety Project Description
Type of Work Description: Safety - Improve San Juan Street Storm Drain Improvements - Preliminary design studies, hydrology and hydaulic
roadway drainage analysis to scope improvements.
Limits FISCAL TOTAL
San Juan Street from Falmouth Drive to 600' E/O
YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL ESCALATED
Red Hill Avenue 2027 Unfunded/Unknown $75,000 $0 $0 $0 $75,000 $75,000
Project Notes
Unfunded/Unknown: Uncertain funding - M2 LFS,
S61, Gas Tax, GF or other funds. Totals: $75,000 $0 $0 $0 $75,000 $75,000
Total Programmed: $75,000
Local Project Number:
Project Title
Additional Project IDs:
The Hill Median Improvements [City CIP No. TBA]
Type of Work: Safety
Project Description
Type of Work Description: Safety - Install curb
Street improvements along Red Hill Avenue including installation of raised median near San Juan
median
Street.
Limits
FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED
Along Red Hill Avenue near San Juan Street
between San Juan Street to El Camno Real.
Project Notes
Totals: $0 $0 $0 $0 $0 $0
Street improvements including new raised
medians. Other funding sources: Future
development Fees. FY 24/25 Funds: 23/24 100k
M2-LFS funds CO from FY 23/24. Project is
along Red Hill Ave, however the current project
title is "The Hill...."
Total Programmed: $0
Local Project Number:
Project Title
Additional Project IDs:
Traffic Signal Equipment Upgrades and
Replacements [CIP No. 400801
Type of Work: Traffic Signals
Project Description
Type of Work Description: Traffic Signals -
Replace and upgrade traffic signals and
Upgrades or replacement of aging traffic signal
equipment at various
locations throughout the City.
equipment
Ongoing multi -year project.
Limits
FISCAL
FUND TYPE
YEAR
TOTAL
ENG ROW CON/IMP O&M TOTAL
ESCALATED
Citywide - Various existing signalized
intersections throughout the City.
2025 Measure M2 Local
$0
$0
$50,000 $0
$50,000 $51,500
Project Notes
Fairshare
M2 LFS: Continuous ongoing multi -year project.
2026 Measure M2 Local
$0
$0
$100,000 $0
$100,000 $106,090
Project Expenditures of M2-LFS fund till
Fairshare
06/30/2024: $907,375.00
2027 Measure M2 Local
$0
$0
$100,000 $0
$100,000 $109,273
Fairshare
2028 Measure M2 Local
$0
$0
$100,000 $0
$100,000 $112,551
Fairshare
2029 Measure M2 Local
$0
$0
$100,000 $0
$100,000 $115,927
Fairshare
2030 Measure M2 Local
$0
$0
$100,000 $0
$100,000 $119,405
Fairshare
2031 Measure M2 Local
$0
$0
$100,000 $0
$100,000 $122,987
Fairshare
Totals: $0 $0 $650,000 $0 $650,000 $737,733
Total Programmed: $650,OOO
DocuSign Envelope ID: EFEBA85B-0515-43D5-BCC9-D47CFOD221 FO
Local Project Number: Project Title
Additional Project IDs: Traffic Signal Installation at San Juan Street and Red Hill Avenue CIP NO. TBA
Type of Work: Traffic Signals Project Description
Type of Work Description: Traffic Signals
Install new traffic signals and equipment Traffic Signal Installation
Limits FISCAL YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL TOTAL ESCALATED
San Juan Street & Red Hill Avenue Intersection
Project Notes Totals: $0 $0 $0 $0 $0 $0
New Signal Installation Project - Potential other
funding sources - GF, SB1, Gas Tax or other
funds. Current Projet programming in FY
2024/25. FY 24/25 M2-LFS funds CO from Prior
Yrs and other funds (future development fees).
Revised:Last • Total Programmed: $0
Local Project Number: 20-ORNG-TSP-3976 Project Title
Additional Project IDs: Tustin Avenue - Rose Drive RTSSP [400951
Type of Work: Traffic Signals Project Description
Type of Work Description: Traffic Signals - Design & implement traffic signal coordination along Tustin Avenue. Part of multi -jurisdictional
Interconnect traffic signals to improve coordination RTSSP project managed by the City of Orange as lead agency. Overall project limits - Tustin
and communications Avenue from 1st Street to Wabash Avenue.
Limits FISCAL
YEAR
TOTAL
FUND TYPE ENG ROW CON/IMP O&M TOTAL
ESCALATED
Tustin Avenue - Rose Drive from 1st Street to
Wabash Avenue 2025
Measure M2 Local $0 $0 $0 $2,405 $2,405 $2,405
Project Notes
Fairshare
M2-LFS: City of Tustin 20% match share for their
portion of the RTSSP project - 2022/23 budget
$45,000- CO from prior yr. Map shows project
Totals: $0 $0 $0 $2,405 $2,405 $2,405
limits in the City of Tustin only. [City of Tustin CIP
No. 40095 - Tustin Avenue Signal
Synchronization]. M2-LFS: City of Tustin O&M
Match 2023/24 budget of $13,186- CO from prior
yrs. M2 RTSSP funds [IMP $2,663,153- in
FY2020/21 and O&M $103,680- in FY 2021/22]
allocated to the City of Orange as lead agency.
M2-LFS: City of Tustin O&M match 2024/25
budget of $2,405- CO from prior yrs
Local Project Number:
Additional Project IDs:
Type of Work: Safety
Type of Work Description: Safety - Other
Limits
Along Tustin Ranch Road north and south of
Irvine Blvd
Project Notes
New Project
Total Programmed: $2,405
Project Title
Tustin Ranch / Irvine Boulevard Radar Project [City CIP No. 40096]
Project Description
Installation of radar traffic control equipment to improve the flow of traffic along the Tustin Ranch
Road corridor to the north and south of Irvine Boulevard.
FISCAL TOTAL
YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL ESCALATED
2025 Measure M2 Local $30,000 $0 $0 $0 $30,000 $30,000
Fairshare
2025 General Fund $0 $0 $285,318 $0 $285,318 $293,878
Totals: $30,000 $0 $285,318 $0 $315,318 $323,878
Total Programmed: $315,318I
DocuSign Envelope ID: EFEBA85B-0515-43D5-BCC9-D47CFOD221 FO
Local Project Number: N/A Project Title
Additional Project IDs: Tustin Village Way Drainage Improvements (N/O McFadden) [CIP No. TBA]
Type of Work: Safety Project Description
Type of Work Description: Safety - Improve Develop plans to alleviate drainage concerns along Tustin Village Way.
roadway drainage
Limits FISCAL TOTAL
Tustin Village Way north of McFadden
YEAR FUND TYPE ENG ROW CON/IMP O&M TOTAL ESCALATED
Project Notes 2026 Unfunded/Unknown $75,000 $0 $0 $0 $75,000 $75,000
Unfunded/Unknown: Uncertain funding - M2 LFS,
GF, Gas Tax, SB1 or other funds.
Totals: $75,000 $0 $0 $0 $75,000 $75,000
Total Programmed: $75,OOO
Local Project Number:
Project Title
Additional Project IDs:
Valencia Avenue Widening between Newport Av and Red Hill Av [CIP No. TBA]
Type of Work: Road Widening
Project Description
Type of Work Description: Road Widening -
Widening to 4-lane primary arterial roadway with landscaped median and bike lanes. Intersection
Add 2 lanes to existing roadway in project limits
improvements at Valencia/Red Hill including NB and SB dual left -turn lanes, and SIB right -turn lane.
Limits
FISCAL TOTAL
FUND TYPE ENG ROW CON/IMP O&M TOTAL
YEAR ESCALATED
Valencia Avenue between Newport Avenue
Extension and Red Hill Avenue.
2028 Unfunded/Unknown $500,000 $0 $0 $0 $500,000 $500,000
Project Notes
2029 Unfunded/Unknown $0 $2,000,000 $0 $0 $2,000,000 $2,318,548
Unfunded/Unknown: Uncertain Funding.
2030 Unfunded/Unknown $0 $0 $3,000,000 $0 $3,000,000 $3,582,157
Totals: $500,000 $2,000,000 $3,000,000 $0 $5,500,000 $6,400,705
Total Programmed: $5,500,000�
Local Project Number: Project Title
Additional Project IDs: Yorba Street Storm Drain from 17th Street to Laurie Lane [CIP No. TBA]
Type of Work: Safety Project Description
Type of Work Description: Safety - Improve Design and preparation of plans and specifications, for Installation of storm drain pipe, catch basins
roadway drainage and junction structures to alleviate drainage concerns in this area.
Limits FISCAL TOTAL
FUND TYPE ENG ROW CON/IMP O&M TOTAL
Yorba Street from 17th Street to Laurie Lane YEAR ESCALATED
Project Notes 2027 Unfunded/Unknown $75,000 $0 $0 $0 $75,000 $75,000
Unfunded/Unknown: Uncertain funding - M2 LFS,
SB1, Gas Tax, GF, or other funds. Totals: $75,000 $0 $0 $0 $75,000 $75,000
Total Programmed: $75,OOO
DocuSign Envelope ID: EFEBA85B-0515-43D5-BCC9-D47CFOD221 FO
Attachment "C"
Excerpts from City's Seven -Year CIP Budget
DocuSign Envelope ID: EFEBA85B-0515-43D5-BCC9-D47CFOD221FO
DocuSign Envelope ID: EFEBA85B-0515-43D5-BCC9-D47CFOD221 FO
Attachment "D"
Maintenance of Effort (MOE) Reporting Form
DocuSign Envelope ID: EFEBA85B-0515-43D5-BCC9-D47CFOD221 FO
m OCGO APPENDIX]
Local Tax Dollars at Work Maintenance of Effort (MOE) Certification Forn-
Jurisdictior CITY OF TUSTIN
Type of GENERAL FUND Transportation Expenditures:
Please complete and attach supporting budget documentation for each line item listed below.
MAINTENANCE
Total Expenditure
Engineering [100-40-12] - GF Allocated Budget
$
200,200.00
Streets [100-40-13] - GF Allocated Budget
$
485,700.00
Landscape [100-40-14] - GF Allocated Budget
$
1,434,700.00
Subtotal Maintenance
$
2,120,600.00
CONSTRUCTION
Total Expenditure
Main Street Improvements [GF - 189 & GF - 200] - Allocated Budget
$ 5,600,000.00
Old Town Improvements
$ 4,200,000.00
Subtotal Construction
$ 9,800,000.00
INDIRECT/OTHER
Total Expenditure
Department Admin
$
111,800.00
Subtotal Indirect/Other
$
111,800.00
Total General Fund Transportation Expenditures
(Less Total MOE Exclusions')
MOE Expenditures
MOE Benchmark Requiremeli
(Shortfall)/Surplus
$
12,032,400.00
$
$
12,032,400.00
$
1,938,025.00
$
10,094,375.00
Certification:
I hereby certify that:
�x The City of Tustin is aware of the State Controller's "Guidelines Relating to Gas Tax Expenditures for Cities and
which is a guide for determining MOE Expenditures for Measure M2 Eligibility purposes and;
XjThe City of Tustin's MOE Certification Form is in compliance with direction provided in the State Controller's
Relating to Gas Tax Expenditures for Cities and Counties" and;
RIThe City of Tustin certifies that the budgeted MOE expenditures meet or exceed the fiscal year (FY) 2024-25 MOE
benchmark requirement3.
V" 71 Jennifer King _S
Finance Director Signature Finance Director (Print Name) Date
Funding sources include Measure M, federal, state, redevelopment, and bond financing.
Z Please refer to Exhibit 2 in the M2 Eligibility Guidelines for the City's MOE benchmark requirement.
DocuSign Envelope ID: EFEBA85B-0515-43D5-BCC9-D47CFOD221F0
BumW-.. EWumnlabelz
$726 54M $41,386 $33,629 $1,640 $86]II $5.525 $13,502 $422 $110,]85 04- %A51 $232,513
$226 $2,262 $41,386 $33,629 $1,640 $8- $5,525 $13,502 $422 $110,785 $12,474 $1,451 $232,513
130 1 $2,116,754 $3,1W $1T9 $2,1W,032
5 $2,116,250 $3,100 $- $2,120,032
139 $55500 $14M $2,075,821 $211,656 $2,254,9]6
5 $55,500 $12,OW $2,0]5,821 $111,656 $2,254,9T6
1. $1, 3.211 ($40,500) ($4O,5 ) $1,355,211
8 (S1T,1W) ($4 ,500( ($40,5W) ($98,100(
8 $IA53,311
5
-------------------
Gemralfulld E ineerin labor hoursfor MOE Pra'ezts: $2W,O]3
Tolalf neerin Division Sala 8 fieneRts Casts: $I,fi]8,14].W
%of En . Dlvhbn Allrcated towards MOf Pm egtz: 11.92%
General FUM Budgeted Engineering Salarbs A -.e.: $1,679,566
....
e Engineering MOE Ma Menance: 2W,2O0
DocuSign Envelope ID: EFEBA85B-0515-43D5-BCC9-D47CFOD221FO
Public Works Street Division MOE Allocation (100-40-13)
Fiscal Year 2024.2025
lNotes
Staff
Title
Alloc. %
I Salary & Benefits
$ Allocation
Dave Carta
Maintenance Supervisor
67%
$134,566
$89,711
B
Vacant
Maintenance Leadworker
100%
$97,122
$97,122
A
Adrian Castro
Sr. Maintenance Worker
50%
$103,181
$51,591
A
Charles Childress
Sr. Maintenance Worker
100%
$95,785
$95,785
A
Raul Sanchez
Sr. Maintenance Worker
100%
$102,052
$102,052
TA
Israel Preciado
Maintenance Worker
50%
$98,842
$49,421
JA
$485,700
A: Since staff puts down on their timesheets that they charge their time to Coslcl3, Costc14, and Costc58 then their time is a direct charge to MOE.
B: The indirect allocation for Dave is based on a proportional number of employees that work on street -related maintenance
have 8 in Streets and 4 in buildings.
Dave Carta
j• Maintenance Supervisor
I V J1N St,
eets�euildings
Publlr Works— FwId Services
300 Centennial Way, Tustin, CA 927M
P_ ]145]3-3359 I F: ]14259-8128
dradafinuslirca.om I Watinca or0
Indirect allocation to MOE for 8 of
12 employees that work in streets.
66.67
Total for FY 2023 $118,315
Tor41 for 1?ropinyer No: O1629
Fcdernl C--: 87,550.65 St7re Crt'a6a-
Rcurc ,G.. 86,665A2 FLSA Gross:
Deductions: 1a4520 S5 Beneans-
87,550.65 FIGA(J-1 0.00
85,957.42 Grass Wage: ID4,520.85
13,793.79 Tonal Cast: 119,314.64
DocuSign Envelope ID: EFEBA85B-0515-43D5-BCC9-D47CFOD221 FO
Public Works Landscape Division MOE Allocation (100-40-14)
Fiscal Year 2024-2025
GL Account
Description
Vendor(s)
Contract/Budget
Alloc. %
$ Allocation
100-40-14-6028
Landscape Maintenance
Mariposa
$2,299,000
40%
$919,600
100-40-14-6132
Contract Tree Trimming
Mariposa & West Coast Arborists
$511,500
40%
$204,600
100-40-14-6335
Electric
SCE
$90,000
5%
$4,500
100-40-14-6350
Water
City of Tustin & IRWD
$668,000
15%
$100,200
Street Related - Landscape Personnel Costs
$205,800
$1,434,700
All of this is a direct charge. These amounts above are estimates but the City will use the actual amounts for the annual report
DocuSign Envelope ID: EFEBA85B-0515-43D5-BCC9-D47CFOD221FO
C
C
Funding Source
189 MCAS Land Sale Proceeds
Project Number
ITBA
Request Title
Cornerstone II Infrastructure
FY2025
1 400,000.00
TBA
Tustin Legacy Park from Tustin Ranch Road to Edinger Avenue
$7,040,000.00
TBA
Warner Avenue Pedestrian Bridge
$0.00
70258
Neighborhood G Phase 1
$17,300,000.00
70259
Neighborhood D North Phase 1
70257
Armstrong Avenue Pedestrian Bridge
$3,920,000.00
10076
South Hangar Renovation
$9,945,544.00
70256
Neighborhood D South Phase 2
$6,400,000.00
20083
Tustin Legacy Linear Park from Armstrong Avenue to Warner Avenue
$9,411,530.00
70254
Old Town Improvements
$4,200,000.00
40087
Main Street Improvements
$1,700,000.00
10069
Civic Center Alternate Power Source
3,000,000.00
20090
Centennial Park Improvements
$450,000.00
20091
Bark Barracks at Tustin Legacy Park
$1,000,000.00
Total 189 MCAS Land Sale Proceeds
$52,767,074.00
200 General Fund CIP
40096
Tustin Ranch Road / Irvine Boulevard Radar Project
$285,318.00
TBA
Intersection Improvements at Jamboree Road and Irvine Boulevard
TBA
Jamboree Road Widening from Tustin Ranch Road to East City Limit
70236
Citywide Pedestrian ADA Improvements
70254
Old Town Improvements
40087
Main Street Improvements
$3,900,000.00
40093
Red Hill Avenue Signal Synchronization
$351,260.00
10086
Police Department Improvements
$500,000.00
10032
Annual Major Building Maintenance
$1,000,000.00
Total 200 General Fund CIP
$6,236,578.00
DocuSign Envelope ID: EFEBA85B-0515-43D5-BCC9-D47CFOD221FO
City of Tustin
Basis for Allocation of Admin Program to MOE Calculation -General Fund/Fund 100
FY 24/25
Public Works Department
Dept/Div
Salaries & Benefits (1)
% of Total (2)
Salaries & Benefits Allocated
(1) x (2) _ (3)
MOE Salary & Benefits
Programs (4)
Total Allocated to MOE
(4)/(3)
Engineering
40-12
$1,679,566
11.92%
$200,242
$200,242
Streets
40-13
$608,395
$0
$485,700
Landscape
40-14
$2,137,041
$0
$205,752
Water Quality
40-15
$196,815
3.84%
$7,558
Fleet Maintenance
40-16
$541,146
11.38%
$61,582
Building Facilities/Maint
40-17
$446,080
9.70%
$43,270
Totals
$5,609,043
$312,652
$891,693
15.90%
A
100-40-10 Salaries & Benefits
$703,427
Avera e MOE Pro ram %
A
15,90%
Salaries & Benefits Allocated to MOE
$111,800
Total Operating MOE Alloc:
$1,003,493
Note:
Percentage for Engineering is derived from MOE project labor worksheet
Percentage for Streets reflects an estimate of the amount of work directly related to MOE
DocuSign Envelope ID: EFEBA85B-0515-43D5-BCC9-D47CFOD221 FO
Attachment "E"
Transit — Non -Motorized
Land Use Planning Strategies Letter
DocuSign Envelope ID: EFEBA85B-0515-43D5-BCC9-D47CFOD221 FO
Department of Public Works
Mike Grisso
Acting Director
June 18, 2024
Ms. Charvalen Alacar
Section Manager, Measure M - Local Programs
Orange County Transportation Authority
600 S. Main Street
Orange, CA 92868
Attention: Ms. Stephanie Mooney, Transportation Funding Analyst
Subject: City of Tustin's General Plan Consistency Regarding Land Use Strategies
Accommodating Transit and Non -Motorized Transportation
Dear Ms. Alacar:
As part of the OC Go (also known as the Renewed Measure M (M2)) Eligibility package, the
City of Tustin is pleased to provide our land use strategies, which accommodate transit and
non -motorized transportation.
The City of Tustin's General Plan incorporates all of the following elements: Land Use,
Housing, Conservation/Open Space/Recreation, Noise, Circulation, Public Safety and a
locally mandated element, Growth Management. In particular, it is the Circulation Element
which incorporates the land use strategies to accommodate transit and non -motorized
transportation.
The Land Use Element identifies the present and planned land use activity; the general
distribution and location of residential and non-residential land uses; and density and
building intensity. The Land Use Element constitutes official City policy for the location of
various land uses and provides guidance to ensure orderly growth and development. Transit
and non -motorized transportation are addressed in this element in a broad manner with
expanded detail covered in the subsequent elements. The following is a listing of the
applicable Land Use Element goals, which are expanded upon in the Circulation Element:
GOAL 1: Provide for a well-balanced land use pattern that accommodates
existing and future needs for housing, commercial and industrial land,
300 Centennial Way, Tustin, CA 92780 • P: (714) 573.3150 • F: (714)734-8991 • www.tustinca.org
DocuSign Envelope ID: EFEBA85B-0515-43D5-BCC9-D47CFOD221 FO
Land Use Strategies Accommodating Transit and Non -Motorized Transportation
June 2024
Page 2
and community facilities and services, while maintaining a healthy,
diversified economy adequate to provide future City services.
GOAL 3: Ensure that new development is compatible with surrounding land uses
in the community, the City's circulation network, availability of public
facilities, existing development constraints and the City's unique
characteristics and resources.
Policy 3.2 - Locate major commercial uses in areas that are easily
accessible to major transportation facilities.
GOAL 10: Improve and strengthen the Tustin Old Town/First Street area with a
unique pedestrian environment and diverse mix of goods, services, and
uses.
GOAL 11: Policy 11.3 — Promote building forms that relate to the scale and
character of surrounding development while also relating new
development to pedestrian functions.
The Circulation Element guides the development of the City's circulation system by providing
adequate capacity for future land uses and provides for a safe, efficient, and adequate
circulation system for the City. The Element establishes a hierarchy of transportation routes
with specific development standards described for each category of roadway. The following
subjects are included in the Circulation Element: streets and highways, transportation
corridors, transportation system management, transportation demand management, transit,
rapid transit, railroads, paratransit (e.g. carpooling, vanpooling and taxi service), bicycle,
pedestrian facilities, commercial, general, and military airports.
The following is a listing of the applicable Circulation Element goals and implementation
measures:
GOAL 1: Provide a system of streets that meets the needs of current and future
inhabitants and facilitates the safe and efficient movement of people
and goods throughout the City consistent with the City's ability to
finance and maintain such a system.
Policy 1.1 - Develop and maintain a circulation system that is based
upon and is in balance with the Land Use Element of the General Plan.
Policy 1.11 - Encourage new development which facilitates transit
services, provides for non -vehicular circulation and minimizes vehicle
miles traveled.
DocuSign Envelope ID: EFEBA85B-0515-43D5-BCC9-D47CFOD221 FO
Land Use Strategies Accommodating Transit and Non -Motorized Transportation
June 2024
Page 3
GOAL 4: Maximize the efficiency of the circulation system through the use of
transportation system management and demand management
strategies.
Policy 4.4 - Require that proposals for major new non-residential
developments include submission of a Transportation Demand
Management plan to the City, including monitoring and enforcement
provisions.
GOAL 5: Support development of a public transportation system that provides
mobility to all City inhabitants and encourages use of public
transportation as an alternative to automobile travel.
Policy 5.2: Require new development to fund transit facilities, such as
bus shelters and turn -outs, where deemed necessary to meet public
needs arising in conjunction with development.
Policy 5.5: Promote new development that is designed in a manner
which facilitates provision or expansion of transit service, and provides
non -automobile circulation within the development.
Policy 5.6: Encourage developers to work with agencies providing
transit service with the objective of maximizing the potential for transit
use by residents and/or employees.
GOAL 6: Increase the use of non -motorized modes of transportation.
Policy 6.13: Maintain a City of Tustin Bikeway Plan (that complements
and is coordinated with the County's Plan as well as neighborhood
jurisdictions) which will identify existing and future routes within the City
to accommodate such uses.
Policy 6.14: Require new development
improvement of bicycle, pedestrian and
deemed necessary to meet public needs
development.
Implementation Measures are as follows:
to dedicate land and fund
equestrian facilities, where
arising in conjunction with
• New Development: Require new development to dedicate land and
fund improvement of bicycle, pedestrian and equestrian facilities, where
DocuSign Envelope ID: EFEBA85B-0515-43D5-BCC9-D47CFOD221 FO
Land Use Strategies Accommodating Transit and Non -Motorized Transportation
June 2024
Page 4
deemed necessary to meet public needs arising in conjunction with
development.
• Bus Service: The City works closely with the Orange County
Transportation Authority (OCTA) to provide local and express bus service
to the community. The City continued a cooperative effort with designs
to enhance access to bus stops that are compliant with the Americans
with Disabilities Act (ADA).
Bus Shelters and Bus Bench Program: The City has implemented a
bus shelter and bus bench program and installs these facilities as
opportunities become available for their implementation.
Bus Turnouts: The City reviews development plans and identifies
locations for the installation of bus turnouts on arterial roadways. It also
ensures bus turnouts are included where applicable on new roadway
construction and widening. The City continues to coordinate the design
and implementation of new bus turnout locations at Tustin Legacy with
OCTA and the development community.
• Regional Hiking and Biking Trail System: The City supports and
promotes the safety of pedestrians and bicyclists by complying with
uniform standards and practices, including designation of bicycle lanes,
off -road bicycle trails, proper signage, and adequate sidewalks, bicycle
lanes, and off -road bicycle trail widths.
Orange County Master Plan of Bikeways: The City supports and
coordinates the development and maintenance of bikeways in
conjunction with the Orange County Master Plan of County Bikeways.
GOAL 7: Provide for well -designed and convenient parking facilities.
Implementation Measures are as follows:
Parking Facilities: Tustin encourages the efficient use of existing parking
facilities, including provisions for shared use of facilities and other
provisions to improve the effectiveness of City parking codes and
ordinances. Additionally, the City provides for common parking facilities
in the Old Town area to provide convenient access to public and private
facilities. In cooperation with the City, OCTA constructed a parking
structure at the Metrolink Commuter Rail Station to accommodate parking
demands as Metrolink service expands.
Development Review and Parking Requirements: The City monitors
development to ensure sufficient off-street parking for all land use
decisions.
DocuSign Envelope ID: EFEBA85B-0515-43D5-BCC9-D47CFOD221 FO
Land Use Strategies Accommodating Transit and Non -Motorized Transportation
June 2024
Page 5
I trust this information will be helpful in documenting how the City of Tustin addresses transit
and non -motorized transportation through its General Plan. Please feel free to contact
me at (714) 573-3389 if you have any questions.
Sincerely,
Ken Nishikawa, P.E.
Deputy Director of Public Works/City Engineer
Attachment: City of Tustin — General Plan Excerpts
Copy: Mike Grisso, Acting Director of Public Works
Stacey Cuevas, Acting Assistant Director of Public Works
S:\OCTA\Measure M2 Eligibility\Measure M2 2024-2025\Files\Working Word Files\J Land UseStrategies Letter 2024-25.docx
DocuSign Envelope ID: EFEBA85B-0515-43D5-BCC9-D47CFOD221 FO
CITY OF TUSTIN
GENERAL PLAN
DocuSign Envelope ID: EFEBA85B-0515-43D5-BCC9-D47CFOD221 FO
LAND USE ELEMENT
DocuSign Envelope ID: EFEBA85B-0515-43D5-BCC9-D47CFOD221FO
balance between the City's revenue generation needs and service
provision responsibilities.
GOAL 1: Provide for a well balanced land use pattern that
accommodates existing and future needs for housing, commercial
and industrial land, open space and community facilities and
services, while maintaining a healthy, diversified economy
adequate to provide future City services.
Policy 1.1: Preserve the low -density quality of Tustin's existing
single-family neighborhoods while permitting compatible
multi -family development to meet regional housing needs where best
suited from the standpoint of current development, accessibility,
transportation and public facilities.
Policy 1.2: Provide for and encourage the development of
neighborhood -serving commercial uses in areas of Tustin presently
underserved by such uses. Encourage the integration of retail or
service commercial uses on the street level of office projects.
Policy 1.3: Facilitate the development of vacant and underutilized
freeway parcels with commercial uses where appropriate and
compatible with surrounding uses to capitalize on their freeway
access and visibility.
Policy 1.4: Consider modification of present City boundaries in
unincorporated areas within the City of Tustin's sphere where they
are irregular and create inefficiencies.
Policy 1.5: Encourage compatible and complementary infill of
previously by-passed parcels in areas already predominately
developed.
Policy 1.6: Ensure an adequate supply of commercial and industrial
land within the City of Tustin for potential commercial and industrial
expansion and development.
Policy 1.7: As part of the City's attraction to business and industry,
provide adequate sites to house future employees.
CITY OF TUSTIN LAND USE ELEMENT
GENERAL PLAN 13 NOVEMBER 2018
DocuSign Envelope ID: EFEBA85B-0515-43D5-BCC9-D47CFOD221FO
Policy 1.8: Provide incentives to encourage lot consolidation and
parcel assemblage to provide expanded opportunities for coordinated
development and redevelopment.
Policy 1.9: Provide development of light industrial and business park
uses under strict performance development standards. Encourage
industrial and business parks as the preferred method of
accommodating industrial growth.
Policy 1.10: Ensure that the distribution and intensity of land uses are
consistent with the Land Use Plan and classification system.
Policy 1.11: Where feasible, increase the amount and network of
public and private open space and recreational facilities which will be
adequate in size and location to be useable for active or passive
recreation as well as for visual relief.
Policy 1.12: Evaluate all future annexation proposals within the City's
sphere of influence for their potential financial, social and
environmental impacts on the City of Tustin. The analysis of financial
impacts shall include preparation of a fiscal impact report which
provides an analysis of impacts on operating costs and costs
associated with needed short and long term capital improvements.
Policy 1.13: Preserve the existing low density character of North
Tustin single family zoned neighborhoods.
GOAL 2: Ensure that future land use decisions are the result of
sound and comprehensive planning.
Policy 2.1: Consider all General Plan goals and policies, including
those in other General Plan elements, in evaluating proposed
development projects for General Plan consistency.
Policy 2.2: Maintain consistency between the Land Use Element,
Zoning Ordinances, and other City ordinances, regulations and
standards.
Policy 2.3: Endeavor to promote public interest in, and understanding
of, the General Plan and regulations relating to it.
CITY OF TUSTIN LAND USE ELEMENT
GENERAL PLAN 14 NOVEMBER 2018
DocuSign Envelope ID: EFEBA85B-0515-43D5-BCC9-D47CFOD221FO
Policy 2.4: Encourage citizen participation in planning and
development of land use programs.
Policy 2.5: Foster inter -governmental cooperation and coordination in
order to maximize the effectiveness of land use policies.
Policy 2.6: Maintain consistency with the Airport Environs Land Use
Plan (AELUP) for John Wayne Airport in terms of maximum
allowable building height, noise levels, safety areas, and other
applicable standards.
COMPATIBLE AND COMPLEMENTARY DEVELOPMENT
Intermixing of different land uses can result in incompatibilities
attributable to differences in traffic levels, noise levels, physical scale,
and hours of operation. Incompatibility can also occur when the
characteristics of a specific land use do not match the physical
characteristics of available land (such as intensive development in
hillside areas).
GOAL 3: Ensure that new development is compatible with
surrounding land uses in the community, the City's circulation
network, availability of public facilities, existing development
constraints and the City's unique characteristics and resources.
Policy 3.1: Coordinate and monitor the impact and intensity of land
uses in adjacent jurisdictions on Tustin's transportation and
circulation systems to provide for the efficient movement of people
and goods with the least interference.
Policy 3.2: Locate major commercial uses in areas that are easily
accessible to major transportation facilities.
Policy 3.3: Allow development clustering in hillside areas when this
method will better preserve the natural terrain and open character of
the City.
Policy 3.4: In designing hillside development, give particular
attention to maximizing view opportunities, minimizing dangers of
geologic and soil hazards, minimizing adverse visual impact on
CITY OF TUSTIN LAND USE ELEMENT
GENERAL PLAN 15 NOVEMBER 2018
DocuSign Envelope ID: EFEBA85B-0515-43D5-BCC9-D47CFOD221FO
Policy 9.9: Site buildings and align roadways to maximize public
visual exposure to the north -south Peters Canyon ridgeline, the
redwood/cedar grove, the knoll and major tree stands.
DEVELOPMENT CHARACTER IN OLD TOWN/FIRST STREET AREA
The development character of Old Town and the First Street area can
be significantly enhanced by greater integration of residential uses
and thriving commercial uses and physical renovations to existing
buildings and street frontages which promote a pedestrian
orientation.
GOAL 10: Improve and strengthen the Tustin Old Town/First Street
area with a unique pedestrian environment and diverse mix of
goods, services, and uses.
Policy 10.1: Improve the Old Town District's identity as the City's
historical and architectural focus and its contribution to the City's
economic base.
Policy 10.2: Review and consider the possible development of
residential uses in the Old Town area both as individual residential
projects, and integrated above ground floor retail and office uses.
Policy 10.3: Encourage outdoor pedestrian spaces, such as courtyards,
arcades and open landscaped passages, to be integrated into new
development. Encourage high -quality pedestrian -oriented building
frontages which open onto these pedestrian spaces and public
sidewalks.
Policy 10.4: Develop and use signage to promote a district parking
concept that emphasizes shared parking facilities. Promote
improvements which will upgrade circulation and access in the Old
Town District.
Policy 10.5: Study the potential expansion of the Cultural Resources
Overlay District north of First Street to Irvine Boulevard.
Policy 10.6: Encourage the integration of retail or service commercial
uses on the street level of office projects through flexibility in site
development standards.
CITY OF TUSTIN LAND USE ELEMENT
GENERAL PLAN 23 NOVEMBER 2018
DocuSign Envelope ID: EFEBA85B-0515-43D5-BCC9-D47CFOD221FO
Policy 10.7: Encourage the consolidation of individual parcels/
consolidated site planning and parking and access along First Street
and in Old Town through utilization of development incentives such
as reduced parking, height bonus, lot coverage relaxation, allowance
for secondary uses, fee waivers, and/or financial assistance in land
acquisition and/or infrastructure improvements.
Policy 10.8: Encourage rehabilitation of existing facades and signage
to comply with the Downtown Commercial Core Specific Plan design
criteria.
Policy 10.9: Allow existing single family residential uses/ structures
listed within the City's official historic survey to be preserved and
used as a residence, or preserved and used as a commercial use
consistent with the City's Cultural District Residential Design
Guidelines and the Secretary of Interiors Standards for Rehabilitation.
DEVELOPMENT CHARACTER IN THE PACIFIC CENTER EAST AREA
The future image of the Pacific Center East area will consist of a more
intensive and integrated business park environment. The area's
distinct location adjacent to SR 55 creates a significant opportunity to
capitalize on its freeway orientation to achieve regional recognition.
GOAL 11: Provide for an integrated business park environment in
the Pacific Center East Area which both capitalizes on market
opportunities and is compatible with adjacent developed land uses.
Policy 11.1: Provide a wide range of uses and intensities which meet
the City's future needs for mixed land uses and for a variety of
facilities and services in the project area, and which capitalize on
visibility and access of freeway interchange locations.
Policy 11.2: Create a cohesive architectural image and attractive
streetscape through implementation of development standards and
design guidelines to unify the area.
Policy 11.3: Promote building forms that relate to the scale and
character of surrounding development while also relating new
development to pedestrian functions.
CITY OF TUSTIN LAND USE ELEMENT
GENERAL PLAN 24 NOVEMBER 2018
DocuSign Envelope ID: EFEBA85B-0515-43D5-BCC9-D47CFOD221 FO
CIRCULATION
ELEMENT
DocuSign Envelope ID: EFEBA85B-0515-43D5-BCC9-D47CFOD221FO
CIRCULATION ELEMENT GOALS AND POLICIES
The following goals and policies form the basis for providing a circulation system
which adequately serves the development intensity anticipated in the Land Use
Element. They are designed to reflect and support the Citywide goals of the
General Plan, and acknowledge the changing economic and environmental
conditions in the City and surrounding regions.
LOCAL THOROUGHFARES AND TRANSPORTATION ROUTES
A well -planned street system provides safe and convenient access to
land use development in the City and serves the primary mobility
needs of the community. To provide such a system, the Circulation
Element includes a planned hierarchy of arterial roadways, each
roadway serving a specific function and carrying a portion of the
anticipated traffic demands.
GOAL 1: Provide a system of streets that meets the needs of current
and future inhabitants and facilitates the safe and efficient
movement of people and goods throughout the City consistent
with the City's ability to finance and maintain such a system.
Policy 1.1: Develop and maintain a circulation system that is based
upon and is in balance with the Land Use Element of the General
Plan.
Policy 1.2: Develop and implement circulation system standards for
roadway and intersection classifications, right-of-way width,
pavement width, design speed, warrant requirements, capacity,
maximum grades and associated features such as medians and
bicycle lanes or trails that are adjacent or off -road.
Policy 1.3: Coordinate roadway improvements with applicable
regional, state and federal transportation plans and proposals.
Policy 1.4: Develop and implement thresholds and performance
standards for acceptable levels of service.
CITY OF TUSTIN CIRCULATION ELEMENT
GENERAL PLAN 10 JUNE 2018
DocuSign Envelope ID: EFEBA85B-0515-43D5-BCC9-D47CFOD221F0
Policy 1.5: Develop a program to identify, monitor and make
recommendations for improvements to roadways and intersections
that are approaching, or have approached, unacceptable levels of
service or experiencing higher than expected accident rates.
Policy 1.6: Develop and improve the City's transportation network
consistent with available funding; scheduling shall be coordinated
with land use plans to ensure the orderly extension of facilities and
to preserve a free -flowing circulation system.
Policy 1.7: Provide for and work with responsible agencies
regarding the safe and expeditious transport of hazardous materials.
Policy 1.8: Limit driveway access on arterial streets to maintain a
desired quality of flow.
Policy 1.9: Design local and collector streets to discourage their use
as alternate through routes to secondary, primary, and major streets.
Policy 1.10: Require that proposals for major new developments
include a future traffic impact analysis which identifies measures to
mitigate any identified project impacts.
Policy 1.11: Encourage new development which facilitates transit
services, provides for non -vehicular circulation and minimizes
vehicle miles traveled.
Policy 1.12: Minimize pedestrian and vehicular conflicts through
street design and well -marked pedestrian crossings.
Policy 1.13: Minimize effects of transportation noise wherever
possible so as to comply with the Noise Element.
Policy 1.14: Enhance the important role that streetscapes play in
defining the character of the City by expanding street planning and
design procedure to include aesthetic and environmental concerns,
as well as traffic considerations. Develop a circulation system which
highlights environmental amenities and scenic areas.
Policy 1.15: Ensure construction of existing roadways to planned
widths, as new developments are constructed.
CITY OF TUSTIN CIRCULATION ELEMENT
GENERAL PLAN 11 JUNE 2018
DocuSign Envelope ID: EFEBA85B-0515-43D5-BCC9-D47CFOD221FO
Policy 1.16: Continue to require dedication of right-of-way and
construction of required public improvements on streets adjacent to
construction projects at the developer's expense.
Policy 1.17: Direct existing through traffic from local streets to
collector, secondary, and arterials to reduce traffic on local streets,
improve neighborhood safety and environmental quality.
Policy 1.18: Assist and develop safe school routes in conjunction
with the Tustin Unified School District.
GOAL 2: Provide for a truck circulation system that provides for
the effective transport of commodities while minimizing the
negative impacts throughout the City.
Policy 2.1: Provide primary truck routes and describe such routes on
selected arterial streets to minimize the impacts of truck traffic on
residential areas.
Policy 2.2: Provide appropriately designed and maintained
roadways for the primary truck routes.
Policy 2.3: Provide loading areas and accessways that are designed
and located so as to avoid conflicts with efficient traffic circulation.
Policy 2.4: Consider safety regulations addressing trucks hauling
materials within the City.
Policy 2.5: Discourage on -street loading and unloading of
commercial and industrial products.
INTERCITY AND REGIONAL TRANSPORTATION
The Circulation Element is set in a regional context which recognizes
the related transportation needs and planning activities of the
surrounding County, Region, and State.
GOAL 3: Support development of a network of regional
transportation facilities which ensure the safe and efficient
CITY OF TUSTIN CIRCULATION ELEMENT
GENERAL PLAN 12 JUNE 2018
DocuSign Envelope ID: EFEBA85B-0515-43D5-BCC9-D47CFOD221FO
Demand Management (TDM) strategies. Together, these improve
the efficiency of the transportation system and reduce vehicular
demands, thereby reducing the impacts of future development.
GOAL 4: Maximize the efficiency of the circulation system
through the use of transportation system management and
demand management strategies.
Policy 4.1: Implement traffic signal coordination on arterial streets to
the maximum extent practical, consistent with financial resources,
integrate signal coordination efforts with those of adjacent
jurisdictions, and implement other operational measures where
possible to maximize the efficiency of the existing circulation system
and to minimize delay and congestion.
Policy 4.2: Implement intersection capacity improvements where
feasible.
Policy 4.3: Encourage the implementation of employer
Transportation Demand Management (TDM) requirements, which
were included in the Southern California Air Quality Management
District's Regulation 2202 of the 1997 Air Quality Management Plan
and as required by Proposition 111 as part of the Congestion
Management Program (CMP) and participate in regional efforts to
implement TDM requirements.
Policy 4.4: Require that proposals for major new non-residential
developments include submission of a TDM plan to the City,
including monitoring and enforcement provisions.
Policy 4.5: Encourage the development of additional regional public
transportation services and support facilities including park -and -
ride lots near the SR-55 and I-5 freeways.
Policy 4.6: Encourage the promotion of ridesharing through
publicity and provision of information to the public.
GOAL 5: Support development of a public transportation system
that provides mobility to all City inhabitants and encourages use
of public transportation as an alternative to automobile travel.
CITY OF TUSTIN CIRCULATION ELEMENT
GENERAL PLAN 14 JUNE 2018
DocuSign Envelope ID: EFEBA85B-0515-43D5-BCC9-D47CFOD221FO
Policy 5.1: Support the efforts of the appropriate transportation
agencies to provide additional local and express bus service to the
Tustin community, and to provide park -and -ride lots near the SR-55
and I-5 freeways.
Policy 5.2: Require new development to fund transit facilities, such
as bus shelters and turn -outs, where deemed necessary to meet
public needs arising in conjunction with development.
Policy 5.3: Ensure accessibility of public transportation for elderly
and disabled persons, consistent with City responsibilities for
accessibility.
Policy 5.4: Encourage employers to reduce vehicular trips by
offering employee incentives, such as subsidized bus passes and
vanpool/carpool programs.
Policy 5.5: Promote new development that is designed in a manner
which facilitates provision or expansion of transit service, and
provides non -automobile circulation within the development.
Policy 5.6: Encourage developers to work with agencies providing
transit service with the objective of maximizing the potential for
transit use by residents and/or employees.
Policy 5.7: Promote the provision of safe transit stops and shelters.
TRANSIT, BICYCLE, PEDESTRIAN AND EQUESTRIAN FACILITIES
Non -vehicular modes of travel serve certain mobility needs and also
provide recreational opportunities. Where possible, the Element
provides for these modes of travel by separate trails, walkways and
bike lanes.
GOAL 6: Increase the use of non -motorized modes of
transportation.
Policy 6.1: Promote the safety of pedestrians and bicyclists by
adhering to uniform standards and practices, including designation
CITY OF TUSTIN CIRCULATION ELEMENT
GENERAL PLAN 15 JUNE 2018
DocuSign Envelope ID: EFEBA85B-0515-43D5-BCC9-D47CFOD221FO
CITY OF TUSTIN
GENERAL PLAN
of bicycle lanes, off -road bicycle trails, proper signage, and adequate
sidewalk, bicycle lane, and off -road bicycle trail widths.
Policy 6.2: Maintain existing pedestrian facilities and require new
development to provide pedestrian walkways between
developments, schools and public facilities.
Policy 6.3: Ensure accessibility of pedestrian facilities to the elderly
and disabled.
Policy 6.4: Support and coordinate the development and
maintenance of bikeways in conjunction with the County of Orange
Master Plan of Countywide Bikeways to assure that local bicycle
routes will be compatible with routes of neighboring jurisdictions.
Policy 6.5: Require the provision of showers and an accessible and
secure area for bicycle storage on certain size non-residential
developments as required by the City's TDM ordinance.
Policy 6.6: Develop programs that encourage the safe utilization of
easements and/or rights -of -way along flood control channels, public
utility rights -of -way, and street rights -of -way wherever possible for
the use of bicycles and/or pedestrian/ equestrian trails.
Policy 6.7: Ensure link -up of trails within the City to the regional trail
system.
Policy 6.8: Support retrofit installation of sidewalks in industrial
districts and Planned Community Business Parks as development
occurs.
Policy 6.9: Support and coordinate the development and
maintenance of bikeways and trails in conjunction with the master
plans of the appropriate agencies.
Policy 6.10: Encourage safe biking by supporting safety clinics/
courses sponsored by various local and state agencies.
Policy 6.11: Consider the provision of unique transportation
methods, such as shuttle buses from outlying parking areas, for
special events.
16
CIRCULATION ELEMENT
JUNE 2018
DocuSign Envelope ID: EFEBA85B-0515-43D5-BCC9-D47CFOD221FO
PARKING
Policy 6.12: Provide for a non -vehicular circulation system that
encourages bicycle transportation and pedestrian circulation.
Policy 6.13: Maintain a City of Tustin Bikeway Plan (that
complements and is coordinated with the County's Plan as well as
neighborhood jurisdictions)
which will identify existing and future routes within the City to
accommodate such uses.
Policy 6.14: Require new development to dedicate land and fund
improvement of bicycle, pedestrian and equestrian facilities, where
deemed necessary to meet public needs arising in conjunction with
development.
Adequate and convenient parking facilities are an important part of
the transportation amenities provided by a City. The Circulation
Element therefore contains policies which ensure the provision of
such amenities.
GOAL 7: Provide for well -designed and convenient parking
facilities.
Policy 7.1: Consolidate parking, where appropriate, to eliminate the
number of ingress and egress points onto arterials.
Policy 7.2: Provide sufficient off-street parking for all land uses.
Policy 7.3: Encourage the efficient use of parking facilities, including
provisions for shared use of facilities, smaller vehicles and other
provisions to improve the effectiveness of City codes and
ordinances.
Policy 7.4: Reduce use of arterial streets for on -street parking in an
effort to maximize traffic flow characteristics of roadways.
CITY OF TUSTIN CIRCULATION ELEMENT
GENERAL PLAN 17 JUNE 2018
DocuSign Envelope ID: EFEBA85B-0515-43D5-BCC9-D47CFOD221F0
BIKEWAYS
The existing bikeway system within the City of Tustin and the
Planning Area is illustrated in Figure C-4. There is one Class I bike
trail along Newport Avenue between El Camino Real and Irvine
Boulevard, and several Class II lanes throughout the remainder of
the City and Planning Area. The County Regional Trail (Class I)
currently exists from Peters Canyon Road to Jamboree Road. The
network of bicycle routes is only partially established, and with few
exceptions, most bicycles share street right-of-ways with
automobiles.
To provide adequate accommodations in the future, a City Bikeway
Plan has been developed. Missing links in the existing system and
constraints for future routes were considered with the resulting
Bikeway Plan illustrated in Figure C-5. Table C-7 describes and
summarizes classifications relating to the Plan. The future network
is comprehensive with several new facilities and extensions to
existing routes. A conscious effort was exerted to ensure the Bikeway
Plan achieved a continuity of routes and trails that did not terminate
except at logical locations such as schools or parks.
A Class I trail is proposed along the Peters Canyon Wash on the
eastern boundary of the City. This trail is part of the East Tustin and
Lower Peters Canyon Specific Plans and will also provide facilities
for pedestrians and equestrians. The trail also extends north of
Tustin Ranch Road along Pioneer Way, then inland adjacent to the
Cedar Grove Park site and hillside areas to the west providing access
to Peters Canyon Regional Park. The trail is part of the regional trail
network.
CITY OF TUSTIN CIRCULATION ELEMENT
GENERAL PLAN 42 JUNE 2018
DocuSign Envelope ID: EFEBA85B-0515-43D5-BCC9-D47CFOD221F0
_1,
NORTH mLiaecals
SOURCE. Aut6r.FaelAssnselea Inc.
TUSTIN Figure C-4
ENEML PLAN Existing Pkewa s
Updated N vember 20, 2012
CITY OF TUSTIN CIRCULATION ELEMENT
GENERAL PLAN 43 JUNE 2018
DocuSign Envelope ID: EFEBA85B-0515-43D5-BCC9-D47CFOD221 FO
V
NORTH not to scale
SOURCE: Austin -Foust Asso6ales, Inc.
IR1W1KI 10
-February 22, 2005
CITY OF TUSTIN
GENERAL PLAN
44
Figure C-5
Master Bikeway Plan
CIRCULATION ELEMENT
JUNE 2018
DocuSign Envelope ID: EFEBA85B-0515-43D5-BCC9-D47CFOD221FO
the Tustin community and to provide Park and Ride lots near
the freeways.
o Require new development to participate in transit amenities,
such as bus shelters, turn -outs, landing pads and similar
items.
o Coordinate roadway improvements with transit service so
that where applicable, special features, such as bus turn -outs,
can be provided in the improvement program.
Responsible Agency/Department: Engineering Division,
Community Development
Funding Source: Developer exactions, Measure "M", Proposition 111
Time Frame: On -going
Related Circulation Element Policies: 3.7, 3.8, 4.1-4.6, 5.1-5.7
BICYCLE, PEDESTRIAN AND EQUESTRIAN FACILITIES
11. Alternative Transportation Modes: These components of the
General Plan Circulation Element provide alternative modes of
transportation (in the case of bicycle), and recreation -related
facilities (in the case of bicycle, pedestrian, and equestrian).
Implementing actions are as follows:
o Provide uniform standards and practices for the safety of
pedestrians and bicyclists by providing adequate sidewalks,
bicycle lanes, and off -road bicycle trails and requiring
dedication and improvement of these facilities where deemed
necessary to meet public needs arising as a result of
development.
o Include pedestrian walkway standards as requirements on
new development.
o Coordinate the development and maintenance of bikeways
with the work carried out by the County of Orange for the
Master Plan of Countywide Bikeways.
CITY OF TUSTIN CIRCULATION ELEMENT
GENERAL PLAN 55 JUNE 2018
DocuSign Envelope ID: EFEBA85B-0515-43D5-BCC9-D47CFOD221FO
PARKING
0 Encourage City-wide development to participate in transit
amenities, such as bus shelters, turn -outs, and similar
facilities.
Responsible Agency/Department: Community Development,
Public Works
Funding Source: Developer exactions, Federal and State grants, City
General Fund
Time Frame: On -going
Related Circulation Element Policies: 6.1-6.13
12. Sidewalks in Industrial Areas: Continue to study and
implement, if feasible, the creation of an assessment district for
sidewalk construction within each industrial area which would
spread the cost of said sidewalk construction and administrative
district costs over a multi -year payoff period or 10 or 20 years.
Responsible Agency/Department: Public Works Department
Funding Source: Assessment District
Time Frame:1993/1994
Related Circulation Element Policies:1.12,1.16, 6.1, 6.2 and 6.8
13. Parking Ordinance Study: The City shall complete a Parking
Ordinance study which will include issues such as guest parking
standards, shared use of parking facilities, parking for smaller
vehicles and necessary changes to City codes and regulations.
Responsible Agency/Department: Community Development
Department
Funding Source: City General Fund
CITY OF TUSTIN CIRCULATION ELEMENT
GENERAL PLAN 56 JUNE 2018