Loading...
HomeMy WebLinkAbout07 AWARD OF CONTRACT FOR VANDENBERG WELL REHABILITATION PROJECT (CIP NO. 60177)Docusign Envelope ID: 2DB419AB-B4BF-4B43-92C2-3C1F75CF57EC AGENDA REPORTAgenda Reeweldm DS 05 v City Manager aS Finance Director dK MEETING DATE: JULY 16, 2024 TO: ALDO E. SCHINDLER, CITY MANAGER FROM: MICHAEL GRISSO, ACTING DIRECTOR OF PUBLIC WORKS SUBJECT: AWARD OF CONTRACT FOR VANDENBERG WELL REHABILITATION PROJECT (CIP NO. 60177) SUMMARY Vandenberg Well is one of the City's nine active groundwater wells. Vandenberg Well was last rehabilitated in 2010 and is due for rehabilitation. The City retains a list of three prequalified well and pump contractors and requested proposals from each. Three proposals were received with General Pump Company as the lowest responsible bidder. RECOMMENDATION It is recommended that the City Council award a construction contract in the amount of $671,440 for the Vandenberg Well Rehabilitation Project (CIP No. 60177) to General Pump Company as the lowest responsible bidder and authorize the Mayor and City Clerk to execute the contract documents on behalf of the City. FISCAL IMPACT Sufficient funds have been appropriated in the Fiscal Year 2024-2025 Capital Improvement Program for the rehabilitation of Vandenberg Well from the 2024 Water Bond Fund (Fund 307). CORRELATION TO THE STRATEGIC PLAN The rehabilitation of water wells contributes to the fulfillment of the City's Strategic Plan Goal B: Public Safety and Protection of Assets. Specifically, the project implements Strategy 5, which among other items, is to ensure continuous maintenance and improvement of public facilities. BACKGROUND The City's 2023 Water Master Plan identifies a goal to rehabilitate one groundwater well each year. Evaluation and prioritization criteria include operating hours between rehabilitations, overall well production, comparing design flow to field flow conditions, and other considerations such as water quality and/or operational challenges are used to define timing and priority for rehabilitating the City's groundwater wells. Additionally, and in preparation for the completion of the Main Street PFAS Treatment Facility in 2025, Water Services staff has prioritized maintenance of the groundwater wells that will pump to the new treatment plant to ensure maximum output at startup. Recent production data from Vandenberg Well has shown a significant drop in overall production capacities with a design flow of 1800 gallons per minute (GPM) and a current operating capacity of approximately 1100 GPM. Generally, a comprehensive well rehabilitation will increase production capacity, restoring operating flows back to near design flow. Docusign Envelope ID: 2DB419AB-B4BF-4B43-92C2-3C1F75CF57EC Award Contract — Vandenberg Well Rehabilitation July 16, 2024 Page 2 In October 2023, Vandenberg Well pump was removed and inspected. The Engineer's Report recommends a full pump replacement, as well as, a well rehabilitation including mechanical and chemical cleaning to restore production capacity. On April 22, 2024, the City requested formal proposals from General Pump Company, Layne Christensen Company, and Weber Water Resources. Three bids were received, with General Pump Company being the lowest responsible bidder. Bids results are summarized as follows: • General Pump Company.................................................................. $671,440.00 • Layne Christensen Company........................................................... $695,980.00 • Weber Water Resources.................................................................. $704,144.00 Staff has reviewed the references, the State Contractor's License, and registration with the Department of Industrial Relations for General Pump Company and has determined that they are appropriate for the subject project. It is recommended that the City Council award the construction contract for the Vandenberg Well Rehabilitation Project, CIP No. 60177 to General Pump Company as the lowest responsive/responsible bidder, and authorize the Mayor and the City Clerk to execute the contract documents on behalf of the City. v- ,,` 0 C---- - Michael Grisso Acting Director of Public Works 1710321.1