HomeMy WebLinkAboutPRESENTATION - OLD TOWN IMPRONEMENTS PROJECTOLD TOWN &
MAIN STREET
IMPROVEMENTS
CITY COUNCIL
SEPTEMBER 17, 2024
DOWNTOWN COMMERCIAL CORE SPECIFIC PLAN
Media
Releases
Workshops
DICCSP
Adopted 2017
Public
Meetings /
Hearings
Stakeholder
Interviews
Technical
Advisory
Committee
Promoting pedestrian -oriented development
Improvements to the streetscape, roadways, and
pedestrian/bicycle amenities
Drawing more patrons to Old Town
Chapter 2 — Development Plan
2.4 Streetscape & Open Space
2.4.1 Ficus Tree Program
Planned tree replacement
2.4.2 Street Tree Pa lette
2.4.3 Monumentation Plan
2.4.6.2 Pa rklets
OLD TOWN IMPROVEMENTS
Construction of seven parklets
Crosswalk improvements on Main Street at C Street &Prospect Avenue
Electrical improvements for tree lighting
Retractable in -pavement bollards at key event closure intersections
Bicycle safety improvements on El Camino Real &Main Street
Digital way -finder /information kiosk at EL Camino Real &Main Street
Q '
-+- c � 'fir ''�, ? _- ik•
Remembering what connects us.
7
1
ME BL
BAR - FISH
Ti1SIIN Remembering what connects us.
�. # # r ♦r
,
tom'-rt 1, 16
All
- �-,t�.s . r �� y t ti • yy
r 4 ►1. _
' a
hL
ddP—
TLJSK I N Remembering what connects us.
L`
Y
AJO
-dp W,
-k�- NOW-
,�446
;Zfl
Ito rj
OF
46
Mi
Remembering what connects us.
� I�IMM
�IMp
PARKLET #7
IPi W14PP/n
Ise w r4H
PlfrheE30flL
I.
I IMMST. Ci QINN3 �
Mae��c m
0 I� ss!y Td
9�1� ;Rd 1 Z3� S� •s•. u..ma� ,
I I ti.
I
I
IMPROVEMENTLEGENQ
rxIs:INC -Rrr �-Pf^.IPS VARY)
NEW CHINE5E t-m aRAKE TREE
- NEW PINK TRUMPET TREE
_ - NEW !UPGRADED PLANTING AREA
- COLORED AC PAVEMEtO
_ - NEW PAVERS
- EXISTING PAVER
_ NEW UNDE;CGROJN1-7 ELECTWCAL
` ` -dl KEE LIGI-'INC
®- PROPOSEL] RE IRACIA$LE SOLLAR❑
I�_ PROI°O5EI1 PELt5TRIAN ACTIVA�SEO
WARNING DEVICE IMPROVEMENT
PARKLET #2 1 '
I
STREET—
ua�nlaraa
— PARKLET #d
L CAMINC REAL.
I.
$
LLJ
w�
f
10m , a
'
I
1.1 U1
z
LET#3
L --
I d sw gqq5d
d
EY
II
f 17"
-I Ps !
�nwsays I I
iui §da �R d5 �d mIS 3d
i sLU
Lu
co
PARKLET #d
I
— -- --� LL
I
I I'
I I
I �
I I•
I I '
I — I f r
— — —
��ftQSPECT AVE f — -
-_--- ---- -- -- --- ------ ----------------------- ---------- --- ----- ---------- - ------
IMPROVEMENT PLAN
_ _ • ' PARKLET #5
� �w�'�"�ivx � Ursa �'�., � �`� a �' ,, � � •� k':� r ��� 3�"��'."� < 4`�*'f�! �
6
......III---
_
s
11
a] I kIll I F�' N Mi M I kv, I a] � � N 0
*-2
/' uJ' � N Remembering what connects us.
12
MAIN STREET IMPROVEMENTS
"Old Town Tustin" gateway sign spanning Main Street
Raised / landscaped center median
Realignment to a single travel lane in each direction
Bike lane improvements
Widened multi -use path
Driveway realignment & lighted crosswalk between Library & Tustin Plaza
Addition of angled parking along Tustin Plaza
Cr
1'
�1 • 4 �
J
11S N Remembering what connects us.
TLJSIIN
M, W,-Z&
7
j�
`tom \, -`� x+� �• � f i,
NIT
Remembering what connects us.
NO IFL
me M M
MI UM MUM MUMMONEEff
Mono 0 as 0 Al M MAJIN
L is r"Ift-
M -
F
l
ohs
Remembering what connects us.
Remembering what connects us.
■ ■
■■■■■■■■
■
■ ■
■■■■■■■■
■
■ ■
■■■■■■■■
■
iWN!
Remembering what connects us.
,ter- :r � '�- 7•: - �- .ir- � '� � i
r
�S ++ �a'i.�.� ..-emu: c--��: ��GL����_. ��► '� -�_a� .��
w �w
i +
+
0 NEW CHINESE ELM "DRAKE" TREE
@ NEW PINK TRUMPET TREE
+EXISTING PALM TREE
EXISTING FICUS TREE
0 EXISTING CHINESE ELM TREE
111 EXISTING STONE PINE TREE
EXISTING HONEY LOCUST TREE
NEW/REPLACED BRISBANE BOX TREE
ITREE WELLS AT BACK OF CURB
PLANTING AREA THAT CAN BE USED
FOR FUTURE PATIO SEATING
IMPROVEMENT PLAN
wl
H
�F r
r
x
b _
O,
NEW ENTRY ARCH
EXISTING MONUMENT WALL
EXISTING TRELLIS STRUCTURE r
NEW DECORATIVE PAVERS, TYPICAL /
EXISTING PALM TREES '�
BY THE NUMBERS
Combined the projects add:
7 pa rklets
45 trees
14 parking spaces
3 safety enhanced crosswalks
11 intersections with retractable
bollards
PUBLIC OUTREACH
Recognizing:
Construction fatigue
Business impacts
Tree removal sensitivity
Traffic impacts
Community events in Old Town
Positives outcomes:
Commitment to revitalizing Old Town
Boost local economy through increased
visitors
Creating community by constructing outdoor
gathering spaces
Additional parking on Main Street
Enhanced pedestrian & bicycle safety
PUBLIC OUTREACH
Communitv Notification
Presentation to City Council
Letter to properties directly impacted
Project Post Cards (DCCSP area)
Social Media
Tustin Today Winter Edition — Old Town
Tustin Today Spring Edition — Main Street
Website — www.tustinca.ora/oldtown
Other Interested Parties
• Tustin PD & OCFA — Emergency Response
OCTA— Bus routes
Senior Center
Boys and Girls Club
Tustin Library
Chamber of Commerce
TUSD
Tustin Community Foundation
CITY WEBPAGE
Overview
Objectives / Benefits
What to Expect
Public Parking Options
Renderings / Concept Plans
Background / Link to Specific Plan
Contact Us
Home> Departments> Public Works � Engineering> Improvemems Coming to Old Town
IMPROVEMENTS COMING TO OLD TOWN
About the Projects
The Old Town Improvements Project and the Main Street improvements
Project mark the beginning of a comprehensive initiative aimed at
revitalizing the downtown area to create a vibrant, cohesive, connected,
livable and memorable City core. The City of Tustin is working diligently
to preserve, enhance and revitalize the Old Town Tustin area through
responsible and intentional development, while ensuring the historic
character is preserved. These projects are designed to invest in and
support local businesses and the community at large by enhancing the
overall quality of the Old Town Tustin streetscape and surrounding
i n f ra structu re.
Old Town Improvements - Renderings
Old Town Improvements - Concept Plan
Main Street Improvements - Renderings
Main Street Improvements - Concept Plan
PROJECT TIMELINE
Presentation at City
Council Meeting
September 17 Award Contract
Substantial
Old Town
Completion of
Complete Old
November 2024
Parklets Late
Town
Start Old Town
May 2025
Construction
Construction
October 2025
January 2025
Authorization to
hili Cookoff
Bid Old Town
June 1
October 2024 1
1
Sep 24 Oct 24 Nov 24 Dec 24 Jan 25 Feb 25 Mar 25 Apr 25 May 25 Jun 25 Jul 25 Aug 25 Sep 25 Oct 25 Nov 25 Dec 25 Jan 26 Feb 26 Mar 26 Apr 26 May 26 Jun 26
Authorization to I Start Main Street
Bid Main Street Construction
February 2025 October 2025
Award Contract
Main Street
April 2025
Public Outreach and Social Media
As Needed
• Letter to impacted properties
• Post card to all of Old Town (3,500)
• Tustin Today Winter and Spring Editions
• Other as needed
Complete Main
Street Construction
June 2026
Remembering what connects us.
Thank You'.
USTIN
t2
l
V9 T . I- I . I .i .. - .1
"M mat
vlkWjA �,
All