HomeMy WebLinkAboutPC RES 4053RESOLUTION NO. 4053
A RESOLUTION OF THE PLANNING COMMISSION ADOPTING
THE FINAL MITIGATED NEGATIVE DECLARATION FOR
TENTATIVE TRACT MAP 17080 AND DESIGN REVIEW 06-011, A
PROPOSAL TO MERGE TWO PARCELS DEVELOPED WITH 57
APARTMENT UNITS INTO ONE 4 -ACRE SITE FOR
DEVELOPMENT OF A NEW 75 -UNIT CONDOMINIUM PROJECT
LOCATED AT 14421 TO 14471 RED HILL AVENUE
The Planning Commission of the City of Tustin does hereby resolve as follows:
The Planning Commission finds and determines as follows:
A. The applicant (Sun -Cal Red Hill LLC) has requested to merge two
properties currently developed with 57 apartment units into one 4 -
acre site for development of a new 75 -unit condominium project.
The properties are located at 14421 to 14471 Red Hill Avenue;
B. That the requested tentative tract map and design review are
considered a "project' subject to the terms of the California
Environmental Quality Act ("CEQA") (Pub. Resources Code §21000
et. seq.);
C. That City staff prepared an Initial Study to evaluate the potential
environmental impacts associated with Tentative Tract Map 17080
and Design Review 06-011 that concluded that with mitigation
measures potential significant impacts can be reduced to a level of
insignificance and a draft Mitigated Negative Declaration (MND)
was prepared;
D. That a Notice of Intent to Adopt a Mitigated Negative Declaration was
published and the Negative Declaration and Initial Study were made
available for a 20 -day public review and comment period from
February 16, 2007, to March 7, 2007, in compliance with Sections
15072 and 15105 of the State CEQA Guidelines;
E. No comments were received and a Final Negative Declaration was
prepared;
F. That the City Council is the final authority for the project and will
consider the MND prior to action on Tentative Tract Map 17080; and,
G. The Planning Commission considered the Initial Study and the
Mitigated Negative Declaration (Exhibit A) and finds it sufficient for
the proposed Design Review 06-011 and Tentative Tract Map
17080.
Resolution No. 4053
Page 2
II. The Planning Commission hereby adopts Final Mitigated Negative
Declaration for Tentative Tract Map 17080 and Design Review 06-011 for
the subdivision and development of 75 condominium units on properties
located at 14421 to 14471 Red Hill Avenue, attached hereto as Exhibit A.
PASSED AND ADOPTED at a regular meeting of the Tustin Planning
Commission held on the 13th day of March, 2007.
IF
Id
L
ELIZABETH A. BINSACK
Planning Commission Secretary
STATE OF CALIFORNIA )
COUNTY OF ORANGE )
CITY OF TUSTIN )
I, ELIZABETH A. BINSACK, the undersigned, hereby certify that I am the
Planning Commission Secretary of the Planning Commission of the City of
Tustin, California; that Resolution No. 4053 was duly passed and adopted at a
regular meeting of the Tustin Planning Commission, held on the 13`h day March,
2007.
i icy r��t.: 'rim iy
ELIZABETH A. BINSACK
Planning Commission Secretary
INITIAL STUDY
A. BACKGROUND
COMMUNITY DEVELOPMENT DEPARTMENT
300 Centennial Way, Tustin, CA 92780
(714) 573-3100
Project Title: Red Hill Town Homes
Lead Agency: City of Tustin
300 Centennial Way
Tustin, California 92780
Lead Agency
Contact Person: Minoo Ashabi Phone: (714) 573-3126
Project Location: 14421-14471 Red Hill Avenue
Project Sponsor's SunCal- Red Hill LLC
Name and Address: c/o Southwind Realty Group
18301 Von Karman, Suite 710
Irvine, CA 92612
General Plan Designation: High Density Residential
Zoning Designation: Multiple Family Residential (R-3)
Project Description: A request to demolish two existing apartment complexes containing 57 units on a
4 -acre site and redeveloping the site with 75 three story condominium units
Surrounding Uses:
North: residential and office use East: commercial
South: commercial West: residential
Other public agencies whose approval is required:
® Orange County Fire Authority ❑ City of Irvine
❑ Orange County Health Care Agency ❑ City of Santa Ana
❑ South Coast Air Quality Management ❑ Orange County
District EMA
❑ Other
B. ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED
The environmental factors checked below would be potentially affected by this project, involving at least one
impact that is a "Potentially Significant Impact' as indicated by the checklist in Section D below.
❑Land Use and Planning
❑Population and Housing
❑Geological Problems
❑Water
❑Air Quality
❑Transportation & Circulation
❑Biological Resources
❑Energy and Mineral Resources
C. DETERMINATION:
On the basis of this initial evaluation:
❑Hazards
❑Noise
❑Public Services
❑Utilities and Service
Systems
❑Aesthetics
❑Cultural Resources
❑Recreation
❑Mandatory Findings of
Significance
❑ I find that the proposed project COULD NOT have a significant effect on the environment, and a
NEGATIVE DECLARATION will be prepared.
® I find that although the proposed project could have a significant effect on the environment, there will
not be a significant effect in this case because the mitigation measures described on an attached sheet
have been added to the project. A NEGATIVE DECLARATION will be prepared.
❑ I find that the proposed project MAY have a significant effect on the environment, and an
ENVIRONMENTAL IMPACT REPORT is required.
❑ I find that the proposed project MAY have a significant effect(s) on the environment, but at least one
effect 1) has been adequately analyzed in an earlier document pursuant to applicable legal standards, and
2) has been addressed by mitigation measures based on the earlier analysis as described on attached
sheets, if the effect is a "Potentially Significant Impact' or "Potentially Significant Unless Mitigated."
An ENVIRONMENTAL IMPACT REPORT is required, but it must analyze only the effects that
remain to be addressed.
❑ I find that although the proposed project could have a significant effect on the environment, there WILL
NOT be a significant effect in this case because all potentially significant effects 1) have been analyzed
adequately in an earlier EIR pursuant to applicable standards, and 2) have been avoided or mitigated
pursuant to that earlier EIR, including revisions or mitigation measures that are imposed upon the
proposed project.
❑ I find that although the proposed project could have a significant effect on the environment, there WILL
NOT be a significant effect in this case because all potentially significant effects 1) have been analyzed
adequately in an earlier NEGATIVE DECLARATION pursuant to applicable standards, and 2) have
been avoided or mitigated pursuant to that earlier NEGATIVE DECLARATION, including revisions or
mitigation measures that are imposed upon the proposed project.
Preparer: Minoo Ashabi Title Associate Planner
zDate ,7•S=d77-
Elizabeth A. Binsack, Community Development Director
I. AESTHETICS —Would the project:
a) Have a substantial adverse effect on a scenic vista?
b) Substantially damage scenic resources, including, but not
limited to, trees, rock outcroppings, and historic buildings
within a state scenic highway?
c) Substantially degrade the existing visual character or
quality of the site and its surroundings?
d) Create a new source of substantial light or glare, which
would adversely affect day or nighttime views in the area?
H. AGRICULTURE RESOURCES: In determining
whether impacts to agricultural resources are significant
environmental effects, lead agencies may refer to the
California Agricultural Land Evaluation and Site Assessment
Model (1997) prepared by the California Dept. of
Conservation as an optional model to use in assessing impacts
on agriculture and farmland. Would the project:
a) Convert Prime Farmland, Unique Farmland, or Farmland
of Statewide Importance (Farmland), as shown on the maps
._prepared pursuant to the Farmland Mapping and Monitoring
Program of the California Resources Agency, to non-
agricultural use?
b) Conflict with existing zoning for agricultural use, or a
Williamson Act contract?
c) Involve other changes in the existing environment, which,
due to their location or nature, could result in conversion of
Farmland, to non-agricultural use?
III. AIR QUALITY: Where available, the significance
criteria established by the applicable air quality management
or air pollution control district may be relied upon to make the
following determinations. Would the project:
a) Conflict with or obstruct implementation of the applicable
air quality plan?
b) Violate any air quality standard or contribute substantially
to an existing or projected air quality violation?
c) Result in a cumulatively considerable net increase of any
criteria pollutant for which the project region is non -
attainment under an applicable federal or state ambient air
quality standard (including releasing emissions, which exceed
-quantitative thresholds for ozone precursors)?
d) Expose sensitive receptors to substantial pollutant
concentrations?
e) Create objectionable odors affecting a substantial number
of people?
Cl
Less Than
❑
Significant
Potentially
With Less Than
Significant
Mitigation Significant
Impact
Incorporation Impact No Impact
Cl
❑
❑
ED
❑
❑
❑
❑
❑
❑
®
❑
❑
❑
®
❑
❑
❑
❑
ED
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
®
❑
❑
❑
®
❑
❑
❑
®
❑
❑
❑
®
❑
❑
❑
®
❑
IV. BIOLOGICAL RESOURCES: - Would the project:
a) Have a substantial adverse effect, either directly or
through habitat modifications, on any species identified as a
candidate, sensitive, or special status species in local or
regional plans, policies, or regulations, or by the California
Department of Fish and Game or U.S. Fish and Wildlife
Service?
b) Have a substantial adverse effect on any riparian habitat
or other sensitive natural community identified in local or
regional plans, policies, regulations or by the California
Department of Fish and Game or U.S. Fish and Wildlife
Service?
c) Have a substantial adverse effect on federally protected
wetlands as defined by Section 404 of the Clean Water Act
(including, but not limited to, marsh, vernal pool, coastal, etc.)
through direct removal, filling, hydrological interruption, or
other means?
d) Interfere substantially with the movement of any native
resident or migratory fish or wildlife species or with
established native resident or migratory wildlife corridors, or
impede the use of native wildlife nursery sites?
e) Conflict with any local policies or ordinances protecting
biological resources, such as a tree preservation policy or
ordinance?
f) Conflict with the provisions of an adopted Habitat
Conservation Plan, Natural Community Conservation Plan, or
other approved local, regional, or state habitat conservation
plan?
V. CULTURAL RESOURCES: - Would the project
a) Cause a substantial adverse change in the significance of
a historical resource as defined in § 15064.5?
b) Cause a substantial adverse change in the significance of
an archaeological resource pursuant to § 15064.5?
c) Directly or indirectly destroy a unique paleontological
resource or site or unique geologic feature?
d) Disturb any human remains, including those interred
outside of formal cemeteries?
VI. GEOLOGY AND SOILS: - Would the project:
a) Expose people or structures to potential substantial
adverse effects, including the risk of loss, injury, or death
involving:
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
❑
Less Than
❑
Significant
Potentially
With Less Than
Significant
Mitigation Significant
Impact
Incorporation Impact No Impact
❑
❑
❑
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
❑
❑
❑
❑
®
❑
❑
❑
®
❑
❑
❑
®
❑
❑
i) Rupture of a known earthquake fault, as delineated on the
most recent Alquist-Priolo Earthquake Fault Zoning Map
issued by the State Geologist for the area or based on other
substantial evidence of a known fault? Refer to Division of
Mines and Geology Special Publication 42.
ii) Strong seismic ground shaking?
iii) Seismic -related ground failure, including liquefaction?
iv) Landslides?
b) Result in substantial soil erosion or the loss of topsoil?
c) Be located on a geologic unit or soil that is unstable, or
that would become unstable as a result of the project, and
potentially result in on- or off-site landslide, lateral spreading,
subsidence, liquefaction or collapse?
d) Be located on expansive soil, as defined in Table 18-1-B
of the Uniform Building Code (2001), creating substantial
risks to life or property?
e) Have soils incapable of adequately supporting the use of
septic tanks or alternative waste water disposal systems where
sewers are not available for the disposal of waste water?
VII. HAZARDS A_ND HAZARDOUS MATERIALS:
Would the project:
a) Create a significant hazard to the public or the
environment through the routine transport, use, or disposal of
hazardous materials?
b) Create a significant hazard to the public or the
environment through reasonably foreseeable upset and
accident conditions involving the release of hazardous
materials into the environment?
c) Emit hazardous emissions or handle hazardous or acutely
hazardous materials, substances, or waste within one-quarter
mile of an existing or proposed school?
d) Be located on a site which is included on a list of
hazardous materials sites compiled pursuant to Government
Code Section 65962.5 and, as a result, would it create a
significant hazard to the public or the environment?
e) For a project located within an airport land use plan or,
where such a plan has not been adopted, within two miles of a
public airport or public use airport, would the project result in
a safety hazard for people residing or working in the project
area?
f) For a project within the vicinity of a private airstrip,
would the project result in a safety hazard for people residing
or working in the project area?
Less Than
Significant
Potentially With Less Than
Significant Mitigation Significant
Impact Incorporation Impact No Impact
❑
❑
❑
❑
❑
®
❑
❑
❑
®
❑
❑
❑
❑
❑
❑
®
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑ ❑ ❑
❑
❑
❑
❑
❑
❑
❑ ❑ ❑
❑ ❑ ❑
g) Impair implementation of or physically interfere with an
adopted emergency response plan or emergency evacuation
plan?
h) Expose people or structures to a significant risk of loss,
injury or death involving wildland fires, including where
wildlands are adjacent to urbanized areas or where residences
are intermixed with wildlands?
VIII. HYDROLOGY AND WATER QUALITY: — Would
the project:
a) Violate any water quality standards or waste discharge
requirements?
b) Substantially deplete groundwater supplies or interfere
substantially with groundwater recharge such that there would
be a net deficit in aquifer volume or a lowering of the local
groundwater table level (e.g., the production rate of pre-
existing nearby wells would drop to a level which would not
support existing land uses or planned uses for which permits
have been granted)?
c) Substantially alter the existing drainage pattern of the site
or area, including through the alteration of the course of a
stream or river, in a manner which would result in substantial
erosion or siltation on- or off-site?
d) Substantially alter the existing drainage pattern of the site
or area, including through the alteration of the course of a
stream or river, or substantially increase the rate or amount of
surface runoff in a manner, which would result in flooding on -
or off-site?
e) Create or contribute runoff water which would exceed the
capacity of existing or planned stormwater drainage systems
or provide substantial additional sources of polluted runoff/
f) Otherwise substantially degrade water quality?
g) Place housing within a 100 -year flood hazard area as
mapped on a federal Flood Hazard Boundary or Flood
Insurance Rate Map or other flood hazard delineation map?
h) Place within a 100 -year flood hazard area structures
which would impede or redirect flood flows?
i) Expose people or structures to a significant risk of loss,
injury or death involving flooding as a result of the failure of a
levee or dam?
j) Inundation by seiche, tsunami, or mudflow?
k) Potentially impact stormwater runoff from construction
activities?
❑ ❑ ❑
❑ ❑ ❑ ED
❑ ❑ ❑
❑ ❑ ❑ ED
❑ ❑ ® ❑
❑
Less Than
®
❑
Significant
❑
Potentially
With
Less Than
Significant
Mitigation
Significant
Impact
Incorporation
Impact No Impact
❑ ❑ ❑
❑ ❑ ❑ ED
❑ ❑ ❑
❑ ❑ ❑ ED
❑ ❑ ® ❑
❑
❑
®
❑
❑
❑
®
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
l) Potentially impact stormwater runoff from post -
construction activities?
m) Result in a potential for discharge of stormwater
pollutants from areas of material storage, vehicle or equipment
fueling, vehicle or equipment maintenance (including
washing), waste handling, hazardous materials handling or
storage, delivery areas, loading docks or other outdoor work
areas?
n) Result in a potential for discharge of stormwater to affect
the beneficial uses of the receiving waters?
o) Create the potential for significant changes in the flow
velocity or volume of stormwater runoff to cause
environmental harm?
p) Create significant increases in erosion of the project site
or surrounding areas?
IX. LAND USE AND PLANNING — Would the project
a) Physically divide an established community?
b) Conflict with any applicable land use plan, policy, or
regulation of an agency with jurisdiction over the project
(including, but not limited to the general plan, specific plan,
local coastal program, or zoning ordinance) adopted for the
purpose of avoiding or mitigating an environmental effect?
c) Conflict with any applicable habitat conservation plan or
natural community conservation plan?
X. MINERAL RESOURCES —Would the project
a) Result in the loss of availability of a known mineral
resource that would be of value to the region and the residents
of the state?
b) Result in the loss of availability of a locally important
mineral resource recovery site delineated on a local general
plan, specific plan or other land use plan?
XI. NOISE
Would the project result in:
a) Exposure of persons to or generation of noise levels in
excess of standards established in the local general plan or
—noise ordinance, or applicable standards of other agencies?
b) Exposure of persons to or generation of excessive
groundbome vibration or groundbome noise levels?
❑ ❑ ® ❑
❑
Less Than
®
Significant
Potentially
With Less Than
Significant
Mitigation Significant
Impact
Incorporation Impact No Impact
❑ ❑ ® ❑
❑
❑
®
❑
❑
❑
®
❑
❑
❑
®
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑ ® ❑ ❑
c) A substantial permanent increase in ambient noise levels
in the project vicinity above levels existing without the
project?
d) A substantial temporary or periodic increase in ambient
noise levels in the project vicinity above levels existing
without the project?
e) For a project located within an airport land use plan or,
where such a plan has not been adopted, within two miles of a
public airport or public use airport, would the project expose
people residing or working in the project area to excessive
noise levels?
f) For a project within the vicinity of a private airstrip,
would the project expose people residing or working in the
project area to excess noise levels?
XII.POPULATION AND HOUSING — Would the project:
a) Induce substantial population growth in an area, either
directly (for example, by proposing new homes and
businesses) or indirectly (for example, through extension of
roads or other infrastructure)?
b) Displace substantial numbers of existing housing,
necessitating the construction of replacement housing
elsewhere?
c) Displace substantial numbers of people, necessitating the
construction of replacement housing elsewhere?
XIII. PUBLIC SERVICES
a) Would the project result in substantial adverse physical
impacts associated with the provision of new or physically
altered governmental facilities, need for new or physically
altered governmental facilities, the construction of which
could cause significant environmental impacts, in order to
maintain acceptable service ratios, response times or other
performance objectives for any of the public services:
Fire protection?
Police protection?
Schools?
Parks?
other public facilities?
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
❑
Less Than
®
❑
❑
Significant
®
❑
Potentially
With
Less Than
❑
Significant
Mitigation
Significant
❑
Impact
Incorporation
Impact
No Impact',
I
❑
❑
®
❑
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
❑
❑
®
❑
❑
❑
®
❑
❑
❑
®
❑
❑
❑
®
❑
❑
❑
®
❑
I
-XIV. RECREATION—
a) Would the project increase the use of existing
neighborhood and regional parks or other recreational
facilities such that substantial physical deterioration of the
facility would occur or be accelerated?
b) Does the project include recreational facilities or require
the construction or expansion of recreational facilities which
might have an adverse physical effect on the environment?
XV.TRANSPORTATION/TRAFFIC — Would the project:
a) Cause an increase in traffic which is substantial in relation
to the existing traffic load and capacity of the street system
(i.e. result in a substantial increase in either the number of
vehicle trips, the volume to capacity ratio on roads, or
congestion at intersections)?
b) Exceed, either individually or cumulatively, a level of
service standard established by the county congestion
management agency for designated roads or highways?
c) Result in a change in air traffic patterns, including either
an increase in traffic levels or a change in location that results
in substantial safety risks?
d) Substantially increase hazards due to a design feature (e.g.
sharp curves or dangerous intersections) or incompatible uses
(e.g., farm equipment)?
e) Result in inadequate emergency access?
f) Result in inadequate parking capacity?
g) Conflict with adopted policies, plans, or programs
supporting alternative transportation (e.g., bus turnouts,
bicycle racks)?
XVI. UTILITIES AND SERVICE SYSTEMS —
Would the project:
a) Exceed wastewater treatment requirements of the
applicable Regional Water Quality Control Board?
b) Require or result in the construction of new water or
wastewater treatment facilities or expansion of existing
facilities, the construction of which could cause significant
environmental effects?
___c) Require or result in the construction of new storm water
drainage facilities or expansion of existing facilities, the
construction of which could cause significant environmental
effects?
❑
Less Than
®
Significant
Potentially
With Less Than
Significant
Mitigation Significant
Impact
Incorporation Impact No Impact
❑
❑
®
❑
❑
❑
®
❑
❑
®
❑
❑
Cl
❑
❑
❑
❑
Cl
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑ ❑ ❑ ED
❑ ❑ ❑
d) Have sufficient water supplies available to serve the
project from existing entitlements and resources, or are new or
expanded entitlements needed?
e) Result in a determination by the wastewater treatment
provider which serves or may serve the project that it has
adequate capacity to serve the project's projected demand in
addition to the provider's existing commitments?
f) Be served by a landfill with sufficient permitted capacity
to accommodate the project's solid waste disposal needs?
g) Comply with federal, state, and local statutes and
regulations related to solid waste?
XVII. MANDATORY FINDINGS OF SIGNIFICANCE
a) Does the project have the potential to degrade the quality
of the environment, substantially reduce the habitat of a fish or
wildlife species, cause a fish or wildlife population to drop
below self-sustaining levels, threaten to eliminate a plant or
animal community, reduce the number or restrict the range of
a rare or endangered plant or animal or eliminate important
examples of the major periods of California history or
prehistory?
b) Does the project have impacts that are individually
limited, but cumulatively considerable? ("Cumulatively
considerable" means that the incremental effects of a project
are considerable when viewed in connection with the effects
of past projects, the effects of other current projects, and the
effects of probable future projects)?
c) Does the project have environmental effects, which will
cause substantial adverse effects on human beings, either
directly or indirectly?
S:�WFNWaW Nil O6�a N11 to h—. -initial nudyh
❑
Less Than
❑
Significant
❑
Potentially
With
Less Than
Significant
Mitigation
Significant
Impact
Incorporation
Impact No Impact
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
EVALUATION OF ENVIRONMENTAL IMPACTS
TENTATIVE TRACT MAP 17080
DESIGN REVIEW 06-11
RED HILL TOWN HOMES
BACKGROUND
The property is located within the Multiple Family Residential (R-3) zoning district and High
Density Residential land use designation. The site is surrounded by commercial uses on the south
and east, an office building and residential uses on the north, and a residential neighborhood on
the west. The proposed site includes two parcels that are currently developed with two apartment
complexes including 57 units known as Whispering Woods and Tustin Terrace Apartments. The
Whispering Woods site is 1.87 acres and contains 27 units with two story buildings, and the Tustin
Terrace site is 2.14 acres and includes 30 one story apartments. All existing units at the site are
proposed to be demolished. To redevelop the site with 75 condominium units, a tentative tract map
and a design review application need to be approved for subdivision of the land and the site and
building designs. This analysis evaluates the environmental impacts of the proposed project for 75
units in comparison with the existing 57 unit apartment complex.
The site is designed to include seven 4-plex buildings, seven 5-plex buildings and two 6-plex
buildings designed as town homes with garage access through alleys. One main entrance is provided
to the site from Red Hill Avenue, and the buildings are proposed parallel to Walnut Avenue. A pool
and recreation area are provided across from the main entry. The proposed condominiums are three
stories with the exception of the units along the residential properties on the west that are designed
with two stories and a loft. The units include two bedrooms and a loft or three bedrooms and range
in size from 1,637 square feet to 1,997 square feet.
I. AESTHETICS
Items a. & b — No Impact
The subject property is not located on a scenic vista. The property is a 4 -acre parcel
currently developed with two story and one story apartment buildings and is surrounded
by developed parcels. Significant landscaping is provided along Red Hill Avenue and
Walnut Avenue, most of which will be preserved until future road widening projects.
Additional trees and landscaping would be provided with emphasis at the corner and
project entry. The proposed project would not disturb any trees, rock outcroppings, or
historical buildings, and the site is not located on a State scenic highway.
Item c & d — Less than Significant Impact:
The project would involve construction of new three story residential buildings and
would change the visual character of the area. The existing apartments were developed in
the 1960s and appear as dated architecture; therefore, redevelopment of the site would
enhance the visual characteristics of the area with new and contemporary structures and
new landscaping. Since the site is adjacent to a residential neighborhood on the west,
separated with a narrow buffer, the applicant has placed the buildings ten feet from the
property line which is a five foot increase from the minimum side yard setback. Although
the project proposes three story structures to replace existing one story and two story
Red Hill Town Homes
TTM 17080
DR 06-011
Page 2
structures, the proposed buildings have been designed to be sensitive to the existing
neighboring residences. Specifically, units along the residential property line have been
designed at two stories with a loft that are five feet lower in height than other proposed
units on the site. To provide a green screen, significant landscaping in the form of up-
right trees is proposed on the west and north along the residential and commercial
properties. In addition, no balconies will be located on the west and the window openings
are smaller in size and carefully placed to minimize intrusion of privacy on the adjacent
existing residential properties. A shade and shadow study was provided comparing shade
and shadow effects on the adjacent properties with existing conditions and proposed
development during December at 9:00 a.m. and 12:00 a.m. when the longest shadows are
experienced (Exhibit 3). The study reflects the proposed height increase and new
landscaping along the westerly property line. Since the scope of the project meets the
City's multiple family zoning standards and additional measures to mitigate height and
aesthetic impacts associated with the new development has been incorporated, the project
is not expected to result in significant aesthetic impacts. With the proposed setback,
staggered building height, and design considerations, visual and shade impacts to the
adjacent properties will be reduced to a level of insignificance.
The project is designed to adhere to all of the City's development standards with respect
to setbacks, height, parking standards and landscaping guidelines and the City's Private
Street Improvement Standards.
The proposed condominium complex would generate new light sources with the
installation of new exterior lighting for streets, alleys, landscape areas, patios, and
parking areas. However, the new sources of light would not adversely affect day- or
night-time views in the area since the number of lights would be compatible with a
typical residential project and would be required to comply with the City's security code
standards. In addition, all lights would be required to be arranged so that no direct rays
would shine onto adjacent properties.
Mitigation Measures/Monitoring Required: Compliance with existing rules and regulations
is not mitigation under CEQA. Consequently, no mitigation is required.
Sources: Submitted Plans
Tustin City Code Section 8103(w)l5
Private Street Standards
Tustin Security Ordinance
Submitted Plans
Field Inspection
II. AGRICULTURAL RESOURCES
Items a, b & c — No Impact:
The project site is currently improved with residential buildings and surrounded by other
developed residential, commercial, and office buildings. The proposed project will have
no impacts on any farmland, nor will it conflict with existing zoning for agricultural use, or
Red Hill Town Homes
TTM 17080
DR 06-011
Page 3
a Williamson Act contract. The proposed project will not result in the conversion of
farmland to a non-agricultural use.
Mitigation Measures/Monitoring Required: None Required
Sources: Tustin General Plan
Field Inspection
Submitted Plans
III. AIR QUALITY
Items a, b, c, d & e — Less Than Significant Impact:
The project will temporarily increase the amount of short-term emissions to the area due
to the proposed demolition, grading, and construction activities at the property. Since the
site is relatively flat, only minor grading will be required. Redevelopment of the site
would result in 18 additional residential units that is well below the thresholds of
significance established by Tables 6-2 (operation thresholds) and 6-3 (construction
thresholds) of the Air Quality Management District's CEQA Air Quality Handbook,
which notes that construction of fewer than 297 condominium units is not considered a
significant impact. In addition, cumulative construction within the area does not exceed
the established thresholds. Less than significant short-term emissions associated with
demolition, grading, construction, and operation of the proposed project will comply with
the regulations of the South Coast Air Quality Management District and the City of
Tustin Grading Manual, which include requirements for dust control. As such, the
proposed project will not create a significant impact related to air quality.
Mitigation Measures/Monitoring Required: Compliance with existing rules and
regulations is not mitigation under CEQA. Consequently, no mitigation is required
Sources: South Coast Air Quality Management District Rules & Regulations
Air Quality Management District's CEQA Air Quality Handbook
City of Tustin Grading Manual
Project Application
Field Inspection
IV. BIOLOGICAL RESOURCES
Items a, b, c, d, e & f— No Impact:
The project site is currently improved with residential buildings and surrounded by other
developed residential, commercial, and office buildings. The site is not inhabited by any
sensitive species of animals and would have no impacts on animal populations, diversity
of species, or migratory patterns. No wetlands exist within the project site. No impacts to
any unique, rare, or endangered species of plant or animal life identified in local or regional
plans, policies, or regulations by the California Department of Fish and Game or U.S. Fish
and Wildlife Service would occur as a result of this project.
Red Hill Town Homes
TTM 17080
DR 06-011
Page 4
Mitigation Measures/Monitoring Required: None Required
Sources: Field Inspection
Submitted Plans
Tustin General Plan
V. CULTURAL RESOURCES
Items a — No Impact:
The project site is currently improved with residential buildings built in the 1960s and
surrounded by other developed residential, commercial, and office buildings. The
property is not located in an area where any cultural or historic resources have been
identified on the site.
Mitigation Measures/Monitoring Required: None
Items b c & d - Less Than Significant with Mitigation Incorporation
The proposed project is redevelopment of an existing residential site and not located in an
area with undisturbed land. However, as a standard grading condition of approval, if
buried resources are found during grading within the project area, a qualified archaeologist
would need to assess the resource and recommend appropriate mitigation. The Native
American viewpoint would be considered during this process. With the mitigation
measures listed below, potential impacts to archeological resources would be reduced to
less than significant.
Mitigation Measures/Monitoring Required:
If buried resources are found during grading within the project area, a qualified
archaeologist would need to assess the site significance and perform the appropriate
mitigation. The Native American viewpoint shall be considered during this process.
This could include testing or data recovery. Native American consultation shall also
be initiated during this process.
Sources: Submitted Plans
Tustin General Plan
VI. GEOLOGY & SOILS
Items a -ii, a -iii. & b — Less Than Significant Impact
The proposed buildings will be located within an area of the City that is known to contain
expansive soils which may subject people or structures to strong seismic ground shaking
and seismic -related ground failure including liquefaction. However, a soils report is
required to be submitted prior to issuance of building permits per the 2001 California
Red Hill Town Homes
TTM 17080
DR 06-011
Page 5
Building Code to demonstrate compliance with Chapter 18, which requires proper
excavation and fills for buildings, structures, foundations, and retaining structures, and
appropriate construction techniques to ensure seismic stability in sites depending on their
soils or geological concerns. No significant impact is anticipated since the project must
comply with the 2001 Uniform Building Code related to Chapter 18.
Mitigation Measures/Monitoring Required: Compliance with existing rules and
regulations is not mitigation under CEQA. Consequently, no mitigation is required
Sources: Tustin General Plan
Tustin Grading Manual
2001 California Building Code Chapter 16 and 18
Project Application
Field Evaluation
Items a -i, a -iv, c, d, & e — No Impact:
The project site is not located within an area identified as a fault zone on the Alquist-
Priolo Earthquake Fault Zoning Map. However, a soils report is required to be submitted
prior to issuance of building permits per the 2001 California Building Code to
demonstrate compliance with Chapter 18, which requires proper excavation and fills for
buildings, structures, foundations, and retaining structures, and appropriate construction
techniques to ensure seismic stability in sites depending on their soils or geological
concerns. The project will be required to be engineered to withstand unstable soils,
possible landslide, lateral spreading, subsidence, or collapse as they relate to the this
specific site. Since all new buildings in the City are required to operate on the existing
sewer system, the use of septic tanks or alternative wastewater disposal systems will not
be necessary.
Mitigation Measures/Monitoring Required: Compliance with existing rules and
regulations is not mitigation under CEQA. Consequently, no mitigation is required
Sources: Tustin General Plan
Tustin City Code
2001 California Building Code Chapter 16 and 18
California Seismic Hazard Zone Map, Tustin Quadrangle, January 17, 2001
Project Application
Field Evaluation
VII. HAZARDS & HAZARDOUS MATERIALS
Items a, b, c, d, e, f, g, and h — No Impact:
The proposed project involves construction of 75 condominium units. No storage or
transport of hazardous materials are anticipated from the proposed residential
development. The project would not result in exposure to hazardous substances other
than the possibility of household hazardous waste which residents could properly dispose
Red Hill Town Homes
TTM 17080
DR 06-011
Page 6
of at approved County drop-off locations. A residential project is not anticipated to store
or emit hazardous materials which could create a hazard to the adjacent properties,
school, or the general public if released into the environment. The scope and location of
the project has no potential to interfere with an adopted emergency response plan or
emergency evacuation plan. The site is in an urbanized area and has no potential to
expose people or structures to a significant risk due to wild land fires. All grading and
construction is subject to compliance with all applicable Uniform Building and Fire
Codes. As such, the project is not anticipated to result in any significant hazards.
Mitigation Measures/Monitoring Required: None Required
Sources: Submitted Plans
Tustin General Plan
Approved Fire Master Plan
Mitigation Measures/Monitoring Required: None Required
VIII. HYDROLOGY & WATER QUALITY
Items a, b, f, g, h, i, i, and n — No Impact:
The project site is relatively flat, and the proposed project will continue to maintain a
relatively flat site with improved site drainage and additional landscaping. A significant
amount of stormwater received on-site will percolate into the soil where landscaping is
provided and remaining stormwater will be conveyed through a fossil filter prior to
entering a City stormdrain. City stromwater infrastructure is currently available to
accommodate storm water from the project. The applicant must provide a drainage and
hydrology report to the City and demonstrate that the private storm water drainage
system will be able to handle the capacity of any storm water directed into the system.
Best Management Practices are required to be implemented for construction activity to
deter water from flowing off-site. Best Management Practices will also be implemented
to ensure that, once the project is constructed, storm water leaving the site will be filtered
prior to entering the storm drain. As such, the project will not violate any water quality
standards or waste discharge requirements or degrade water quality in the area.
The project by nature would not substantially deplete groundwater supplies or interfere
with groundwater recharge such that there would be a net deficit in aquifer volume or a
lowering of the local groundwater table level. The project is located within Zone X
(areas of 0.2 percent annual chance flood), as mapped on a Flood Insurance Rate Map.
Accordingly, the project will be designed and graded with an appropriate drainage system
to avoid any potential flood hazards. The project site will not expose people or structures
to a significant risk of loss, injury, or death as a result of the failure of a levee or dam, or
by inundation by seiche, tsunami, or mudflow. Nor would the project increase significant
erosion at the project site or surrounding areas.
Mitigation Measures/Monitoring Required: Compliance with existing rules and
regulations is not mitigation under CEQA. Consequently, no mitigation is required.
Red Hill Town Homes
TTM 17080
DR 06-011
Page 7
Sources: Field Verification
Submitted Plans
Tustin City Code 4900 et al
Federal Flood Insurance Rate Map 06059CO281H, February 18, 2004
Items c, d, e, k, 1, in, n & o — Less Than Significant Impact:
The project site is relatively flat, and the proposed project will continue to maintain a
relatively flat site with improved site drainage, including drive aisles, curbs and gutters,
and additional landscaping. With new construction, there is the potential to impact
stormwater runoff from construction and post -construction activities with stormwater
pollutants from landscaped areas and trash enclosures. There is also the potential for the
discharge of stormwater that could affect the beneficial uses of the receiving waters and
changes in the flow velocity or volume of storm water runoff. However, the project is
required to comply with the City's Water Quality Ordinance and most recently adopted
NPDES permit (Santa Ana Regional Water Quality Control Board (RWQCB) Order R8-
2002-0010), thus reducing any potential impacts to a level of insignificance. Together,
these regulations minimize water pollution by regulating point sources that discharge
pollutants into local waters. As such, the project will .not violate any water quality
standards or waste discharge requirements or degrade water quality in the area.
Mitigation Measures: Compliance with existing rules and regulations is not mitigation
under CEQA. Consequently, no mitigation is required
Compliance with existing rules and regulations is not mitigation under CEQA.
Consequently, no mitigation is required
Sources: Field Verification
Submitted Plans
Tustin City Code Section 4900 et al
IX. LAND USE PLANNING
Items a, b & c — No Impact:
The property is designated by the General Plan Land Use Map as High Density
Residential and located within the Multiple Family Residential (R-3) zoning district. The
proposed residential density of 19 du/acres is consistent with the applicable land use and
zoning regulations.
If approved, the proposed project would increase the percentage of ownership housing
consistent with Goal 3 of the City's Housing Element, the project is accessible through
the City's current street system, and the project could be supported with existing
transportation and public facilities. The proposed project would not divide an established
community since it includes construction on an existing site that is already improved with
multiple -family residences. The proposed project is not located in a habitat conservation
Red Hill Town Homes
TTM 17080
DR 06-011
Page 8
plan or natural community conservation plan. The proposed project would not conflict
with any applicable conservation plan.
Mitigation Measures: None Required.
Sources: Submitted Plans
Tustin General Plan
Tustin Zoning Code
Tustin Zoning Map
X. MINERAL RESOURCES
Items a & b — No Impact:
The proposed project is not located on a mineral resource recovery site. The construction
of a condominium project on a lot which is improved with existing apartment buildings
will not result in the loss of availability of a known mineral resource.
Mitigation Measures/Monitoring Required: None Required
Sources: Submitted Plans
Tustin General Plan
XI. NOISE
Item a — Less Than Significant with Mitigation Incorporation
The project site is located at the northwest corner of Walnut Avenue and Red Hill
Avenue, and therefore is exposed to significant traffic related noise. The City's General
Plan recognizes that residents adjacent to major and secondary arterials are typically
exposed to a CNEL over 65 dB. Table N-2 of the Tustin Noise Element identifies
potential conflicts between the land uses and the noise environment. Per Table N-2, most
of the project site falls within Zone A through Zone B with the exception of units along
Red Hill Avenue and Walnut Avenue which fall under Zone C. Zone A requires no
mitigation measures for noise while Zone B requires minor soundproofing as needed.
The City's noise ordinance requires a maximum 45 dB value for interior noise and 65 dB
for exterior noise. An acoustical study was submitted by the project proponent with
recommendations for exterior noise barriers for balconies along Walnut Avenue and Red
Hill Avenue and upgraded windows and doors to be incorporated in the building design
(Exhibit 1). The noise study indicates an existing 70.2 dB reading along the southeasterly
building line and 68.7 dB along the southwesterly building line, which concludes that the
buildings along Red Hill Avenue and Walnut Avenue must provide an A -weighted noise
reduction value of at least 26.1 dB to achieve a maximum interior 45 dB value.
Red Hill Town Homes
TTM 17080
DR 06-011
Page 9
The noise reduction technique recommended by the acoustical analysis would be
implemented and required as a condition of approval. With the mitigation measures
listed below, potential noise impact would be reduced to less than significant.
Mitigation Measures/Monitoring Required:
• Roof ceiling construction shall be roofing on %z inch plywood. Batt insulation
shall be provided in joist spaces and the interior ceiling shall be finished with one
layer of 5/8 inch gypsum board.
• All exterior walls shall be 2 x 4 studs at 16 inches on center with batt insulation
between studs. Exterior walls shall be plaster with 5/8 inch gypsum board on the
interior.
• All southeast and southwest facing windows and glass doors shall be glazed with
STC 32 glazing with either '/4 inch laminated glass or dual pane assembly with %z
inch air space. In either case, a test report must be provided at the time of
installation to ensure compliance with the minimum requirements. The report
shall be prepared in an independent, accredited testing laboratory in accordance
with ASTM E-90.
• All entry doors shall be 1-3/4 inch solid core door with weather stripping seals on
the sides and top. No glazing shall be permitted for the entry doors.
• Since meeting the minimum levels of interior noise standard would require closed
windows and doors, the structures shall be equipped with ventilation or an air-
conditioning system to provide a habitable interior environment.
• Balconies six feet in depth along Walnut Avenue and first units along Red Hill
Avenue shall be designed with 42 inch high solid railings designed compatible
with the proposed architecture.
Sources: Submitted Plans
Tustin City Code 4611 et al
Tustin General Plan
Acoustical Study (Exhibit 1)
Items b, c & d— Less Than Significant Impact:
Although the grading and construction of the site may result in typical temporary
construction noise impacts, the Tustin Noise Ordinance only allows construction
activities to occur during the daytime on Monday through Saturday. The proposed
project will not create excessive ground vibrations, nor will it create a permanent increase
in the existing ambient noise levels beyond the City's established standards.
Mitigation Measures/Monitoring Required: Compliance with existing rules and
regulations is not mitigation under CEQA. Consequently, no mitigation is required.
Sources: Submitted Plans
Tustin City Code Section 4611 et al
Tustin General Plan
Red Hill Town Homes
TTM 17080
DR 06-011
Page 10
Item e & f — No Impact:
The site is not located within an airport land use plan or within two (2) miles of a public
or private airport/airstrip. The proposed project is three stories in height consistent with
the City's maximum height limit and similar to other structures in the vicinity.
Mitigation Measures/Monitoring Required: None Required
Sources: Submitted Plans
Tustin General Plan
Irvine Industrial Planned Community District Regulations
XII. POPULATION & HOUSING
Items a, b, and c — No Impact:
The project involves the proposed construction of a condominium project on a site that is
currently improved with apartment complexes including 57 units known as Whispering
Woods and Tustin Terrace Apartments. The proposed project would remove and replace the
existing 57 units and 18 additional units (total 75 units) that would not result in significant
population growth in the area. -
The existing apartment units are rented at market rate (not considered as affordable units)
and the existing residents are on a month-to-month lease. While there will be
displacement of existing residents as a result of the proposed project, the displacement
would not be substantial nor necessitate the construction of replacement housing
elsewhere since the impact could be absorbed by the local rental market. The project is
privately financed and no public funds are involved that would trigger relocation pursuant
to state law. However, the applicant has submitted a Tenant Leasing and Relocation Plan
that indicates that a minimum 120 -day notice will be provided prior to vacation of the
property, tenants would be on a month-to-month lease basis and the last month's rent
would be waived, which should provide the tenants with adequate time and monetary
incentives to relocate.
Mitigation Measures/Monitoring Required: None Required
Sources: Submitted Plans
Tustin General Plan
XIII. PUBLIC SERVICES
Item a — Less Than Significant Impact
The proposed project is in an existing urbanized area where fire and police protection are
currently provided. While police patrols to the area may be needed from time to time to
ensure safety, no new additional police protection would-be required as a result of the
proposed project. The Police Department has recommended mitigation measures to
Red Hill Town Homes
TTM 17080
DR 06-011
Page 11
reinforce safety and effectively patrol the area, which will be included as conditions of
approval. The project would utilize existing infrastructure and is not anticipated to
increase the need for new streets, public services, or infrastructure.
The proposed project is located within Tustin Unified School District (TUSD). The
proposed 18 additional units are not anticipated to have a significant rise in the number of
students served by local schools. The TUSD will receive its statutory school impact fees
per Senate Bill 50 from the residential development. As a condition of approval for the
project, the developer will be required to pay applicable school fees prior to issuance of
the building permit.
Mitigation Measures/Monitoring Required:
• The pool access gates need to be equipped with a knox box for emergency access.
• Landscaping should be designed with surveillance opportunities for residents and
police personnel in patrol vehicles.
• Security devices such as double locking deadbolts, strike plates, with 1-1/2 inch
screws and pin locks on windows and sliders shall be installed minimizing the
potential for criminals to access the units.
Sources: Submitted Plans
Tustin City Code
XIV. RECREATION
Items a & b — No Impact:
The project would include a private community pool recreation area to benefit the
residents of the project. However, since the size of the recreation area does not comply
with the minimum criteria for parkland dedication, the project would be conditioned to
pay in lieu fees for parkland dedication in accordance with Section 9331 of the Tustin
City Code. The developer has indicated that they will pay in lieu fees to comply with
Section 9331 of the Tustin City Code.
While the residents of the project may use existing City parks, the increased use of these
parks would not be such that substantial deterioration of the facility would occur or be
accelerated, nor does the project propose recreational facilities that would have an
adverse physical effect on the environment.
Mitigation Measures/Monitoring Required:
• Prior to issuance of a building permit, the applicant shall pay park land in lieu fees
based on Tustin City Code Section 9331.d.3
Sources: Submitted Plans
Tustin City Code
Red Hill Town Homes
TTM 17080
DR 06-011
Page 12
XV. TRANSPORTATION/TRAFFIC
Items a — Less Than Significant Impact with Mitigation Incorporation:
A traffic study was submitted and reviewed by the City's Engineering Division (Exhibit
2). The study concluded that the proposed project is expected to generate approximately
718 daily trips, which in comparison with the existing development, would be an increase
of 342 daily trips. This is a relatively significant increase in comparison with the
previously existing land use.
The more detailed (than daily trip comparisons) peak hour intersection analyses,
however, for future conditions with the Project show that no significant traffic impacts
would occur as a result of the Project. In addition, build -out (post -year 2020) evaluations
were included in the study. For these long range projections, the intersection of Red Hill/
Walnut is shown to have over capacity operations (if the current intersection geometry is
maintained), but the Project does not cause any significant traffic impacts, as defined by
City of Tustin policies. In addition, there are improvement projects anticipated to be
implemented at this intersection, to maintain acceptable operations for long range future
conditions.
Access to/from the site is provided at Red Hill Avenue which will be open to both
northbound and south bound traffic. The traffic analysis also considered on-site
circulation and determined that the 25 foot wide access on Red Hill Avenue is adequate
to allow for one outbound lane and one inbound lane. For conditions at the completion of
the Project, the access is shown to maintain acceptable operations. Under the build -out
(post -year 2020) scenario, the left turn egress from the Project site would result in
significant Project impacts. A project condition of approval may require prohibiting this
movement under "longer range" conditions, as necessary, to maintain acceptable
operations at the Project driveway.
Mitigation Measures/Monitoring Required: Access to and from the site to Red
Hill Avenue should be available with completion of the project. The left turn egress from
the project site may be prohibited in the future if determined necessary by the City's
Traffic Engineer.
Sources: Submitted Plans
Tustin City Code
Traffic Impact Analysis (Exhibit 2)
Items b, c, d, e, f, and g — No Impact:
The project will not exceed, either individually or cumulatively, a level of service
standard established by the county congestion management agency for designated roads
or highways. The proposed project will not induce substantial population or growth,
result in changes to air traffic patterns, or conflict with adopted policies, plans, or programs
supporting alternative transportation such as bus turnouts or bicycle racks. The project
Red Hill Town Homes
TTM 17080
DR 06-011
Page 13
includes sufficient parking on-site to comply with current parking requirements for the
proposed use. As such, no impacts to parking are anticipated.
Mitigation Measures/Monitoring Required: None Required
Sources: Submitted Plans
Tustin City Code
XVI. UTILITIES & SERVICE SYSTEMS
Items a, b, c, d, e, f & e — No Impact:
The proposed project will not exceed the requirements of the applicable Regional Water
Quality Control Board or require or result in the construction of new water or wastewater
treatment facilities. The proposed project will utilize the existing sewer and storm drain
systems and thus will not require construction of a new storm water drainage facility or solid
waste facility. The project proponent would be required to submit a hydrology report to
ensure proper grading, drainage, and connection of planned sewer systems. The project will
be served by the City's existing trash hauler contract, thus will not require a new trash
hauler. Adequate water supply from existing resources will be available to serve the
proposed project.
Mitigation Measures/Monitoring Required: Compliance with existing rules and regulations
is not mitigation under CEQA. Consequently, no mitigation is required.
Sources: Submitted Plans
Tustin City Code
Tustin General Plan
XVII. MANDATORY FINDINGS OF SIGNIFICANCE
Items a, b & c — No Impact:
The site is located in the multiple family residential (R-3) zoning district and currently
improved with 57 apartment units. The project includes redevelopment of the site with 75
condominium units. The proposed project design, construction, and operation will
comply with applicable City codes and regulations. The project, by nature of its location
and as designed, does not have the potential to: degrade the quality of the environment;
reduce the habitat of fish or wildlife species; cause a fish or wildlife population to drop
below self-sustaining levels; threaten to eliminate a plant or animal community; reduce
the number or restrict the range of a rare or endangered plant or animal; or, eliminate
important examples of the major periods of California history or prehistory. The project
does not have the potential to achieve short-term environmental goals to the disadvantage
of the long-term. It does not have impacts that are individually limited but cumulatively
considerable or that would cause substantial adverse impacts on human beings.
Red Hill Town Homes
TTM 17080
DR 06-011
Page 14
Sources: Submitted Plans
Tustin General Plan
S9Cdd\MINOO\Red Hill Condos\ND analysis.doc
Exhibit 1
Acoustical Analysis
Davy
Associates, Inc.
Consultants in Acoustics
2627 Manhattan Beach Blvd., Suite 212 • Redondo Beach, CA 90278-1604 • Tel: 310-643-5161 • Fax: 310-643-5364 • Email:DavyAssoc®aolcom
JN2006-44B
ACOUSTICAL ANALYSIS
Redhill Avenue & Walnut Avenue
Tustin, California
f i•T:7
Southwind Realty Group, LLC
Irvine, California
October, 2006
1.0 Introduction
At the direction of Southwind Realty Group, LLC, Davy & Associates, Inc. has
completed an acoustical analysis of the Redhill Avenue & Walnut Avenue project in
Tustin, California.
The California Administrative Code (Title 24) as enforced by the City of Tustin specifies
maximum allowable interior noise levels of CNEL 45 for all habitable spaces
in residential buildings where exterior noise from transportation sources exceeds
CNEL 60.
Section 2.0 of this report contains the results of measurements and calculations of the
future exterior noise environment at the site to determine compliance with these
requirements.
Section 3.0 of this report contains recommendations for complying with the
City of Tustin interior noise level requirements.
Section 4.0 of this report contains the requirements of the State Building Code
concerning ventilation.
2.0 Exterior and Future Acoustical Environment
Environmental noise levels were monitored at the site in Tustin, California on
April 6, 2006 between the hours of 3:00 p.m. and 5:00 p.m. The location of the site is
shown in Figure 1. Noise measurements were made at the southeast and southwest
building line.
Noise levels at the site are dominated by traffic on Red Hill Avenue to the southeast
and by traffic on Walnut Avenue to the southwest. No other significant sources of noise
were noted during the site visit.
Environmental noise levels were measured with a precision integrating LD 820 sound
level meter that had been calibrated with a B&K 4230 Acoustical Calibrator immediately
prior to use. The sound level meter measures and displays the equivalent noise level
(LEQ), as well as the.maximum and the minimum noise levels during the measurement
period. A copy of the analysis of the acoustical data is attached to this report.
Figure 1. Site Location
2
The data thus collected were analyzed to determine the CNEL level at the
measurement location. The CNEL value was determined by measuring the equivalent
noise level (LEQ) directly, and then calculating the equivalent noise level for each of the
other 23 hours in the day.' This CNEL approach has been utilized extensively. The
accuracy of this procedure has been established with automatic 24-hour measurements
at the same location. The procedure has always been within acceptable accuracy
limits. The results of the monitoring and calculations are summarized below in Table 1.
Table 1
Measured Ambient Noise Levels in dB
Location Peak Hour LEQ CNEL
SE Building Line 69.2 dB 70.2 dB
SW Building Line 67.7 68.7
Section 3501.(c) of the State Building Code states the following:
Worst-case noise levels either existing or future, shall be used as the basis for
determining compliance with this Section. Future noise levels shall be predicted
for period of at least 10 years from the time of building permit application.
CALTRANS, Division of Traffic Operations publishes an annual traffic volume book that
contains previous traffic trends. The 2000 traffic volumes on the California State
Highway System Book (the latest edition available) lists an average annual increase
of 2.2% per year in annual traffic volumes for the years 1994 through 1999. Assuming
that this annual growth of 2.2% would hold for this site, it was projected that traffic
volumes would increase by a factor 1.24 by the year 2016. This traffic volume increase
over the next 10 years would result in a 0.9 dB traffic noise increase. Therefore, the
projected future year noise level is summarized in Table 2.
Table 2
Exterior 2016 CNEL Value at the Site in dB
Location CNEL
SE Building Line 71.1 dB
SW Building Line 69.6
Semple, 'Insulation of Buildings Against Highway Noise," Bruce Davy and Steven Skale,
Federal Highway Administration FHWA-TS-77-202.
3
With an exterior noise level of CNEL 71.1, the building must provide an A -weighted
noise reduction value of at least 26.1 dB to achieve an interior CNEL 45 value.
Standard construction consisting of 2x4 studs with R-11 insulation, exterior stucco,
interior gypboard, and standard glazing provides a minimum A -weighted noise reduction
of 20 dB.
If all southeast and southwest facing perimeter windows and glass doors are glazed
with STC 32 glazing, the noise reduction of the buildings will be a minimum of 30 dB.
This means that with the use of standard construction and STC 32 glazing in all
southeast and southwest facing perimeter windows and glass doors, interior noise
levels should not exceed CNEL 45. Therefore, the Building will comply with the
California Noise Insulation Standards as enforced by the City of Tustin.
STC 32 glazing can be provided with either 1/4" laminated glass or a dual pane
assembly with a 1/2" airspace. In either case, the glazing supplier should submit a test
report documenting the STC 32 rating. The test report should be prepared in an
independent, accredited testing laboratory in accordance with ASTM E-90.
3.0 Construction Recommendations
3.1 Roof ceiling construction will be roofing on 1/2" plywood. Batt insulation will be
installed in joist spaces. The ceilings will be one layer of 5/8" gypboard nailed
direct.
3.2 All exterior walls will be 2x4 studs 16" o.c. with Batt insulation in the stud spaces.
Exteriors will be exterior plaster or stucco. The interiors will be 5/8" gypboard.
3.3 All southeast and southwest facing perimeter windows and glass doors will be
glazed with STC 32 glazing. STC 32 glazing can be provided with either 1/4"
laminated glass or a dual pane assembly with a 1/2" airspace. In either case, the
glazing supplier should submit a test report documenting the STC 32 rating. The
test report should be prepared in an independent, accredited testing laboratory in
accordance with ASTM E-90.
3.4 All other windows and glass doors may be standard glazing.
3.5 All entry doors should be 1-3/4" solid core doors with weather stripping seals on
the sides and top. Glazing in entry doors should not be accepted.
4
4.0 Ventilation Requirements
The California Noise Insulation Standards (Title 24) states the following paragraph
concerning ventilation:
"If inter or allowable noise levels are met by requiring that windows be
unoper able or closed, the design for the structure must also specify a ventilation
or air -c nditioning system to provide a habitable interior environment. The
ventilat on system must not compromise the dwelling unit or guest room noise
reducti n."
With windows open, typical noise reduction values will be in the 12 dB range. This
means that a ventilation system must be provided for all habitable rooms. This can
normally be supplied with an FAU (forced air unit) with a summer switch. Outside air
intake must be in compliance with the Uniform Building Code.
5.0 Exterior Living Area Requirements
There will be balconies on the second floors of the buildings.
The City of Tustin has established criteria for exterior living space. Noise Levels in
exterior living space cannot exceed CNEL 65. To determine compliance with this
requirement, an analysis was completed for the balconies facing SW towards Walnut
Avenue and the balconies facing SE towards Red Hill Avenue.
The balconies in buildings 7 and 8 face Walnut Avenue. It was assumed that the
balconies would have solid railings consisting either of glass, plexiglass, wood or
stucco. A railing height of 42" was assumed for this analysis. This 42" railing will be
required for all 6 balconies in buildings 7 and 8.
The first row of units closest to Red Hill Avenue in units 1-6 and building 16 will also
require 42" high solid balcony railings. The balconies that are furthest away from Red
Hill Avenue in these buildings will not require solid railings.
There are no requirements for solid railings for the balconies in buildings 9-15.
The results of this analysis for buildings facing Walnut Avenue and buildings facing
Red Hill Avenue are summarized in Table 4.
Table 4
Calculated CNEL Values in dB
For The 2nd Floor Balconies.
Orientation Bldg. CNEL
SW 7&8 62.7 dB
SE 1-6&16 60.7 dB
Based on this analysis, the four exterior living spaces will comply with the requirements
of the City of Tustin.
Bruce A. Davy, P.
I.N.C.E. Board Certified
Davy & Associates, Inc.
C:
SITE MONITORING NOISE ANALYSIS
JN2006-44B
PROJECT:
LOCATION:
TEST DATE:
START TIME:
END TIME:
EQUIPMENT USED:
TEMPERATURE:
RELATIVE HUMIDITY:
WIND:
LEQ:
LMAX:
LMIN:
CNEL:
LDN:
69.2
90.1
55.1
70.2
70.2
TUSTIN TOWNHOMES
SOUTHEAST BUILDING LINE
APRIL 6, 2006
al
M11u
LD 820 SLM
1/2" RANDOM INCIDENCE MIC
WINDSCREEN
B&K 4230 CALIBRATOR
TRIPOD
WIND SPEED INDICATOR
MICRONTA THERMOMETER/HYGROMETER
66°f
60%
0-2 mph
L90:
58.8
L50:
64.3
L25:
68.3
L8:
72.6
L2:
76.8
L1:
79.4
DAVY
& ASSOCIATES, INC.
Consultants in Acoustics
SITE MONITORING NOISE ANALYSIS
JN2006-44B
PROJECT:
TUSTIN TOWNHOMES
LOCATION:
SOUTHWEST BUILDING LINE
TEST DATE:
APRIL 6, 2006
START TIME:
400 P.M.
END TIME:
5:00 P.M.
EQUIPMENT USED:
LD 820 SLM
1/2" RANDOM INCIDENCE MIC
WINDSCREEN
B&K 4230 CALIBRATOR
TRIPOD
WIND SPEED INDICATOR
MICRONTA THERMOMETER/HYGROMETER
TEMPERATURE:
650f
RELATIVE HUMIDITY:
60%
WIND:
0-2 mph
LEQ: 67.7
L90: 53.4
LMAX: 80.4
L50: 60.1
LMIN: 49.9
L25: 67.6
CNEL: 68.7
1-8: 73.0
LDN: 67.7
1-2: 76.5
L1: 77.8
DAVY
& ASSOCIATES, INC.
Consultants in Acoustics
Exhibit 2
Traffic Analysis
1
1
1
1
Traffic Study for a
Residential Project
in the City of Tustin
December 2006
RECEIVED
DEC 18 2006
COMMUNITY DEVELOPMENT
Prepared for:
Southwind Realty Group, LLC
Centerpoint
19722 MacArthur Boulevard, Suite 240
Irvine, CA 92612
Prepared by:
\_,Katz, Okitsu & Associates
Trafc Eng --,aid Thvupon um Poaa s
17852 E. Seventeenth Street, Suite 102
Tustin, California 92780-2412
714/573-0317 Phone
714/573-9534 Fax
Project No: JA6539
Katz, Okitsu & Associates
Planning and Engineering
I
1711111. Seventeenth It
December 15, 2006
Suite 102
Tustin, CA
92780-2142
James Magstadt
714.573.0317
Southwind Realty Group, LLC
fax: 714.573-9534
Centerpoint
'koaoc@kaaokiau.com
19722 MacArthur Boulevard, Suite 240
w Aaaokitsu.com
Irvine, CA 92612
' Subject: Traffic Study for a Residential Project in the City of Tustin
' Dear Mr. Magstadt:
Katz, Okitsu & Associates is pleased to present this revised traffic study report for a
' proposed residential project in the City of Tustin. The project, known as "Red Hill
Townhomes", would be located along Red Hill Avenue north of Walnut Avenue and
' consists of 75 condominiums on a 3.86 -acre site.
The traffic study addresses access and circulation issues, potential traffic impacts of
' the project, and possible mitigation measures. The study has been prepared to meet
the traffic study requirements of the City of Tustin for the analysis of traffic impacts
' associated with the proposed development.
The report is being submitted to you for review and forwarding to the City of Tustin.
' Please contact our office if you have any questions or comments about the report, or if
you need additional information to complete your submittal. If there are any
comments that require response or revisions, please notify our office as soon as
Los Angeles possible for prompt revision.
323.260.4703
' fax: 323.260.4705 It has been a pleasure to prepare this study for Southwind Realty and the City of
Tustin.
'San Diego
619.683.2933 Sincerely,
fax: 619.683.7982
i Bernardino
'909.890.9693 Rock Miller, P.E.
fax: 909.890.9694 Principal
1. INTRODUCTION.........................................................................................................................1
'
2. PROJECT STUDY METHODOLOGY..........................................................................................4
STUDYTIMEFRAMES.................................................................................................................................4
'
PROJECT STUDY AREA..............................................................................................................................4
ANALYSISMETHODOLOGIES.....................................................................................................................4
INTERSECTION CAPACITY ANALYSIS........................................................................................................5
TRAFFICCOUNT DATA..............................................................................................................................5
FUTURETRAFFIC VOLUMES......................................................................................................................6
STANDARDSOF SIGNIFICANCE..................................................................................................................6
'
3. EXISTING CONDITIONS.............................................................................................................7
EXISTINGCIRCULATION NETWORK..........................................................................................................7
PEAK HOUR INTERSECTION LEVEL OF SERVICE.......................................................................................7
PEDESTRIANTRAFFIC..............................................................................................................................
11
4. FUTURE TRAFFIC CONDITIONS WITHOUT PROJECT ....................................
FUTURETRAFFIC GRowTH.....................................................................................................................12
.................12
'
FUTURE INTERSECTION CONFIGURATION...............................................................................................12
PEAK HOUR INTERSECTION LEVEL OF SERVICE- FUTURE NEAR TERM................................................12
5. BUILDOUT TRAFFIC CONDITIONS WITHOUT PROJECT..................................................15
'
FUTURE TRAFFIC GRowTH.....................................................................................................................15
FUTURE INTERSECTION CONFIGURATION...............................................................................................15
'
PEAK HOUR INTERSECTION LEVEL OF SERVICE- BUE.DOUT.................................................................
6. PROJECT RELATED TRAFFIC...................................................................................................19
15
'
PROJECT TRIP GENERATION....................................................................................................................19
PROJECTTRAFFIC....................................................................................................................................19
7. FUTURE TRAFFIC CONDITIONS WITH PROJECT................................................................25
PEAK HOUR INTERSECTION LEVEL OF SERVICE.....................................................................................25
8. BUILDOUT TRAFFIC CONDITIONS WITH PROJECT...........................................................28
'
PEAK HOUR INTERSECTION LEVEL OF SERVICE.....................................................................................28
'
9. DETERMINATION OF SIGNIFICANT IMPACT......................................................................31
NEAR-TERM FUTURE (2008)...................................................................................................................31
BUILDOUT(POST-2020)..........................................................................................................................32
J
L
' Katz, Okitsu & Associates City of Tustin
Traffic Engineers and Transportation Planners
Red Hill/Walnut Residential Project Trak Study
9
8. CIRCULATION AND ACCESS...................................................................................................33
ACCESS RoADs AND DRIvEWAYs...........................................................................................................33
PARKING DiSTRIBUTION.......................................................................................................................... 35
9. MITIGATION AND RECOMMENDATIONS...........................................................................36
10. CONCLUSIONS......................................................................................................................37
Katz, uxitsu ac Associates City of Tustin
Trai/e Engineers and Transportation Planners
ii Red Hill/Walnut Residential Project Trac Study
11
1
1 FIGURE 15 - FUTURE TRAFFIC VOLUMES WITH PROJECT, PM PEAK HOUR ............................................... 27
FIGURE 16 - BUILDOUT TRAFFIC VOLUMES WITH PROJECT, AM PEAK HOUR ........................................... 29
FIGURE 17 - BUILDOUT TRAFFIC VOLUMES WITH PROJECT, PM PEAK HOUR ........................................... 30
1
FIGURE 1 -PROJECT LOCATION.....................................................................................................................
2
TABLE 1 - LEVELS OF SERVICE FOR INTERSECTIONS.....................................................................................
1
FIGURE2 - PROPOSED SITE PLAN...................................................................................................................
3
11
FIGURE 3 - EXISTING INTERSECTION GEOMETRY..........................................................................................
8
12
1
FIGURE 4 - EXISTING TRAFFIC VOLUMES, AM PEAK HOUR.........................................................................
9
1
TABLE 5 - TRIP GENERATION RATES...........................................................................................................
FIGURE 5 - EXISTING TRAFFIC VOLUMES, PM PEAK HOUR........................................................................
10
TABLE 6 - PROJECT TRAFFIC GENERATION..................................................................................................
FIGURE 6 - FUTURE TRAFFIC VOLUMES WITHOUT PROJECT, AM PEAK HOUR ..........................................
13
1
FIGURE 7 - FUTURE TRAFFIC VOLUMES WITHOUT PROJECT, PM PEAK HOUR ...........................................
14
TABLE 8 - PEAK HOUR INTERSECTION CONDITIONS, BUILDOUT WITH PROJECT .......................................
FIGURE 8 — BUILDOUT INTERSECTION GEOMETRY......................................................................................
16
1
FIGURE 9 - BUILDOUT TRAFFIC VOLUMES WITHOUT PROJECT, AM PEAK HOUR .....................................
FIGURE 10 - BUILDOUT TRAFFIC VOLUMES WITHOUT PROJECT, PM PEAK HOUR .....................................
17
18
TABLE 10 - LEVEL OF SERVICE ANALYSIS /DETERMINATION OF IMPACTS, BUILDOUT CONDITIONS.........
TABLE 11 — CITY PARKING CODE REQUIREMENTS FOR THE PROPOSED PROJECT ......................................
FIGURE 11 — PROJECT TRIP DISTRIBUTION..................................................................................................
20
1
FIGURE 12 — PROJECT TRIPS, AM PEAK HOUR............................................................................................
22
23
FIGURE 13 — PROJECT TRIPS, PM PEAK HOUR............................................................................................
FIGURE 14 - FUTURE TRAFFIC VOLUMES WITH PROJECT, AM PEAK HOUR ...............................................
26
1 FIGURE 15 - FUTURE TRAFFIC VOLUMES WITH PROJECT, PM PEAK HOUR ............................................... 27
FIGURE 16 - BUILDOUT TRAFFIC VOLUMES WITH PROJECT, AM PEAK HOUR ........................................... 29
FIGURE 17 - BUILDOUT TRAFFIC VOLUMES WITH PROJECT, PM PEAK HOUR ........................................... 30
1
TABLE 1 - LEVELS OF SERVICE FOR INTERSECTIONS.....................................................................................
5
1
TABLE 2 - PEAK HOUR INTERSECTION CONDITIONS, EXISTING CONDITIONS .............................................
11
TABLE 3 - PEAK HOUR INTERSECTION CONDITIONS, FUTURE WITHOUT PROJECT .....................................
12
TABLE 4 - PEAK HOUR INTERSECTION CONDITIONS, BUILDOUT WITHOUT PROJECT .................................
15
1
TABLE 5 - TRIP GENERATION RATES...........................................................................................................
21
TABLE 6 - PROJECT TRAFFIC GENERATION..................................................................................................
21
TABLE 7 - PEAK HOUR INTERSECTION CONDITIONS, FUTURE WITH PROJECT ...........................................
25
1
TABLE 8 - PEAK HOUR INTERSECTION CONDITIONS, BUILDOUT WITH PROJECT .......................................
28
TABLE 9 - LEVEL OF SERVICE ANALYSIS /DETERMINATION OF IMPACTS, FUTURE CONDITIONS ...............
31
1
TABLE 10 - LEVEL OF SERVICE ANALYSIS /DETERMINATION OF IMPACTS, BUILDOUT CONDITIONS.........
TABLE 11 — CITY PARKING CODE REQUIREMENTS FOR THE PROPOSED PROJECT ......................................
32
35
1
1 Appendix A — Existing Traffic Counts
Appendix B — Intersection Level of Service Worksheets
1 Appendix C — Intersection Level of Service Concepts
Appendix D — Project Site Plan
1 Katz, Okitsu & Associates City of Tustin
Traffic Engineers and Transportation planner
1 iii Red Flil1/Walnut Residential Project Trak Study
r.,
' The subject of this traffic impact study is a proposed residential project known as 'Red Hill
Townhomes", consisting of a 75 -unit townhome/condominium complex in the City of Tustin.
' The proposed project is located on Red Hill Avenue north of Walnut Avenue. The developer of
the proposed project is Southwind Realty Group of Irvine, California. The project location is
shown in Figure 1 and the proposed site plan is shown in Figure 2
I
The project site is currently occupied by two apartment complexes: a 30 -unit complex known as
"Whispering Woods" and a 27 -unit complex known as "The Terrace".
The City is requesting a trip generation and distribution analysis to show the difference in trips
from the site due to the proposed development, an intersection traffic analysis for the intersection
of Red Hill Avenue and Walnut Avenue, and an analysis of the on-site circulation and access to
Red Hill Avenue. The study also documents parking distribution within the project site. The
analysis is intended to meet the requirements of the City of Tustin.
Katz, Okitsu & Associates City of 1 ustin
Tra(tk Engineers and Transyanadan Planners
1 Red Hill/Walnut Residential Project Trak Study
■ Project Location
0 Study Intersection
N
iSchool
— Major Street
— Minor Street
tH Railroad
Not to Scale
Katz, Okitsu & Associates
City of Tustin Figure 1
Red Hill / Walnut Residential Project TIS Vicinity Map
Planning and Engineering
ISI
This chapter documents the methodologies and assumptions used to conduct the analysis for the
proposed project. This section contains the following background information:
' • Study timeframes
• Study area description
• Capacity analysis methodologies
J
Study Timeframes
This report presents an analysis of the intersection operating conditions during the morning and
evening peak hours during the following anticipated timeframes:
• Existing Conditions (Year 2006)
• Future Year 2008
• Buildout (Post -2020)
Project Study Area
The study area was determined through consultation with City of Tustin staff. The study area
consists of the following:
• Red Hill Avenue at Walnut Avenue
Analysis Methodologies
This section presents a brief overview of traffic analysis methodologies and concepts used in this
study. Street system operating conditions are typically described in terms of 'level of service."
Level of service is a report -card scale used to indicate the quality of traffic flow on roadway
segments and at intersections. Level of service (LOS) ranges from LOS A (free flow, little
congestion) to LOS F (forced flow, extreme congestion). A more detailed description of the
concepts described in this section is provided in Appendix C of this document.
The local jurisdictions within the project area, including the City of Tustin, have determined that
Level of Service D is the minimum acceptable level of service for peak hour operation. Any
roadway segment operating at Level E or F is considered to be operating deficiently. An impact is
deemed significant when the level of service is E or F and the project causes an increase in V/C or
delay over the defined threshold. For further information on these significance thresholds see
Appendix C.
Katz, Okitsu &Associates
Tralj¢ Engineers and Transponation Planners
City of Tustin
4 Red Hill/Walnut Residential Project Traffic Study
t
I
[1
1
Project Study Methodology
Intersection Capacity Analysis
The analysis of peak hour intersection conditions was conducted using the TRAFFIX software
program developed by Dowling Associates. The following peak periods were selected for analysis:
• Weekday AM (peak hour between 7:00 AM and 9:00 AM)
• Weekday PM (peak hour between 4:00 PM and 6:00 PM)
Traffic conditions in Southern California are often evaluated during peak hours at intersections
using a methodology known as the Intersection Capacity Utilization (ICU) technique. This is the
preferred analysis method for the City of Tustin. This analysis method is widely accepted and
essentially measures the amount of traffic signal "green" time required for the intersection. It is a
significant variation from the HCM method; however it produces results that are generally
similar. The City of Tustin generally requests that this method be used in the City, so all
signalized intersections were analyzed based on this method. Table 1 shows the relationship
between Level of Service and the ICU Method volume/capacity criteria for signalized
intersections, and Level of Service and delay for unsignalized intersections.
Table 1
Levels of Service for Intersections
Level of Service
Signalized Intersection
Volume/Capacity
Ratio
Unsignalized
Intersection Control
Delay'
A
0.00-0.60
0-10
B
0.61-0.70
10-15
C
0.71-0.80
15-25
D
0.81-0.90
25-35
E
0.91-1.00
35-50
F
1.00 and up
50 or more
Note 1: Average delay in seconds/vehicle
' Traffic Count Data
Existing daily and peak hour traffic volumes were supplied by Traffic Data Services of Santa Ana,
' California in March, 2006. All traffic count data used in this study is compiled in Appendix A of
this report.
Katz, Okitsu & Associates City of Tustin
Trails Engineers and TransNnalm Planners
5 Red Hill/Walnut Residential Project Traffic Study
L
1
I
IJ
Project Study Methodology
Future Traffic Volumes
Peak hour traffic volumes for Red Hill Avenue and Walnut Avenue under future near term
conditions were forecast based on a 1% annual growth rate from existing conditions. Peak hour
volumes for buildout (Post -2020) conditions were based on traffic forecasts prepared for the
Tustin MCAS Tustin Legacy Study, when these volumes were higher than existing plus an annual
growth factor. When the existing volumes plus an annual growth factor were higher than the
MCAS forecasts, the existing plus growth factor volumes were used per City direction. The
Tustin MCAS Legacy traffic forecasts were provided by the City of Tustin. Project trips were
added to the background base for each scenario to determine the relative impact of the project.
Standards of Significance
The City of Tustin has determined that Level of Service D is the minimum acceptable level of
service during peak hours at intersections. Any roadway segment operating at Level of Service E
or F is considered to be operating deficiently. An impact is deemed significant when the level of
service is E or F and the project causes an increase in the Volume/Capacity ratio of .01 or more
over the defined threshold. For further information on these significance thresholds see
Appendix C.
Katz, Okitsu & Associates City of 1 ustin
Trait Engineers and Transportation Planus 6 Red Hill/Walnut Residential Project Traffic Study
' This section documents the existing conditions in the study area, including local land uses,
roadway geometry, and driveway locations. The discussion presented here is limited to specific
' roadways in the project vicinity. The project location is on Red Hill Avenue north of Walnut
Avenue in the City of Tustin.
' Existing Circulation Network
Streets in the project vicinity which could be affected by the proposed project include Red Hill
' Avenue and Walnut Avenue. The existing roadway circulation network was shown previously in
Figures 1 and 2. Existing intersection geometry is shown in Figure 3.
Red Hill Avenue is a 4 -lane street on a northeast -southwest alignment located immediately to the
east of and adjacent to the project site. The City has designated Red Hill Avenue as a north -south
roadway. The street has a signalized intersection with Walnut Avenue. The speed limit on Red
Hill Avenue is 35 mph. The intersection has left -turn pockets on all approaches. The existing
signal phasing is protected/permissive for the east and west approaches (Walnut Avenue), and
' protected for the north and south approaches (Red Hill Avenue). Land use along the street is
residential north of Walnut Avenue, with single- family homes located on the east side of the
' street and apartments located on the west side of the street. A neighborhood
commercial/shopping center is located on the west side of the street south of Walnut Avenue.
Elementary and middle schools are located approximately'/, mile south of the project site and '/4
' mile north of the project site. The traffic volume on the street is 23,800 vehicles per day.
Walnut Avenue is a 4 -lane divided arterial on a northwest -southeast alignment located immediately
to the south of and adjacent to the project site. The City has designated Walnut Avenue as an
east -west roadway. The street has a painted median with left -turn pockets, and a signalized
' intersection with Red Hill Avenue. The speed limit on Walnut Avenue is 35 mph in the project
vicinity. Land use along the street is residential on the north side of the street and
commercial/retail on the south side of the street west of Red Hill. East of Red Hill land use is
' residential. The traffic volume on the street is 16,700 vehicles per day.
' Regional circulation is provided by the I-5 Freeway approximately V2 mile to the north and the SR -
55 Freeway approximately 3/4 mile to the west of the project site.
Peak Hour Intersection Level of Service
Figure 4 illustrates the existing peak hour traffic volumes during the AM peak hour, while Figure 5
illustrates the existing peak hour traffic volumes during the PM peak hour. Based on these
Okitsu & Associates City of Tustin
ginmrs and Transportation Planners
7 Red Hill/Walnut Residential Project Trak Study
■
Project Location
•
Study Intersection
iSchool
Major Street
Minor Street
Railroad
Signalized Intersection
Lane Geometry
AuerKatz, Okitsu & Associat
Planning and Engineering
City of Tustin
Red Hill / Walnut Residential Project TIS
N
Not to Scale
Figure 3
F)dsting Geometries
■
Project Location
•
Study Intersection
■
School
Major Street
—
Minor Street
—
Railroad
+F
Turning Movement Volume
Katz, Okitsu & Associatescity of Tustin
Planning and Engineering Red Hill / Walnut Residential Project TIS
N
Not to Scale
Figure 4
Usting Traffic Volumes, AM Peak Hour
. Project Location
• Study Intersection
ischool
N
Major Street
Minor Street
-+—F Railroad
X Turning Movement Volume Not to Seale
IrKatz, Okitsu & Associates City of Tustin Figure 5
Planning and Engineering I Red Hill / Walnut Residential Project TIS Existing Traffic Volumes, PM Peak Hour
I
I
I
I
F
1
I
Existing Conditions
existing traffic volumes, level of service analyses were conducted for the study intersection. The
results of these analyses are summarized in Table 2 for the existing conditions. As shown in the
table, the intersection currently operates at Level of Service D or better under existing conditions.
Table 2
Peak Hour Intersection Conditions
Existing Conditions, Year 2006
Intersection AM Peak Hour
PM Peak Hour
Volume/ Level Of
Volume/ Level Of
Capacity Service
Capacity Service
Red Hill Avenue & Walnut Avenue .804 D
.684 B
Pedestrian Trac
Significant pedestrian traffic at the Red Hill/Walnut intersection was observed, both during the
peak hours and before and after school, particularly on the west leg of the intersection (Walnut).
Pedestrian volumes were moderate, with about 20 pedestrians per hour crossing Red Hill and 30
per hour crossing Walnut during the AM peak hour, and about 45 per hour crossing Red Hill and
60 per hour crossing Walnut during the PM peak hour. During the afternoon school peak hour
(2:00 PM to 3:00 PM) there were about 30 pedestrians per hour crossing Red Hill and about 75 per
hour crossing Walnut. The majority of the pedestrians crossing Walnut in the afternoon peak
hour were school children crossing on the west leg.
Okitsu & Associates City of Tustin
ginars and Transponailon Planners
11 Red Hill/Walnut Residential Project Trak Study
' This section documents the future without project traffic conditions in the study area with
' ambient growth added. The year 2008 was selected for analysis based on study requirements.
The project is scheduled for completion before the end of the year 2008.
Future Traffic Growth
Peak hour traffic volumes for the Red Hill Avenue/Walnut Avenue intersection under near-term
' future (Year 2008) conditions were forecast based on a 1 % per year growth factor.
' Future Intersection Configuration
The traffic signal at Red Hill/Walnut will soon be converted from the current FELT operation to
protected left -turn operation for eastbound and westbound Walnut Avenue. The lane
configuration of the intersection will also be changed, restriping westbound Walnut to provide
dual left -turn lanes. These changes to lane geometry and signal phasing have been incorporated
' into the analyses of future intersection conditions.
Peak Hour Intersection Level of Service — Future Near Term
To simulate the near-term growth conditions for the year 2008, the peak hour volumes in Figures
4 and 5 were increased by a factor of 1% per year for two years. Figures 6 and 7 illustrate the
' resulting AM and PM peak hour volumes, respectively.
' Table 3 illustrates the future without project intersection level of service conditions. As shown in
the table, the intersection is expected to operate at Level of Service B or better under the future
without project condition for the year 2008.
' Table 3
Peak Hour Intersection Conditions
' Future Without Project Conditions, Year 2008
Intersection AM Peak Hour
PM Peak Hour
Volume/ Level Of
Volume/ Level Of
Capacity Service
Capacity Service
Red Hill Avenue & Walnut Avenue .678 B
.648 B
Katz, Okitsu & Associates City of Tustin
Traffic Engineers and Transportation P/annus
12 Red Hill/Walnut Residential Project Trak Study
'J
11
I
U
I
1
Katz, Okiltsu & Associates Cily of Tustin
Planning and Engineering Red Hill / Walnut Residential Project TIS
N
Not to Scale
Figure 6
Future Traffic Volumes Without Project, AM
Project Location
•
Study Intersection
iSchool
—
Major Street
—
Minor Street
Railroad
Turning Movement Volume
Katz, Okiltsu & Associates Cily of Tustin
Planning and Engineering Red Hill / Walnut Residential Project TIS
N
Not to Scale
Figure 6
Future Traffic Volumes Without Project, AM
■ Project Location
• Study Intersection
i School
Major Street
Minor Street
++ Railroad
Turning Movement Volume
Katz, Okitsu & AssociNor ates
Planning and Engineering
City of Tustin
Red Hill / Walnut Residential Project TIS
N
Not to Scale
Figure 7
Future Traffic Volumes Without Project, PNI
1
L
I
U
This section documents the buildout without project traffic conditions in the study area. Post
2020 was selected for analysis based on information provided by the City from the MCAS Tustin
Legacy study.
' Future Traffic Growth
Peak hour traffic volumes for the Red Hill Avenue/Walnut Avenue intersection under buildout
t(Post -2020) conditions were forecast based on information from the MCAS Tustin Legacy study
and existing volumes plus a growth factor. The Legacy Study takes into account certain planned
t roadway improvements to be completed by Year 2020. These improvements are included in all
Buildout scenario analyses. Post -2020 designated lanes are illustrated in Figure 8.
Future Intersection Con figuration
The traffic signal at Red Hill/Walnut will soon be converted from the current PPLT operation to
protected left -turn operation for eastbound and westbound Walnut Avenue. The lane
configuration of the intersection will also be changed, restriping westbound Walnut to provide
dual left -tum lanes. Red Hill Avenue is planned to have a buildout configuration of 3 through
lanes in each direction. These changes to lane geometry and signal phasing have been
incorporated into the analyses of buildout intersection conditions.
Peak Hour Intersection Level of Service — Buildout
Buildout traffic volume forecasts for the Post -2020 conditions were provided by the City of Tustin
from the MCAS Tustin Legacy study. Existing volumes plus a growth factor were used when
higher than the Legacy Study forecasts. Figures 9 and 10 illustrate the resulting AM and PM peak
hour volumes, respectively. Table 4 illustrates the buildout without project intersection level of
service conditions. As shown in the table, the intersection is expected to operate at Level of
Service E in the AM peak hour and Level of Service F in the PM peak hour under the buildout
without project condition.
Table 4
Peak Hour Intersection Conditions
Buildout Without Project Conditions, Post 2020
Intersection
AM Peak Hour I PM Peak Hour
Okitsu & Associates City of Tustin
ginars and Transprnalioa Planners
45 Red Hill/Walnut Residential Project Traffic Study
Level Of
Volume/
Level
iVolume/ I
Service
I Capacity I
10fCapacity
Servi
Red Hill Avenue & Walnut Avenue .959
E
1.030 1
F
Okitsu & Associates City of Tustin
ginars and Transprnalioa Planners
45 Red Hill/Walnut Residential Project Traffic Study
City of Tustin
Red Hill / Walnut Residential Project TIS
N
Not to Scale
Figure 8
Buildout Geometries
I�
UCUa Imu
■
Project Location
•
Study Intersection
iSchool
Major Street
—
Minor Street
�—
Railroad
Signalized Intersection
J6
Stop Sign
1
Lane Geometry
ErKatz, Okitsu & Associal
Planning and Engineering
City of Tustin
Red Hill / Walnut Residential Project TIS
N
Not to Scale
Figure 8
Buildout Geometries
I�
I
1
11
U
0
Project Location
•
Study Intersection
iSchool
—
Major Street
—
Minor Street
+-I-
Railroad
Turning Movement Volume
Katz, Okitsu & Associates City of Tustin
Planning and Engineering Red Hill / Walnut Residential Project TIS
N
Not to Scale
Figure 9
Buildout Traffic Volumes Without Project, AM
1
1
1
1
■ Project Location
• Study Intersection
jSchool
Major Street
Minor Street
�H Railroad
Turning Movement Volume
Katz, Okitsu & Associates
Planning and Engineering
City of Tustin
Red Hill / Walnut Residential Project TIS
N
Not to Seale
Figure 10
Buildout Traffic Volumes Without Project, PM
L
The proposed project consists of 75 townhome/condominium units. This residential development
' is expected to generate additional traffic volumes as documented below.
' Project Trip Generation
Trip generation is a measure or forecast of the number of trips that begin or end at the project site.
' All or part of these trips will result in traffic increases on the streets where they occur. Traffic
generated is a function of the extent and type of development proposed for the site.
' Trip generation is generally equal to the traffic volume expected at project driveways. The trip
generation rates are equivalent to the number of trips that start or end (in and out) at the project
site, and are specific by land use for a given time period (i.e. AM peak hour). Trip generation rates
' are expressed as a function of a given characteristic of the land use area (i.e. floor area, site area,
number of employees, or seating capacity). The rates are based on regression analysis, and are
' derived from field observations from as many sources as possible. At each site, trips in and out of
the site are counted, trip rate modifiers are identified and regression analysis is used to derive a
"best fit" for a particular land use. An equation is developed which calculate an average trip
' generation rate for the specific land use.
' Project Traffic
The trip generation for the proposed project consisting of 75 townhome/condominiums is shown
in Table 5. The project trips summarized in these tables are based on trip generation rates
provided by ITE Trip Generation, Th Edition with consideration of comparable trip generation
rates for similar uses in this region. This report is widely used in Southern California and
' indicates the probable traffic generation rates for various land uses based on studies of existing
developments in comparable settings. City staff directed Katz, Okitsu & Associates to use single-
family detached housing trip generation rates for the proposed project due to the size of the
' proposed units. Figure 11 illustrates the expected trip distribution for these project trips.
1^
1
1
Okitsu & Associates City of Tustin
;mars and Transpanaeiva Rama
19 Red Hill/Walnut Residential Project Traffic Study
■ Project Location
0 Study Intersection
N
iSchool
Major Street
Minor Street
Railroad Not to Scale
Katz, Okitsu & Associates City of Tustin Figure 11
Planning and Engineering Red Hill / Walnut Residential Project TIS Project Trip Distribution
Project Related Traffic
Table 5
Trip Generation Rates
Land Use Units Daily AM Peak Hour PM Peak Hour
Total In Out Total In Out
Low -Rise Apartments
ITE Code 221 DU 6.59 0.46 0.10 0.36 0.58 0.38 0.20
Single -Family Detached Housing'
DU 9.57 0.75 0.19 0.56 1.01 0.64 0.37
ITE Code 210
Note 1: SFDU rate used for townhomes per City direction.
Existing Land Use Traffic
57 apartment units currently occupy the project site. These apartment units will be demolished
upon approval of the proposed project. The trip generation currently associated with the project
site is also shown on Table 6. Figures 12 and 13 show the added trips expected as a result of the
project less the existing use trips.
Table 6
Project Traffic Generation
Land Use Size Daily AM Peak Hour PM Peak Hour
Total Ia I Out Total In I Out
Vehicle Trips
Low -Rise Apartments
ITE Code 221
57 DU 1 376 j 26 1 6 j 20 1 33 1 22 1 11
Townhomes/Ccondominiums' 75 DU 718 56 14 42 76 48 28
ITE Code 210'
Net Project Vehicle Trips 342 1 30 1 8 1 22 1 43 1 26 1 17
Note 1: SFDU rate used for townhomes per direction from the City
As shown in Table 6, the proposed project is expected to generate approximately 718 daily trips.
Of this amount, 56 are expected to be in the AM peak hour, including 14 trips entering and 42
trips exiting the site. There are expected to be 76 trips during the PM peak hour, including 48
trips entering and 28 trips exiting the site.
Katz, Okitsu & Associates City of Tustin
Trattrc Engineers and Transportation Planners
24 Red Hill/Walnut Residential Project Traffic Study
■ Project Location
• Study Intersection
School
N
Major Street
Minor Street
+-1- Railroad
Turning Movement Volume Not to Scale
NorKatz, Okitsu & Associates City of Tustin Figure 12
Planning and Engineering Red Hill / Walnut Residential Project TIS Project Trips, AM Peak Hour
I
I
. Project location
• Study Intersection
i School
N
Major Street
Minor Street
Railroad
Turning.Movemert Volume Not to Scale
Planning
la nig and E &Associates
City of Tustin Figure 13
uPlanning and Engineering Red Hill /Walnut Residential Project TIS Project Trips, PM Peak Hour
Project Related Traffic
The project will have 718 vehicles per day going in and out onto Red Hill Avenue. This is an
increase of 342 vehicles per day above the existing land use. The resulting 'NET Project Vehicle
Trips' are shown in Table 6. Adding 342 vehicles per day to a street that is currently serving
' 23,800 vehicles per day (Red Hill Avenue) is less than a 1.5% increase. This additional traffic will
have little impact on Red Hill Avenue.
L1
Li
I
LL
Katz, Okitsu & Associates
Traffic Enginars and Transponarion Planners
City of Tustin
24 Red Hill/Walnut Residential Project Trak Study
V
This section documents the near-term future traffic conditions with the addition of project -
related traffic to the surrounding street system. It evaluates near term traffic conditions in the
study area with ambient growth (1% per year) and the proposed project added. The proposed
project completion date of 2008 was selected for analysis to be conservative.
Peak Hour Intersection Level of Service
' Table 7 summarizes the results of the level of service analyses for this scenario. As shown in the
table, the intersection of Red Hill at Walnut continues to operate at Level of Service B or better
' with the addition of project -related traffic. Figures 14 and 15 illustrate the resulting AM and PM
peak hour volumes, respectively.
I
n
Table 7
Peak Hour Intersection Conditions
Future With Project Conditions, Year 2008
Intersections AM Peak Hour PM Peak Hour
Red Hill Avenue & Walnut Avenue .681 B .656 B
Project Driveway' 27.0 D 23.3 C
Note 1: Seconds per vehicle average
Note 2: Delay is for poorest movement (left -tum from project driveway)
Okitsu & Associates City of Tustin
ginars and Transyanatin P/anxas
25 Red Hill/Walnut Residential Project Trak Study
■ Project Location
• Study Intersection
iSchool
Major Street
Minor Street
tF Railroad
Turning Movement Volume
MKatz, Okitsu & Associates
Planning and Engineering
City of Tustin
Red Hill/ Walnut Residential Project TIS
N
Not to Scale
Figure 14
Future Traffic Volumes With Project, AM
hi
I
I
1
■
Project location
•
Study Intersection
School
—
Major Street
—
Minor Street
Railroad
X
Turning Movement Volume
Katz, Okitsu & Associates ICity of Tustin
Planning and Engineering Red Hill! Walnut Residential Project TIS
N
Not to Scale
Figure 15
Future Traffic Volumes With Project, PM
' This section documents the buildout traffic conditions with the addition of project -related traffic
' to the surrounding street system. It evaluates buildout traffic conditions in the study area with
traffic from the proposed project added. Buildout Post -2020 was selected for analysis based on
information received from the City for the MCAS Tustin Legacy study.
Peak Hour Intersection Level of Service
' Table 7 summarizes the results of the level of service analyses for this scenario. As shown in the
table, the intersection of Red Hill at Walnut continues to operate at Level of Service E in the AM
' peak hour and Level of Service F in the PM peak hour with the addition of project -related traffic.
Figures 16 and 17 illustrate the resulting AM and PM peak hour volumes, respectively.
Table 8
Peak Hour Intersection Conditions
Buildout With Project Conditions, Post 2020
Intersections AM Peak Hour
' I
' Red Hill Avenue & Walnut Avenue 1 .961
IJ
OMEProject Driveway' 709.3 F
Note 1: Seconds per vehicle average
Note 2: Delay is for poorest movement (left -turn from project driveway)
PM Peak Hour
87.4 1 F
Katz, Okitsu & Associates City of Tustin
Tial& Egineers and Tut.sponatioa Planners 28 Red Hill/Walnut Residential Project Trafc Study
I
[J
I
I
I
I
1
I
.
Project Location
•
Study Intersection
iSchool
Major Street
—
Minor Street
—
-r-F-
Railroad
Turning Movement Volume
Katz, Okitsu & Associates City of Tustin
Planning and Engineering Red Hill / Walnut Residential Project TIS
N
Not to Scale
Figure 16
Buildout Traffic Volumes With Project, AM
■ Project Location
• Study Intersection
■ School
N
Major Street
Minor Street
�H Railroad
XXI Turning Movement Volume Not to Scale
ErKatz, Okitsu & AssociatesCity of Tustin Figure 17
Planning and Engineering Red Hill / Walnut Residential Project TIS Buildout Traffic Volumes With Project, PM
r--
I
I
I
I
I
I
Traffic impacts are identified if the proposed project will result in a significant change in traffic
conditions on a roadway or intersection. A significant impact is normally defined when project
related traffic would cause level of service to deteriorate to below the minimum acceptable level
by a measurable amount. Impacts may also be significant if the location is already below the
minimum acceptable level and project related traffic causes a further decline.
The City of Tustin has identified Level of Service D as the minimum allowable service level during
peak hours at signalized intersections in the City. Most arriving traffic will clear the intersection
on the first allowable green cycle under this level of service. Any roadway segment operating at
Level of Service E or F is considered to be operating deficiently. An impact is deemed significant
when level of service is E or F and the project causes an increase in the V/C ratio of 0.01 or more
over the defined threshold. Mitigation measures should be considered when traffic conditions are
forecast to decline to poorer levels of service.
Near -Term Future (2008)
The level of service analyses for the Near -Term Future (Year 2008) study scenarios determined
that level of service will remain at Level B or better under both the 'Future Without Project" and
"Future With Project" scenarios. The project will not create a significant impact at the study
intersections in the Future scenarios. Table 9 provides a comparison of the levels of service and
volume/capacity ratios of all study scenarios for the Future condition. Traffic impacts created by
the project can be evaluated by comparing the "Future Without Project" condition to the "Future
With Project" condition.
Table 9
Level of Service Analysis /Determination of Impacts
for Future Conditions
Intersection
Existin
Future
Without
Proieet
Future Increase/
With Project Decrease
Significant
!;m
Impactf
ed Hill Ave. & Walnut Ave., AM Pk Hr
D/.8041
B/.678
B/.681
.003
No
ed Hill Ave. & Walnut Ave., PM Pk Hr
B/.6841
B/.648
B 1.656
.008
No
roject Driveway, AM Peak Hour
N/A
N/A
D/27.0
N/A
No
roject Driveway, PM Peak Hour
N/A
N/A
C / 23.3
N/A
No
Note: LUS = Level of Service; V/C = volume/Gapacity; Velay = Seconds per velucle average, poorest movement
Katz, Okitsu & Associates City of Tustin
Trott¢ Egi"an and TimWnatm Plannns
31 Red Hill/Walnut Residential Project Trak Study
' Determination of Significant Impact
' Buildout (Post -2020)
The level of service analyses for the Buildout (Post 2020) study scenarios determined that level of
service will be at Level E in the AM peak hour and Level F in the PM peak hour under both the
"Buildout Without Project" and "Buildout With Project" scenarios. Although the intersection will
be operating at Level F under the buildout scenario, the project will not create a significant
impact at the study intersection. The project driveway will operate at Level of Service F under
buildout conditions.
rThe poor level of service at the project driveway is due to a relatively small number of vehicles
turning left from the driveway onto Red Hill. This condition can be tolerated or it can be
' improved by prohibiting left turns from the project onto Red Hill, requiring right turns only.
Traffic conditions at the project driveway under buildout conditions may be adequate due to the
effect of platooning traffic from the nearby signalized intersection at Red Hill/Walnut. However
the City may want to consider mitigating the condition in the future by prohibiting the left turn
from the project driveway onto Red Hill.
' Table 10 provides a comparison of the levels of service and volume/capacity ratios of all study
scenarios for the Buildout condition. Traffic impacts created by the project can be evaluated by
comparing the "Buildout Without Project" condition to the "Buildout With Project" condition.
Table 10
Level of Service Analysis /Determination of Impacts
for Buildout Conditions
!]
iI
Note: LOS = Level of Service; V/C = Volume/Capacity; Delay = Seconds per vehicle average, poorest movement
L
'Katz, Okitsu & Associates City of Tustin
Nor Trat("Enginars and Transponat ion Planners 32 Red Hill/Walnut Residential Project Traffic Study
Buildout
Buildout
Increase/
Significant
Intersection
Existing
Without
With
Decrease
Impact
Project
P
Project
ed HillAve. & Walnut Ave., AM Pk Hr
D/.804
E /.959
E / .961
.002
No
ed Hill Ave. & Walnut Ave., PM Pk Hr
B 1.694
F / 1.030
F / 1.038
.008
No
roject Driveway, AM Peak Hour
N/A
N/A
F / 709.3
N/A
Yes
Project Driveway, PM Peak Hour
N/A
N/A
F / 87.4
N/A
Yes
Note: LOS = Level of Service; V/C = Volume/Capacity; Delay = Seconds per vehicle average, poorest movement
L
'Katz, Okitsu & Associates City of Tustin
Nor Trat("Enginars and Transponat ion Planners 32 Red Hill/Walnut Residential Project Traffic Study
Access Roads and Driveways
The project is proposed to access Red Hill Avenue at one location near the north end of the project
site. This is the only site access for project entry. Currently the apartment complexes on the site
' access Red Hill Avenue near the center of the project site and Walnut Avenue near the west
boundary of the project site. There will be no entry gates regulating access to this project. The
project site plan with existing street dimensions and recommended turn pocket configuration is
' presented in Appendix D of this report.
' The designated site access on Red Hill Avenue will be accessible to both northbound and
southbound traffic on Red Hill. Analysis indicates that there is sufficient distance between the
project driveway and Walnut Avenue to allow both the existing southbound left -turn pocket at
Redhill/Walnut as well as a northbound left -turn pocket at the project entrance. A southbound
left -turn pocket on Red Hill of 160 feet in length will be adequate to accommodate all traffic
' expected to make this move during the peak hours under buildout conditions. This includes left -
turn traffic from the project.
A northbound left -turn pocket of 80 feet in length at the project driveway will be adequate to
accommodate project traffic during the peak hours. Allowing for a 90 -foot southbound transition
and a 90 -foot northbound transition for the turn pockets the total length required would be 420
' feet. The distance available on Red Hill Avenue between the project driveway centerline and the
crosswalk limit line at Walnut Avenue is 450 feet. There is therefore more than adequate distance
available to accommodate both turn pockets
The tum pockets can be separated from opposing traffic lanes with a painted median, and can be
' configured "back to back" to maximize turn pocket vehicle storage capacity. The proposed turn
pockets with street dimensions are shown on the site plan in Appendix D of this report.
The proposed driveway has sight distance to comply with the Caltrans 7.5 second sight distance
criteria for a roadway speed of 40 mph or higher. The proposed Red Hill Avenue access roadway is
about 450 feet from the Red Hill/Walnut intersection and has sight distance over 600 feet to the
north and 500 feet to the south.
Near-term future expected traffic volumes at Redhill/Walnut indicate that an eastbound left -turn
pocket storage length of 140 feet will be adequate to accommodate expected traffic volumes in the
near term, including project traffic. Buildout (post -2020) traffic volumes indicate however that
increased capacity for the eastbound left movement will be required. If projected buildout
Okitsu & Associates City of Tustin
ginan and Transportanm Planners
33 Red Hill/Walnut Residential Project Trak Study
I
I
On -Site Circulation and Access
volumes occur, split -phase signal timing could be installed to accommodate the increase in traffic
volumes, allowing left turns from the adjacent through lane.
It should be noted that this signal will soon be converted from the current PPLT operation to
protected left- turn operation for eastbound and westbound Walnut Avenue at Red Hill Avenue.
The lane configuration of the intersection will also be changed, restriping westbound Walnut to
provide dual left -turn lanes.
The project site plan was reviewed for internal circulation. The site access roadway to Red Hill
Avenue is 25 feet in width. This is adequate to allow for one outbound lane and one inbound
lane. Parking must be prohibited on the north side of this roadway. The south side of the
roadway has parking "cutouts" that allow for 3 visitor parking spaces on the south side while
maintaining the 25 -Foot roadway width for the traffic lanes. Parking should be prohibited on all
other 25 -foot width project streets. Concern over 'dead end" drive aisles has been addressed
through a Waste Management Plan documented in the Design Review package.
Maximum outbound project traffic volume is expected to be 42 vehicles in the AM peak hour.
Approximately 40%, or 17 of these vehicles are expected to tum left from the project driveway.
This is only one vehicle every 3.5 minutes. The low expected volume of left turns indicates that a
' separate left -turn pocket will not be required at the project entrance in the near-term future.
Level of service is indicated as Level D or better for the project entrance in the near-term future
with one inbound and one outbound lane and STOP sign control.
Projected traffic volumes under buildout conditions (from the MCAS Tustin Legacy study)
t indicate Level of Service F for the project driveway with one inbound and one outbound lane. The
level of service reported is for a relatively small number of vehicles turning left from the driveway
onto Red Hill. The AM and PM peak conditions at this intersection are expected to be adequate
' due to the effect of platooning traffic from the nearby signalized intersection at Red Hill/Walnut.
The condition can be mitigated in the future by prohibiting the left turn from the project
driveway onto Red Hill.
The interior street running roughly parallel with Red Hill Avenue is 36 feet in width, and is
' therefore adequate for vehicles to pass each other and to allow for curbside parking on both sides
of the street. Parking should be prohibited on all other project streets except the south side of the
project entry roadway, as noted above. This restriction will allow adequate space for vehicles to
tpass each other and emergency vehicle access.
' ADA access is provided from the public right-of-way at the site's Red Hill Avenue entry to all of
the development's accessible units as well as the pool area. Curb ramps will be provided
' "Katz, Okitsu & Associates City of Tustin
Trafc raginan andTranspunadva Planners 34 Red HilI/Walnut Residential Project Traffic Study
On -Site Circulation and Access
throughout the development per City of Tustin Standard Drawings. Two handicap parking stalls
are also provide near the development's private pool area. An ADA accessible path will also be
' provided into the community from the Walnut Avenue pedestrian entry.
' Parking Distribution
The City of Tustin has established parking space requirements for the multi -family residential
land use category (Tustin Municipal Code Chapter 9224 P -D, Section G-7). The requirements
vary by number of units, and are shown for the proposed project in Table 11.
1
1
1
Table 11 — City Parking Code Requirements for the Proposed Project
Red Hill Townhomes Project
Residential Units
City Requirement
Project Requirement
Resident Spaces
2 Spaces per Unit
150 Spaces
Visitor Spaces
1 Space per 4 Units
19 Spaces
Total Project
75 Units
169 Spaces
As shown in the table, the parking code requirement for the proposed project is a minimum of
two assigned covered parking spaces per unit, plus one visitor parking space for every 4 residential
units (Ord. No. 573, Sec. 2; Ord. No. 906, Sec. 2, 2-21-84).
' The project provides 150 resident and 27 visitor parking spaces. The project parking supply is
therefore adequate for the use per City code. All parking stalls are accessible, and all parking areas
' comply with accepted design standards for stall and aisle width. Parking is distributed relatively
evenly throughout the project.
1
I
Katz, Okitsu & Associates City of Tustin
Tra((u Engimmn and Transpwwion P/ammn
35 Red Hill/Walnut Residential Project Trak Study
Mitigation measures are required if approval and construction of the project will result in or
significantly increase unacceptable traffic conditions. They are also appropriate if cumulative
traffic conditions will result in an unsatisfactory level of service and the proposed development
contributes to these conditions significantly. Although the intersection of Red Hill Avenue and
Walnut Avenue will operate at an unacceptable level of service under Buildout (Post 2020)
conditions, the project does not significantly contribute to these conditions.
The poor level of service at the project driveway under buildout conditions can be mitigated by
prohibiting the left turn from the project driveway onto Red Hill. Traffic exiting the project to
travel north on Red Hill would be required to make a U-turn at Walnut or use an alternate route.
Okitsu & Associates City of Tustin
ginars and Transponation Plannea
36 Red Hill/Walnut Residential Project Trak Study
f;
[1
' The subject of this traffic study is a proposed residential project known as "Red Hill Townhomesn,
' consisting of a 75 -unit condominium/townhome complex in the City of Tustin. The proposed
project is located on Red Hill Avenue north of Walnut Avenue.
The City requested a trip generation analysis to show the difference in trips from the site due to
the proposed development, a level of service analysis for one study intersection, an analysis of on-
site circulation, and an analysis of access to Red Hill Avenue and Walnut Avenue. The
intersection studied was Red Hill Avenue and Walnut Avenue.
The results of the trip generation analysis showed that the project is expected to generate
approximately 718 daily trips. Of this amount, 56 are expected to be in the AM peak hour,
including 14 trips entering and 42 trips exiting the site. There are expected to be 76 trips during
' the PM peak hour, including 48 trips entering and 28 trips exiting the site.
The analysis showed that the existing apartment complex on the site currently generates 376 daily
trips, including 26 trips in the AM peak hour and 33 trips in the PM peak hour. These are the
existing use "trip credits".
The net daily trips from the proposed project are the project -generated trips less the existing use
'
"trip credits". The net daily trips due to the proposed project less the existing use trip credit are
therefore 342 daily trips, including 30 trips in the AM peak hour and 43 trips in the PM peak hour.
These are the traffic volume increases on Red Hill Avenue and Walnut Avenue that can be
expected as a result of the project.
The level of service analyses for the near-term future year (2008) conditions showed that the
study intersection will operate at Level of Service B or better (good), including project trips,
during both the AM and PM peak hours. The analysis for buildout (post -2020) conditions showed
' that the study intersection will operate at Level of Service F (fail) during the AM and PM peak
hours. The project does not significantly contribute to this condition however.
' The on-site circulation analysis showed that traffic conditions should be adequate and the
entrance/exit on Red Hill should provide adequate width for one outbound and one inbound lane.
' Level of service is indicated as Level D or better for the project entrance in the near-term future
with one inbound and one outbound lane and STOP sign control.
F
Okitsu & Associates City of Tustin
ginwa and TmxWnadon Plannen
37 Red Hill/Walnut Residential Project Trak Study
Conclusions
Expected future traffic volumes at Walnut Avenue and Red Hill Avenue indicate that the
southbound left -turn pocket storage length required to accommodate the expected queue of
vehicles turning left from southbound Red Hill Avenue onto eastbound Walnut Avenue is 160
feet. The recommended northbound left -tum pocket storage length at the project driveway is 80
' feet. Expected near-term future (2008) volumes indicate that a left -turn pocket length of 140 feet
will be required for eastbound Walnut Avenue to northbound Red Hill Avenue. Buildout (post
' 2020) traffic volumes indicate that increased capacity for the eastbound left movement will be
required. If projected buildout volumes occur, split -phase signal timing could be installed to
accommodate the increase in traffic volumes, allowing left turns from the adjacent through lane.
The designated site access on Red Hill Avenue will be accessible to both northbound and
southbound traffic on Red Hill. Analysis indicates that there is sufficient distance between the
' project driveway and Walnut Avenue to allow both the existing southbound left -turn pocket at
RedhilVWalnut as well as a northbound left -turn pocket at the project entrance. Traffic
' conditions at the project driveway in the near-term future are adequate with this configuration.
Buildout conditions however indicate a poor level of service for traffic turning left onto Red Hill
from the project driveway with this configuration. This condition can be mitigated by
prohibiting the left tum from the project driveway onto Red Hill.
' The traffic impact study for the proposed project will be submitted to the City of Tustin, who
will review the plan for compliance with applicable City standards. We anticipate that any minor
internal circulation issues will be addressed in conjunction with this review. Katz, Okitsu &
Associates recommends that the City find that the traffic impacts of the project have no adverse
effect on the surrounding street system for the future year.
Katz, Okitsu & Associates City of Tustin
' Tra//k Engineers and Transportation Planners
38 Red Hill/Walnut Residential Project Trak Study
1
1
F
1
1 -
Appendix A
Existing Traffic Counts
Katz, Okitsu & Associates
Trait¢ Ercgmmu and Twa spo mnoa Planners
City of 1 ustin
Red Hill/Walnut Residential Project Traffic Study
'
TRAFF DATA SERVICES, INC.
LOCATION CODE 01519.111
fY 1ra111a•.Yta11r11a11aY«fi1..11aw1Y11wfYYf«r.i111rYr11rf1.firllfIC
iarfarflrfraa«Iarl
rf.firflfaiirif.lRkfff.ft.faat.Mfafa
LOCATION - RED
HILL -BTM WALNUT/NISSON
VOLUMES FOR -
TUESDAY 1/31/06
♦w11.........fallYwfa•1Y11.
AN 11r1Y1Y o1..r.......a1..11
w.1ual.u... uf.Y•rYf.11.f
PH uY.fl....a
... 1.a•......
TIME
NB
SB
TOTAL
TIME
NB
$B
TOTAL
41f MYN«1Hr.HHfrlraflrl•SHHria H«Mra
Yfwiarf Yfl)NbHrH
lirlf•i.iH.H«rblH
bri.iH
HbraHifir
HrrlH aT.HL
'
12:00 - 12:15
23
16
39
12:00
- 12:15
209
172
381
12:15 - 12:30
20
18
38
12:15
- 12:30
189
190
379
12:30 - 12:45
17
10
27
12:30
- 12:45
180
196
376
'
12:45 - 1:00
9 69
9 53
18 122
12:45
- 1:00
206 784
193 751
399 1535
1:00 - 1:15
12
7
19
1:00
- 1:15
186
197
383
1:15 - 1:30
10
10
20
1:15
- 1:30
183
191
374
1:30 - 1:45
14
9
23
1:30
- 1:45
164
197
361
'
1:45 - 2:00
8 44
5 31
13 75
1:45
- 2:00
216 749
159 744
375 1493
2:00 - 2:15
9
8
17
2:00
- 2:15
184
171
355
2:15 - 2:30
8
5
13
2:15
- 2:30
202
192
394
'
2:30 - 2:45
9
5
14
2:30
- 2:45
224
190
414
2:45 - 3:00
2 28
4 22
6 50
2:45
- 3:00
294 904
174 727
468 1631
3:DO - 3:15
3:15 - 3:30
7
7
10
7
17
14
3:00 - 3:15
3:15 - 3:30
232
278
173
1B8
405
466
3:30 - 3:45
12
6
18
3130 -
3:45
257
155
412
3:45 - 4:00
7 33
9 32
16 65
3:45
- 4:DO
286 1053
159 674
444 1727
'
4:00 - 4:15
10
13
23
4:00
- 4:15
278
182
460
4:15 - 4:30
12
15
27
4:15 -
4:30
267
160
427
4:30 - 4:45
10
18
28
4:30 -
4:45
308
150
458
4:45 - 5:00
16 48
31 77
47 125
4:45 -
5:00
318 1171
184 676
_
502 1847
'
5:00 - 5:15
18
30
48
5:00 -
5:15
324
184
508
5:15 - 5:30
28
36
64
5:15 -
5:30
334
184
518
5:30 - 5:45
30
63
93
5:30 -
5:45
296
184
460
'
5:45 - 6:00_
48 124
101 230
149 354
5:45 -
6:00
288 1242
212 764
500 2006
6:00 - 6:15
56
116
172
6:00 -
6:15
320
168
485
6:15 - 6:30
55
112
167
6:15 -
6:30
292
176
468
'
6:30 - 6:45
6:45 - 7:00
81
ee 280
143
206 577
224
294 857
6:30 -
6:45 -
6:45
7:00
286
230 1128
160
150 654
446
380 1782
7:00 - 7:15
112
238
350
7:00 -
7:15
196
122
318
7:15 - 7:30
142
280
422
7:15 -
7:30
158
121
279
'
7:30 - 7:45
191
323
514
7:30 -
7:45
156
119
275
7:45 - 8:00
180 625
379 1220
559 1845
7:45 -
8:00
124 634
104 466
228 1100
5:00 - 8:15
166
327
493
8:00 -
8:15
119
90
209
8:15 - 8:30
138
276
414
8:15 -
8:30
93
Be
181
'
8:30 - 8:45
126
263
389
8:30 -
8:45
84
94
178
8:45 - 9:00
142 572
248 1114
390 1686
8:45 -
9:00
74 370
87 359
161 729
9:00 - 9:15
136
241
377
9:00 -
9:15
71
94
165
'
9:15 - 9:30
120
196
316
9:15 -
9:30
74
60
134
9:30 - 9:45
122
181
303
9:30 •
9:45
56
72
128
9:45 - 10:00
114 492
190 BOB
304 1300
9:45 -
10:00
54 255
64 290
118 545
'
10:00 - 10:15
120
176
296
10:00 -
10:15
53
56
109
10:15 - 10:30
131
132
263
10:15 -
10:30
42
60
102
10:30 - 10:45
114
158
272
10:30 -
10:45
36
34
70
10:45 . 11:00
126 491
136 602
262 1093
10:45 -
11:00
26 157
40 190
66 347
11:00 - 11:15
I58
144
302
11:00 -
11:15
34
32
66
11:15 - 11:30
154
155
309
11:15 -
11:30
22
31
53
11:30 - 11:45
169
170
339
11:30 -
11:45
27
26
53
11:45 - 12:00.
192 673
157 626
349 1299
11:45 -
12:00
24 107
12 101
36 208
•wtarirflafft.iafl.lrfr.aroll«r.ff«1.«tnuf•firalirtafrr•tw•aaa•a».laifa••aa•a.1111.1.faa.11rf+«rfiaarfRlt«uf•f.t.a
TOTALS
3,479
5,392
8,871
8,554
6,396
14,950
ADZ'S
12,033
11,788
23,821
•HNaalrf•ail.fff i.fulR.le..lalf•r•1r.rb•urt.rrl.arr.f
ritafrralla
i.af.N1.1r11ar1.f
lraa aalrfugtaailaNrlfaaaRR.at
TRAFFIC DATA SERVICES, INC. LOCATION CODE C1519.147
H b.H••UH.IHf.MHMH• i f f •f HbN'trMRi•••fi of •fIf HHf HMtf f RNfNfvNffriltrl l•riHi•IH •f HHf,IH ff HMtH fflRf
LOCATION - WALNUT-BTN RED HILL/NEWPORT VOLUMES FOR - TUESDAY 11/22/05
•uf.fff •.f u•1.••f. ffu•ff
AM ..r•..•lf... lf... aff....f•
•.f•f o•. 1•.t•• ... Q.l.ffe
PI1 ...o• ... ••..ff •. •.f ••••. 1
TIME
EB
WB
TOTAL
.TIME
EB
WB
TOTAL -- J
.. bl....f f Haff f•..f.•H.H f L IH.ff Ht11 Hff I•fH H. •H.f.•• ffHf•b M..••H
H.f.f.f••M Y.fff.f•f a. M1..Y N..f.LHb
12:00 - 12:15
11
14
25
12:00 -
12:15
120
148
268
12:15
- 12:30
6
10
16
12:15 -
12:30
134
118
252
12:30
- 12:45
8
6
14
12:30 -
12:45
145
100
245
12:45 -
1:00
10 35
10 40
20 75
12:45 -
1:00
133 532
126 494
261 1026
1:00 -
1:15
9
5
14
1:00 -
1:15
118
105
223
1:15 -
1:30
4
12
16
1:15 -
1:30
130
110
240
1:30 -
1:45
7
6
13
1:30 -
1:45
153
110
263
1:45 -
2:00
3 23
9 32
12 55
1:45 -
2:00
139 540
111 436
250 976
2:00 -
2:15
6
3
9
2:00 -
2:15
114
132
246
2:15 -
2:30
1
3
4
2:15 -
2:30
128
128
256
2:30 -
2:45
3
3
6
2:30 -
2:45
129
154
283
2:45 -
3:00
10 20
2 11
12 31
2:45 -
3:00
100 471
148 562
248 1033
3:00 -
305
3
5
8
3:00 -
3:15
111
168
279
3:15 -
3:30
4
9
13
3:15 -
3:30
98
149
.247
3:30 -
3:45
7
3
10
3:30 -
3:45
104
180
284
3:45 -
4:00
16 30
2 19
18 49
3:45 -
4:00
128 441
205 702
333 1143
4:00 -
4:15
12
3
15
4:00 -
4:15
110
218
328
4:15 -
4:30
15
4
19
4:15 -
4:30
116
226
342
4:30 -
4:45
15
8
23
4:30 -
4:45
120
259
379
4:45 -
5:00
28 70
11 26
39 96
4:45 -
5:00
134 480
270 973
404 1453
5:00 -
5:15
26
11
37
5:00 -
5:15
126
269
395
5:15 -
5:30
33
12
45
5:15 -
5:30
148
260
428
5:30 -
5:45
75
17
92
5:30 -
5:45
176
270
446
5:45 -
6:00
81 215
24 64
105 279
5:45 -
6:00
168 618
258 1077
426 1695
6:00 -
605
76
28
104
6:00 -
6:15
138
282
420
6:15 -
6:30
94
34
128
6:15 -
6:30
138
234
372
6.30 -
6:45
140
42
182
6:30 -
6:45
137
210
347
6:45 -
7:00
183 493
66 170
249 663
6145 -
7:00
93 506
192 918
285 1424
7:00 -
7115
174
78
252
7:00 -
7:15
96
162
258
7:15 -
7:30
206
120
326
7:15 -
7:30
106
128
234
7:30 -
7:45
240
112
352
7:30 -
7:45
80
112
192
7:45 -
8:00
254 874
142 452
396 1326
7:45 -
8:00
96 378
65 487
181 865
8:00 -
8:15
192
128
320
8:00 -
8:15
70
72
142
5:15 -
8:30
174
110
284
8:15 -
8:30
66
70
136
8:30 -
8:45
153
100
253
8:30 -
8:45
64
60
124
8:45 -
9:00
126 647
82 420
210 1067
8:45 -
9:00
50 250
53 255
103 505
9:00 -
9:15
87
57
144
9:00 -
9:15
59
58
117
9:15 -
9:30
92
82
174
9:15 -
9:30
56
54
110
9:30 -
9:45
90
66
156
9:30 -
9:45
41
49
90
9:45 -
10:00
90 359
70 275
160 634
9:45 -
10:00
38 194
26 187
64 381
10:00 -
10:15
86
85
171
10:00 -
10:15
36
53
89
10:15 -
10:30
63
77
140
10.15 -
10:30
32
42
74
10:30 -
10145
82
59
141
10:30 -
10:45
23
36
59
10:45 -
11:00
85 316
82 303
167 619
10:45 -
11:00
32 123
46 177
78 300
11:00 -
11:15
80
68
148
11:00 -
11:15
19
32
51
1105 -
11:30
86
120
206
11:15 -
11:30
12
28
40
11:30 -
11:45
104
138
242
11:30 -
11:45
13
25
38
11.45 -
12:00
111 381
123 449
234 830
11:45 -
12:00
8 52
13 98
21 150 ,
•f •tl..f
bff. b.b H.N R.i. b..U.
Hf.•.M b.Mf
Hf N•HH•f Hb.•.L HNH.MtlNtlf
f H•f1.l R.f.. H..H.•.f..f •.fi.•Hi
TOTALS
3,463
2,261
5,724
4,585
6,366
10,951
ADTIS
8,048
8,627
16,675
f•.•. ....
•......... .rN•.r.....f
... .f• .......
f•.K1.••!•....•...... ..ff
... r...••f.f....... u.•)f.. ufH.......••......
I
TRAFFIC DATA SERVICES, INC
SUMMARY OF VEHICULAR TURNING MOVEMENTS
N/S ST: RED HILL. AVE
ENV ST: WALNUT AVE
CITY: TUSTIN
FILENAME: 0361801
DATE: 3NSU6
DAY: WEDNESDAY
PERIOD NORTHBOUND SOUTHBOUND EASTBOUND WESTROUND
BEOINS IR HT NR SL ST SR EL ET ER WL WT WR TOUT
LANES: 1 3 0 1 2 0 1 2 0 1 2 0
7:00 AM
10
67
43
23
189
11
18
81
45
60
55
26
628
15 AM
21
129
55
25
262
8
35
109
78
74
92
27
915
30 AM
14
80
34
19
240
9
25
65
72
50
72
18
698
45 AM
53
104
32
31
261
18
31
107
77
67
107
16
904
8:00AM
21
92
33
16
206
17
38
113
99
111
165
37
948
15 AM
9
84
31
10
152
7
11
55
44
53
40
19
515
30AM
14
80
35
22
188
13
10
51
53
69
70
30
635
45 AM
26
59
21
11
241
13
19
47
56
71
75
28
667
PEAK HOUR BEGINS AT: PHF; 0.91
715 AM
VOLUM 109 405 154 91 968 52 129 394 328 302 435 98 3485
FILENAME: 0361MIP
DATE: 312301
DAY: THURSDAY
PERIOD NORTHBOUND SOUrNBOUID EASTBOUND WESTBOUND
BEGINS NL NT NR 51. ST SR EL ET ER NTL Wr WR TOUT
4�0 PM
57
280
35
19
139
20
39
70
24
75
195
37
970
15 PM
SO
194
38
26
97
18
25
83
20
55
141
19
765
30 PM
83
217
35
50
100
21
27
67
28
72
187
38
915
45 PM
47
242
38
26
97
21
32
85
21
64
160
29
862
5.'00 PM
68
278
38
30
88
22
26
98
22
66
181
39
958
15 PM
65
272
48
33
140
33
29
102
33
56
170
32
1013
30 PM
80
238
46
32
112
31
32
107
27
73
198
40
996
45 PM
55
276
39
33
131
24
29
91
21
66
150
33
937
PEAK HOUR BEGINS AT: PHP 0.96
1700 PM
VOWAEB. 248 1064 171 128 471 110 118 395 103 250 699 144 3904
' COMMENTS:
enn iennisn
'�UT''"AC VTVn' 1TJJWT n7n7T*C%T/ 4 J OT•TT nAA7,%,inn
' 2s. Baa IM 8 Nalaat
Post -2020 Reuse llttrutive 1
:
AR Pf
"HOOK
PM PM
HOUR
LMRMS
Um
CLPACny
VOL
VIC
VOL
VIC
RBL
1
1700
60
.04*
150
.0
NBT
3
5100
150
.04
1900
.43*
IN
0
0
120
.07
280
SBL
SBL
2
3400
40
.01
10
.00
SBT
3
5100
2220
.49*
780
.17
SBR
0
0
280
70
80
SBL
m
1
1700
160
.09
390
.23*
MT
2
3400
390
.17*
280
.09
m
0
0'
200
30
30
NBL
NBL
1
1700
200
.12*
370
.22
IBT
2
3400
470
.14
710
.21*
NB!
1
1700
20
.01
70
.04
Clearance Interval
.05*
.05*
OS*
.05*
I= CAPI= OTTLIte" .47
Post -2020 Reuse liternative 2
IN PK MM
PR PR
BOOR
BOOR
LMRMS
CAPACITY
VOL
V/C
VOL
V/C
m
1
1700
50
.03*
130
.06
0
3
5100
150
.04
1970
.45*
MR
0
0
140
.08
320
320
SBL
2
3400
30
.01
10
.00
SBT
3
5100
2300
.50*
850
.18
SBR
0
0
260
270
70
90
SBL
1
1700
130
.08
400
.24*
sw
2
3400
410
.19*
290
.09
&BR
0
0
220
260
30
30
NBL
1
1700
170
.10*
390
.23
NBT
2
3400
470
.14
660
' .19*
m
1
1700
20
.01
90
.05
Clearance Interval
Clearance interval
.05*
.05*
OS*
.92 T04AL CLRCM UTILISLTIE .87
Post -2020 Ramo alternative 3
IN PR
BOOR
PR K
BOOR
LAMES
CAPICITY
VOL
V/C
VOL
VIC
!BL
1
1700
50
.03*
150
.09
1BT
3
5100
160
.05
1950
.4S*
MBR
0
0
120
.07
320
SOL
2
3400
40
.01
20
.01*
SBT
3
5100
2330
.51*
870
.19
SBR
0
0
270
90
MIL
1
1700
140
.06
410
.24*
8BT
2
3400
460
.21*
280
.09
MR
0
0
260
30
NBL
1
1700
190
.11*
370
.22
NBT
2
3400
490
.14
670
.20*
NBR
1
1700
20
.01
70
.04
Clearance interval
.05*
.05*
TOTAL QPACIT7 oYRL uffoN .91 .95
.93
TRAFFIC DATA SERVICES, INC.
(714)541-2228
PEDESTRIAN COUNT
I
N/S ST: RED HILL AVE
FILENAME:
03616PIA
E!W ST: WALNUT AVE
DATE:
3/15/06
CITY: TUSTIN
DAY:
WEDNESDAY
Time
CROSSED AT CORNER
CROSSED MIDOLOCK
Period
'
Beginning N -LEG
S -LEG
E -LEG W=LEG
N -LEG S -LEG E -LEG W -LEG TOTAL
6:00 AM
'
:15 AM
:30 AM
:45 AM
7:00 AM 2
10
2
1
15
:15 AM 3
1
0
14
18
:30 AM 0
1
1
6
8
:45 AM 0
5
5
2
12
'
8:00 AM 1
1
1
5
8
:15 AM 1
3
5
8
17
:30 AM 1
6
6
2
15
'
:45 AM 2
4
3
7
16
9:00 AM
:15 AM
:30 AM
:45 AM
10:00 AM
ASAM
'
:30 AM
:45 AM
' 11:00 AM
:15 AM
:30 AM
:45 AM
12:00 PM
:15 PM
:30 PM
:45 PM
'
COMMENTS:
I
TRAFFIC DATA SERVICES, INC.
(714)541-2228
PEDESTRIAN COUNT
N/S ST: RED HILL AVE FILENAME: 03616P1 M
ENV ST: WALNUT AVE DATE: 3/15/06
CITY: TUSTIN DAY: WEDNESDAY
Time CROSSED AT CORNER CROSSED MIDBLOCK
Period
Beginning N -LEG S -LEG E -LEG W -LEG N -LEG S -LEG E -LEG W -LEG TOTAL
9:00 AM
:15 AM
:30 AM
:45 AM
10:00 AM
:15 AM
:30 AM
:45 AM
11:00 AM
:15 AM
:30 AM
:45 AM
12:00 PM
:15 PM
:30 PM
:45 PM
1:00 PM
1
5
3
17
26
:15 PM
1
3
0
5
9
:30 PM
2
4
1
11
18
:45 PM
2
4
0
2
8
2:00 PM
2
5
2
5
14
:15 PM
4
2
1
18
25
:30 PM
5
1
4
24
34
:45 PM
4
8
7
14
33
3:00 PM
7
3
8
10
28
:15 PM
3
8
6
4
21
:30 PM
:45 PM
COMMENTS
TRAFFIC DATA SERVICES, INC.
(714)541-2228
PEDESTRIAN COUNT
NIS ST: RED HILL AVE
FILENAME:
03616P1P
EAN ST: WALNUT AVE
DATE:
3/15/06
CITY: TUSTIN
DAY:
WEDNESDAY
Time
CROSSED AT CORNER
CROSSED MIDBLOCK
'
Period
Beginning N -LEG
S -LEG
E -LEG W -LEG
N -LEG S -LEG E -LEG W -LEG TOTAL
12:00 PM
:15 PM
:30 PM
:45 PM
'
1:00 PM
:15 PM
:30 PM
'
:45 PM
2:00 PM
:15 PM
:30 PM
:45 PM
3:00 PM
:15 PM
:30 PM
:45 PM
4:00 PM 4
10
9
14
37
:15 PM 9
4
2
13
28
'
:30 PM 5
4
4
6
19
:45 PM 4
4
6
2
18
5:00 PM 1
7
13
6
27
:15 PM 3
0
1
5
9
:30 PM 3
3
2
9
17
:45 PM 2
1
3
3
9
'
6:00 PM
:15 PM
:30 PM
:45 PM
COMMENTS:
Appendix B
Intersection Level of Service Worksheets
Okitsu & Associates City of Tustin
;ineen and hunspnrtarion P/nnkrs
Red Hill/Walnut Residential Project Trak Study
�
.
}
;�1�1:4•:
!_
�
:
��
i
;�§ �!�'
■
no
•� :
°
!
�
I
I
I
I
I
I
I
!! !|` /\
.............
\\\..\ §�/)
`\\\\\\/
{t nom:
\
..........
� g2 §! « 2xz2:E2ge52w!
/£R//§\j
/ � §!)(JEagaEg��Qz�a{#e
.E
6Z�j�
8
�
9
a
8n88€_884
18
`
2�
$' y
p $EyS
P5�1=opn'2t
111MU
4!
H
;!\
|
/§)Ah
\
•� :
! (
(
■
\�
�
!:(
§��)|
$
/j§
r.!
I
I
000
oac
qi
�Y
P P
Y
F�
Y�
Vm�
e0o
oot
Ni
O
q
qp
U G
'
Y
�W
o0o
O oc
Y
RM
V
p a
�9�MiIX
O�
Y�
�IXe4rYq
Sd Y 4
G�
SY
o00
oeo
'M IX
�
�✓
s
eee
o o0
o
P P
m
_
r
��
w
UY
�a �o
��
nen
o0o
eoo
M
FVUyy4Y U'O-Y�
1
�
�
�yyl fy O
1K(
yGYaC
i=V«i
WyY
nOn
000
00
yC
n
L�ipNNp
ti�C 04�i
tt
V0�
P „
00
Ym�C
OIX
I
Vi
000
000
G� O�
N
W
o00
oeo
N 6
P P
'
00
ao
3pIX
n
�
Ly
4"
Go
O
F
zw
ti
goao
s�
;ee
%ne
q�oo
,,
m' �
p�
aR, pqH
Wi[
ium°y90
4F
imgF
I
U
qi
Y
Y�
O�
�b W
H YO
U G
Y
�W
�9C�piyy O
�9�MiIX
�IXe4rYq
Sd Y 4
i.yy � C
yY pp
y
M1 9
W � ya
C� M
yy ymy M u4p �]] e w ymy
IXf4gp�%OOM
q
ry
m
_
r
��
w
UY
M
FVUyy4Y U'O-Y�
1
�
�
�yyl fy O
1K(
yGYaC
U
•
~
�oo
OF
o
Ai
V o
y
Y>uN
o
4�
M
Oi
y
gs�
! t
Y
O i
_ Yy
Y;YY
0 O
YUq�Y>
mYYF
iYYVi�Yi
;gHGi~yNYN
Gi
O O
i
04
"s SSSmiii
it o .+ ; q o
T�;SI;
yyiKpp
V V
qq
O�
is
en
ToJ
H
O U
N
O�
O
qq U
Y �
N
p ;
rOi q
• i
•
~
�K
OF
o
y
o
i
! t
C
iYYVi�Yi
yy
FF
i
04
T�;SI;
yyiKpp
V V
qq
O�
is
c
H
AKS
ti
qo0
F
0
Z
i
o� u
iN OiO�
O YiK66!
X CY
m onA
Y�Ym
iYY•�YiYJggV
iVNMi4u
00 �
YYtli>V�
N C�tl�
a
m .Yo
�Qf PPyy 90
me %m• 'iVreiO n... ~~ ~wn o
1%f YFiOS n
tli w
i%V i2tj'�iY90 n nn ,y .i ,y .,o e
• .. 6 M i N F i M rOi o n n n .Y w
. V m
iYMYi m
iU4>Y V$
,�i O,iU�o •Y n.Y nn .�wo 0
m u o
U FFrOw
mww Y
7i �4Nai� o ,y n,y o
Si m iS
. _ ggqGm� ' .'n o vioSmemo eo uri oee mo C;
'IY m i V�YO„ NrvmOOO 11 o,•IOOm � U00OrN i ;H
9i � YE � OrCi ry opo.Y i Oro i''P�o
�: z��a oei iEe oo�mr
:Oil
mU'••�Y>SA490V Y99 �A mE
HYa EY tlO HyVICE...
H mi� Y� 4>UV44'•gqv�M.] qq�Vm
tli pm~6:qq�OYYFF9VmCC�U\+Cp"CC�6n.Vi
rerl �aOi N.iS�UmE.li>dUM�WWKKW�R�W04a4�U>U
L.
_ m..on..op
o
LL i
M H
ra rY N n
ti� U i i
�>a is
✓�
�E
mFiy`Y
pi6�. YVmV•
iV
Y�Y>.
•Viiy�O
•� .Yn n.Y .Y .yo O
,O�u.Vi.
.V4r]i
i �. GHiUCo
TKO%�U>
n a
�w
u�VUa�Yii
�4w
Oi�
ar
ti Nti NN titiH O
m.mm�C�
OOi
r oerero e n ..
„ONOONOON NOO Oo,O M
OrY
v
Ui N�
mUti
N9,.i m0
m •5i
iii
'Ql
i�
LFi
O
wn
OW..
.yw VOr n
p
So
,4No0..O�,-1 .1ry � On�4 ,4 Noi
F qp [9-,Y>yL�
Mm OY 99 iyN AY- N£Y
Y
eY�O
�U�rtlim��YMY�YF
Y���3YEUYH�>77�4Ai'J\74k�N\Y.
m i
i � iOi X� a O♦ F pO s O .� +I
.N4Z�UmE
A, O A H„ 9 m F m m Y UU � AAS rvl i V 7 V �
,>m U' mWrvDmm mW�6imm d
i
o� u
iN OiO�
O YiK66!
X CY
m onA
Y�Ym
iYY•�YiYJggV
iVNMi4u
00 �
YYtli>V�
N C�tl�
a
m .Yo
�Qf PPyy 90
me %m• 'iVreiO n... ~~ ~wn o
1%f YFiOS n
tli w
i%V i2tj'�iY90 n nn ,y .i ,y .,o e
• .. 6 M i N F i M rOi o n n n .Y w
. V m
iYMYi m
iU4>Y V$
,�i O,iU�o •Y n.Y nn .�wo 0
m u o
U FFrOw
mww Y
7i �4Nai� o ,y n,y o
Si m iS
. _ ggqGm� ' .'n o vioSmemo eo uri oee mo C;
'IY m i V�YO„ NrvmOOO 11 o,•IOOm � U00OrN i ;H
9i � YE � OrCi ry opo.Y i Oro i''P�o
�: z��a oei iEe oo�mr
:Oil
mU'••�Y>SA490V Y99 �A mE
HYa EY tlO HyVICE...
H mi� Y� 4>UV44'•gqv�M.] qq�Vm
tli pm~6:qq�OYYFF9VmCC�U\+Cp"CC�6n.Vi
rerl �aOi N.iS�UmE.li>dUM�WWKKW�R�W04a4�U>U
L.
O
.0 'MOO O o0 0O 00 00 ,
b — F' UCO o0 0 00 �F]eon o
6� mi
:a ;c oe eo 00 eo '
U
OW p✓ Y: 00 00 00
X« ' W« 9 W' Y a F o
K
�F i;MK: !O«0 iY�e O O0 0O 00 00 0.4
F Ooo
iu Z;ypmp« «>«uF;GCO a 0O eo q o.y o
q
oo e0000 oe oo u
........... 00 Ko y
;OUifiVL« «LF'p„F o 00 iF.l en o
S�CVI; Yl. Z«o.0 �W Oe oo Oo Ho «M
per• qS« «C4 pUOO C; C;
Keon «Z
eN Cirl F: a: C«�ii0�'OOe 0 00 V 1 op m
;y A«7. •U!«LF; 6„O O oo eo_ oo ;]Oo p• On e
�O ne �80 a0 «Y
o0 ooeo
�; m.z✓� o ea £ee�ue o aeon «u
8: _ 9O O� Y -VUN LOd OV J dJGGY OOW pyLQQ� O
VR\
>uwCU�V;005 [CUG]CUiUU;�
«M!4
«06iu✓m'ti vUl'4Ow S;YTY�uMM9MMH«V
0 •Y. N. XU Ctl��AUYYtlAYM Oqq �qnU
• Y. p � C N C� O 9 Y -I Y i 6 9 C .1 v1 -1 � 6 W✓ Y � i A C W A M A 6 6. ✓
u.
w, 2
;F 0104
4 ;0�
ffi Sg0
ACi�Y4
Y✓�pOOpppO ppq
�042iVY
G�OUS�%S
ni Yam
iR eiaU
pry I
C i O
E
5
2
A
8
—
......... —
pe
o
eo
ceen
:3� �9ue
a oo
:OF;M�
0
0o
Fo
�e„o
V«i
0
0o
v on o
e'
ee
99 O
e0
.Risen
gg �o4n
a
eo
rc en
o«O
a e0
oho
a: W F i M.4
0
00
�LO
4>i OreiO
0
O o
0o
en o
O
o0
q:
O
00
c; .4
V
o op
O
eO
M:
M:9W'
o
c;
Keen
6:
O oo
u:
•WFi�Un
a
oo
Ko
Ha
• L � ow
o
0o
on o
� c�
:WOO �N
a
O
a
oo
c; c;
M:
a ee
♦9W'
0
00
KOOn
•C•
Im
L:0 �%N
is
a
oo
Co
LF;dC”
;Voo
i9c;
.Fi on o
•V•
4: Mi10w
o
i0
O
m•Z'liW
O
iYU00
�F-1-IOOn
:p:
ioo�_
a 00
a -y0__
__ __•X
;9
•p GGo—ppppo
••4 �•••�;VUwiSOp-0.W
J
pOYWYW: O:
W! SOV-;V>La�yVOV>i�N
VVUY;eWOiYa9E9
MS•
Y
N.Mp1V�Y
yy 4>4n� DUH
Oq�y✓yn�V
Q MG
SVO�yY T✓ppo
Yu VOO•�
My•Y`
q��VEYX
p�MXOMMy
4:4£iE�rl;>0VX'w"-1W
W0i;UU4�U6E0�J
;..]A U.1
SiNNN%44:
Z:
5
2
A
8
........... O ....00 Co0.4
OY m MCN ee o0 oe ¢e
mi uF' pCN o ao Ha O. -r O
W� y V' O O 00 00
u« u«za�� e o ee aeoN
Oe = eo =
oVN•i M: «wiq%'q oo O oo FOON
F u• «Oi 0' Dgwjo 0 0o Oo 00 -o-o
Y 'O�« «�«YF'ONf1 o e o0 aoON o
oo pe
e
Y N
y'Uq• ♦W ,y Oo 00 00
� Y 0.4 B Y O• N� U O i99
�C RAYL• •L gar o 0o a oN o
Ny YY,�Y C' O O
pi7UCiwV•C• •%a' 0 00 0O Oo 0 00 00
VF., ��O'�•Z« ........... 00 00 Oo •C
d,Y«O« •qC�K4' V 00� 00 COOr1 •Y
S�C«i«L«m i.iyo O oo Y 50 w
ry m' O•>«7«LF'dOU�Oi o0 00- oo i�oo a eN o iq
p �y• O o O VV O ♦ V
R fay F«G«mi2 .........000000 - O Vo0 FOo.a O
O a U
'-' f • H « V « � 9 V _ O > - V U' e � Orr _ , wy •• Y Y r• � ri w • V
�LOd-6� O> dCV% V
m� «u. •sY�_ ��.i� o'A-�>oN.-, �r udu L� z.+.ic9c s�2: �r
F, •V•Y• C� - O iSNgTN > �� A�'O„.4�C Op •
•A•mY AY�O �Y>LA MiRgOu VU VVUY� O yggVq
Y •M•A«Ofi'MY �� 'O my 4> �VwC �� M fiYY Y00•
V •U«M M L YV Y M 7q �A.rYy �YTY YMMgMXM•u
iC Yq YdCq pY+Y1.4�6 ag �>ACw>AAMAdd«
«„«Y d� O Y,OWyM)C WC 55 O� 000 $O LL d O
N V• 6p mqp O yy Yy NyNy pp py opG G y
gyp, � • R•RL,UIX.i i5wN46N OVddSdVVd�UU6L>,r�n 4r]Lwwww44•y
iqp' N o 07 00 oe COo.+
YO
:O �X?N o 00 o eo Ke
m; F'eeN o eo Ha c; o
A m �N ee
u« a o ee aeoN
Yi >• O Oo
O A: •YV/«q5 d FO
',%, w�yGY+• «O«rJ� 9oi O 00 O a0 K Or.
� F i Nn• Yi WRV � M.04 a o0
Oi04« «>i uF�CCO Fo
�Y u yVy' y iON ao 0 00 a eN O
e Oo o O YY oo aeeN .A�
N C> A Y« O 0 0 « X
�C•�O•�Y�aaNA« iNi Opp O oo FOON «6�
�9Fui �O« • •� �..mj qj0 0 00 O 00 % «Xi
9 99
.1 • 5% rr K O i V
ipV•u,Yi >yU Y« «L>F�Owei O O o 0o Fa oN o �O;
a00ee O oo Oe FOO" !i
C O rc1%.N•e. a; a
— — — c
— — o — — .....—
oeN «GVi
'r' Cirip•�« «'O'iNVoi O 00v k
00 o•..Yii
£o«S!L•5 �Mn '.Vi Cne
�h e' U«>•>«LF�O,CiO, O iu0 00 ;Oeo Ha
.zap a ee lie lue Iuee
Nml «ta • m « — _ u _ d _ � � _ j Y �p p o Q 3 • M�
i«�� - ;i.: am"- Yp�•o.il3�'ti l�>°'da ': nd �'W OpE-U'J Cr]GL«7i
m, •V• •VCS O O.", r,>SV �NA�Y uN�iONrr C pO VV•dl
•C•p��WY�O-iY>LARgOu SUV
UtiC UUUY� OLTY
V9gUgAtl•
Y •X•W O�iMY �E y 4i �6, M�YX100•
0 • Y« M• N L Y 'J YY l Y M ] A i Y M .r � A e. Y Y 'J i Y 'n Y M M g M M M• Y �
«M«>•6>�CmCy, V V%Fq �dWpY>p �>pACo%>p AMW p6 p6•
iq � , • 4• tR1 L0 � UUO C'r] �>SA UF"'C'7nWC0. � U[i PO. � UUnS> � r]taiUi2maLima 4'4'« 2i
O
qCW 00
O�
AF
v� m 00
Vr IX
Vi O Oo
O
M O
F �i i 00
uoe
o i
M
6 yy�V� C ee
AC>�V O]Oi
22�V� YF
�O�M�6i O, Oo
yV�IX� Wi
VON 00
u umlu.
�I�ua�o� �IX Oe
81
M LF
R� �i NVi 00
M
iN Ci a 00
ih
% F
W O
,i Y NN
Y qq
W� C rvry
C w --
V
9
a;
F
ee
a�
oe
O�
IX
w
o
aF
F
ao
Y
Yi
00
�0
2�
M
M�
9Cu
�CVa�yOy�
LF
o0
i9�MiIX�
Oi
iC04i��
oe
T
ViYVVi�
OIX
M�
Oi
2
OI i
O
q
K
p
LL
V
Y
u
�• T
W
m�
a
rry
V
8
y
qCW 00
O�
AF
v� m 00
Vr IX
Vi O Oo
O
M O
F �i i 00
uoe
o i
M
6 yy�V� C ee
AC>�V O]Oi
22�V� YF
�O�M�6i O, Oo
yV�IX� Wi
VON 00
u umlu.
�I�ua�o� �IX Oe
81
M LF
R� �i NVi 00
M
iN Ci a 00
ih
% F
W O
,i Y NN
Y qq
W� C rvry
C w --
V
9
a;
F
rl
6
z
ti
H
eoo
eee
'
01
m m
n"
U;
Y
o00
ooe
m�
c
O
BYO S�
o;
zY
eee
ooe
iq a;
s
n m
;OHM a
u
u
ei
z
4 d
W
'
�Y✓m�Y
V
Y
iW �O
qM
M� U� C
000
000
'ti.tlnw'�
Y
m�
a a
N
000
000
t3d3zm8€anm
" "
m
00o
Ooe
iK04i2
"
9T
" "
�o
0
uutli Ui
US
>;
'
W;
tltlM
Y
N
ooe
o00
Uyy YUO�
s <
qM
C
qC pY
5'!yE �� OyY�pW
iH
�i j
O
fmt
W
oa0
000
tl�
r�HHWKU
•V]"
'O G
u
and
' 00
00
so
w
,o
m�
Sm
R000
SUooe
��
yw
G4N
"
O
O
G�
2YU
oo
A'o
qo o0
m
C i
909
5.l
KVYb
y;
gVUA
UY
`JV
[[��
O9O
OUa"
■
iNV4H
.Vo
yt04F
�
#04F
6
z
ti
H
u
m;
n"
V
U
O
BYO S�
eC>
CY qCqC
;OHM a
u
u
N;KUR�R4
4 d
W
'
�Y✓m�Y
V
Y
M� U� C
VMy
Yu0
n m
mm11q
qRm
N
t3d3zm8€anm
m
�o
0
>;
W;
tltlM
Y
N
C'
Uyy YUO�
qM
C
qC pY
5'!yE �� OyY�pW
'
fmt
W
UO>UO
tl�
r�HHWKU
6
z
ti
H
1;
F
9
§
,
|
\.j
}
]i/
\�
\..91
22
\
W0
;«
{
!.)v1.9
7!
|
}
on
\ /
§
,
]i/
\..91
22
\
W0
;«
{
!.)v1.9
7!
|
\ /
11
F
0
-Y,o
—
Ype
m
Y=
a
O♦
SONO �ON�
en
mF
u
��Ww
OOOe
6'
U•
OwY
n r•.f .y
e
ee
ee
Yo: :4
a�
umi�
a me. o
GY- O BYO
;iVVY
:``V: mF�YUO
rmi
L • C
M
S'CY: :7�U: m iyNCCo
M4• •%> •AV
Y'
�wwwiy�.
:Vmn:
:YM M>Yf m�
N
iE�C�tOJ
p�5]yyV:
Y� :V4rYl: Oiiygo
w nw n.f nne e
E: m UJ
0 : :UmU:S�F�Uoo
1.990
V
�U
YiC>' nAi M:
�Mw
n.f
ww.f a
-o
..u.
.. .. .. .. .. _
.+..� _ o00•
AMY
:N M�U1•
mi
gpqp�QOppQB8
ih
%:Y: LFiVCO
ipn
i9FV�OG.
:V4a: Q�'Y00
p7n
— =F�uFO
iCOitiY2:
Y—'e
�:
mfe'�: she
� go'�m�-�>°e:,,:>>° ✓e �.; 'b
a�^JOUY�mu:
7: :RNa�
� a mA'
� V>Y U04..
N
NppA ¢Y¢
pY>YL�N
y- � Ma Y i V N
'
' ♦
—
—
:ea
m
iYo
iq�N
ih
LFiOwo
ym 6: 9:�
" M
iE.ni
.YrvViLo:
Ei
Mi .mY a
ONO .EO.
•ry n"r
iAN
60.,•n
rl'
'M: •fi
C
Y'10 �C
i9pp
�R
y
U: •YmE�:2VYi
Y
ppf-O>
�Er•4mOT�
Ord
-�i> ..O�tiYyYy
m i
q
: M• YFfi. OOU
s��O>L4
� MY
MARVOYV9V �m�lY
m 5 9Yw 4'i UR4'1
i'a �O i�
A
ri � UN
�YliY\Y
•V: r1Y •UM
YG:w6G�G�Omrei
:NY
1
Um YYmYM
O YddbbfCdC i
CC i a.. '�.
1t
mi
i.o
:V.iO• RS�UmEr]�>mV
q�qiOA�N „�o�„ YaV W �ilypq
R 06 mai EsiN
iAOMM
4.1d �UiV
11
F
0
Ype
a
O♦
SONO �ON�
��Ww
OOOe
.rel' •'J
e
_
iF
GY- O BYO
;iVVY
:``V: mF�YUO
rmi
F�GPEiE:
M
S'CY: :7�U: m iyNCCo
�wwwiy�.
:Vmn:
:YM M>Yf m�
iE�C�tOJ
p�5]yyV:
Y� :V4rYl: Oiiygo
w nw n.f nne e
E: m UJ
4U
V
m�°U
YR�a!6
iNY1: 7Y
m�uLr� :a��'uo
Ye
ih
%:Y: LFiVCO
ipn
p7n
Y—'e
�:
mfe'�: she
� go'�m�-�>°e:,,:>>° ✓e �.; 'b
c
� _w
u: F : � O !J
� a mA'
� V>Y U04..
N
NppA ¢Y¢
pY>YL�N
y- � Ma Y i V N
'
' ♦
11
F
0
:95 d op 00 o Op o0 6pory
C Va
o :m iH�O o 0o O0 ee po �to
yi%F Voi p o e o0 ..l en o
T y fOC oe
ao
Oi M: •4i9a, V Oo 00 0 00 Oo KOOri
'Ywi a yyYY :OY �� Loi o Oo �
'Y' pyiNp: ♦m QMH 00 00 00 CO
u CO 1 00 F.l p.• p
,p ZiVCC'y: Y�:W��C po 00 00
�S �Op: gym• .]�� o Oe a oo .Flpen
"VHNgqq Veryry �: UU op 00 Oo
9�M e• ♦ S. O�' P90 .Y O 00 O Op KpOr1
.Yy1'U88 :m iNN po 00 00 „O
iK TR�VjiQo: :LFiOrCiF o V op .] o.' o
~ YOiNS:.4 :� i% p0 Oo Oa
ao
o
—
a � Uqp• OY :'Ow I Vo eo K0o.1
V� ♦ qi 9 r O"VOCO
w M'�� 9ss p o0 Op o0 00 �.Viop Keeo
�Ya �m(� L�Y w: \•LF�OCry p,0 uoo c; c;
Si W' 6. 0: 0•S' 00 OOOo00900 .. 0 iU�O FOo.•
:Y• T: ^�=w =Ve0e0 00 Fq yOe—B8= i40p—� 0 00
M1 •�• yq• Vo .U..d 0 V.4 U'U'ti 20a-0. AVp> 6'VJp-
YL V I ew
LGSUV�CrI�
pi• ' O >LA N OOu E ti V UY' O>V99U0
• V:M M gy G V UYeS YY� 0 tlYY•' Y �' U 7.Y N N wO M M
V:0.>'CPC' OOaaVC.Y +�.•'6wY� '>qCw>q MVO
YY :„: >: 6p'O qq'ORywVgC055Y+11�1�0 qCO O NNSOOOLLGLO
wi i • R Rg'V�a .l>mU RaYnOaaCaUVaiVUaE>�rin UriSwwwwR
m q a 00 %O
q :� .Vi Va o 00 O Oa 1 on
4Va KO
Obi O p 00 oe H en o
:uF��we a
��: Sa° p O pa ap SeoF
Oi YY :m`mi� a
c; c; KOOn
VV�: :O iegoi ee
V V o K e
: . m
.Y• F� Va
a �
�U M'UR• YiYO 'OM 00 erY o
tl � V : U • _ _ _ — yM :
iCY Yp iYJ m: :MY Kip o O Oo 0 00 600.+ �
COV
Oe ee r] e.Y a
PipUYiyu:Y♦ .way 0 0o O o ao 0o SOo.Y ::
W'{{��VI. OY M9m� p O 00 600ei YY:
N Ci�.i C: pTY Y�"�'JV O 00 O 00 �.Vneo'
Ow:
q p i s Gy Y m [aye ry Vyyf V: vil: \iFFi00ry o O qqV ;poo rlon a :U:
�' • o oe ' VO � Uoe
di o0ao e e o "0 00 .Y.
♦N•
i.rl: O: �p m �U'U'w�iF 'q ••Y tln .. wY V.
pp O0. -a' Y GCYwV �
m� •VVY V.0 O N >�gq�i�Y q\i0 G d% V C/;
Ol:q �Om�V>Lyys1�RVOYqq'�� VYU 6yV6y'yymXL tlY YOOY_
y%� ♦d: U: G��YPC��mOYYaa�G'uY �0.wY>�li>>yNGowo �$N gMM xyy y0.: Y:
m� i . �O ,Oq w Yw O' 0 O�rin4r] MNNNRR: z:
%
F'
1 IX q o
°o�� a ee o e aryee e
YF'vvn e e +�}p}p{{ ry6ry6 nbnb o ^' o Fo~ c
w� u °Y� ekReRNe a
♦b« IXiV o
Fee
«Y« a_ — O
' w ..Oj .ii Y mU « ♦ V
'
vVyY �.giSpm8� «i«3�moe a ee
CReRem�04iUYy« : «LFi0.CO1 0o O la�R{ eRRo e o o Fo~ a
r Y e 11
«00 ',IX o Fen
' 1�IX wiVNa 0. 0lOIX a o0 0 - �Ne��O o o .! -O Ken
Lm6
F OwoOo%eNe
00 '
e
W' 'vVii Y« i9pp yY �0. y0 WW �VErV 50q0.q --t�l pi qw pnpoo
m� «Ui a«F - �Z •i{m -�i0i0 ��-M F� iuiU-0.� OS'V OC rI�
O� - O Cern i'Y .Yiy ryppO�V yV� UYgUi00 YEVV4 gV�Om-iVPinM,4COu VCVUn V' pp m ' •M!m O �X m�E iNi d�,K�7'Y�YYi4•�iOY i�IX�EMEMM
! Y« X N G
Y«p6 .cmYcS. YwwCg� Y FtlVUri q i0.WYrps fids+� 0.
�� w«4l4iUCri�>m�rOipwaCi�C4 C4 �(yiii iiiu°fii���i�wm�i'
k
V�
m.
u�
di
O
M
'
Y
O
S�
M
qpqp
Y�
.WY
.0
O.y
YXX��YO�
y~y
O�OVYi
Ki
y
mJi
Wi
S�
h
yuN�'
_
tl�
'
ml
C
1 IX q o
°o�� a ee o e aryee e
YF'vvn e e +�}p}p{{ ry6ry6 nbnb o ^' o Fo~ c
w� u °Y� ekReRNe a
♦b« IXiV o
Fee
«Y« a_ — O
' w ..Oj .ii Y mU « ♦ V
'
vVyY �.giSpm8� «i«3�moe a ee
CReRem�04iUYy« : «LFi0.CO1 0o O la�R{ eRRo e o o Fo~ a
r Y e 11
«00 ',IX o Fen
' 1�IX wiVNa 0. 0lOIX a o0 0 - �Ne��O o o .! -O Ken
Lm6
F OwoOo%eNe
00 '
e
W' 'vVii Y« i9pp yY �0. y0 WW �VErV 50q0.q --t�l pi qw pnpoo
m� «Ui a«F - �Z •i{m -�i0i0 ��-M F� iuiU-0.� OS'V OC rI�
O� - O Cern i'Y .Yiy ryppO�V yV� UYgUi00 YEVV4 gV�Om-iVPinM,4COu VCVUn V' pp m ' •M!m O �X m�E iNi d�,K�7'Y�YYi4•�iOY i�IX�EMEMM
! Y« X N G
Y«p6 .cmYcS. YwwCg� Y FtlVUri q i0.WYrps fids+� 0.
�� w«4l4iUCri�>m�rOipwaCi�C4 C4 �(yiii iiiu°fii���i�wm�i'
k
0
VO
mOa M.-Oiw .........o w o w o meo
EF ; Oww o O MAI.
� �e
ee �Qf
ee
$ae ...........ee IfjQI$eO a yew
✓UF;F0
w o 0N-9
oo
O0 n
mA' oo po 0
a�� n o Sen
q n o aen
e o a0e
yF;Owo 0 0o O�j(e%%e n w o S n o
pr,N%
p oo ee ee e n e w o aen
q CUo n o aon
ee eO ooYVo0 c n �.-Vio Kee
LF;acei eoe eooe ;e yxy _.:e gee a n o
Ori%w 000000 0O OOS ��O�IiOp>00, � O
say U On ;Uo ;VO Son
�y� aU p]OO U,y ':� NOOM1W_V�O Y�Gn .rOYp> qO pY ON pY
990 ��-N Fn�T>V-w; CSYVOrIF
pe; - o >mna >Y ti�.+4 yg m Ai�Y apqron c p V
q ,O -,U>Lb M44gOY Y- gUVOUyUi VYAV� OTUgVgA
p rNY y gYUti 4> VV.J4��>yPtir pV MG V UO
M LYr�YSUY VM � 'UJq N Y VY,9.�riY U�UY MMM
i8H,>m;ad�Aaa�gtl�.�Lkbbi�689;��3%`2
x
GF
A�
2
O
9N
O
0 2 m
N N
Y
w
.0 O
�y iLY VY Vi
'
i�UYi�i
O
GN
'�Q=1K
O�
Z,
o
ry
yC�
G
�
L
Y
9
O
x
N
P
I
1
P
1
1
I
N.
q
a
Vi
Y�
rV L
Y
O Sr
X Y
�C>10
iY�CiK
0 ASO
rOFM�
Y�O U
yyM��Yyr � yy q Y
KV4�R4 R �
tiYy ppT rC
O�OV6Y,iNW W�ggE NSW
air ai C C�u� uYG
uuue ��u
pr X yOyM FY�II Vqy VqyYy
Gr M mgNSe��C0f4
£ fa C
q i C .Yi
w
�VVY q
m� o .V Tm yem 'yJ
tiy� M Cp>Y yQUpX qUq U'O �u V1
Ni r U �i0666YUC
N H8Mgi:8g8
o�
Y�
q6
nm
N�
O%
Li
FH
r
M!
rvry
Ho
r
Vmm
Y�
N
a
wC
O
iF Mr
MW
F
�
W
V Y
qVqY
nCi Y
�C
J qp
a�
V�
Y
WYE
T
V
yV
C i 7 r
Fj
i F
%
N
N
u"
rc u
F
Wi
O
;N
Cr
N.
q
a
Vi
Y�
rV L
Y
O Sr
X Y
�C>10
iY�CiK
0 ASO
rOFM�
Y�O U
yyM��Yyr � yy q Y
KV4�R4 R �
tiYy ppT rC
O�OV6Y,iNW W�ggE NSW
air ai C C�u� uYG
uuue ��u
pr X yOyM FY�II Vqy VqyYy
Gr M mgNSe��C0f4
£ fa C
q i C .Yi
w
�VVY q
m� o .V Tm yem 'yJ
tiy� M Cp>Y yQUpX qUq U'O �u V1
Ni r U �i0666YUC
N H8Mgi:8g8
u
u:
P
O�
�F M,
d,
u
V L
V
F O
�o a.
V
-�a
Yeo
tp�
�C
F°
o00
Onry
Nim
O
Ow
ry
eta
�MVV,V
O
�
VVI
S�
a 6
eee
ervry
M
f �
Zy
o00
000
h 0i
Vi
V
n m
ti
y m
4
Orvl
�
'F
y,
m�
oPP
eeo
c
G
X 1
N
,a
T,o
B�
oeo
Onn
QVC>�a
py
ePP
ooe
�
m „
yyCapiY
�YWYip>p�
onm
000
B�m°Vu�c
��
o00
oee
a p
P P
M1�Vj
iF
qy
P P
o00
owc
di
N
•]
F'
Oo
00
P
%i
�a
tim
9
n
��
a'
8�
CG
KOaa
To00
Vgno
C
C
°�
qy
gorvry
TOOo
]
KgypVy
OOgpL
OW9Y
1Y1tt�
u
u:
P
O�
�F M,
d,
u
V L
V
�o a.
V
-�a
Yeo
tp�
�C
F°
�VFM,Y
O
e u
�MVV,V
O
�
VVI
a 6
M
d�
qVM
h 0i
Fry
N�
ti
y m
4
�
a
m�
c
X 1
N
O�
O
Oi
OF
e
m�
W
V,
S
O
O
a
9
m
Oa
m
i Vf
AF
Y,
OF
n
o
,V V�
�O i�YiV�
U C
m
.]
v u i
�M x�OH
y
O
,w 6Yi
9a
N
fiRu;
�U
LF
,R
�E�u�7U�
Na
a p
S��4Y,mVi
a,Ym�
Q��
�VVO�V>
SCa
o
yVy
a w
z•
M
O
is
Of
v
h
kaS
a,
O
CC
OI i
O
Vti
Y M M
c
.g.
aoo
w
w
C
no
oU
Mnm
O�
O
Oi
OF
e
a
O
a
9
m
i Vf
AF
+
o
,V V�
�O i�YiV�
U,a
uuu
y
�V
CF
Y,>Y
Na
04i�'Ji
e
S��4Y,mVi
a,Ym�
Q��
N
yY
o
a w
z•
v
�00
OI i
O
Vti
Y M M
c
.g.
aoo
F
6
'
m�
6
Y
m
n
O��
L
N i yCo
U N
4. US
o
iYWFi
Nn
o�'n..��
�„
Y� �� Y11i i2q�•
iVYo
r. nr.m .Fiwem� o
iF
M1 AOV♦ m
Go
8
79
ME•
�`—>V.
�VnO
FiYC
o
iY
yiGN�
�Kii nMr
�M�
�L
CiF
00
�YYY�57pp5V•
•YNY!
mr
m
�V�M�OGyy�
�V4a. ��iYTlo
>i
u
�UO
.m
..4iVu
�.�i L
NYU
uc
m.
F
O
L
m'
H
>`.
m
—
�S�
�5
LL''h�YCo
qqUr �V�
iZo
W� iYi M�iH�
iOF
�z0000�
W
1•:Q
�O O
V�rV.�V
UV YU A-
C
Y
O C i� VV!
O VY0- O>
�
C
imi E ♦ZUC
i.. -M
�••C
� OF V�
Y
V
FA. AV�OmU'-�Y>L�490uY0v
! M! V B Y Y O
.U! V ♦YM
i M
LU
�RqY- qi
• i � yy R> V U M1' 4' r. � Y a � V m
YWfYY >>>
jq�VV>Yq�q\Y!
i>Ym;'�aMd�d,M9a;�>V:
'
m�
6
Y
L
U N
iYWFi
Nn
YV��
Go
8
79
9
o
�L
CiF
00
ih
m
>i
u
pi
9
m.
F
O
L
m'
H
eeo9 ee em omo
m 9 F
'� .m o 00 �•o
mi mH Ck0 0 0o a o" e
d S OC o 00
u: a;� ee aeow
v! a«9m a ee ° — 9 — pe — 99 �eew
00
o
V IX• : r] : A O w o
-;a s
C; e oo eY aeow e
;AC>rAY :M
;'°OFMrOm• :2.0 rNEw O 00 O ao m ow 4
;rc°4;uv: :L"me"a oo a ow o
o ee a oe w
oo aeew :.
_
m;U01:0: •9IX 00 CeOrl YY
r•r Nr> T: .. OiiNVa O 00 ..
oo
s ski,«am
o voe ee Ives a'eow o «d
Ri mi m: O: m:SaimwO ;Be .. O ;V9O O99 :O
rd0 rV00 a .0
e_O o—Z :M
:O: - yy9m- °.4i iA 000 -AV Q U
m� " .nus- ;t 4 -�>oi ��� ea�� L Euu•�2S�H'J
Ci :m: Y. VCS O qq >�Ay A\iON'r C QO UV:O
.OI. AY�O-rViC�4'90Y �U �IUYVUr OTY99U9AA.
Y :M. A. OS5�MY Q y 4>Vr4� C QQ MOpUU Y00.-
ymy ♦V. M. MLS LYNr'JVTUM •y�i rL;YYw�AwVV'J rYTY YMH9 MM.0
mi 0KN3i>AmUH'OrOiDWGiCm ��d 688 >��rE�9 wy k
pIX
" m` yiiVOo
m un
P1 !: :Yir�a nnm ww www
rF WiM'a: R0U♦ d iVr040
wgm-:
A d. a r l n e
>° a. " ggs
ww www e
emirn�: •Au me` — —m —
Vkr 5pp5OO NV>♦ 9 O Yl o
imO.V4�VS: mUF;000w o00 mOOe
—
4 r U U Y m♦ . 9 9
n mlu:w :IX°iiu "
p i4i m 9: 9:" YFiOw w iV.riwnnrio
.ipeeormo«
ii V U: Zi i =V'yw wr+ w.i ; �tiww ; pNo.
w0-
aoi.O miT-i
F ` UrOmV'-iU>L^"m Hm 90 V99 qM- wRS
•M.� �. VOQr. yy 9Uy 4>UU4Nyyrl ;VA �Y
V
. Ymu•Hn>�emcc� O o dm:99me�
a;:�:�sg:��E�e�ss�>maaaaasaaaada;r;aa�aa;a>a
8
9
S
pp eO
_�W_�ie_
YW
n n..
�R•��•X•
......... p
R��
y
........... �QR$,{��j� ,�R
�{ .
N M % M i•.
Ori
F;ONF
o p e
oo
jOow o
e
Oe
u:
a�
o
po
.Freon
n nn
IY
Oi u• :O:
0e
K•�`
0
00
e0o0o 00irX•
P
°' E: •a
�
p pp a
pp
cepa
iF
�� u• :0: �'
O?p
Y
Mw
04: Y•
Mn
F
p
00
FO
C� dYpYp i. Y
C,C,P
O
oo
a O.y O
�_:�
COVn
n n. -r •u
+
:U•
i9F��OC:
A•
�2F>�9Y:
Y
_ _
O
ao�
99
O99
:X:
Y•
�YYpp
M••�5�pp5 q:
ppK
pp
a
o0
Ke.r
d•
9HM�OW•
:S: er�Yi9p
o Oo
M♦
Y r U'Y : ♦ O
p
:'
4i
♦ A
YY
04p:
o
0O
n�uq: COQ :OCCw
.U•
iw044
:AH
6C0i
0
Oo
.Fleo.. o
'Y: 'G: "ai
"
S 2: �:m
eve.e.ee.e. Nmwo
'u'
GiOuuimX
y4
O
ee
.FiOo..
w
2.
B'P
:Y
w� 0. �.�riMp
r
FnoPa
:O
a �'"pm:
r o
pp
cep..
•Y•
O oa
•.Oi. Y:
�9
O-OY Vn UO+ei�iOddrw-Y>
vOi
go:EQ5^ew
C�r]VVO:
Ye
U u OGO-qUp
Uy'
pQ2 V
S: Fimr;V00
u0
o
ee
wo
.•r
Y
W. VY�OV-iY>LA
:M: A. OV�MY
_O
l000
rpp
yMM:Y
V
•V. X.X
• V. 6
w� •p♦
YV M MYYni YU9�VTY
() Q Ydd�G�r +rn i 6wu � i Cw
o
p
M•
:R
.Y�.Uo
FO
—y
d
V•
iF'J
. E
q Y n i w��
O
nX VQ
{� {f
F1N
d_ d r i
cauq ggi-uq
d'a W
�29,92.
p
G r
• Y. U
C -
>>°o1
O O > q q r
q\ O
p 0 0
p
m �., N.A
p
•Y. M. M.Ir
�:$dsYO.ruLC
yQ rOY-
L
q O
>Lr[Y 1VV
4
yy 4i Vr4 O r Uw
r�YY
VYUYr NOi,YE9UO
C ML
C
rSYidTgY0.
Y Y Y O:
MALENME6dMdd
-
•�YO'•
�r
�w♦..rYit
091:9.M4
dxCdC1HOq;
91-:r6tld
EoYOV$Vin>�
3N
LNMg
s�LXg�
rc rc
a.
S
pp eO
_�W_�ie_
n n..
�R•��•X•
R��
y
........... �QR$,{��j� ,�R
�{ .
N M % M i•.
Po OP
'w
n nn
IY
Oi u• :O:
0e
K•�`
e0o0o 00irX•
KI{�(}�
Lis IF"MC"
�_:�
COVn
n n. -r •u
K�pP{{7Op7p{{P66%%
i9F��OC:
X
.LF10wJn
KpKp xbP �6�55 xa�
nn RR•aRRR�wa:o
��Fau�ima:
x: :�a_
ep oeR� xaxRx�
RR�•aR•
:'
4i
00000•�XXR,
n�uq: COQ :OCCw
o
OOo000e
:C
"
S 2: �:m
eve.e.ee.e. Nmwo
wA
y4
,gam
Oq.OiUyy
w
2.
B'P
:Y
w� 0. �.�riMp
n0 OrY p>nNr
FnoPa
:O
—UOno
7
d
•.Oi. Y:
�9
O-OY Vn UO+ei�iOddrw-Y>
q'Oa YWYW:�
��U�WD�
U u OGO-qUp
Uy'
pQ2 V
C�
:U�Y: UCS
_
p••�>y0 i.q �YY\rONnECU
qyR SOY
O�VU:O
�
.•r
Y
W. VY�OV-iY>LA
:M: A. OV�MY
UU rrVY Vi O,T
OYy4�>UnnM��u ppVp MG
YV UCr4
rpp
yMM:Y
V
•V. X.X
• V. 6
Ly��VY
OIV r
YV M MYYni YU9�VTY
() Q Ydd�G�r +rn i 6wu � i Cw
MM�M
ypj
6d� Y
S
1
n0 on
�m
N wN
M�QM�Qff•pIXpj{%j{ff��j{%f��•%$Q
�{�N,�{jjjj
m!
Y
o0
no ory �Q%��
q�
p
3�
a
N
i 4 i m
0 YYi
M %���
d
•
'f�
O o 0 0
o0
�p
°i
SF
_ K%%Ki KYa���•
Y L�
oo ee
p iM�
Vpam
�%� ��•��NMY
VIU�
Oo
M�
YI V•
i i
°O
�
O�
'
r F
uF
' 9 e
M.Oi
MO Ory 1(}� �jQ �Qf �Qf
�(�$
S�Mi�
O
u�
"a
%NMX� M%•a�K�•tf
u;YYV 4�
'
.Ym
00
V
M�
pi ��mi
uF
o0
F
g
za
ee
1
h
�•�iiyN
�y•
M
Y
p m
4�
o
V
O-
FaL
iLJF�pCo
mm
��� �%�%i �%•��N%'m
a�
m
miK°4�juj
Cyyi
nn
1
iYYm�HS•
YOi�V
eo e.
1
n0 on
�m
N wN
M�QM�Qff•pIXpj{%j{ff��j{%f��•%$Q
�{�N,�{jjjj
.mi
m m1
.wi9w
Mn
no ory �Q%��
F, w
�N �%•a%%�•%
N
i 4 i m
0 YYi
M %���
d
•
'f�
O o 0 0
_ K%%Ki KYa���•
oo ee
Ui
Ni
�%� ��•��NMY
N
M�
YI V•
i i
°O
�
w ww
K�
'
r F
]m
0
1O� rY1 •
d Moi im°
O•
' 9 e
M.Oi
MO Ory 1(}� �jQ �Qf �Qf
�(�$
d5QQ �Qf
5
O
F� Vry
(�j�
��i
%NMX� M%•a�K�•tf
j
:
iuYY�a�:
m
�•�iiyN
�y•
R� R���'
iLJF�pCo
��� �%�%i �%•��N%'m
miK°4�juj
Cyyi
nn
1
iYYm�HS•
YOi�V
eo e.
OOOOOO..000
YCAi C•
m'
���d%•�M�•
'
N
~ w~
Yi ii Lyy��
'N
ee oo �Ki
yy
mi S. O:
2a
-N _UOwYOeOw
N%i lik%�;YNK•F�%M•'
o eo
000���—'J%%��_�%�
a��•.
4�
:Y.
q:
�'
'r°I�Y�
�8�8
qqyy
•d�
•• iS_4mOT�
yy>O> pV 'I�VVti�SOd�gdq�N-V
FiuitAJ FdVU�00i
O7O dd pLp ppN pYOI
Ci
VC���
"Ji0 dV�
O im.loo iAA A��ONw
S
C u�
YVVY V.
OI. AUiOA��UiFA
FAf90Y VV UYUV� OTUS9UO
Ai
U O
.Y.N M
iYLY
UY ee((VUmYN 'JA Yw�A.4yY �VTY
OM M1pp�N MI
y1
.„. y•(rypyOiOPCqiOAMOOOACO°ySO°MMOL
d88022O
pYSOOoN
pipFFLL 61
qi
4.°iL
�Umrl�imGFiYdwpppCdUVp�
U> a1.0
rlEmmmmf�•
5p
F
qU
4
M
a
i
Yi
�N Y
rF W�
�Y Yr
ry0y tr
�6 yV
iUC>�M
.rww i M1
Y'u(�UCi�a �Z Ry CYJJ�
O �'J Yi 6Wp�e„ SOS
M1 i � i C F C M guy u u C
YYYi '~J 7H
y �U{yO MyLN NyyR �U{
C� Y1 aa5P��00'a
p i ry
Ou
w'J C
-R-1
.Ci' M p5C yQ"yQuVO--O�
YY i 4 6 �yO Otiy'NrY � G
M� i N UO>U'wHFWKV
0
2
R
WA
pY
CC
6r
HF
�
nN
y6 J
FO
�
Y
GC
Nfl
O
M r+
W
iV
u�
Y
YO
MQ
�
YYYrIX
M
a'C
rgFVr
rOYWYrU
V iYYY;L
O
Y
W
w'
aU
y
u
M%
�
�
fp[pwr
i
Yi
�N Y
rF W�
�Y Yr
ry0y tr
�6 yV
iUC>�M
.rww i M1
Y'u(�UCi�a �Z Ry CYJJ�
O �'J Yi 6Wp�e„ SOS
M1 i � i C F C M guy u u C
YYYi '~J 7H
y �U{yO MyLN NyyR �U{
C� Y1 aa5P��00'a
p i ry
Ou
w'J C
-R-1
.Ci' M p5C yQ"yQuVO--O�
YY i 4 6 �yO Otiy'NrY � G
M� i N UO>U'wHFWKV
0
2
R
d6
°nn
nn
n f
V
m�
a°
F;
V
N di
000
Omm w
1
m
E
Wi
,Y
Y�
m
r
oea
Orvry
�FY
OS
F
r
CAp �O
u,F,
u
z✓
ee0
000 �
N
O
uYuipYd�O
P�?uYiN
G
C�ya
Y
F
n
onr
o00
'
c
m
ry
°
Y
M1
W
i
m�
c
V
V
�V�
4
�
i; �,
eee
eM1ry
O
It �
C„
9
n� mi
8OK
=moN
Kenn
ieee
GGGGM
L�
H
V rei
O
O
i
yY
i.e nn
1.000
yy
n
S
S M
�
fii
m09i
oYS4
mLu �y
mi �
b°�
ANm4N
sNmRF
YK41°+
'
Y
m�
a°
V
N di
1
O�
�F
Wi
,Y
Y�
Y
idCi�C
�FY
OS
F
CAp �O
F
„iK°RiM
N
O
uYuipYd�O
P�?uYiN
G
C�ya
Y
C�
V'
i
M1
W
i
m�
c
�
!
/
§
!
9
.A0;.
.
�
!
/
§
!
9
F
0
C� u90
.Y .ior
001•
m] 4i
V
Fi V„o
Yli
A i
._ • O
o
j� •U2 �6
•.04
yY `.0 i
3"x.°4
iN
WiME« «A0u«
i0�. •`� F1NVO
.d
X00« ♦>xN•
��
.-I ”" ".y" e
0 0
wwCC
V
YYiX 9•i
" •Y •Y .+"e o
�9FM�oL•
•eyy•0• V>♦
«U4.li >��uVO
••"
w; i0 m Ye
iK°iV
-- LF Zaoll:
0111:
oi�Uuim�«a«
•4N��.•"
wle n•
.�" .5 .4" o
W�
_
a«Si • iS
_
a ....
O�OO�OnnF'a
V • H
6 i YN. JY Y U�0K i SUO
om
�R
iy
Y «{�C« F�UVe
• A«'Oi L .YC
DOOmO PiOn
.
O.Y 01o.•.a
.ON
.. �'JnONYiSO
'e
y
W� •«K« Opp
iEUo •N
.�"
E
• .. 2...............
o0.
.a" .'�i
7AO
'"
[moi : N • _ •� �. « °s c
im ♦A
a •• u ii n o
iZ.+R•.j�.. .. ]ii Opti^Y Nay
E«
m«
e
4dqqC
9U qqOCq C���u0.A�OYy.«
pp:COtiwqq
ORW
:>98nS•NhR.
M!
.i.NYyyeiaYN
4.]CiU>Ui
F
I-
P,
u
I
I
n
�F
tl
M
�d
$K O—
o�mi
0 VCo
Fite
ui
i%� iSCj�iV90 •• nn wn nno 0
iU�u� mF�u�ow
> Y 0 mq
i N M Y i K
Y y
F�YV
Yz YP�e
m •>O iEw .. nn nn o
iOma� w ww n.. www O•
K
„ • T m- _ — _ ry
.m���Vq •• r.n ..n n..0 quo
m
Bu
iYOONV;�rv.
CF YC i�Jn�
O �d a01-OOFOI.00FiSOOO
Tai .. ww ww �„„„Ciwr1
mu' — M=Yn n ry n ry ry g
o�c -i
•eEuiSGui- V ii-iim 0).d..O>>-..o �.Oiuu N��-Y
V
•� +lNqq �Y0g556�OMY Yi� o mY 4>0VU'UOF n>�i�u9N`c9Ye�
Uwq
iVpmV yGiHy6y ppLL>�Cpp OAC yC•� m�Vg9 Udd00 pup6OC�yy ppSYSCi q'yq �i .yYyi
��.lO�N4S�UmSr]i>m U'wii 6rmiOWpNCn y'4.�%%9ad�V>OU
6
i
Kq
000m000
oo..o
FO
Fid„e
O
0-0:Co
Pi
O o
0o
o
Y V
.S
m. i❑
O o0�
000eoo
00 w
....
F
oei
oo
a oN
o
0o
O� C. ♦q �U
o
00
Fo
T O..
w
iF
yV. Cj .4 Yo
♦O.m
0 00
4iaMaV .M>o
O
a
oa
Oe
m0
S o.. e
Y
yimF:CCw
iKQm' �.i�A iVw
o
O
2� ]� •m �C
a
9 990
eo
Y�
m`
QAC>�AU
00
c; 1;
� Y�
0
0o
Mi
U•
IVY
Vqq�]�Ei mapp
0
00
Fo
m on
6♦
�9�Mi
�w. �2•���N�..
0 00
M.
9o
rcTi
cF oF”9
0o
a ow o
o.
YVV
>u'
MS` .O �Mo
0.O
YVY
O��VYiy
M. T. .wai
O
00
rF]On
I
0 0 0
6
Ci
�qw
O
Oo
4iYTi 0•
o 00 oa0
Kec;
w
C Ci
w
ih
7i ti0 O.C.
e� PSi i. i. LFiOww
0
,Yo
C; C;
mo
rF] o4 o
iYi
o 00
li
�o.
u.
O 00
o.-8;
Iuoo
Oo—�
.Fieow
a:
C
A' — 7.
—2q
M�
O
v01 •
y
0 •• _ V V S i
S - Y
f Y
ti
rm. AY�00-
>p A�[yOY ��
VVI Oi�
yp ggUq
Y.
m
q
U. N. MY NGV��V
CNC
9> ..�O�V�•u
Yu 9 SMV
� ddgC
NG
q ��y'hY
i C
VY 00.
yMMgMNM.
Yr
1t
mi
Y. 4i
w.> pp O q Ogyr
� . •4i�{L�UKr.�>mm
TS¢ yyyyO
Om4GCR�UUd�VSdi>�.]
4w >
q UpO VVrvOO
Ur]I
»>99M964•
CCGCy O•
Vi 4i Vi tu444i 2.
�F
tl
M
�d
$K O—
o�mi
0 VCo
Fite
ui
i%� iSCj�iV90 •• nn wn nno 0
iU�u� mF�u�ow
> Y 0 mq
i N M Y i K
Y y
F�YV
Yz YP�e
m •>O iEw .. nn nn o
iOma� w ww n.. www O•
K
„ • T m- _ — _ ry
.m���Vq •• r.n ..n n..0 quo
m
Bu
iYOONV;�rv.
CF YC i�Jn�
O �d a01-OOFOI.00FiSOOO
Tai .. ww ww �„„„Ciwr1
mu' — M=Yn n ry n ry ry g
o�c -i
•eEuiSGui- V ii-iim 0).d..O>>-..o �.Oiuu N��-Y
V
•� +lNqq �Y0g556�OMY Yi� o mY 4>0VU'UOF n>�i�u9N`c9Ye�
Uwq
iVpmV yGiHy6y ppLL>�Cpp OAC yC•� m�Vg9 Udd00 pup6OC�yy ppSYSCi q'yq �i .yYyi
��.lO�N4S�UmSr]i>m U'wii 6rmiOWpNCn y'4.�%%9ad�V>OU
6
1
1
1
1
1
1
1
1
1
1
1
1
1
m.
,oar
Ulu:
� YY�7g
iK04�Vi:
p �'aUUU'09lm
a ' 1 i
£ry m OZ:P
C
pi YV
c u
Yy Y
mi i lrOi
m 9 00 00 KNN%•mrX•
n!9 n„e
F' xpxp xaxa xaxa
u: al° ee oe
�o
r!, U• r uw .! r
Y:°° �� re or _ _ o�a��•
a a w om
wR•sm ire
NVr. •+ n.v mn mmo om
: L N i O L w
'7m NOo 00 0O �% ��� ..%•���j1�•
: Llw w m0 en �OcmA N' mm
U m
: il2aiw n0 On'J .1w'_ rSyyyyy Om
on n„Mn gnn�Y"cmerY amcm
qp —y'pOQ -�
:O: q O� U�-' 06-61 w�Y> 6'JVw
�®�Omn m O.+ F' >A OO U yQ
eY�- r3wm O'S. - >Oq.1 1 u8 L $uu 2$H2
VI UC' O >w.'19 > A Y A\rON.!O V
•011 AU'Om�rV>L� HAr[90Y U UYgr OT 9 U9AA
♦AI OE'H V y 9UVY 4iVr'.r +� iVtiC ]�YTULMHOMMM
•HI MVr LUr�UY V M PA Y.1'AwU iiiiii
• V! 6> C NC' O+ui9 V ydy��m9 CHyy by .1' 6wCru r QQ> COw A A H A d6
:4:438 �UKrVI�>NA CHi rOi iOU GlLi�GWKiUUOOr.iUUW >�r]n UrI SO'm vLi Fw m44
�e
~
w
! m M .o.'
O
o C' O
Ni
O%%O��o
o Fa .y e
uF Or0'~
�Qf jQjQff
O
6
O
O
u•
o SOw
a_=
V�
O 00
O
O
.y
�! • �!
e O
Kp
Ug
:y>y:
O
o S .i o
iV
tiy6y�!
uVNio
OH:—.
FORRO
O
iVUFi6mA:
5 :Oi 9CmiCUF
o 00
p y r 019 0
o
o%Ae
HaC.
o n e
NiK0H4
!LF OrViO
o
O
! O iN
O
Ao
O
VURU
GAl.
�'in
!e
OOOa
O
o
pie~qp!
0! :Fm'�YO
Li;y
mow
Np1:
o oe �Q�Qff
OOi
w _P
X
♦)l L:m iwM
Oo000 �Y4
HO mo
qq
go,�Q1¢jf
F1 a o
iVe
O
Y`!O
E
Bq nyo
O—U
O'u:
m00 .. .:—p
y� BBue
bVO>
V: P• .. i0
SO
rMY00WWn
-'Oma 0.-'�>o "
Vfi9V S0
4
N
gdXoR
>A GSUV
Ci
♦L rS.r
:mI UCr
i0'9
�M
'T
Vdi fn. rvl ln.
OT5VOU9A
y•Ml
91 U'OV rV>L�
90u rY� U9U
O'UyU�'
VYAUr
ru�L U VO
V
AI OE'yYVr6
•V:M. MV' LU 'J
Vu�H igr']9 >.
mV y
rY Y.r Ar4YU
r6nlur
ry>Cpw >M09 MM
f�
1t
Y.d>'CNOr
:„: >!dp'Ow r0
UU Vdd9Cr AU
1l mmV.1 qM
U(� MVi�.�UUrVUW4�rr]VriSMmm4
p> pd
mi
i ! 414Z'Vmr]r>mU
4O 'JVddmd�4U'ssd�H4
m.
,oar
Ulu:
� YY�7g
iK04�Vi:
p �'aUUU'09lm
a ' 1 i
£ry m OZ:P
C
pi YV
c u
Yy Y
mi i lrOi
m 9 00 00 KNN%•mrX•
n!9 n„e
F' xpxp xaxa xaxa
u: al° ee oe
�o
r!, U• r uw .! r
Y:°° �� re or _ _ o�a��•
a a w om
wR•sm ire
NVr. •+ n.v mn mmo om
: L N i O L w
'7m NOo 00 0O �% ��� ..%•���j1�•
: Llw w m0 en �OcmA N' mm
U m
: il2aiw n0 On'J .1w'_ rSyyyyy Om
on n„Mn gnn�Y"cmerY amcm
qp —y'pOQ -�
:O: q O� U�-' 06-61 w�Y> 6'JVw
�®�Omn m O.+ F' >A OO U yQ
eY�- r3wm O'S. - >Oq.1 1 u8 L $uu 2$H2
VI UC' O >w.'19 > A Y A\rON.!O V
•011 AU'Om�rV>L� HAr[90Y U UYgr OT 9 U9AA
♦AI OE'H V y 9UVY 4iVr'.r +� iVtiC ]�YTULMHOMMM
•HI MVr LUr�UY V M PA Y.1'AwU iiiiii
• V! 6> C NC' O+ui9 V ydy��m9 CHyy by .1' 6wCru r QQ> COw A A H A d6
:4:438 �UKrVI�>NA CHi rOi iOU GlLi�GWKiUUOOr.iUUW >�r]n UrI SO'm vLi Fw m44
I
t
I
1
L__l
I
I
1
F
I
r
L
A
mo om
•]m �9n
wN
����
n
. O '
N
%�w%�m %
%y•�•
H
rye ery m���0^��e
�Q�Qff
�X
�Q�Qff ?Qyf
T�
imi mH�OSw
.. n'v
Q�Qff
X��
1yy1
%•i?�pp{{��o
?p?���
Yyy� �i m—a —
00 00
�
�•F�•
�F
a r e o r
N
N
Y U V i i>' m H r O �Ci m
a
�j
• a• o
o��
=goo: •,i:maiy
on ee oo
ii o R R o' gip{ �pN{
��j{ ��j{
m �
O e o o
o
•
� : : _
w ~ n
�
�
.o
� � � g m ; o
�
�
k N K
�
00 0o O��~�kn
?Q?Q$$ ?Q�?Q$$ ?Q�$ �j�j
?Q?Q$$ ?iQ?Q$E$ 1p{
uiisV4ivai
isHiw�o�
.. .. ..
��{{ kk� %%%%�
Q'a���n
ouiYYo'w
no on
g���a�m°a•c:
n
nRa�•
�. i
00 oo
Pi
n n
�o
� �•
Um� Ti � ]m OiEO
a',•y�•Vi
�
Oe eeOeN%���eV�N�
�jQ�jQ {5�{S����
�jR��jD�{�{f�f,
�h
m 4F'OGO
� wn
��f �j%H
{55{��
NX%iEN`,��•
99
C i
♦ e y C -
�V� YiOV�V>LN
O '>m.yp TY
MR4 OY
�J"riq pp Y
OVUOU ti
dV � Ow O O
VUR OTUOUV
Y'p
Y'p
y
V.d>�CNC�
i M: >. dO i 0+1 qq� O
S 9 ViaOC i!
NM Ca S C 55 o p4
mUU+�M �d'YYr
U>.y y y O
>
OOOLLL d
mi
i . 4.RS�Umr]i>mU'wgpwpaaCdgGRRaUF�UEU�Uba�E�NUr]SmmmR
A
(
-
���
A�{
\�
;
;.:
!, ,:
`
��
....
(
-
���
A�{
\�
!, ,:
1
1
1
U
V
iNNf
U
OCY
'pJ N
O,
�F
m
tiMi
�Yi
,Y
O 2
O
,M Mi
OHU,Y,
O,
� a,
ma �{
Ku4i�l
R6
9K
C
P�CUYiU�
8��
La
6,q
C,W
o
ry
N
F
41
O
m�
2
c
U
V
u
a�
q
W
.m
U
'F V
O
Mr
r V
0 ar
rM Yr
rd
2i w
mi9�Ygp imA CM N
rvrVYMiMY BOB i Y
ui�KUViC4 4� y 44
YiCUyq'NrV �� 6 Y]4
�r O 4' E SKm
M1' Yyry
g0YM wwo
> N? a aaax��ssd
a.
eFA1ih
yr O
p VVMM Y
n M CY �YryVO-mp�
uV.i r N Ui U"+FFWKU
ow
�
V�
A�dr
nn
H
dry
Mry
m
mm
O
Y O
U G
Y
O
iS YAM
y�
C
'
C
nmr V
�
U
'
tiU'mJy O
w
iry
V
e
q
KVV�Y
V
+
Ury 4'Ur
CU
O
M1
G r p S i .di
m
'F
di
F
b
n Y
oy
ry
vilrm O'
Yrry W
�
O�
nV
V
r
n
4
mC
u
a�
q
W
.m
U
'F V
O
Mr
r V
0 ar
rM Yr
rd
2i w
mi9�Ygp imA CM N
rvrVYMiMY BOB i Y
ui�KUViC4 4� y 44
YiCUyq'NrV �� 6 Y]4
�r O 4' E SKm
M1' Yyry
g0YM wwo
> N? a aaax��ssd
a.
eFA1ih
yr O
p VVMM Y
n M CY �YryVO-mp�
uV.i r N Ui U"+FFWKU
3
z
t+
N
rvn
u1
�N V�
ofF;
N N
Y
M
a.
.o s�
u
Y�
000
Onn
m�
s
�cn�a
F
CV>i$
orvn
B�
u�C
F
u
i 0
O
au
YY ppari gV
O'Pu4�0.
o00
000
S
n n
'
�o
enn
o00
w
m
n n
Fn
n
IrvV�O Liu
-id VMO
8�
yM
S
000
Onn
Z 6
tt
� gNn i YY.
fdE
oam
o00
'
ry
i UVH�eUe
r]
Onn
000
�O:VV�L�
901
ry n
Mi �F
6�
O
YlV
000
O!V
0
iry a
9N
YO
0
CgC
Mi
Gry
V
ti
u
S�R
G�
i�o�e
CC O!!
2000
4�
'dOu
T000
VTonn
>
>
yJ
q
0
rlY
�e9u
e02
�mLu
M
UHF
sM
3
z
t+
N
u1
�N V�
M
a.
.o s�
u
zia
iggF
�cn�a
F
CV>i$
n��OVi�
F
i 0
O
YY ppari gV
O'Pu4�0.
Y
U
'1
a
pN!C
Fn
n
yM
S
n
3
z
t+
m o
ro ..
o� o
qF
a as o
a o
9 r'r
iN Y SF e
Vi Me
�F yi Ni
�Y aiy ti
O C H V
W 6Mqq OK e
�ti�q,�leeRr N� 00
ti �u,w
pp i V .'Oa i 9p IX
A i O u E m V ? •� o
4r Cmc YF e
H�
t e
> o a
pup iii a.
M� C TKa
R U nqT
Ys
w goo
qV .Inn
0 O
O T.
p5
F
u
U >
>
EC
m.
u
4
h #
}
> Vro
V
jm
o
iV
m
O
r M
Gi
u�H
rd
SrOGG
iUq
rbCw�Y�
m
.nuU�
r!M
>
m.iLo
�UyN�HY
ai�
e
o
rUO
GM iCgCO
atl
Vi w4�u>
m'
of
x
C � r4j
C 9
n
U
i
C
O
C
O
4r
T
T
z Y
9
V
V 1r
K G
M
O
M
U
rvr rI
r'1
Oi
Y
C
I
a i ji
M•
Y.
w u 4•
�F VrMVr
OrOE]i
rY a�Kii
;ACyi9mi
rYYY�p]66p9�
;VM�giOi�
—
0
2
0 i
r U
raTY i V.�
m V
_F;UU_o
Y
Y Y r YO rr nrrry
ii0 ;a
• 4Na �0
r nn F.• .rH.• o
C
♦ i S
F a�
a �Vno rU00o i�jm
sr;w axe imr
u a � F .rF Fn ; o.F. .•n � re:
U U•y —Y� qG
U m V•�� 6 C ; 9p q U QY O � C _ ~ im y�
F gVrOmG y>LN490YU99 �iAY- YNL•
V �� YO r 4Y � 0 4> 44r4 � Mrl r VN
♦UM rYL V 'JY VM ]]p q�VVOUArA�Yr
>V. pV y♦M6 rCp TCrCyi m� VSaS WW99 pUwC� ��OO gCqCr qwN'r .yyr
U ri Oi%4 ;UaSr]iiNtf rCi 'Y6naaW�a;Nm4r.iw;Uifi•
E
[i w
—
—
r•r e e —
—
a
m v�
F'
OrOiO
n.r .. .r
n ry
Yr M
r4
a;
w rn F.•
Hwrr
o
^L C
o
a;
i%> i 3
\
t9j' ; 9 U
.� .r .• .r .i
n r• a
e
rY9
i\� u
H r U U O
O Opo e
T>
y �Ow
.•p n.y
• O .� Y•
m i W o
w A fl
Y MY•
• U4.Uii
pay
'J r i d90
'r .+.. .rn
n.•O
O
m V
_F;UU_o
Y
Y Y r YO rr nrrry
ii0 ;a
• 4Na �0
r nn F.• .rH.• o
C
♦ i S
F a�
a �Vno rU00o i�jm
sr;w axe imr
u a � F .rF Fn ; o.F. .•n � re:
U U•y —Y� qG
U m V•�� 6 C ; 9p q U QY O � C _ ~ im y�
F gVrOmG y>LN490YU99 �iAY- YNL•
V �� YO r 4Y � 0 4> 44r4 � Mrl r VN
♦UM rYL V 'JY VM ]]p q�VVOUArA�Yr
>V. pV y♦M6 rCp TCrCyi m� VSaS WW99 pUwC� ��OO gCqCr qwN'r .yyr
U ri Oi%4 ;UaSr]iiNtf rCi 'Y6naaW�a;Nm4r.iw;Uifi•
E
[i w
p O0
• � . � V p
o ee
Foen
a
.ni
O rY;O
S
F10w0
O 00
ym
00
01i
��
p p O Op
.F]oOw
O
Li
�
p
V • r� r
rF-1
n nn 'rti
wwry O
Y':o
00 00
FOO
e. rro
eoi oo
a ow
a °?-
O pp
F oc�p
e ee
on
o
�Y
>: Ar
p p0
�O
�•
Y1p00:
O 0O
q:
�S
6•m�li°w
S H>• q:
O 00
0 00
rFleOw
rw.0in
eY `u•
�_
w nn .•.�
r40w
Ju•
NW: :uN°:
e O0
FO
6:
'
rCyMiE6%•
M. VC
o ee
O 00
a ow
.. .. .. .�..
..Fo p
rVOOMiYG•
�mF�%yVn
FO
.V.
�ra�YrUU:n
.1 Ow
O 00 O oa
..l on
O O:
TVr
O pp
O
xis°4�N�O�u:�:
•tm°„w
O 00
Oi4
r
O oo
Y.
OrjCP:O:
00
O 00
KOOw
:y:
y
O e0
JVV-JO
L:mr NT X40
p 00 N
N
Y OpOw
-
O
M�
ui
:m:°.Z iNw
YV
O �000�- o
oo0a O 0!E_O
•S:
Y
�•2V�'O.
FO
:O:
pry
R
—Y
MOO
-88> o
�£O
Mi
Y�
M�rNw
V•a• O
CYp AY
:Y.
ONwO ig0
�0n
2
iV
:Oyy. �O-Rm
0 Y VU+Eii£06-d�W-VS
OMr F� >m qr OIO
q0
V•
n
-
•0: O'•UC� - £O
•gYOm p(
O-�>>rgq�iY °N��OY
>L gr4yOY ��V UYUYr NOTYOCUO
U'J C�1L
C O
L: 7•
U: O•
.
5
:
dH—F
y R>UNr OrUHC 5 ML
MY yCOO Z i
UU.COy .U'p. rir
YU VOO•-
VL%M
%pp.I
V0:♦
dO:
M••. 4Y..
90-4.0
rrrVq4WYYO
£Y�>tlO
Vu .y>yy.].nqT[UYCO
% OwY
L%qH
GN4gSNMg
4HdyyfH66....
8•
'
w• V E
-jO> Y O C
Cpp
i r(
0
O
r.NOY
FiOn
orni
00
m.
��
voro
Li
y• iY=rrn
n nn 'rti
wwry O
V
m �
mFiYYO
�Y
O�On%. :\._Y1:
�O
LVSV: •ONY• mgrrp
•.vxm
0.
Si.Oi
�_
w nn .•.�
r40w
Ju•
NW: :uN°:
— —
V YMY•
a
.. .. .. .�..
..Fo p
�oF�pe
gOp
�u�• :[Hi4a: �E'p
•
LF�CO
I
�Ow
TVr
nwnry nn ry rvn
O
xis°4�N�O�u:�:
•tm°„w
NNoro De
-
M�
Opo
•S:
rOn
pry
LFIYCo
m•L:
w nn ww iEn
�£O
Mi
Y�
M�rNw
V•a• O
id O
ONwO ig0
�0n
2
ry ry rvOry
O MO
Y r
w• V E
-jO> Y O C
Cpp
i r(
[p� yy
yC
qq-
F4: gYi000�V>L�
yyO
E � M V
M94TOYV90
5 Ym +r 44
�„Y
qY- N£:
r]
Y
u: .Yi mw•
•YMY�YL
Yy•
YE YM�>>> qq��
C i
�ON�9\Y•
O
NyTy
�'
• „• >V. OY Y6>p
� O m.OI
A yy CaOa m C mYSEYU a0.�O N
yCA A O M•
1 • Ur]O.mr(SrUa23�>�OwgdwOdViaadECl%%4rlW�U>U♦
:om u e o eO eo aee,.
'Y m w °. o e o yK�
Vi F C°C«F O OO r]O
z ?Y�e e e
0.
o eee aew
YY O. J •�'�90 �
V M�W44` m
0
y>:YF�o 00 .lO e.y e
V W;KgY Ya: Ni�o0
a oo a e.Y
mC.aAtl: :U•
M•
~u .Ort:
"�:98: `S:Oii0�0 o Oo O O 0O 00 C O •N:
O;OUS�mrtY C, a� O 00 a 00 rF]o 0.. :�:
o O Oe 00 Koon :q:
O n Y yy
.
L.mFm o
Ri"a m �Yl: i:<i6w0 V 00 i9oo r]Oor. O :C:
10.
UP: 0i0 ;N O iso
p 2a; oo tle pee a S`
R i : YR: TY _ —Y e••eO � .. - £ppO—qqO .O—M -.. -O-M -.. vvyvvy1111 Y':
^yM• BOOO ppm ¢V �UU¢�E>06-6�N-U>
n :V:o:FY;- �Yngm •••pi0� Fy;�U 6U� FetYUJCC AA ii
O ♦mY - O >�YYP; m\�ON.i C PO VUY p^
�: m510-.tl>Lw�oou you .w �uutl� oTYoouoma
n •M. N. OS�MY @ y Y(i V.Y� U Y p MggYY V00•-
�� •Y. H. MtliCCLtli'J Um 3YM pp'Jqq�VYti� V]�UTY YXM9XNN. tlY
O� .rY >. °i>�OmC Om Cm�S4G M~O A0000 >SOw +�gLgL °i 6`O
•.761L90 .1 Nw %�; %���� ��•IXK�K•
w wi
;F U :O;O�e
Oo eo
1 o.. .. fZj �Rj tRj jRj 16i i6i g '
is Zi�i: `0`mai� n mo n.Y Ow P m omR.fl�Oa` :w
V CO�i°�°�` MM9m� n0 On m a `KmOP� °i
.'Y;�T�i�g: :«Fi�ery eoeoeee o0 i2 'A; RkkkK� kk'aklik`Y�'�:o
.Y rv�>FnY O: :ow;cdo .. .. .Y ii�� �R"'�-RW'��• :u
;q
O C. i. L: m m
pY V• F� urv;Ve p
a w9 99
0 i0en4C$�$ 04�
win S: w: �: w � � O°• vm m iEo°� MMa j$aa�d fai {Rb6i P : Y
OiY•O•m:2 iw no ory pO .• - iY�X( •Fm aR •Xp
_ a� 01- �Vrvm iU% aPOm :y
4� YhY _ •°y0~o
Yn _nn.Yn-
cOi u: ; aee ••Od m -o> A�'w ; i o v•• o�; w u i�u ao•`S• o
ry :u�O: VYi- �L.Y4mOi�%q-�i0 �i TiU CUi O$$ mU�
O d• O� - O im.-�R� inm''jj ��Y \�ONn C
Ol. mtl�0m-iUiLN MV 90Y UV VYU �O yyS'%O 9 q•�
n :H« YOE�YLLY m;� C0Y 4> �1YNiUwC 6i M�EtlY Y00•-
16>pYV 0, my.Yi9 m.�VSR W9y F%yywyyni6rvpCu d'!i y)y9pC pw NN>ANM Hm H4 W`Y
W� :r°i: 4Y42;UCr];iOU'�tnr°i � W vmli liC�VUnEi;rin U.]SM0Lw 0<4':2
'
oo 0O
qm yyy
•9m p
O�qJ P
~ HH
•X
�X NX� %•���•
n: mFimn�%Ki%j
�{f� �jR �{f�
m�
V�
.�jQMM
%•It1i
qm
0
O L
y
�w
u Y� •ui
un nF.yo
ry �„
Yew Oi
]F
m.] X
F
VOgiK�
�d
ONS
W�mU: :rl:
nnii yN•FnmQy{o6mV.�.
M%M�
Vi�U4�0i
'
i � . m� � m
(j'm
n
Y
LLF
�� Edi
• a�
O
N�•
5
o
ry V
O
O b
R �
L
V
ry�uOMiuO:
� m
:mFiFVN
� n • : L C C
���
U
Y
`Y,-��
" N%y��Ni N�•P���'�•
C S
...........
yxxyy kx
�1y(( y%y
0
B
1yy(
'4.J
-J-
F i�N�'�a•V•
'
oo 0O
•9m p
O�qJ P
~ HH
•X
�X NX� %•���•
n: mFimn�%Ki%j
�{f� �jR �{f�
�jR �jR x
V�
.�jQMM
%•It1i
�w
u Y� •ui
un nF.yo
ry �„
Nq0
F
oa oo
�d
ONS
W�mU: :rl:
nnii yN•FnmQy{o6mV.�.
M%M�
nn
o
i � . m� � m
m fM{
n
Y
• a�
N�•
ry�uOMiuO:
� m
:mFiFVN
� n • : L C C
���
U
Y
`Y,-��
" N%y��Ni N�•P���'�•
...........
yxxyy kx
�1y(( y%y
•6
1y%{ 1yy{
� ��X%_ XX•aN�Xf%'
1yy(
'4.J
-J-
F i�N�'�a•V•
—..........
9
� � � � � �
•
� � •
•
'
~
'1 1
i
� X
v>i
O C ♦ S : Ly . ; M
m
Pih
d
n ononV�%i �k%%i0%K'a���•••V
E�>:\:LF�CFry
d�
Y. P. m:O
m
nmom mo ry nn N m
'
S a—
U n V
P j•
6
4
_.
Zen o, O n
F i4 .4 n
'
.. ..
-
..
q >
[mOTd -]>OnnF>46U� LP
-V
ry
yE
:M.m:OUiWVYi]>yLUV4u�4>V'IwySiU.U1CU��
O m 4. > N A'y A\ O
mXLfiN�4Y00♦..
Cr]Ln:]
yC O U
V• O
u
V M• M {
pp>
S M O A u u V V '] Y >.
60�O�gC
.4
e OM V�.CI ~4 uN
V
'
W
.w'j. Oq
1 . �UmA�>mOrv4n~Ossm.6t;
Cpq oagRl a: g: yiOON
UFins>iarvVOOmmmm
p4.4.4.466.0
44'.2
i;k�
!.
..;AA
F�
1
..moi y�
.fin
HMpO
rvry
MN
Mi
u n�
o A
s o
6
S
YV�w
M
w
Y„
�a�wqq'o
a
'UOY�4
iC V�V
i0
TY yCy
Y
Y
V pYYE�U'
6r4
O
0.
Y
up
Mi �F
i urli u
p
'e
H Or
n0
gU>
,
V
w
V�
?N
a
w
� m
�
\\/
\\\
,..
\!|)
umu
�
�
-
)�)°��\
@
0
r
I
,M1
V
OF
ry
u
m
Ot
�
o
9
ry
rF
SH
m01�
W
a
M
Y
a
n
O LiMV
X iON
is i6u
�YYpY�EOi
LF
YYVf��
y9K
LF
o
r
r
i9�ei>X°4V1
m°Oi
m
ryV
i
a
.�
COU r O.EPy
TY�wO
rvuu upYii
YT
i
EK
ry
Oi.OYWiM�i
O.
4i CCi
FF
o
Y2 a
M.
O�
y
C�
$
o
M
C
2 C
q
w0
V O O
p
r-
Oi
O
CC
JOO
u
qi>
Y
) �
w
%CP
nrvm
I
V
LH
m
N�
9
ry
rF
+
W
a
M
Y
a
n
O LiMV
�YYpY�EOi
LF
SSP 4p�
ro�
u~qF^�7p
VY4 u;
O
ryV
am
ry
Za
u 0
Y2 a
y
C�
•CS
M
C
2 C
ti i
w0
V O O
r-
wi
X
Yum
O
qi>
F
U
! >
un
�o
94n
V
o
Vi
C
m m
�F Vi
m
r Y
ip Y�pM
PUm
m
3
wiYY �K�1
mw
i9 Yr m
sm
0. .0
w Tu
uu4�u�v
M imom u
�I L;
V
o�>
M�
x
V
�C
C
a
C S
Y
S
C Q
M
�W
V
i i
p
A q
V S9
2�
V Y
q
ai �i
H
V r4
ry n
YYY�V
Y
�Cm>�
N!
iKYViM
ti
YY�O
i 6
y p
YiCUS�m
4�V
N
w
�F
om n
N
r] T
A
A
Y i
rY4
Y
i
S
W
S
W
i i
W W
4�
9
U V
S
9
9 V
c°
O
m�
M
rc
rc
a rc
F
U
! >
gCC
94n
V
o
Vi
C
m m
�F Vi
m
r Y
ip Y�pM
PUm
wiYY �K�1
mw
i9 Yr m
sm
0. .0
w Tu
uu4�u�v
M imom u
�I L;
p
A
a
C S
Y
S
C Q
i i
p
A q
V S9
V Y
q
ai �i
H
V r4
ry n
Y
F
I
C'
m
MYQj
VOLL
n.i .n Nm nn
U M
'
�•
i4s.]_d
.� nnre�nnr— nn rry o
- _
_
• .- V N C
%
.Yy
yy
4� •%V •S��'Uae
n nn nn .-I .lo 0
'
V1
dF
1
L
6idi •U V• Yeo
i1Ui '�
01 0
w w nn o
�O
LiNV 7w ItiOAV: y
s
H
iYYV.'.faY
.. .. .. .. .. ..ne e
niYON�V�
• ! F�Bugn
F
F
F
�
U �
'a
.9:
pS11
'
u
Br
a�u
. t m
q5
% c:
a
ee
r1 .Y .-I
VAN
Y�U>.!� !C�•iOHuo
-ono
Vn�0
i YO
��
i.Ci
G" b�Sin LFiV
q
i
EMr
N
�: E
Eno
i0
naNG
Yi
Y id o
ito
4-
'nL.
�
01VF6•ZNYiO.
wr{901+ia�U>�uN
.i
U'-
uiL rC�Y- rat•
n
.U! . IYMU. ttVi�UeMM
CN�
'J 'J
06 Y ggag �dep�r FY"OR .Y•0
iu
"s
•'rur:
°i
.>Z.�g8a
'
C'
'
s
H
F
F
F
�
pS11
pF
q5
G
iy yre
Y
d zr
Y
rq
�
.i
"s
r[
n'yyYiM
'
U� qip00
.
G
b
ry
H
V
R;
ua
Yzu
a
a
a
o
n
m
e
k
e
s
u
M
un
F
I
I
I
I
11
I
1
I
I
1]
11
m q e oo Ho
iq imUO o0� o; o; K on
Y :C i0>O O o0 O oo mo
pii H;oCe 0 0o S o.r o
A
o c o0 00 .Risen
—
Mw •m�gCS�U Oo 0O C; C; Boon
rm U U♦ O.] nq0 0 0o r
rF u�VY �m0 Mti_ o eo kyr
iU yXV 4uui ;yy: VF�OCn o 0o a0on o
rM L��?i 'aimr�?n O 00 r U
d i v01>w ! A� a O 00 O o0 joOn C
0 00 U
M =@Y Y mi No d
yy pAp QUO• ♦m iW O 00 io 4
�KOY�VYi iLF�POrCn O ee i en o
YVi y O
ry Swn O ibF o0 0001 1� X
m: ma 9a C; 1; aeon g
n Ni»ppli Oi iCmCCVo o Oo OOi Oo Hd'oon iF
_il r w�{ OPi )i Gi r N?e a oa IOQ
q�.a d aF ji i�LF�6Crv� �90o rF.loon O iq
YU � ON Y i O . V i SI Or uI r6Hp o i�e O a0o Fo i0
q. ieim a - a Oe ,a Ye Coo a on iu
�Y•O� _ iYR-m .. .. O70r HrT>U d\r O AV w0
e YY�Y. qui O � >ruu)�+✓1u U rONr'1 C PO UU♦
I N�OY�YV >G4 p OY OTYggVgAA♦
u �IYi �� y 4>Unrn Orew ✓O �r Mqp V U00♦ -
N. M.M CSU YEYM 'Jqq Y✓nr V rY)rY YMMgMMM.V
•V!d>�C Ci O VCCgC� rdWY> r>ACm �
-1 O>AAX46d•SSVOr 0a 00 S LLLL 6.0
r r 4wrca�u�.��>mu..�ddsd�b�idruA6m>�Srv83smmmwri4ls
m- — —
m6� � �yqo n nn nn nnn O
0 N
y F YUO
Wi �i YZr��n n o
n 14 1— o
d N X
i„ Vi 4i i%> iSq Eu0 n nn nn nn0 0
�F Y�pNp �� �ALVY m :tl
�Y n�60i .O—U• FruFo
o
i0 t;o :01.: W Y
Si n nn nn nnn O
�VyUq�VA� iU4�i iy ]O n nn nn nne O
i60MiVIi .. mNiynO
N YIDD L CYC n0'
yUiVpV4�XV� V i>O��Wn e„oe n a
gipVarOV. �. w4Sai nn o
pi r G. C• e n — — n nn nn n —
;i0 Yitl�: H• iSYriY�O n nn nn nn0 u
9iry O r] ^sin LHiYCO9 9 0.
i;�obmipnpJp a.i
i. q. 'On n iq nfls �a0
Yi iS. ZiiX ia00000iVM•
q� ji iei �- ai _ n nn nn Onnn To
p ym .VTiw — —Vrvyyr ry n ry n— n-3^
W� U�~•mu6 �i 2�V�- Y iS-RmOi��.. ..�>>_-OiwYU Ri>. .. �♦
O Fggqg•YApVp �OmO-rY>L� X g91 M �AAY- Aa
ry IV.I�YMUrYL Vi�YU YY0YM4>CC44n:f�\>Y.... .
.Y• .X4 rCmCC� gOwYRdggSWC.,Y Co."—
p� .Vmd rO.INAiOAXC COFSYYU iAAq OM•
d'S$. 4�rumaa�>mPn.inA"..>dnmmn�mimm4ria�cl>u.
•9a a9 99 00 O O O0 00 KOow
3 O N
m MO O Oo a0
2� F'OC~ 0 00 0 00 j o.r O
' — u•3a_= _ o 0o e — oc- me — oo aoo..
_ _
a 9 O o0 Fo
' F Y WY' i0 u' M;O o e 0O o0 0,4 O
Y O pi(�
V andgg
o L�mB: 'aim c� a oe u:
_ 2 H>• Ai O Oo
;wwn AYi iV• — O o0 0 o Oo 00 o.X Mi
iVVY��Ni 'di a� FO d�
pm~ m
~ CrUO• m �N> O 00
YOM �V L.
it dC O oa ,F.IOOn o V
e,y O�
_ — ee — n Fo m mm a on .
rnil Y YY T, EE a oo O0Ow O
0 n a0
o
O ; 90 �H.t Oi
mi •O. VVI Or O i�00 O •M.
Y _•Sa;
oo 00 Ue : o .EtOOn i6i
o_ _.. a _- o Oe__
VV Si06-d�N-Yi d>YNU >.
V 88 ppm- $$O H� >A Yi (YOO-aYOOpQQ V♦
�VioiLY�- �Sn4 -�J>O� yy�T UdV� L S VVO.iLc'
O •U. YM UCS - O 9 >�AA'Ji.Y Y\�ON., C Op VV. OY
n ♦V•T♦A� �Om �m>L�i10 �tiw UYUY� °TVOCUNYY•
V.X C MG pYU Y 00!
.U. M. MV�YLY��mfYM Oqq YY if'rVY��YTY YMMNMMM V^
•Y. V. d>�CmC� C YddOC� ,6WCY> >ACN> Y d6.
■ w' P.:.>e:$s°��s3�>°mb�o°aaza.�bbd; uUUo°i$>>°��'n �s$�w��ii: z°:
Oo 00
n
iSYmErMFO
o0 00%;
Oli
%%%;•yy••
iq
Y� U!
VOF
nn
E
Y ��
V
M 0
M : oU
G4mYE
I �Cr°CE
00 00
X
n;O
C�a Amar
u�DY°i
C
r0 Or
!{��X
CU
;W
m'
'�'
a�
t m
n nn
om4j {ai
M
;»CniYMi
Y°;>Yi
a;
n
•Eo �4
M
d
m P
M nn
OP
'
0O 00
ia�V!Ci
i�r'OCN
Ei 4n
P4lO
'
X°YIOM�VO
YY Ui 7i
M%i M%MMi
%IFXl
b �buw�o
0000000 �p5
Y: rc:
ir4y
O, C C ) iL1 X m
d OX i'>i GE,
m iCeP4rE1NM%'m4iU
yyy IISyIYY{{${ yy I��(
n
pYp
M�
�i Ni Vi M��Y
OrC-in
Vm
i$yy
XX
•Y
'Y°ri
'Fl di mi y°.
rm
a;
oOorOr 0000 rOrinNi .mieUe�VYXEn�r4
O. Ornr� om , Vff��
amOm
�O
•6
M1r
OO�a.
>
-V
n
VX •GYM-
iS.+�
-VGti�SOd•'d;m-Y>°
OT -�>O iu !S d`�
d�YmYN'�
L S V CSLLi�
°
n
:m:m
� Y• a l O
,om..
ySY M Y Y r
>L� Ya�oau uu uubY�
yJ V Y +X 4> V ,q1 H �1 �� U +X 55
oi�Yo�uvAA.
M p ° Y pp
Y 0 0 X -
'
O
'.c.:R:a4$�u°aaA�>>°m"b°.�a°r°.>°aos°ibild°;usd°z>°;rinusimm�iwi4�:
n°O;
z°
1
oe 00
Yqa
�
X�
N?$%?$♦��y�%•
xa
pI
%
q o
C_
w
SF
i
%KpKp
YI
Y
n�
w�
d
o
O L
:s.
........... mm ee a%N%xai'
�pxp{%�pxp{ggN%{
W Y
y
q4_ RNkk�
k•aR��♦
V�Y�•YR ]r
qa
mn NPPo
O�OUn'Yr
8O� y
cm �
� F
y
Oi
oc �jP
��
% yy aa''
��♦Fn
ry
is �F pCrY
%���
M
C
y
O
�
Ziu>J•
P
�X"''�♦
Y N
ry
'.
_'a
C y
.♦ nn n o—
M
M
S
Y
—
22Q{�
1
oe 00
Yqa
�
X�
N?$%?$♦��y�%•
•
w
Ye.
i
%KpKp
%•.]XfKpKf %%♦
1.1O0
A
:s.
........... mm ee a%N%xai'
�pxp{%�pxp{ggN%{
ppN%%
q4_ RNkk�
k•aR��♦
:m♦$a
mn NPPo
F:
• : O: B� O
cm �
� F
y
N o
u yV
M4: m NN -
i
M � 6V: Y
oc �jP
��
% yy aa''
��♦Fn
is �F pCrY
%���
wl 'l l•ipp♦
a�—w
Ziu>J•
P
�X"''�♦
:N
'.
_'a
:rV]: =
.♦ nn n o—
M
M
S
y y
—
22Q{�
~ ry
O
:2:0' nV0
.Y ww
i9Fu�0�:
p pp
pp
:cF�ee�
u'"
�OVE�Nq:
z: :�a�°
O
ii R•�y•
R-RiiR�
_
O O ...... O
�
��
ri ri ..
li
X"� X♦
Mie
R i']
OiaC: T:Y:� M.]i�
Wi
N: Vi:FFrO°�
-It%rK�%%♦,M•":q
pPp:
n ry .y nV
♦pU
Y'
x•a♦m'Z
m„e_~~_ nynn _„�
.Ye N ne n°
n
�¢y{
M%M%
:p
-�~
Pry Vo o'urvtimF�%•_
o .]
'
4
-
♦V� q
: Y♦O - �O-B
••O _ V U'n �£Op^pew
m.♦>� �OH F� >q
r
V> p]YNdo
CI00gV�Op.i:V
]
o
♦ V• ♦ � u� .. � E.y
C� -
4 O T > O nA q � T U p U
O >m.1q > �' A�iON.4
C £ Y U]
G p0
r] L u
V :�
Y
Ya♦d♦
q: gUiMb-�V>CA
MgROOY VY)�H� VUi
OY�VggVgqA•
♦U♦M♦MY�YL �]VV
YYmYM ]q 'gtiYV��YTY
"eY> >
VXMgMMMYy
C
'
O�O�OACOO
w .'CS VwMyO� C000
a' ppmmpUUV.�UUa£>�SnUs24wmmw44♦2
g
20 LLGLp6♦O
a
♦ 4♦4E�Um��>m0'+4
I
f
(
§
§
)(
��
�/
)�
:
1 0
f
(
§
§
Appendix C
Intersection Level of Service Concepts
Katz, Okitsu & Associates City of Tustin
Trak Eagman and Transp mam Manners
Red Hil1/Walnut Residential Project Trak Study
E
I
1
1
THRESHOLDS OF SIGNIFICANCE
A project will normally have a significant adverse impact on traffic and circulation if it results in any of
the following conditions:
• An increase in traffic that is substantial in relation to the existing traffic load and capacity of the
street system (i.e., results in a substantial increase in either the number of the vehicle trips, the
volume to capacity ratio on roads, or congestion at intersections); or,
• An increase in the level of service standard established by the Orange County Transportation
Authority for designated roads or highways.
An increase in the number of the peak hour trips over and above a residential project in
conformance with the General Plan land use designation.
To understand how well a roadway or intersection is handling traffic, several concepts have been devised.
The fust is a qualitative measure, referred to as Level of Service, which evaluates a roadway's operation
based on observations. A LOS "A" is an optimal traffic condition, while a LOS "F" represents service
congestion. A second, more quantitative measure, referred to as Volume to Capacity Ratio (V/C), is the
ratio of an intersection's or roadway's traffic volumes to its design capacity. The relationship between the
LOS and V/C Ratio are summarized below in Table C-1.
TABLE C-1
DEFINITIONS OF LEVEL OF SERVICE
Level ofservice Definitions
LOS
ICU Range (V/C
Ratio)
Description
A
Less than 0.60
Free flowing traffic conditions, no congestion.
B
0.60 to less than 0.70
Generally free from congestion. All vehicles may clear signal
in a single cycle.
C
0.70 to less than 0.80
Dght congestion with occasional back-ups at critical
approaches.
D
0.80 to less than 0.90
Congestion at critical approaches.
E
0.90 to less than 1.0
Moderate to severe congestion during peak period.
F
1.00 or greater
Severe congestion.
Source: Blodgett/Baylosis Associates, 2000
Okitsu & Associates
;imam and Transponasas P/annus
City of Tustin
Red Hil1/Walnut Residential Project Trak Study
DEFINITIONS OF LEVEL OF SERVICE
FOR SIGNALIZED INTERSECTIONS
LEVEL OF SERVICE DEFINITIONS FOR SIGNALIZED INTERSECTIONS
(Source: City of Los Angeles Trac Studies Policies and Procedures, November 4993)
Level of Volume/Capacity
Service Ratio
Definition
A 0.000 - 0.600
EXCELLENT. No vehicle waits longer than one
Red light and no approach phase is fully used.
B 0.601- 0.700
VERY GOOD. An occasional approach phase is
fully utilized; many drivers begin to feel somewhat
restricted within groups of vehicles.
C 0.701— 0.800
GOOD. Occasionally, drivers may have to wait
through more than one red light; backups may
develop behind turning vehicles.
D 0.801— 0.900
FAIR. Delays may be substantial during portions
of the rush hours, but enough lower volume periods
occur to permit clearing of developing lines,
preventing excessive backups.
E 0.901-1.00
POOR. Represents the most vehicles that
intersection approaches can accommodate; may be
long lines of waiting vehicles through several
signal cycles.
F Greater than 1.000
FAILURE. Backups from nearby intersections
or on cross streets may restrict or prevent
movement of vehicles out of the intersection
approaches. Tremendous delays with continuously
increasing queue lengths.
or
Katz, Okitsu & Associates
City of Tustin
TrafcEnginanand Transportation Planners
Red Hill/Walnut Residential Project Trak Study
1 Appendix D
Project Site Plan
Okitsu & Associates City of Tustin
gineen and Transp+aadoa Plannen
Red Hill/Walnut Residential Project Trak Study
L
0
Ti
1
A
3nN3NV inNIVM \
_ I dP+•'WV P{G609WUSIRI'OM(1'I
0
h
l
O
�V
U
c
H
4�
�
s
E
-
�x
�P�-4
U
Exhibit 3
Shade and Shadow Study
Es
L
d
h
y
Q
+
O
ANIL
L
d
h
y
Q
+
O
�
v
� H
t
x
N_xx
,O
W
�✓N
W
11
0
A
I
Y:
O
1)
C
E