HomeMy WebLinkAboutCC RES 07-31RESOLUTION NO. 07-31 A RESOLUTION OF THE CITY COUNCIL ADOPTING THE FINAL MITIGATED NEGATIVE DECLARATION FOR TEN- TATIVE TRACT MAP 17080 AND DESIGN REVIEW 06- 011, A PROPOSAL TO MERGE TWO PARCELS DEVEL- OPED WITH 57 APARTMENT UNITS INTO ONE 4 -ACRE SITE FOR DEVELOPMENT OF A NEW 75 -UNIT CONDO- MINIUM PROJECT LOCATED AT 14421 "TO 14471 RED HILL AVENUE The City Council of the City of Tustin does hereby resolve as follows: I. The City Council finds and determines as follows: A. The applicant (Sun -Cal Red Hill LLC) has requested to merge two proper- ties currently developed with 57 apartment units into one 4 -acre site for development of a new 75 -unit condominium project. The properties are located at 14421 to 14471 Red Hill Avenue; B. That the requested tentative tract map and design review are considered a "project" subject to the terms of the California Environmental Quality Act ("CEQA") (Pub. Resources Code 921000 et. seq.); C. That City staff prepared an Initial Study to evaluate the potential environ- mental impacts associated with Tentative Tract Map 17080 and Design Review 06-011 that concluded that with mitigation measures potential sig- nificant impacts can be reduced to a level of insignificance and a draft Mitigated Negative Declaration (MND) was prepared; D. That a Notice of Intent to Adopt a Mitigated Negative Declaration was published and the Negative Declaration and Initial Study were made available for a 20 -day public review and comment period from February 16, 2007, to March 7, 2007, in compliance with Sections 15072 and 15105 of the State CEQA Guidelines; E. A comment letter was received from Orange County Transit Authority (OCTA). At this time, no public roadway construction would be required due to the scope of the project and the recommended bus turnout was noted for future road widening project for which additional environmental documents would be prepared; F. That the City Council is the final authority for the project and will consider the MND prior to action on Tentative Tract Map 17080; and, Resolution No. 07-31 Page 1 of 163 G. The Planning Commission considered the Initial Study and the Mitigated Negative Declaration (MND) on March 13, 2007, and adopted the MND with Resolution No. 4053. II. The City Council hereby adopts Final Mitigated Negative Declaration for Tentative Tract Map 17080 and Design Review 06-011, attached hereto as Exhibit A, and adopts a Mitigation Monitoring and Reporting Program, attached hereto as Exhibit B. PASSED AND ADOPTED at a regular meeting of the Tustin City Council held on the 20th day of March, 2007. LOU BONPV Mayor ATTEST: Ted PAMELA STOKER, City Clerk STATE OF CALIFORNIA ) COUNTY OF ORANGE ) SS CITY OF TUSTIN ) I, Pamela Stoker, City Clerk and ex -officio Clerk of the City Council of the City of Tustin, California, do hereby certify that the whole number of the members of the City Council of the City of Tustin is five; that the above and foregoing Resolution No. 07-31 was duly passed and adopted at a regular meeting of the Tustin City Council, held on the 20th day of March, 2007, by the following vote: COUNCILMEMBER AYES: COUNCILMEMBER NOES: None (0) COUNCILMEMBER ABSTAINED: None (0) C NCILMEMBER ABSENT: None (0) .,. . N PAMELA STOKER, City Clerk Resolution No. 07-31 Page 2 of 163 INITIAL STUDY A. BACKGROUND Project Title: Lead Agency: Lead Agency Contact Person: Project Location: Project Sponsor's Name and Address: General Plan Designation: Zoning Designation: Project Description: COMMUNITY DEVELOPMENT DEPARTMENT 300 Centennial Way, Tustin, CA 91780 (714) 573-3100 Red Hill Town Homes City of Tustin 300 Centennial Way Tustin, California 92780 Minoo Ashabi Phone: (714) 573-3126 14421-14471 Red Hill Avenue SunCal- Red Hill LLC c/o Southwind Realty Group 18301 Von Karman, Suite 710 Irvine, CA 92612 High Density Residential Multiple Family Residential (R-3) A request to demolish two existing apartment complexes containing 57 units on a 4 -acre site and redeveloping the site with 75 three story condominium units Surrounding Uses: North: residential and office use East: commercial South: commercial West: residential Other public agencies whose approval is required: ® Orange County Fire Authority ❑ City of Irvine ❑ Orange County Health Care Agency ❑ City of Santa Ana ❑ South Coast Air Quality Management ❑ Orange County District EMA ❑ Other Resolution No. 07-31 Page 3 of 163 B. ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED The environmental factors checked below would be potentially affected b this project, involving Y p ro' > gat least one impact that is a "Potentially Significant Impact" as indicated by the checklist in Section D below. ElLand Use and Planning [:]Population and Housing RGeological Problems RWater DAir Quality ElTransportation &Circulation [:]Biological Resources ❑Energy and Mineral Resources C. DETERMINATION: On the basis of this initial evaluation: ❑Hazards F�Noise OPublic Services FlUtilities and Service Systems E]Aesthetics E]Cultural Resources FIRecreation E]Mandatory Findings of Significance El I find that the proposed project COULD NOT have a significant ' gn effect on the environment, and a NEGATIVE DECLARATION will be prepared. ® I find that although the proposed project could have a significant effect ' J g on the environment, there will not be a significant effect in this case because the mitigation measures described on an attached sheet have been added to the project. A NEGATIVE DECLARATION will bere ared. p p ❑ I find that the proposed project MAY havea significant effect ect on the environment, and an ENVIRONMENTAL IMPACT REPORT is required. ❑ I find that the proposed project MAY have a significant effect(s) g on the environment, but at least one i effect 1) has been adequately analyzed n an earlier document pursuant to applicable legal standards an pp g d 2) has been addressed by mitigation measures based on the earlier analysis as described on attached sheets, if the effect is a "Potentially Significant Impact" or "Potentially Significant Unless Mitigated." � g An ENVIRONMENTAL IMPACT REPORT is required, but it must y analyze only the effects that remain to be addressed. y ❑ I find that although the proposed project could have a significant effect on the environment, there WILL NOT be a significant effect in this case because all potentially significant effects 1) have been analyzed adequately in an earlier EIR pursuant to applicable standards, and 2) have been avoided or mitigated pursuant to that earlier EIR, including revisions or mitigation measures that are imposed upon the proposed project. ❑ I find that although the proposed project could have a significant . p, .p J g t effect on the environment, there WILL NOT be a significant effect in this case because all potentially significant effects 1 have been an . g ) analyzed adequately in an earlier NEGATIVE DECLARATION pursuant to applicable standards and Pp 2) have been avoided or mitigated pursuant to that earlier NEGATIVE DECLARATION includingv'0 revisions or mitigation measures that are imposed upon the proposed project. Preparers Minoo Ashabi Title Associate Planner l�2�(' Date .7••S -=dam R�AMl�tli`�A.�[t�ack, Community Development Director Page 4 of 163 I. AESTHETICS — Would the project: a) Have a substantial adverse effect on a scenic vista? b) Substantially damage scenic resources, including, but not limited to, trees, rock outcroppings, and historic buildings within a state scenic highway? c) Substantially degrade the existing visual character or quality of the site and its surroundings? d) Create a new source of substantial light or glare, which would adversely affect day or nighttime views in the area? II. AGRICULTURE RESOURCES: In determining whether impacts to agricultural resources are significant environmental effects, lead agencies may refer to the California Agricultural Land Evaluation and Site Assessment Model (1997) prepared by the California Dept. of Conservation as an optional model to use in assessing impacts on agriculture and farmland. Would the project: a) Convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmland), as shown on the maps prepared pursuant to the Farmland Mapping and Monitoring Program of the California Resources Agency, to non- agricultural use? b) Conflict with existing zoning for agricultural use, or a Williamson Act contract? c) Involve other changes in the existing environment, which, due to their location or nature, could result in conversion of Farmland, to non-agricultural use? III. AIR OUALITY: Where available, the significance criteria established by the applicable air quality management or air pollution control district may be relied upon to make the following determinations. Would the project: a) Conflict with or obstruct implementation of the applicable air quality plan? b) Violate any air quality standard or contribute substantially to an existing or projected air quality violation? c) Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non - attainment under an applicable federal or state ambient air quality standard (including releasing emissions, which exceed quantitative thresholds for ozone precursors)? d) Expose sensitive receptors to substantial pollutant concentrations? e) Create objectionable odors affecting a substantial number of people? 0 Less Than 0 0 0 Significant El Z Potentially With Less Than � Significant Mitigation Significant Impact Incorporation Impact No Impact ❑ ❑ ❑ El El ® ❑ 0 0 0 0 0 0 El Z El a ❑ � El El 0 11 0 0 Z 0 0 0 0 a El El 0 El O O Z ❑ Resolution No. 07-31 Page 5 of 163 IV. BIOLOGICAL RESOURCES: - Would the project: a) Have a substantial adverse effect, either directly or through habitat modifications, on any species identified as a candidate, sensitive, or special status species in local or regional plans, policies, or regulations, or by the California Department of Fish and Game or U.S. Fish and Wildlife Service? b) Have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional plans, policies, regulations or by the California Department of Fish and Game or U.S. Fish and Wildlife Service? c) Have a substantial adverse effect on federally protected wetlands as defined by Section 404 of the Clean Water Act (including, but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological interruption, or other means? d) Interfere substantially with the movement of any native resident or migratory fish or wildlife species or with established native resident or migratory wildlife corridors, or impede the use of native wildlife nursery sites? e) Conflict with any local policies or ordinances protecting biological resources, such as a tree preservation policy or ordinance? fl Conflict with the provisions of an adopted Habitat Conservation Plan, Natural Community Conservation Plan, or other approved local, regional, or state habitat conservation plan? V. CULTURAL RESOURCES: - Would the project: a) Cause a substantial adverse change in the significance of a historical resource as defined in § 15064.5? b) Cause a substantial adverse change in the significance of an archaeological resource pursuant to § 15064.5? c) Directly or indirectly destroy a unique paleontological resource or site or unique geologic feature? d) Disturb any human remains, including those interred outside of formal cemeteries? VI. GEOLOGY AND SOILS: - Would the project: a) Expose people or structures to potential substantial adverse effects, including the risk of loss, injury, or death involving: Resolution No. 07-31 Page 6 of 163 Less Than Significant _ Potentially With Less Than Significant Mitigation Significant Impact Incorporation Impact No Impact El 1:1 1:1 0 El ED 11 i) Rupture of a known earthquake fault, as delineated on the most recent Alquist-Priolo Earthquake Fault Zoning Map issued by the State Geologist for the area or based on other substantial evidence of a known fault? Refer to Division of Mines and Geology Special Publication 42. ii) Strong seismic ground shaking? iii) Seismic -related ground failure, including liquefaction? iv) Landslides? b) Result in substantial soil erosion or the loss of topsoil? c) Be located on a geologic unit or soil that is unstable, or that would become unstable as a result of the project, and potentially result in on- or off-site landslide, lateral spreading, subsidence, liquefaction or collapse? d) Be located on expansive soil, as defined in Table 18-1-B of the Uniform Building Code (2001), creating substantial risks to life or property? e) Have soils incapable of adequately supporting the use of septic tanks or alternative waste water disposal systems where sewers are not available for the disposal of waste water? VII. HAZARDS AND HAZARDOUS MATERIALS: Would the project: a) Create a significant hazard to the public or the environment through the routine transport, use, or disposal of hazardous materials? b) Create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the release of hazardous materials into the environment? c) Emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste within one-quarter mile of an existing or proposed school? d) Be located on a site which is included on a list of hazardous materials sites compiled pursuant to Government Code Section 65962.5 and, as a result, would it create a significant hazard to the public or the environment? e) For a project located within an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project result in a safety hazard for people residing or working in the project area? f) For a project within the vicinity of a private airstrip, would the project result in a safety hazard for people residing or working in the project area? Less Than Significant Potentially With Less Than Significant Mitigation Significant Impact Incorporation Impact No Impact O O O � ❑ ❑ Resol ter' n No. 07-31Z_ age 7"Of 163 El El El Z El El El 0 O O O � ❑ ❑ Resol ter' n No. 07-31Z_ age 7"Of 163 g) Impair implementation of or physically interfere with an adopted emergency response plan or emergency evacuation plan? h) Expose people or structures to a significant risk of loss, injury or death involving wildland fires, including where wildlands are adjacent to urbanized areas or where residences are intermixed with wildlands? VIII. HYDROLOGY AND WATER OUALITY: — Would the project: a) Violate any water quality standards or waste discharge requirements? b) Substantially deplete groundwater supplies or interfere substantially with groundwater recharge such that there would be a net deficit in aquifer volume or a lowering of the local groundwater table level (e.g., the production rate of pre- existing nearby wells would drop to a level which would not support existing land uses or planned uses for which permits have been granted)? c) Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river, in a manner which would result in substantial erosion or siltation on- or off-site? d) Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river, or substantially increase the rate or amount of surface runoff in a manner, which would result in flooding on - or off-site? e) Create or contribute runoff water which would exceed the capacity of existing or planned stormwater drainage systems or provide substantial additional sources of polluted runoff? f) Otherwise substantially degrade water quality? g) Place housing within a 100 -year flood hazard area as mapped on a federal Flood Hazard Boundary or Flood Insurance Rate Map or other flood hazard delineation map? h) Place within a 100 -year flood hazard area structures which would impede or redirect flood flows? i) Expose people or structures to a significant risk of loss, injury or death involving flooding as a result of the failure of a levee or dam? j) Inundation by seiche, tsunami, or mudflow? k) Potentially impact stormwater runoff from construction activities? Resolution No. 07-31 Page 8 of 163 El 1:1 1:1 0 1:1 11 E] 0 1:1 11 11 0 Less Than O � Significant El Potentially With Less Than Significant Mitigation Significant Impact Incorporation Impact No Impact ❑ 1:1 1:1 0 El 1:1 1:1 0 1:1 11 E] 0 1:1 11 11 0 4 ❑ O � El 0 0 0 0 El 13 El 0 D 0 0 0 4 ❑ O � El 0 0 0 0 1) Potentially impact stormwater runoff from post - construction activities? m) Result in a potential for discharge of stormwater pollutants from areas of material storage, vehicle or equipment fueling, vehicle or equipment maintenance (including washing), waste handling, hazardous materials handling or storage, delivery areas, loading docks or other outdoor work areas? n) Result in a potential for discharge of stormwater to affect the beneficial uses of the receiving waters? o) Create the potential for significant changes in the flow velocity or volume of stormwater runoff to cause environmental harm? p) Create significant increases in erosion of the project site or surrounding areas? IX. LAND USE AND PLANNING — Would the project: a) Physically divide an established community? b) Conflict with any applicable land use plan, policy, or regulation of an agency with jurisdiction over the project (including, but not limited to the general plan, specific plan, local coastal program, or zoning ordinance) adopted for the purpose of avoiding or mitigating an environmental effect? c) Conflict with any applicable habitat conservation plan or natural community conservation plan? X. MINERAL RESOURCES — Would the project: a) Result in the loss of availability of a known mineral resource that would be of value to the region and the residents of the state? b) Result in the loss of availability of a locally important mineral resource recovery site delineated on a local general plan, specific plan or other land use plan? XI. NOISE — Would the project result in: a) Exposure of persons to or generation of noise levels in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies? b) Exposure of persons to or generation of excessive groundborne vibration or groundborne noise levels? 1:1 El E] Z Resolution No. 07-31 Page 9 of 163 Less Than Significant Potentially With Less Than Significant Mitigation Significant Impact Incorporation Impact No Impact ❑ ❑ ® ❑ 1:1 El E] Z Resolution No. 07-31 Page 9 of 163 ❑ o � o El El 1:1 El E] Z Resolution No. 07-31 Page 9 of 163 c) A substantial permanent increase in ambient noise levels in the project vicinity above levels existing without the project? d) A substantial temporary or periodic increase in ambient noise levels in the project vicinity above levels existing without the project? e) For a project located within an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project expose people residing or working in the project area to excessive noise levels? f) For a project within the vicinity of a private airstrip, would the project expose people residing or working in the project area to excess noise levels? XII.POPULATION AND HOUSING — Would the project: a) Induce substantial population growth in an area, either directly (for example, by proposing new homes. and businesses) or indirectly (for example, through extension of roads or other infrastructure)? b) Displace substantial numbers of existing housing, necessitating the construction of replacement housing elsewhere? c) Displace substantial numbers of people, necessitating the construction of replacement housing elsewhere? XIII. PUBLIC SERVICES a) Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives for any of the public services: Fire protection? Police protection? Schools? Parks? Other public facilities? Resolution No. 07-31 Page 10 of 163 Less Than Significant Potentially With Less Than Significant Mitigation Significant Impact Incorporation Impact No Impact a a ® a a a ® a El XIV. RECREATION — a) Would the project increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facility would occur or be accelerated? b) Does the project include recreational facilities or require the construction or expansion of recreational facilities which might have an adverse physical effect on the environment? XV. TRANSPORTATION/TRAFFIC — Would the project: a) Cause an increase in traffic which is substantial in relation to the existing traffic load and capacity of the street system (i.e. result in a substantial increase in either the number of vehicle trips, the volume to capacity ratio on roads, or congestion at intersections)? b) Exceed, either individually or cumulatively, a level of service standard established by the county congestion management agency for designated roads or highways? c) Result in a change in air traffic patterns, including either an increase in traffic levels or a change in location that results in substantial safety risks? d) Substantially increase hazards due to a design feature (e.g. sharp curves or dangerous intersections) or incompatible uses (e.g., farm equipment)? e) Result in inadequate emergency access? f) Result in inadequate parking capacity? g) Conflict with adopted policies, plans, or programs supporting alternative transportation (e.g., bus turnouts, bicycle racks)? XVI. UTILITIES AND SERVICE SYSTEMS — 1:1 1:1 0 E-] Less Than Significant 0 Potentially With Less Than Significant Mitigation Significant Impact Incorporation Impact No Impact 1:1 1:1 0 E-] Would the project: a) Exceed wastewater treatment requirements of the applicable Regional Water Quality Control Board? E3 b) Require or result in the construction of new water or wastewater treatment facilities or expansion of existing facilities, the construction of which could cause significant environmental effects? E3 c) Require or result in the construction of new storm water drainage facilities or expansion of existing facilities, the construction of which could cause significant environmental effects? Resolution No. 07-31 Page 11 of 163 0 F-1 ri 11 Would the project: a) Exceed wastewater treatment requirements of the applicable Regional Water Quality Control Board? E3 b) Require or result in the construction of new water or wastewater treatment facilities or expansion of existing facilities, the construction of which could cause significant environmental effects? E3 c) Require or result in the construction of new storm water drainage facilities or expansion of existing facilities, the construction of which could cause significant environmental effects? Resolution No. 07-31 Page 11 of 163 d) Have sufficient water supplies available to serve the project from existing entitlements and resources, or are new or expanded entitlements needed? e) Result in a determination by the wastewater treatment provider which serves or may serve the project that it has adequate capacity to serve the project's projected demand in addition to the provider's existing commitments? 0 Be served by a landfill with sufficient permitted capacity to accommodate the project's solid waste disposal needs? g) Comply with federal, state, and local statutes and regulations related to solid waste? XVII. MANDATORY FINDINGS OF SIGNIFICANCE a) Does the project have the potential to degrade the quality of the environment, substantially reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self-sustaining levels, threaten to eliminate a plant or animal community, reduce the number or restrict the range of a rare or endangered plant or animal or eliminate important examples of the major periods of California history or prehistory? b) Does the project have impacts that are individually limited, but cumulatively considerable? ("Cumulatively considerable" means that the incremental effects of a project are considerable when viewed in connection with the effects of past projects, the effects of other current projects, and the effects of probable future projects)? c) Does the project have environmental effects, which will cause substantial adverse effects on human beings, either directly or indirectly? S. C W MIN00'Acd Hill CondoskRal Hill Townhotncs- initial study.doc Resolution No. 07-31 Page 12 of 163 Less Than 1:1 Significant Potentially With Less Thad Signlf cant Mitigation Significant Impact Incorporation Impact No htipact 1:1 1:1 El 0 1:1 El El 0 z EVALUATION OF ENVIRONMENTAL IMPACTS TENTATIVE TRACT MAP 17080 DESIGN REVIEW 06-11 RED HILL TOWN HOMES BACKGROUND The property is located within the Multiple Family Residential (R-3) zoning district and High Density Residential land use designation. The site is surrounded by commercial uses on the south and east, an office building and residential uses on the north, and a residential neighborhood on the west. The proposed site includes two parcels that are currently developed with two apartment complexes including 57 units known as Whispering Woods and Tustin Terrace Apartments. The Whispering Woods site is 1.87 acres and contains 27 units with two story buildings, and the Tustin Terrace site is 2.14 acres and includes 30 one story apartments. All existing units at the site are proposed to be demolished. To redevelop the site with 75 condominium units, a tentative tract map and a design review application need to be approved for subdivision of the land and the site and building designs. This analysis evaluates the environmental impacts of the proposed project for 75 units in comparison with the existing 57 unit apartment complex. The site is designed to include seven 4-plex buildings, seven 5-plex buildings and two 6-plex buildings designed as town homes with garage access through alleys. One main entrance is provided to the site from Red Hill Avenue, and the buildings are proposed parallel to Walnut Avenue. A pool and recreation area are provided across from the main entry. The proposed condominiums are three stories with the exception of the units along the residential properties on the west that are designed with two stories and a loft. The units include two bedrooms and a loft or three bedrooms and range in size from 1,637 square feet to 1,997 square feet. I. AESTHETICS Items a, & b — No Impact. The subject property is not located on a scenic vista. The property is a 4 -acre parcel currently developed with two story and one story apartment buildings and is surrounded by developed parcels. Significant landscaping is provided along Red Hill Avenue and Walnut Avenue, most of which will be preserved until future road widening projects. Additional trees and landscaping would be provided with emphasis at the corner and project entry. The proposed project would not disturb any trees, rock outcroppings, or historical buildings, and the site is not located on a State scenic highway. Item c & d —Less than Significant Impact: The project would involve construction of new three story residential buildings and would change the visual character of the area. The existing apartments were developed in the 1960s and appear as dated architecture; therefore, redevelopment of the site would enhance the visual characteristics of the area with new and contemporary structures and new landscaping. Since the site is adjacent to a residential neighborhood on the west, separated with a narrow buffer, the applicant has placed the buildings ten feet from the property line which is a five foot increase from the minimum side yard setback. Although the project proposes three story structures to replace existing one story and two story Resolution No. 07-31 Page 13 of 163 Red Hill Town Homes TTM 17080 DR 06-011 Page 2 structures, the proposed buildings have been designed to be sensitive to the existing neighboring residences. Specifically, units along the residential property line have been designed at two stories with a loft that are five feet lower in height than other proposed units on the site. To provide a green screen, significant landscaping in the form of up- right trees is proposed on the west and north along the residential and commercial properties. In addition, no balconies will be located on the west and the window openings are smaller in size and carefully placed to minimize intrusion of privacy on the adjacent existing residential properties. A shade and shadow study was provided comparing shade and shadow effects on the adjacent properties with existing conditions and proposed development during December at 9:00 a.m. and 12:00 a.m. when the longest shadows are experienced (Exhibit 3). The study reflects the proposed height increase and new landscaping along the westerly property line. Since the scope of the project meets the City's multiple family zoning standards and additional measures to mitigate height and aesthetic impacts associated with the new development has been incorporated, the project is not expected to result in significant aesthetic impacts. With the proposed setback, staggered building height, and design considerations, visual and shade impacts to the adjacent properties will be reduced to a level of insignificance. The project is designed to adhere to all of the City's development standards with respect to setbacks, height, parking standards and landscaping guidelines and the City's Private Street Improvement Standards. The proposed condominium complex would generate new light sources with the installation of new exterior lighting for streets, alleys, landscape areas, patios, and parking areas. However, the new sources of light would not adversely affect day- or night-time views in the area since the number of lights would be compatible with a typical residential project and would be required to comply with the City's security code standards. In addition, all lights would be required to be arranged so that no direct rays would shine onto adjacent properties. Mitigation Measures/Monitoring Required: Compliance with existing rules and regulations is not mitigation under CEQA. Consequently, no mitigation is required. Sources: Submitted Plans Tustin City Code Section 8103(w)15' Private Street Standards Tustin Security Ordinance Submitted Plans Field Inspection II. AGRICULTURAL RESOURCES Items a, b & c — No Impact: The project site is currently improved with residential buildings and surrounded by other developed residential, commercial, and office buildings. The proposed project will have no impacts on any farmland, nor will it conflict with existing zoning for agricultural use, or Resolution No. 07-31 Page 14 of 163 Red Hill Town Homes TTM 17080 DR 06-011 Page 3 a Williamson Act contract. The proposed project will not result in the conversion of farmland to a non-agricultural use. Mitigation Measures/Monitoring Required: None Required Sources: Tustin General Plan Field Inspection Submitted Plans 111. AIR QUALITY Items a, b, c, d & e — Less Than Significant Impact: The project will temporarily increase the amount of short-term emissions to the area due to the proposed demolition, grading, and construction activities at the property. Since the site is relatively flat, only minor grading will .be required. Redevelopment of the site would result in 18 additional residential units that is well below the thresholds of significance established by Tables 6-2 (operation thresholds) and 6-3 (construction thresholds) of the Air Quality Management District's CEQA Air Quality Handbook, which notes that construction of fewer than 297 condominium units is not considered a significant impact. In addition, cumulative construction within the area does not exceed the established thresholds. Less than significant short-term emissions associated with demolition, grading, construction, and operation of the proposed project will comply with the regulations of the South Coast Air Quality Management District and the City of Tustin Grading Manual, which include requirements for dust control. As such, the proposed project will not create a significant impact related to air quality. Mitigation Measures/Monitoring Required: Compliance with existing rules and regulations is not mitigation under CEQA. Consequently, no mitigation is required Sources: South Coast Air Quality Management District Rules & Regulations Air Quality Management District's CEQA Air Quality Handbook City of Tustin Grading Manual Project Application Field Inspection IV. BIOLOGICAL RESOURCES Items a, b, c, d, e & f -- No Impact: The project site is currently improved with residential buildings and surrounded by other developed residential, commercial, and office buildings. The site is not inhabited by any sensitive species of animals and would have no impacts on animal populations, diversity of species, or migratory patterns. No wetlands exist within the project site. No impacts to any unique, rare, or endangered species of plant or animal life identified in local or regional plans, policies, or regulations by the California Department of Fish and Game or U.S. Fish and Wildlife Service would occur as a result of this project. Resolution No. 07-31 Page 15 of 163 Red Hill Town Homes TTM 17080 DR 06-011 Page 4 Mitigation Measures/Monitoring Required: None Required Sources: Field Inspection Submitted Plans Tustin General Plan V. CULTURAL RESOURCES Items a — No Impact: The project site is currently improved with residential buildings built in the 1960s and surrounded by other developed residential, commercial, and office buildings. The property is not located in an area where any cultural or historic resources have been identified on the site. Mitigation Measures/Monitoring Required: None Items b, c & d - Less Than Significant with Mitigation Incorporation The proposed project is redevelopment of an existing residential site and not located in an area with undisturbed land. However, as a standard grading condition of approval, if buried resources are found during grading within the project area, a qualif ed archaeologist would need to assess the resource and recommend appropriate mitigation. The Native American viewpoint would be considered during this process. With the mitigation g measures listed below, potential impacts to archeological resources would be reduced to less than significant. Mitigation Measures/Monitoring Required: • If buried resources are found during grading within the project area, a qualified archaeologist would need to assess the site significance and perform the appropriate mitigation. The Native American viewpoint shall be considered during this process. This could include testing or data recovery. Native American consultation shall also be initiated during this process. Sources: Submitted Plans Tustin General Plan VI. GEOLOGY & SOILS Items a -ii, a -iii, & b — Less Than Significant Impact: The proposed buildings will be located within an area of the City that is known to contain expansive soils which may subject people or structures to strong seismic ground shaking and seismic -related ground failure including liquefaction. However, a soils report is required to be submitted prior to issuance of building permits per the 2001 California Resolution No. 07-31 Page 16 of 163 Red Hill Town Homes TTM 17080 DR 06-011 Page 5 Building Code to demonstrate compliance with Chapter 18, which requires proper excavation and fills for buildings, structures, foundations, and retaining structures, and appropriate construction techniques to ensure seismic stability in sites depending on their soils or geological concerns. No significant impact is anticipated since the project must comply with the 2001 Uniform Building Code related to Chapter 18. Mitigation Measures/Monitoring Required: Compliance with existing rules and regulations is not mitigation under CEQA. Consequently, no mitigation is required Sources: Tustin General Plan Tustin Grading Manual 2001 California Building Code Chapter 16 and 18 Project Application Field Evaluation Items a -i, a -iv, c, d, & e — No Impact: The project site is not located within an area identified as a fault zone on the Alquist- Priolo Earthquake Fault Zoning Map. However, a soils report is required to be submitted prior to issuance of building permits per the 2001 California Building Codi; to demonstrate compliance with Chapter 18, which requires proper excavation and fills for buildings, structures, foundations, and retaining structures, and appropriate construction techniques to ensure seismic stability in sites depending on their soils or geological concerns. The project will be required to be engineered to withstand unstable soils, possible landslide, lateral spreading, subsidence, or collapse as they relate to the this specific site. Since all new buildings in the City are required to operate on the existing sewer system, the use of septic tanks or alternative wastewater disposal systems will not be necessary. Mitigation Measures/Monitoring Required: Compliance with existing rules and regulations is not mitigation under CEQA. Consequently, no mitigation is required Sources: Tustin General Plan Tustin City Code 2001 California Building Code Chapter 16 and 18 California Seismic Hazard Zone Map, Tustin Quadrangle, January 17, 2001 Project Application Field Evaluation VII. HAZARDS & HAZARDOUS MATERIALS Items a, b, c, d, e, f, g, and h — No Impact: The proposed project involves construction of 75 condominium units. No storage or transport of hazardous materials are anticipated from the proposed residential development. The project would not result in exposure to hazardous substances other than the possibility of household hazardous waste which residents could properly dispose Resolution No. 07-31 Page 17 of 163 Red Hill Town Homes TTM 17080 DR 06-011 Page 6 of at approved County drop-off locations. A residential project is not anticipated to store or emit hazardous materials which could create a hazard to the adjacent properties, school, or the general public if released into the environment. The scope and location of the project has no potential to interfere with an adopted emergency response plan or emergency evacuation plan. The site is in an urbanized area and has no potential to expose people or structures to a significant risk due to wild land fires. All grading and construction is subject to compliance with all applicable Uniform Building and Fire Codes. As such, the project is not anticipated to result in any significant hazards. Mitigation Measures/Monitoring Required: None Required Sources: Submitted Plans Tustin General Plan Approved Fire Master Plan Mitigation Measures/Monitoring Required: None Required VIII. HYDROLOGY & WATER QUALITY Items a, b, f, g, h, is i, and v — No Impact: The project site is relatively flat, and the proposed project will continue to maintain a relatively flat site with improved site drainage and additional landscaping. A significant amount of stormwater received on-site will percolate into the soil where landscaping is provided and remaining stormwater will be conveyed through a fossil filter prior to entering a City stormdrain. City stromwater infrastructure is currently available to accommodate storm water from the project. The applicant must provide a drainage and hydrology report to the City and demonstrate that the private storm water drainage system will be able to handle the capacity of any storm water directed into the system. Best Management Practices are required to be implemented for construction activity to deter water from flowing off-site. Best Management Practices will also be implemented to ensure that, once the project is constructed, storm water leaving the site will be filtered prior to entering the storm drain. As such, the project will not violate any water quality standards or waste discharge requirements or degrade water quality in the area. The project by nature would not substantially deplete groundwater supplies or interfere with groundwater recharge such that there would be a net deficit in aquifer volume or a lowering of the local groundwater table level. The project is located within Zone X (areas of 0.2 percent annual chance flood), as mapped on a Flood Insurance Rate Map. Accordingly, the project will be designed and graded with an appropriate drainage system to avoid any potential flood hazards. The project site will not expose people or structures to a significant risk of loss, injury, or death as a result of the failure of a levee or dam, or by inundation by seiche, tsunami, or mudflow. Nor would the project increase significant erosion at the project site or surrounding areas. Mitigation Measures/Monitoring Required: Compliance with existing rules and regulations is not mitigation under CEQA. Consequently, no mitigation is required. Resolution No. 07-31 Page 18 of 163 Red Hill Town Homes "TTM 17080 DR 06-011 Page 7 Sources: Field Verification Submitted Plans Tustin City Code 4900 et al Federal Flood Insurance Rate Map 06059CO28 I H, February 18, 2004 Items c, d, e, k,1, m, n & o — Less Than Significant Impact: The project site is relatively flat, and the proposed project will continue to maintain a relatively flat site with improved site drainage, including drive aisles, curbs and gutters, and additional landscaping. With new construction, there is the potential to impact stormwater runoff from construction and post -construction activities with stormwater pollutants from landscaped areas and trash enclosures. There is also the potential for the discharge of stormwater that could affect the beneficial uses of the receiving waters and changes in the flow velocity or volume. of storm water runoff. However, the project is required to comply with the City's Water Quality Ordinance and most recently adopted NPDES permit (Santa Ana Regional Water Quality Control Board (RWQCB) Order R8- 2002-0010), thus reducing any potential impacts to a level of insignificance. Together, these regulations minimize water pollution by regulating point sources that discharge pollutants into local waters. As such, the project will not violate any water quality standards or waste discharge requirements or degrade water quality in the area. Mitigation Measures: Compliance with existing rules and regulations is not mitigation under CEQA. Consequently, no mitigation is required Compliance with existing rules and regulations is not mitigation under CEQA. Consequently, no mitigation is required Sources: Field Verification Submitted Plans Tustin City Code Section 4900 et al Ix. LAND USE PLANNING Items a, b & c — No Impact: The property is designated by the General Plan Land Use Map as High Density Residential and located within the Multiple Family Residential (R-3) zoning district. The proposed residential density of 19 du/acres is consistent with the applicable land use and zoning regulations. If approved, the proposed project would increase the percentage of ownership housing consistent with Goal 3 of the City's Housing Element, the project is accessible through the City's current street system, and the project could be supported with existing transportation and public facilities. The proposed project would not divide an established community since it includes construction on an existing site that is already improved with multiple -family residences. The proposed project is not located in a habitat conservation Resolution No. 07-31 Page 19 of 163 Red Hill Town Homes TTM 17080 DR 06-011 Page 8 plan or natural community conservation plan. The proposed project would not conflict with any applicable conservation plan. Mitigation Measures: None Required. Sources: Submitted Plans Tustin General Plan Tustin Zoning Code Tustin Zoning Map X. MINERAL RESOURCES Items a & b — No Impact: The proposed project is not located on a mineral resource recovery site. The construction of a condominium project on a lot which is improved with existing apartment buildings will not result in the loss of availability of a known mineral resource. Mitigation Measures/Monitoring Required: None Required Sources: Submitted Plans Tustin General Plan XI. NOISE Item a — Less Than Significant with Mitigation Incorporation The project site is located at the northwest corner of Walnut Avenue and Red Hill Avenue, and therefore is exposed to significant traffic related noise. The City's General Plan recognizes that residents adjacent to major and secondary arterials are typically exposed to a CNEL over 65 dB. Table N-2 of the Tustin Noise Element identifies potential conflicts between the land uses and the noise environment. Per Table N-2, most of the project site falls within Zone A through Zone B with the exception of units along Red Hill Avenue and Walnut Avenue which fall under Zone C. Zone A requires no mitigation measures for noise while Zone B requires minor soundproofing as needed. The City's noise ordinance requires a maximum 45 dB value for interior noise and 65 dB for exterior noise. An acoustical study was submitted by the project proponent with recommendations for exterior noise barriers for balconies along Walnut Avenue and Red Hill Avenue and upgraded windows and doors to be incorporated in the building design (Exhibit 1). The noise study indicates an existing 70.2 dB reading along the southeasterly building line and 68.7 dB along the southwesterly building line, which concludes that the buildings along Red Hill Avenue and Walnut Avenue must provide an A -weighted noise reduction value of at least 26.1 dB to achieve a maximum interior 45 dB value. Resolution No. 07-31 Page 20 of 163 Red Hill Town Homes TTM 17080 DR 06-011 Page 9 The noise reduction technique recommended by the acoustical analysis would be implemented and required as a condition of approval. With the mitigation measures listed below, potential noise impact would be reduced to less than significant. Mitigation Measures/Monitoring Required: • Roof ceiling construction shall be roofing on % inch plywood. Batt insulation shall be provided in joist spaces and the interior ceiling shall be finished with one layer of 5/8 inch gypsum board. • All exterior walls shall be 2 x 4 studs at 16 inches on center with batt insulation between studs. Exterior walls shall be plaster with 5/8 inch gypsum board on the interior. • All southeast and southwest facing windows and glass doors shall be glazed with STC 32 glazing with either V4 inch laminated glass or dual pane assembly with %i inch air space. In either case, a test report must be provided at the time of installation to ensure compliance with the minimum requirements. The report shall be prepared in an independent, accredited testing laboratory in accordance with ASTM E-90. • All entry doors shall be 1-3/4 inch solid core door with weather stripping seals on the sides and top. No glazing shall be permitted for the entry doors. • Since meeting the minimum levels of interior noise standard would require closed windows and doors, the structures shall be equipped with ventilation or an air- conditioning system to provide a habitable interior environment. • Balconies six feet in depth along Walnut Avenue and first units along Red Hill Avenue shall be designed with 42 inch high solid railings designed compatible with the proposed architecture. Sources: Submitted Plans Tustin City Code 4611 et al Tustin General Plan Acoustical Study (Exhibit 1) Items b, c & d— Less Than Significant Impact. Although the grading and construction of the site may result in typical temporary construction noise impacts, the Tustin Noise Ordinance only allows construction activities to occur during the daytime on Monday through Saturday. The proposed project will not create excessive ground vibrations, nor will it create a permanent increase in the existing ambient noise levels beyond the City's established standards. Mitigation Measures/Monitoring Required: Compliance with existing rules and regulations is not mitigation under CEQA. Consequently, no mitigation is required. Sources: Submitted Plans Tustin City Code Section 4611 et al Tustin General Plan Resolution No. 07-31 Page 21 of 163 Red Hill Town Homes TTM 17080 DR 06-011 Page 10 Item e & f — No Impact: The site is not located within an airport land use plan or within two (2) miles of a public or private airport/airstrip. The proposed project is three stories in height consistent with the City's maximum height limit and similar to other structures in the vicinity. Mitigation Measures/Monitoring Required: None Required Sources: Submitted Plans Tustin General Plan Irvine Industrial Planned Community District Regulations XII. POPULATION & HOUSING Items a, b, and c — No Impact: The project involves the proposed construction of a condominium project on a site that is currently improved with apartment complexes including 57 units known as Whispering Woods and Tustin Terrace Apartments. The proposed project would remove and replace the existing 57 units and 18 additional units (total 75 units) that would not result in significant population growth in the area. The existing apartment units are rented at market rate (not considered as affordable units) and the existing residents are on a month-to-month lease. While there will be displacement of existing residents as a result of the proposed project, the displacement would not be substantial nor necessitate the construction of replacement housing elsewhere since the impact could be absorbed by the local rental market. The project is privately financed and no public funds are involved that would trigger relocation pursuant to state law. However, the applicant has submitted a Tenant Leasing and Relocation Plan that indicates that a minimum 120 -day notice will be provided prior to vacation of the property, tenants would be on a month-to-month lease basis and the last month's rent would be waived, which should provide the tenants with adequate time and monetary incentives to relocate. Mitigation Measures/Monitoring Required: None Required Sources: Submitted Plans Tustin General Plan XIII. PUBLIC SERVICES Item a — Less Than Significant Impact: The proposed project is in an existing urbanized area where fire and police protection are currently provided. While police patrols to the area may be needed from time to time to ensure safety, no new additional police protection would. be required as a result of the proposed project. The Police Department has recommended mitigation measures to Resolution No. 07-31 Page 22 of 163 Red Hill Town Homes TTM 17080 DR 06-011 Page 11 reinforce safety and effectively patrol the area, which will be included as conditions of approval. The project would utilize existing infrastructure and is not anticipated to increase the need for new streets, public services, or infrastructure. The proposed project is located within Tustin Unified School District (TUSD). The proposed 18 additional units are not anticipated to have a significant rise in the number of students served by local schools. The TUSD will receive its statutory school impact fees per Senate Bill 50 from the residential development. As a condition of approval for the project, the developer will be required to pay applicable school fees prior to issuance of the building permit. Mitigation Measures/Monitoring Required: • The pool access gates need to be equipped with a knox box for emergency access. • Landscaping should be designed with surveillance opportunities for residents and police personnel in patrol vehicles. • Security devices such as double locking deadbolts, strike plates, with 1-1/2 inch screws and pin locks on windows and sliders shall be installed minimizing the potential for criminals to access the units. Sources: Submitted Plans Tustin City Code XIV. RECREATION Items a & b — No Impact: The project would include a private community pool recreation area to benefit the residents of the project. However, since the size of the recreation area does not comply with the minimum criteria for parkland dedication, the project would be conditioned to pay in lieu fees for parkland dedication in accordance with Section 9331 of the Tustin City Code. The developer has indicated that they will pay in lieu fees to comply with Section 9331 of the Tustin City Code. While the residents of the project may use existing City parks, the increased use of these parks would not be such that substantial deterioration of the facility would occur or be accelerated, nor does the project propose recreational facilities that would have an adverse physical effect on the environment. Mitigation Measures/Monitoring Required: • Prior to issuance of a building permit, the applicant shall pay park land in lieu fees based on Tustin City Code Section 9331.d.3 Sources: Submitted Plans Tustin City Code Resolution No. 07-31 Page 23 of 163 Red Hill Town Homes TTM 17080 DR 06-011 Page 12 XV. TRANSPORTATION/TRAFFIC Items a — Less Than Significant Impact with Mitigation Incorporation: A traffic study was submitted and reviewed by the City's Engineering Division(Exhibit 2). The study concluded that the proposed project is expected to generate approximately pP Y 718 daily trips, which in comparison with the existing development, would be an increase of 342 daily trips. This is a relatively significant increase in comparison with the previously existing land use. The more detailed (than daily trip comparisons) peak hour intersection analyses, however, for future conditions with the Project show that no significant traffic impacts would occur as a result of the Project. In addition, build -out (post -year 2020) evaluations were included in the study. For these long range projections, the intersection of Red Hill/ Walnut is shown to have over capacity operations (if the current intersectioneometr is g Y maintained), but the Proj ect does not cause any significant traffic impacts, as defined by City of Tustin policies. In addition, there are improvement projects anticipated to be implemented at this intersection, to maintain acceptable operations for long range future conditions. Access to/from the site is provided at Red Hill Avenue which will be open to both northbound and south bound traffic. The traffic analysis also considered on-site circulation and determined that the 25 foot wide access. on Red Hill Avenue is adequate to allow for one outbound• • q lane and one inbound lane. For conditions at the completion of the Project, the access is shown to maintain acceptable operations. Under the build -out (post -year 2020) scenario, the left turn egress from the Project site would result in significant Project impacts. A project condition of approval may require prohibiting this movement under "longer range" conditions, as necessary, to maintain acceptable operations at the Project driveway. Mitigation Measures/Monitoring Required: Access to and from the site to Red Hill Avenue should be available with completion of the project. The left turn egress from the project site may be prohibited in the future if determined necessary b the ' . �y y City's Traffic Engineer. Sources: Submitted Plans Tustin City Code Traffic Impact Analysis (Exhibit 2) Items b, c, d, e, f, and g — No Impact: The project will not exceed, either individually or cumulatively, a level of service standard established by the county congestion management agency for designated roads or hi g highways. The proposed project will not induce substantial population org rowth result in changes to air traffic patterns, or conflict with adopted policies, plans, orro ams p �' supporting alternative transportation such as bus turnouts or bicycle racks. TheJro'ect p Resolution No. 07-31 Page 24 of 163 Red Hill Town Homes TTM 17080 DR 06-011 Page 13 includes sufficient parking on-site to comply with current parking requirements for the proposed use. As such, no impacts to parking are anticipated. Mitigation Measures/Monitoring Required: None Required Sources: Submitted Plans Tustin City Code XVI. UTILITIES & SERVICE SYSTEMS Items a, b, c, d, e, f & g — No Impact: The proposed project will not exceed the requirements of the applicable Regional water Quality Control Board or require or result in the construction of new water or wastewater treatment facilities. The proposed project will utilize the existing sewer and storm drain systems and thus will not require construction of a new storm water drainage facility or solid waste facility. The project proponent would be required to submit a hydrology report to ensure proper grading, drainage, and connection of planned sewer systems. The project: will be served by the City's existing trash hauler contract, thus will not require a new trash hauler. Adequate water supply from existing resources will be available to serve; the proposed project. Mitigation Measures/Monitoring Required: Compliance with existing rules and regulations is not mitigation under CEQA. Consequently, no mitigation is required. Sources: Submitted Plans Tustin City Code Tustin General Plan XVII. MANDATORY FINDINGS OF SIGNIFICANCE Items a. b & c — No Impact: The site is located in the multiple family residential (R-3) zoning district and currently improved with 57 apartment units. The project includes redevelopment of the site with 75 condominium units. The proposed project design, construction, and operation will comply with applicable City codes and regulations. The project, by nature of its location and as designed, does not have the potential to: degrade the quality of the environment; reduce the habitat of fish or wildlife species; cause a fish or wildlife population to drop below self-sustaining levels; threaten to eliminate a plant or animal community; reduce the number or restrict the range of a rare or endangered plant or animal; or, eliminate important examples of the major periods of California history or prehistory. The project does not have the potential to achieve short-term environmental goals to the disadvantage of the long-term. It does not have impacts that are individually limited but cumulatively considerable or that would cause substantial adverse impacts on human beings. Resolution No. 07-31 Page 25 of 163 Red Hill Town Homes TTM 17080 DR 06-011 Page 14 Sources: Submitted Plans Tustin General Plan S:`Cdd'\MINOO`,Red Hill Condos\ND analysis-doc Resolution No. 07-31 Page 26 of 163 Exhibit 1 Acoustical Analysis Resolution No. 07-31 Page 27 of 163 Davy &Associates, Inc. Consultants in Acoustics 2627 Manhattan Beach Blvd., Suite 212 • Redondo Beach, CA 90278-1604 • Tel: 310-643-5161 • Fax: 310-643-5364 • Email:Da Assoc@aol �'3' .can ACOUSTICAL ANALYSIS Redhill Avenue & Walnut Avenue Tustin, California FOR Southwind Realty Group, LLC Irvine, California October, 2006 Resolution No. 07-31 Page 28 of 163 JN2006-44B 1.0 Introduction At the direction of Southwind Realty Group, LLC, Davy & Associates, Inc. has completed an acoustical analysis of the Redhill Avenue & Walnut Avenue project in Tustin, California. The California Administrative Code (Title 24) as enforced by the City of Tustin specifies maximum allowable interior noise levels of CNEL 45 for all habitable spaces in residential buildings where exterior noise from transportation sources exceeds CNEL 60. Section 2.0 of this report contains the results of measurements and calculations of the future exterior noise environment at the site to determine compliance with these requirements. Section 3.0 of this report contains recommendations for complying with the City of Tustin interior noise level requirements. Section 4.0 of this report contains the requirements of the State Building Code concerning ventilation. 2.0 Exterior and Future Acoustical Environment Environmental noise levels were monitored at the site in Tustin, California on April 6, 2006 between the hours of 3:00 p.m. and 5:00 p.m. The location of the site is shown in Figure 1. Noise measurements were made at the southeast and southwest building line. Noise levels at the site are dominated by traffic on Red Hill Avenue to the southeast and by traffic on Walnut Avenue to the southwest. No other significant sources of noise were noted during the site visit. Environmental noise levels were measured with a precision integrating LD 820 sound level meter that had been calibrated with a B&K 4230 Acoustical Calibrator immediately prior to use. The sound level meter measures and displays the equivalent noise level (LEQ), as well as the maximum and the minimum noise levels during the measurement period. A copy of the analysis of the acoustical data is attached to this report. Resolution No. 07-31 Page 29 of 163 Figure I. Site Location M Resolution No. 07-31 Page 30 of 163 The data thus collected were analyzed to determine the CNEL level at the measurement location. The CNEL value was determined by measuring the equivalent noise level (LEQ) directly, and then calculating the equivalent noise level for each of the other 23 hours in the day.' This CNEL approach has been utilized extensively. The accuracy of this procedure has been established with automatic 24-hour measurements at the same location. The procedure has accuracy always been within acceptable Yp Y limits. The results of the monitoring and calculations are summarized below in Table 1. Table 1 Measured Ambient Noise Levels in dB Location Peak Hour LEQ CNEL SE Building Line 69.2 dB 70.2 dB SW Building Line 67.7 68.7 Section 3501.(c) of the State Building Code states the following: Worst-case noise levels either existing or future, shall be used as the basis for determining compliance with this Section. Future noise levels shall be predicted for period of at least 10 years from the time of building permit application. CALTRANS, Division of Traffic Operations publishes an annual traffic volume book that contains previous traffic trends. The 2000 traffic volumes on the California State Highway System Book (the latest edition available) lists an average annual increase of 2.2% per year in annual traffic volumes for the years 1994 through 1999. Assuming that this annual growth of 2.2% would hold for this site, it was projected that traffic volumes would increase by a factor 1.24 by the year 2016. This traffic volume increase over the next 10 years would result in a 0.9 dB traffic noise increase. Therefore, the projected future year noise level is summarized in Table 2. Table 2 Exterior 2016 CNEL Value at the Site in dB Location CNEL SE Building Line 71.1 dB SW Building Line 69.6 See, for example, "Insulation of Buildings Against Highway Noise," Bruce Davy and Steven Skale, Federal Highway Administration FHWA-TS-77-202. 3 Resolution No. 07-31 Page 31 of 163 With an exterior noise level of CNEL 71.1, the building must provide an A -weighted noise reduction value of at least 26.1 dB to achieve an interior CNEL 45 value. Standard construction consisting of 2x4 studs with R-11 insulation, exterior stucco interior gypboard, and standard glazing provides a minimum A -weighted noise reduction of 20 dB. If all southeast and southwest facing perimeter windows and glass doors are glazed with STC 32 glazing, the noise reduction of the buildings will be a minimum of 30 dB. This means that with the use of standard construction and STC 32 glazing in all . g 9 southeast and southwest facing perimeter windows and glass doors, interior noise levels should not exceed CNEL 45. Therefore, the Building comply IY with the P California Noise Insulation Standards as enforced by the City of Tustin. STC 32 glazing can be provided with either 1/4" laminated glass or a dual pane assembly with a 1/2" airspace. In either case, the glazing supplier should submit a test report documenting the STC 32 rating. The test report should be prepared in an independent, accredited testing laboratoryin accordance with ASTM E-9 . 0 3.0 Construction Recommendations 3.1 Roof ceiling construction will be roofing on 1/2" plywood. Batt insulation will be installed in joist spaces. The ceilings will be one layer of 5/8"gYP board nailed direct. 3.2 All exterior walls will be 2x4 studs 16" o.c. with Batt insulation in the aces. Exteriorsstuds P will be exterior plaster or stucco. The interiors will be 5/8" gypboard. 3.3 All southeast and southwest facing perimeter windows and glass doors will be glazed with STC 32 glazing. STC 32 glazing can be provided with either 1/4" laminated glass or a dual pane assembly with a 1/2" airspace. In either case, the glazing supplier should submit a test report documenting the STC 32 rating. The test report should be prepared in an independent, accredited testing laboratory in accordance with ASTM E-90. 3.4 All other windows and glass doors may be standardlazin . 9 9 3.5 All entry doors should be 1-3/4" solid core doors with weather stripping in seals on the sides and top. Glazing in entry doors should not be accepted. 4 Resolution No. 07-31 Page 32 of 163 4.0 Ventilation Requirements The California Noise Insulation Standards (Title 24) states the following paragraph concerning ventilation: "If interior allowable noise levels are met by requiring that windows be unopenable or closed, the design for the structure must also specify a ventilation or air-conditioning system to provide a habitable interior environment. The ventilation system must not compromise the dwelling unit or guest room noise reduction." With windows open, typical noise reduction values will be in the 12 dB range. This means that a ventilation system must be provided for all habitable rooms. This can normally be supplied with an FAU (forced air unit) with a summer switch. Outside air intake must be in compliance with the Uniform Building Code. 5.0 Exterior Living Area Requirements There will be balconies on the second floors of the buildings. The City of Tustin has established criteria for exterior living space. Noise Levels in exterior living space cannot exceed CNEL 65. To determine compliance with this requirement, an analysis was completed for the balconies facing SW towards Walnut Avenue and the balconies facing SE towards Red Hill Avenue. The balconies in buildings 7 and 8 face Walnut Avenue. It was assumed that the balconies would have solid railings consisting either of glass, plexiglass, wood or stucco. A railing height of 42" was assumed for this analysis. This 42" railing will be required for all 6 balconies in buildings 7 and 8. The first row of units closest to Red Hill Avenue in units 1-6 and building 16 will also require 42" high solid balcony railings. The balconies that are furthest away from Red Hill Avenue in these buildings will not require solid railings. There are no requirements for solid railings for the balconies in buildings 9-15. �1 Resolution No. 07-31 Page 33 of 163 The results of this analysis for buildings facing Walnut Avenue and buildings facing 9 Red Hill Avenue are summarized in Table 4. Table 4 Calculated CNEL Values in dB For The 2"d Floor Balconies. Orientation B do . CNEL SW 7&8 - 62.7 dB SE 1-6 & 16 60.7 dB Based on this analysis, the four exterior living spaces will comply with the requirements of the City of Tustin. Bruce A. Davy, P. I. N.C.E. Board Certified Davy & Associates, Inc. C01 Resolution No. 07-31 Page 34 of 163 SITE MONITORING NOISE ANALYSIS JN2006-44B PROJECT: LOCATION: TEST DATE: START TIME: END TIME: EQUIPMENT USED: TEMPERATURE: RELATIVE HUMIDITY: WIND: LEQ: 69.2 LMAX: 90.1 LMI N: 55.1 CNEL: 70.2 LDN: 70.2 TUSTIN TOWNHOMES SOUTHEAST BUILDING LINE APRIL 6, 2006 3:00 P.M. 4:00 P.M. LD 820 SLM 1/2" RANDOM INCIDENCE MIC WINDSCREEN B&K 4230 CALIBRATOR TRIPOD WIND SPEED INDICATOR MICRONTA THERMOMETER/HYGROMETER 66°f 60% 0-2 mph L90: L50: L25: L8: L2: L1: 58.8 64.3 68.3 72.6 76.8 79.4 DAVY & ASSOCIATES, INC. Consultants in Acoustics Resolution No. 07-31 Page 35 of 163 SITE MONITORING NOISE ANALYSIS JN2006-44B PROJECT: LOCATION: TEST DATE: START TIME: END TIME: EQUIPMENT USED: TEMPERATURE: RELATIVE HUMIDITY: WIND: LEQ: 67.7 LMAX: 80.4 LMIN: 49.9 CNEL: 68.7 LDN: 67.7 Resolution No. 07-31 Page 36 of 163 TUSTIN TOWNHOMES SOUTHWEST BUILDING LINE APRIL 6, 2006 400 P.M. 5:00 P.M. LD 820 SLM 1/2" RANDOM INCIDENCE MIC WINDSCREEN B&K 4230 CALIBRATOR TRIPOD WIND SPEED INDICATOR MICRONTA THERMOMETER/HYGROMETER 65°f 60% 0-2 mph L90: 53.4 L50: 60.1 L25: 67.6 L8: 73.0 L2: 76.5 L1: 77.8 DAVY & ASSOCIATES, INC. Consultants in Acoustics Exhibit 2 Traffic Analysis Resolution No. 07-31 Page 37 of 163 Resolution No. 07-31 Page 38 of 163 Traffic Study for a Residential Project in the City of Tustin December 2006 RECEIVED Or -C 18 2006 COMPhilNl'(Y DEVELOPMENT �Y ✓ Prepared for: Southwind Realty Group, LLC Centerpoint 19722 MacArthur Boulevard, Suite 240 Irvine, CA 92612 Prepared by: CA rAA Katz, Okitsu & Associates Traffic Engineers and Transportation Planners 17852 E. Seventeenth Street, Suite 102 Tustin, California 92780-2412 714/573-0317 Phone 714/573-9534 Fax Project No: JA6539 V Katz Okitsu & Associates AA Planning and Engineering 17852 E. Seventeenth St. December 15, 2006 Suite 102 Sincerely, Tustin, CA 92780-2142 James Magstadt 714.573.0317 Southwind Realty Group, LLC fax: 714.573-9534 Centerpoint koaoc@katzokitsu.com 19722 MacArthur Boulevard, Suite 240 www.katzokitsu.com Irvine, CA 92612 Subject: Traffic Study for a Residential Project in the City of Tustin Dear Mr. Magstadt: Katz, Okitsu & Associates is pleased to present this revised traffic study report for a proposed residential project in the City of Tustin. The project, known as "Red Hill Townhomes", would be located along Red Hill Avenue north of Walnut Avenue and consists of 75 condominiums on a 3.86 -acre site. The traffic study addresses access and circulation issues, potential traffic impacts of the project, and possible mitigation measures. The study has been prepared to meet N the traffic stud requirements of the Cit of Tustin for the analysis of traffic impacts Y a Y Y p associated with the proposed development. The report is being submitted to you for review and forwarding to the City of Tustin. Please contact our office if you have any questions or comments about the report, or if you need additional information to complete your submittal. If there are any { comments that require response or revisions, please notify our office as soon as Los Angeles possible for prompt revision. 323.260.4703 fax: 323.260.4705 It has been a pleasure to prepare this study for Southwind Realty and the City of Tustin. Son Diego 619.683.2933 Sincerely, fax: 619.683.7982 Son Bernardino Rock Miller, P.E. 909.890.9693 fax. 909.890.9694 Principal Resolution No. 07-31 Page 39 of 163 I. INTRODUCTION.........................................................................................................................1 2. PROJECT STUDY METHODOLOGY..........................................................................................4 STUDYTIMEFR.AMES.................................................................................................................................4 PROJECTSTUDY AREA .....................................................................................:........................................4 ALYSISMETHODOLOGIES.....................................................................................................................4 INTERSECTION CAPACITY ANALYSIS.................................................................... a..*.** 00. s 000.0 .... 00 ...... a ..... a . 5 TRAFFICCOUNT DATA.............................................................................................................................. 5 FU'T'URE TRAFFIC VOLUMES ............................... ...................................... ............s....... s........ .... .... ........ a... 6 STANDARDSOF SIGNIFICANCE..................................................................................................................6 h ' 1 s 3. EXISTING CONDITIONS.............................................................................................................7 EXISTING CIRCULATION NETWORK..........................................................................................................7 t PEAK HOUR INTERSECTION LEVEL OF SERVICE.......................................................................................7 PEDESTRIANTRAFFIC..............................................................................................................................11 N 0 4. FUTURE TRAFFIC CONDITIONS WITHOUT PROJECT.......................................................12 FUTLRE TRAFFIC GROWTH.....................................................................................................................12 FuTuRE INTERSECTION CONFIGURATION........................................................................................ a ....e.12 PEAK HOUR INTERSECTION LEVEL OF SERVICE NEAR TERM ............. ............................ ease ... 12 5. BUILDOUT TRAFFIC CONDITIONS WITHOUT PROJECT..................................................15 FUTURETRAFFIC GROWTH.....................................................................................................................15 FU'T'URE INTERSECTION CONFIGURATION...............................................................................................15 PEAK HOUR INTERSECTION LEVEL OF SERVICE — BUILDOUT.................................................................15 6. PROJECT RELATED TRAFFIC...................................................................................................19 PROJECTTREP GENERATION .. ......... 00.0004 0 0. 000. 0..4.... 0.00 ......mesa *00 0000 *ea.... 0.00 000 ... am *a... s masses, ... 0. 4 ... 4.004.00.00 ..... 9 ..... 19 PROJECTTRAFFIC....................................................................................................................................19 7. FUTURE TRAFFIC CONDITIONS WITH PROJECT................................................................25 PEAK HOUR INTERSECTION LEVEL OF SERVICE.....................................................................................25 8. BUILDOUT TRAFFIC CONDITIONS WITH PROJECT...........................................................28 PEAK HOUR INTERSECTION LEVEL OF SERVICE.....................................................................................28 9. DETERMINATION OF SIGNIFICANT IMPACT...................................................................... 31 NEAR—TERM FUTURE (2008)...................................................................................................................31 BUILDOUT(POST-2020)..........................................................................................................................32 Katz, Okitsu & Associates Cit of Tu Traffic Engineers and Transyn►rariorr Planners y St1I1 Resolution No. 07-31 i Red HilllWalnut Residential Project Traffic Study Page 40 of 163 A P� 8. CIRCULATION AND ACCESS................................................................................................... 33 ACCESSROADS AND DRIVEWAYS...........................................................................................................33 PARKINGDISTRIBUTION..........................................................................................................................35 9. MITIGATION AND RECOMMENDATIONS...........................................................................36 10. CONCLUSIONS ........................... .. Ogg .............................. *see .. *seems *as ..... ease ... Goo . Owego too ................e 37 Katz, Okitsu & Associates City of Tustin Traf%K Engineers and Transportation Planners fi Red HilllWalnut Residential Prpjg4a'64 R&.d97 -31 Page 41 of 163 TABLE 1 — LEVELS OF SERVICE FOR INTERSECTIONS..................................................................................... 5 TABLE 2 — PEAK HOUR INTERSECTION CONDITIONS, EXISTING CONDITIONS ............................................. 11 TABLE 3 — PEAK HOUR INTERSECTION CONDITIONS, FUTURE WITHOUT PROJECT....................................0 12 TABLE 4 — PEAK HOUR INTERSECTION CONDITIONS, BUILDOUT WITHOUT PROJECT ................................. 15 f TABLE 5 — TRIP GENERATION RATES........................................................................................................... 21 ABLE 6 as PROJECT TRAFFIC GENERATION.............................................................................:.................... 21 TABLE 7 - PEAK HOUR INTERSECTION CONDITIONS, FUTURE WITH PROJECT ........................................... 25 { TABLE 8 — PEAK HOUR INTERSECTION CONDITIONS, BUILDOUT WITH PROJECT ....................................... 28 TABLE 9 - LEVEL OF SERVICE ANALYSIS /DETERMINATION OF IMPACTS, FU'T'URE CONDITIONS ............... 31 TABLE 10 - LEVEL OF SERVICE ANALYSIS /DETERMINATION OF IMPACTS, BUILDOUT CONDITIONS ......... 32 TABLE 11 — CITY PARKING CODE REQUIREMENTS FOR THE PROPOSED PROJECT ...................................... 35 Appendix A — Existing Traffic Counts Appendix B — Intersection Level of Service Worksheets Appendix C — Intersection Level of Service Concepts Appendix D — Project Site Plan Katz, Okitsu & Associates Cit of Tustin Tiafj"a Engineers and TmnsportmioM Planners y Resolution No. 07-31 iii Red HilllWalnut Residential Project Traffic Study Page 42 of 163 FIGURE1 — PROJECT LOCATION ..................................................................................................................... 2 FIGURE2 — PROPOSED SITE PLAN................................................................................................................... 3 FIGURE 3 — EXISTING INTERSECTION GEOMETRY.................................................................. a ............... a ....... 8 FIGURE 4 — EXISTING TRAFFIC VOLUMES, AM PEAK HOUR ........................................................ a................ 9 FIGURE 5 — EXISTING TRAFFIC VOLUMES, PM PEAK HOUR .........................................•... a .......................... 10 FIGURE 6 — FUTURE TRAFFIC VOLUMES WITHOUT PROJECT, AM PEAK HOUR ........ a .. • ............................. • 13 FIGURE 7 — FUTURE TRAFFIC VOLUMES WITHOUT PROJECT, PM PEAK HOUR ........................................... 14 FIGURE 8 — BUILDOUT INTERSECTION GEOMETRY ......................... 0................................................... oases.... 16 FIGURE 9 — BUILDOUT TRAFFIC VOLUMES WITHOUT PROJECT, AM PEAK HOUR...................0................0. 17 FIGURE 10 — BUILDOUT TRAFFIC VOLUMES WITHOUT PROJECT, PM PEAK HOUR......... a ........................... 18 FIGURE 11 — PROJECT TRIP DISTRIBUTION................................................................... 20 ;. a............ a................. FIGURE 12 — PROJECT TRIPS, AM PEAK HOUR............................................................................................ 22 FIGURE 13 — PROJECT TRIPS, PM PEAK HOUR.... ..... 0 ... 0 ........... oo-osso sea ova OUR........................................................................................... a 23 FIGURE 14 — FUTURE TRAFFIC VOLUMES WITH PROJECT, AM PEAK HOUR ..................... a........................• 26 FIGURE 15 — FUTURE TRAFFIC VOLUMES WITH PROJECT, PM PEAK HOUR ............................................... 27 FIGURE 16 — BUILDOUT TRAFFIC VOLUMES WITH PROJECT, AM PEAK HOUR.... .............. .......................... 29 FIGURE 17 — BUILDOUT TRAFFIC VOLUMES WITH PROJECT, PM PEAK HOUR ........................................... 30 TABLE 1 — LEVELS OF SERVICE FOR INTERSECTIONS..................................................................................... 5 TABLE 2 — PEAK HOUR INTERSECTION CONDITIONS, EXISTING CONDITIONS ............................................. 11 TABLE 3 — PEAK HOUR INTERSECTION CONDITIONS, FUTURE WITHOUT PROJECT....................................0 12 TABLE 4 — PEAK HOUR INTERSECTION CONDITIONS, BUILDOUT WITHOUT PROJECT ................................. 15 f TABLE 5 — TRIP GENERATION RATES........................................................................................................... 21 ABLE 6 as PROJECT TRAFFIC GENERATION.............................................................................:.................... 21 TABLE 7 - PEAK HOUR INTERSECTION CONDITIONS, FUTURE WITH PROJECT ........................................... 25 { TABLE 8 — PEAK HOUR INTERSECTION CONDITIONS, BUILDOUT WITH PROJECT ....................................... 28 TABLE 9 - LEVEL OF SERVICE ANALYSIS /DETERMINATION OF IMPACTS, FU'T'URE CONDITIONS ............... 31 TABLE 10 - LEVEL OF SERVICE ANALYSIS /DETERMINATION OF IMPACTS, BUILDOUT CONDITIONS ......... 32 TABLE 11 — CITY PARKING CODE REQUIREMENTS FOR THE PROPOSED PROJECT ...................................... 35 Appendix A — Existing Traffic Counts Appendix B — Intersection Level of Service Worksheets Appendix C — Intersection Level of Service Concepts Appendix D — Project Site Plan Katz, Okitsu & Associates Cit of Tustin Tiafj"a Engineers and TmnsportmioM Planners y Resolution No. 07-31 iii Red HilllWalnut Residential Project Traffic Study Page 42 of 163 A The subject of this traffic impact study is a proposed residential project known as "Red Hill Townhomes", consisting of a 75 -unit townhome/condominium complex in the City of Tustin. The proposed project is located on Red Hill Avenue north of Walnut Avenue. The developer of the proposed project is Southwind Realty Group of Irvine, California. The project location is shown in Figure 1 and the proposed site plan is shown in Figure 2 The project site is currently occupied by two apartment complexes: a 30 -unit complex known as "Whispering Woods" and a 27 -unit complex known as "The Terrace". The City is requesting a trip generation and distribution analysis to show the difference in trips from the site due to the proposed development, an intersection traffic analysis for the intersection of Red Hill Avenue and Walnut Avenue, and an analysis of the on-site circulation and access to Red Hill Avenue. The study also documents parking distribution within the project site. The analysis is intended to meet the requirements of the Cit of Tustin. y q y Katz, Okitsu & Associates Traffic Engineers ant! Transportation Planners 1 City of Tustin Red Hil!/Walnut Residential Project Trac Study Resolution No. 07-31 Page 43 of 163 17th St m� �e Ah St 1 st St Main St�a �J5 a McFadden Ave Project Location i c hA S Wa neer Ave Foyer Dyer Rd Tustin US Marine Corps Air Station O LEGEND Project Location Study Intersection N School Major Street Minor Street Railroad Not to Scale Katz, OkItsu & Associates City of Tustin Figure 1 mqA*"#*"g Red Hill / Walnut Residential Project TIS Vicinity Map 16 INMON 17,v:1 1 X-l!""17171111 own Vp a /A PT IL rAl =1110 ww4w1immal"M "qq Amir p WO MW� WA 0 A love, avis i J11111 0, A '0111, of toll, 1 , T4 MCI SPA �� rim �_-1 L moo, '4 P wer= 9 r =11111M ter. -� �..� II, �I I -v-.��.. �._��' , ir WN `�: =ter '�' Mqwlf�-- POW", -------- ME IMM IMMIShis NMI VAN K7 MCI EVM IFOV61 NEW �1 .. It how all IF 11 PON � i' Ik K3 all-, HIM MIA �iiiijir`7` ii��i��= � � � �� ir".:���l�'! 1 AM oil Red Hill Walnut Residential Pmiect TIS ResolufiprdAm� This chapter documents the methodologies and assumptions used to conduct the analysis for the proposed project. This section contains the following background information: • Study timeframes • Study area description • Capacity analysis methodologies Study Time frames This report presents an analysis of the intersection operating conditions during the morning and evening peak hours during the following anticipated timeframes: '0 Existing Conditions ear 2006) • Future Year 2008 • Buildout (Post -2020) Project Study Area The study area was determined through consultation with Cit of Tustin staff. The stud area City y consists of the following: Red Hill Avenue at Walnut Avenue Analysis Methodologies y This section presents a brief overview of traffic analysis concepts methodologies and is used in this g p t study. Street system operating conditions are typically described in terms of "level of service." Level of service is a report -card scale used to indicate ' po c to the quality of traffic flow on roadway segments and at intersections. Level of service (LOS) ranges from LOS A (free flow, little congestion) to LOS F (forced flow, extreme congestion). A more detailed description escn tion o p f the concepts described in this section is provided in Appendix C of this document. The local jurisdictions within the project area, including the City of Tustin, have determined that Level of Service D is the minimum acceptable level of service for peak hour operation. Any roadway segment operating at Level E or F is considered to be operating deficiently. An impact is deemed significant when the level of service is E or F and the project causes an increase in V/C or delay over the defined threshold. For further information on these significance thresholds see Appendix C. Katz, Okitsu & Associates City of Tustin Traffic Engiarcis and Tinaspvndrion Pluancrs 4 Red Hill/Walnut Residential Project Traffic Study Resolution No. 07-31 Page 46 of 163 Project Study Methodology Intersection Capacity Analysis The analysis of peak hour intersection conditions - was conducted using the TRAFFIX software program developed by Dowling Associates. The following peak periods were selected for analysis: • Weekday AM (peak hour between 7:00 AM and 9:00 AM) • Weekday PM (peak hour between 4:00 PM and 6:00 PM) r Traffic conditions in Southern California are often evaluated during peak hours at intersections using a methodology known as the Intersection Capacity Utilization (ICU) technique. This is the preferred analysis niethod for the City of Tustin. This analysis method is widely accepted and essentially measures the amount of traffic signal "green" time required for the intersection. It is a 6 significant variation from the HCM method; however it produces results that are generally similar. The City of Tustin generally requests that this method be used in the City, so all 1 signalized intersections were analyzed based on this method. Table 1 shows the relationship g yz P between Level of Service and the ICU Method volume/capacity criteria for signalized intersections, and Level of Service and delay for unsignalized intersections. P�, Table 1 Levels of Service for Intersections Level of Service Signalized Intersection Volume/Capacity Ratio Unsignalized Intersection Control Delay' A 0.00-0.60 0-10 B 0.61-0.70 10-15 C 0.71-0.80 15-25 D 0.81-0.90 25-35 E 0.91-1.00 35-50 F 1.00 and up 50 or more Note 1: Average delay in seconds/vehicle Traffic fu Count Data Existing daily and peak hour traffic volumes were supplied by Traffic Data Services of Santa Ana, California in March, 2006. All traffic count data used in this study is compiled in Appendix A of this report. Katz, Okitsu & Associates City of Tustin Tia f fa Engineers and TiaKsperiatan Planners S Red Hill/Walnut Residential Project Traffic Study Resolution No. 07-31 Page 47 of 163 Project Study Methodology Future Traffic Volumes Peak hour traffic volumes for Red Hill Avenue and Walnut Avenue under future near. term conditions were forecast based on a 1% annual growth rate from existing conditions. Peak hour volumes for buildout (Post -2020) conditions were based on traffic forecasts prepared for the Tustin MCAS Tustin Legacy Study, when these volumes were higher than existing plus an annual growth factor. When the existing volumes plus an annual growth factor were higher than the MCAS forecasts, the existing plus growth factor volumes were used per City direction. The Tustin MCAS Legacy traffic forecasts were provided by the City of Tustin. Project trips were added to the background base for each scenario to determine the relative impact of the project. 7.2 Standards of Significance The City of Tustin has determined that Level of Service D is the minimum acceptable level of 9e, service during peak hours at intersections. Any roadway segment operating at Level of Service E 1 or F is considered to be operating deficiently. An impact is deemed significant when the level of service is E or F and the project causes an increase in the Volume/Capacity ratio of .01 or more over the defined threshold. For further information on these significance thresholds see Appendix C. 0." Katz, Okitsu & Associates City of Tustin Traffic Engineers and Tianspvnation Planners 6 Red Hill iWalnut Residential Project Traffic Study Resolution No. 07-31 Page 48 of 163 This section documents the existing conditions in the study area, including local land uses, roadway geometry, and driveway locations. The discussion presented here is limited to specific roadways in the project vicinity. The project location is on Red Hill Avenue north of Walnut Avenue in the City of Tustin. Existing Circulation Network Streets in the project vicinity which could be affected by the proposed project include Red Hill Avenue and Walnut Avenue. The existing roadway circulation network was shown previously in Figures 1 and 2. Existing intersection geometry is shown in Figure 3. Red Hill Avenue is a 44 -lane street on a northeast -southwest alignment located immediately to the � east of and adjacent to the project site. The City has designated Red Hill Avenue as a north -south roadway. The street has a signalized intersection with Walnut Avenue. The speed limit on R1�d Hill Avenue is 35 mph. The intersection has left -turn pockets on all approaches. The existibig signal phasing is protected/permissive for the east and west approaches (Walnut Avenue), and protected for the north and south approaches (Red Hill Avenue). Land use along the street is residential north of Walnut Avenue, with single- family homes located on the east side of the street and apartments located on the west side of the street. A neighborhood commercial/shopping center is located on the west side of the street south of Walnut Avenue. Elementary and middle schools are located approximately '/4 mile south of the project site and !4 mile north of the project site. The traffic volume on the street is 23,800 vehicles per day. Walnut Avenue is a 4 -lane divided arterial on a northwest -southeast alignment located immediately to the south of and adjacent to the project site. The City has designated Walnut Avenue as an east -west roadway. The street has a painted median with left -turn pockets, and a signalized �r intersection with Red Hill Avenue. The speed limit on Walnut Avenue is 35 mph in the project vicinity. Land use. along the street is residential on the north side of the street and commercial/retail on the south side of the street west of Red Hill. East of Red Hill land use is residential. The traffic volume on the street is 16,700 vehicles per day. Regional circulation is provided by the I-5 Freeway approximately V2 mile to the north and the Sl: - 55 Freeway approximately % mile to the west of the project site. Peak Hour Intersection Level of Service Figure 4 illustrates the existing peak hour traffic volumes during the AM peak hour, while Figure 5 illustrates the existing; peak hour traffic volumes during the PM peak hour. Based on these Katz, Okitsu & Associates City of Tustin Traffa Enginccrs and TiaMspvrrataa Planners 7 Red Hill/Walnut Residential Project Traffic Study Resolution No. 07-31 Page 49 of 163 LEGEND N Project Location • Study Intersection School ""— Major Street Minor Street N Railroad Signalized Intersection --�' Lane Geometry Not to Scale Katz, Okitsu & Associates City of Tustin Figure 3 so0u"�,(§fJo ne!"g Red Hill / Walnut Residential Project TIS Existing Geometries Page 50 of 163 N Not to Scale EWAKatz, Okitsu & Associates City of Tustin Figure 4 Planning and Engineering I Red Hill / Walnut Residential Project TIS Existing TrafeMldlim C WeSW Hour LEGEND Project Location • Study Intersection School - Major Street Minor Street -�--+- Railroad XXI Turning Movement Volume N Not to Scale EWAKatz, Okitsu & Associates City of Tustin Figure 4 Planning and Engineering I Red Hill / Walnut Residential Project TIS Existing TrafeMldlim C WeSW Hour N Not to Scale Katz, Okitsu & Associates City of Tustin Figure 5 eMfflf8fiaWd."-e5!n9 Red Hill /Walnut Residential Project TIS Existing Traffic Volumes, PM Peak Hour Page 52 of 163 LEGEND Project Location • Study Intersection School - Major Street Minor Street -+-+- Railroad XX Turning Movement Volume N Not to Scale Katz, Okitsu & Associates City of Tustin Figure 5 eMfflf8fiaWd."-e5!n9 Red Hill /Walnut Residential Project TIS Existing Traffic Volumes, PM Peak Hour Page 52 of 163 P� Existing Conditions existing traffic volumes, level of service analyses were conducted for the study intersection. The results of these analyses are summarized in Table 2 for the existing conditions. As shown in the table, the intersection currently operates at Level of Service D or better under existing conditions. Table 2 Peak Hour Intersection Conditions Existing Conditions, Year 2006 Intersection AM Peak Hour PM Peak Hour .,Nii Volume/ Level -Of Volume/ Level Of Capacity Service Capacity Service Red Hill Avenue & Walnut Avenue .804 D .684 1 B Pedestrian Traffic Significant pedestrian traffic at the Red Hill/Walnut intersection was observed, both during the peak hours and before and after school, particularly on the west leg of the intersection (Walnut). Pedestrian volumes -were moderate, with about 20 pedestrians per hour crossing Red Hill and 30 per hour crossing Walnut during the AM peak hour, and about 45 per hour crossing Red Hill and 60 per hour crossing Walnut during the PM peak hour. During the afternoon school peak hour (2:00 PM to 3:00 PM) there were about 30 pedestrians per hour crossing Red Hill and about 75 per hour crossing Walnut. The majority of the pedestrians crossing Walnut in the afternoon peek hour were school children crossing on the west leg. Katz, Okitsu & Associates City of Tustin Traffic Engineers and Transportation Planners 14 Red HiWWalnut Residential Project Trac Study Resolution No. 07-31 Page 53 of 163 This section documents the future without project traffic conditions in the study area with ambient growth added. The year 2008 was selected for analysis based on study requirements. The project is scheduled for completion before the end of the year 2008. Future Traffic Growth Peak hour traffic volumes for the Red Hill Avenue/Walnut Avenue intersection under near-term future (Year 2008) conditions were forecast based on a 1 % per year growth factor. Future Intersection Con figuration The traffic signal at Red Hill/Walnut will soon be converted from the current PPLT operation to protected left -turn operation for eastbound and westbound Walnut Avenue. The lane r configuration of the intersection will also be changed, restriping westbound Walnut to provide- dual rovidedual left -turn lanes. These changes to lane geometry and signal phasing have been incorporated into the analyses of future intersection conditions. Peak Hour Intersection Level of Service — Future Near Terni To simulate the near-term growth conditions for the year 2008, the peak hour volumes in Figures 4 and 5 were increased by a factor of 1% per year for two years. 'Figures 6 and 7 illustrate the resulting AM and PM peak hour volumes, respectively. Table 3 illustrates the future without project intersection level of service conditions. As shown in the table, the intersection is expected to operate at Level of Service B or better under the future without project condition for the year 2008. Table 3 Peak Hour Intersection Conditions Future Without Project Conditions, Year 2008 Katz, Okitsu & Associates Traffic Engineers and Transporration Planners Resolution No. 07-31 Page 54 of 163 City of Tustin 1.2 Red Hill/Walnut Residential Project Trac Study �Katz, Okitsu &Associates City of Tustin e6ljy{fffiaflcf"'��-eTi"g Red Hill /Walnut Residential Project TIS Page 56 of 163 N Not to Scale Figure 7 Future Traffic Volumes Without Project, PM LEGEND Project Location • Study Intersection iSchool Major Street Minor Street -�--+ Railroad Turning Movement Volume �Katz, Okitsu &Associates City of Tustin e6ljy{fffiaflcf"'��-eTi"g Red Hill /Walnut Residential Project TIS Page 56 of 163 N Not to Scale Figure 7 Future Traffic Volumes Without Project, PM This section documents the buildout without project traffic conditions in the study area. Post 2020 was selected for analysis based on information provided by the City from the MCAS Tustin Legacy study. Future Traffic Growth Peak hour traffic volumes for the Red Hill Avenue/Walnut Avenue intersection under buildout (Post -2020) conditions were forecast based on information from the MCAS Tustin Legacy study and existing volumes plus a growth factor. The Legacy Study takes into account certain planned roadway improvements to be completed by Year 2020. These improvements are included in all Buildout scenario analyses. Post -2020 designated lanes are illustrated in Figure 8. Future Intersection Con figuration f . The traffic signal at Red Hill/Walnut will soon be converted from the current PPLT operation to protected left -turn operation for eastbound and westbound Walnut Avenue. The lane configuration of the intersection will also be changed, restriping westbound Walnut to provide dual left -turn lanes. Red Hill Avenue is planned to have a buildout configuration of 3 throuh lanes in each direction. These changes to lane geometry and signal phasing have beim incorporated into the analyses of buildout intersection conditions. Peak Hour Intersection Level of Service -- Buildout Buildout traffic volume forecasts for the Post -2020 conditions were provided by the City of Tustin From the MCAS Tustin Legacy study. Existing volumes plus a growth factor were used when higher than the Legilcy Study forecasts. Figures 9 and 10 illustrate the resulting AM and PM peak hour volumes, respectively. Table 4 illustrates the buildout without project intersection level of service conditions. As shown in the table, the intersection is expected to operate at Level -.:)f Service E in the AM peak hour and Level of Service F in the PM peak hour under the buildout without project condition. Table 4 Peak Hour Intersection Conditions Buildout Without Project Conditions Post 2020 Intersection I AM Peak Hour I PM Peak Hour l Volume/ Level Of Volume/ Level Of Capacity Service Capacity Service Red Hill Avenue &Walnut Avenue .959 E 1 1.030 F Katz, Okitsu & Associates City of Tustin Traffic Engiorurs and Trrtnsivrialan Planners 15 Red Hill/Walnut Residential Project Trak Study Resolution No. 07-31 Page 57 of 163 t t'ri) ■ Project Location • Study Intersection iSchool Major Street Minor Street Railroad N Signalised Intersection J6 Stop Sign _0' Lane Geometry Not to Scale K 9.0 u fates City of Tustin Figure g n e g Red Hill / Walnut Residential Project TIS Buildout Geometries .p I U�jzl LEGEND Project Location • Study Intersection School Major Street N Minor Street -�—+- Railroad XX Turning Movement Volume Not to Scale Katz, Okitsu & Associates City of Tustin Figure 9 Planning and Engineering Red Hill / Walnut Residential Project TIS Buildout Traffic V , XIM LEGEND Project Location • Study Intersection School — Major Street N Minor Street —F—+- Railroad Turning Movement Volume Not to Scale Katz, Okitsu & Associates City of Tustin Figure 10 ? r )K 1z#7Cg'1Fg Red Hill / Walnut Residential Project TIS Buildout Traffic Volumes Without Project, PM aae 60 of 163 The proposed project consists of 75 townhome/condominium units. This residential development is expected to generate additional traffic volumes as documented below. Project Trip Generation Trip generation is a measure or forecast of the number of trips that begin or end at the project site. All or part of these trips will result in traffic increases on the streets where they occur. Trakfic generated is a function of the extent and type of development proposed for the site. Trip generation is generally equal to the traffic volume expected at project driveways. The trip .f generation rates are, equivalent to the number of trips that start or end (in and out) at the project site, and are specific by land use for a given time period (i.e. AM peak hour). Trip generation rates are expressed as a function of a given characteristic of the land use area (i.e. floor aresa, site area, number of employees, or seating capacity). The rates are based on regression analysis, and fire derived from field observations from as many sources as possible. At each site, trips in and out of the site are counted, trip rate modifiers are identified and regression analysis is used to derive: a "best fit" for a particular land use. An equation is developed which calculate an average trip generation rate for the specific land use. Fa 6 Project Traffic fu The trip generation for the proposed project consisting of 75 townhome/condominiurns is shown in Table 5. The project trips summarized in these tables are based on trip generation rates provided by ITE Trip Generation, 7' Edition with consideration of comparable trip generation rates for similar uses in this region. This report is widely used in Southern California and indicates the probable traffic generation rates for various land uses based on studies of existing developments in comparable settings. City staff directed Katz, Okitsu & Associates to use single- family detached housing trip generation rates for the proposed project due to the size of t ie proposed units. Figure 11 illustrates the expected trip distribution for these project trigs. Katz, Okitsu & Associates City of Tustin Traffic Fngina rs amd Transporaaaion Planners 19 Red HilIlWalnut Residential Project Traffic Study Y Resolution No. 07-31 Page 61 of 163 t LEGEND Project Location • Study Intersection i School N r Major Street -' Minor Street Railroad Not to Scale "Katz, Okitsu & Associates City of Tustin Figure 11 961~196POY16*9 Page o Red Hill / Walnut Residential Project TIS Project Tri Distribution P Land Use Project Related Traffic Table 5 Trip Generation Rates Units Daily AM Peak Hour PM Peak Hour Total I In I Out Total I In I Out Low -Rise Apartments ITE Code .2.2 1 DU 6.59 0.46 0.10 0.36 0.58 0.38 0.20 Single -Family Detached Housing' 0.3i' DU 9.57 0.75 0.19 0.56 1.01 0.64 ITE Code .210 Notre 1: SFDU rate used for townhomes per City direction. Existing Land Use Traffic 57 apartment units currently occupy the project site. These apartment units will be demolished upon approval of the proposed project. The trip generation currently associated with the project sitE: is also shown on Table 6. Figures 12 and 13 show the added trips expected as a result of tale project less the existing use trips. Table 6 Project Traffic Generation Note 1: SFDU rate used for townhomes per direction from the City. As shown in Table 6, the proposed project is expected to generate approximately 718 daily trips. Of this amount, 56 .are expected to be in the AM peak hour, including 14 trips entering and 42 trips exiting the site. There are expected to be 76 trips during the PM peak hour, including 48 trips entering and 28 trips exiting the site. Katz, Okitsu & Associates City of Tustin Ti4ffic Engineers and Transpvrtation Planners 24 Red Hill /Walnut Residential Project Traffic Study Resolution No. 07-31 Page 63 of 163 LEGEND Project Location • Study Intersection iSchool Major Street N Minor Street -+—+- Railroad XXZ Turning Movement Volume Not to Scale Katz, Okitsu & Associates City of Tustin Figure 12 AleftiWW.10TIng Red Hill / Walnut Residential Project TIS Project Trips, AM Peak Hour aae o N Not to Scale Katz, Okitsu & Associates City of Tustin Figure 13 ILWA Planning and Engineering Red Hill / Walnut Residential Project TIS Sipa, �� B�a�-lour Page 65 of 16:3 Project Location • Study I ntersection School Major Street Minor Street +-+- Railroad XXZ Turning Movement Volume N Not to Scale Katz, Okitsu & Associates City of Tustin Figure 13 ILWA Planning and Engineering Red Hill / Walnut Residential Project TIS Sipa, �� B�a�-lour Page 65 of 16:3 N Project Related Traffic The project will have 718 vehicles per day going in and out onto Red Hill Avenue. This is an increase of 342 vehicles per day above the existing land use. The resulting "NET Project Vehicle Trips" are shown in Table 6. Adding 342 vehicles per day to a street that is currently serving 23,800 vehicles per day (Red Hill Avenue) is less than a 1.5% increase. This additional traffic will have little impact on Red Hill Avenue. Katz, Okitsu & Associates Traffk Engineers and Trampnriarion Planners Resolution No. 07-31 Page 66 of 163 City of Tustin • .Z4 Red Hill/Walnut Residential Project Trac Study This section documents the near-term future traffic conditions with the addition of project - related traffic to the surrounding street system. It evaluates near term traffic conditions in the study area with ambient growth (1% per year) and the proposed project added. The proposed project completion date of 2008 was selected for analysis to be conservative. Peak Hour Intersection Level of Service j Table 7 summarizes the results of the level of service analyses for this scenario. As shown in the table, the intersection of Red Hill at Walnut continues to operate at Level of Service B or better with the addition of project -related traffic. Figures 14 and 15 illustrate the resulting AM and PM peak hour volumes, respectively. i4 ' Table 7 Peak Hour Intersection Conditions Future With Project Conditions, Year 2008 �i Note 1: Seconds per vehicle average Note 2: Delay is for poorest movement (left -turn from project driveway) Katz, Okitsu & Associates City of Tustin Traffic Fngiaurs anA Trarrspvnaticx Manners 25 Red Hill/walnut Residential Project Traffic Study Resolution No. 07-31 Page 67 of 163 W8Kat2z, Okitsu & Associates City of Tustin Jtfff8fiaWOE?ff "T,p9 Red Hill / Walnut Residential Project TIS r1_ _ AA _r I,.„ rage 00 Or -1015 N Not to Scale Figure 14 Future Traffic Volumes With Project, AM MI LEGEND Project Location • Study Intersection iSchool - --- Major Street Minor Street --�---+- Railroad XXI Turning Movement Volume W8Kat2z, Okitsu & Associates City of Tustin Jtfff8fiaWOE?ff "T,p9 Red Hill / Walnut Residential Project TIS r1_ _ AA _r I,.„ rage 00 Or -1015 N Not to Scale Figure 14 Future Traffic Volumes With Project, AM MI 'A N Project Location • Study Intersection i ydvol Major Street — Minor Street -F—f- Railroad XX Turning Movement Volume MrKatz, 4kitsu & Associates City of Tustin Planning and Engineering Red Hill / Walnut Residential Project TIS N Not to Scale Figure 15 Future Traff6%WkfliWVth On7oj' dt, PM This section documents the buildout traffic conditions with the addition of project -related traffic to the surrounding street system. It evaluates buildout traffic conditions in the study area with traffic from the proposed project added. Buildout Post -2020 was selected for analysis based on information received from the City for the MCAS Tustin Legacy study. Peak Hour Intersection Level of Service ' Table 7 summarizes the results of the level of service analyses for this scenario. As shown in the ` table, the intersection of Red Hill at Walnut continues to operate at Level of Service E in the AM peak hour and Level of Service F in the PM peak hour with the addition of project -related traffic. Figures 16 and 17 illustrate the resulting AM and PM peak hour volumes, respectively. s Table 8 Peak Hour Intersection Conditions Buildout With Project Conditions, Post 2020 mote t: aeconas per vetucle average Note 2: Delay is for poorest movement (left -turn from project driveway) Katz, Okitsu & Associates City of Tustin Tiaffa EagiMurs and Transportation Planners 28 Red Hill/Walnut Residential Project Traffic Study Resolution No. 07-31 Page 70 of 163 k' 0 Project Location • Study Intersection S:hool Major Street — Minor Street -- -t—f- Railroad Turning Movement Volume 44rKatz, Okitsu & Associates City of Tustin Planning and Engineering Red Hill / Walnut Residential Project TIS Buildout Traf9[49 N Not to Scale Figure 16 qJj 614, AM F; Katz, okitsu & Associates City of Tustin Slarn1 tin�raig n 'We ' 9 Red Hill / Walnut Residential Project TIS Page 72 of 163 N Not to Scale Figure 17 Buildout Traffic Volumes With Project, PM LEGEND Project Location • Study Intersection School -- Major Street Minor Street +- i Railroad XXI Turning Movement Volume Katz, okitsu & Associates City of Tustin Slarn1 tin�raig n 'We ' 9 Red Hill / Walnut Residential Project TIS Page 72 of 163 N Not to Scale Figure 17 Buildout Traffic Volumes With Project, PM s Traffic impacts are identified if the proposed project will result in a significant change in traffic conditions on a roadway or intersection. A significant impact is normally defined when project related traffic would cause level of service to deteriorate to below the minimum acceptable level by a measurable amount. Impacts may also be significant if the location is already below the minimum acceptable level and project related traffic causes a further decline. The City of Tustin has identified Level of Service D as the minimum allowable service level during peak hours at signalized intersections in the City. Most arriving traffic will clear the intersection on the first allowable green cycle under this level of service. Any roadway segment operating at Level of Service E or F is considered to be operating deficiently. An impact is deemed significant when level of service is E -or F and the project causes an increase in the V/C ratio of 0.01 or mare over the defined threshold. Mitigation measures should be considered when traffic conditions are forecast to decline to poorer levels of service. Near -Terns Future (2008) The level of service analyses for the Near -Term Future (Year 2008) study scenarios determined that level .of service will remain at Level B or better under both the "Future Without Project" and "Future With Project" scenarios. The project will not create a significant impact at the study intersections in the Future scenarios. Table 9 provides a comparison of the levels of service and volume/capacity ratios of all study scenarios for the Future condition. Traffic impacts created by the project can be evaluated by comparing the "Future Without Project" condition to the "Future With Project" condition. Table 9 Level of Service Analysis /Determination of Impacts for Future Conditions Note: LOS = Level of Serfice; V/C = Volume/Capacity; Delay = Seconds per vehicle average, poorest movement Katz, Okitsu & Associates City of Tustin Traffic Enginuis and Transportation Planners 31 Red Hill/Walnut Residential Project Trac Study Resolution No. 07-31 Page 73 of 163 Determination of Significant Impact Buildout (Post -2020) The level of service analyses for the Buildout (Post 2020) study scenarios determined that level of service will be at Level E in the AM peak hour and Level F in the PM peak hour under both the "Buildout Without Project" and "Buildout With Project" scenarios. Although the intersection will be operating at Level F under the buildout scenario, the project will not create a significant impact at the study intersection. The project driveway will operate at Level of Service F under buildout conditions. The poor level of service at the project driveway is due to a relatively small number of vehicles turning left from the driveway onto Red Hill. This condition can be tolerated or it can be improved by prohibiting left turns from the project onto Red Hill, requiring right turns only. Traffic conditions at the project driveway under buildout conditions may be adequate due }== p 1 y y q u to the effect of platooning traffic from the nearby signalized intersection at Red Hill/Walnut. However the City may want to consider mitigating the condition in the future by prohibiting the left turn from the project driveway onto Red Hill. P. Table 10 provides a comparison of the levels of service and volume/capacity ratios of all study scenarios for the Buildout condition. Traffic impacts created by the project can be evaluated by comparing the "Buildout Without Project" condition to the "Buildout With Project," condition. Table 10 Level of Service Analysis /Determination of Impacts for Buildout Conditions Intersection IExisting Buildout Without Project Buildout With Proj ect Increase,/ Decrease Significant Impact ed Hill Ave. & Walnut Ave., AM Pk Hr D / .804 E / .959 E / .961 .002 No ed Hill Ave. & Walnut Ave., PM Pk Hr B / .684 F / 1.030 F / 1.038 .008 No Project Driveway, AM Peak Hour N/A N/A F / 709.3 N/A Yes Froject Driveway, PM Peak Hour N/A N/A F / 87.4 N/A Yes Note: LOS = Level of Service; V/C = Volume/Capacity; Delay = Seconds per vehicle average, poorest movement Katz, Okitsu & Associates Traffic Engineers and Transportation Planners Resolution No. 07-31 Page 74 of 163 City of Tustin 32 Red Hill/Walnut Residential Project Trac Study Access Roads and Driveways The project is proposed to access Red Hill Avenue at one location near the north end of the project site. This is the only site access for project entry. Currently the apartment complexes on the site access Red Hill Avenue near the center of the project site and Walnut Avenue near the west boundary of the project site. There will be no entry gates regulating access to this project. The project site plan with existing street dimensions and recommended turn pocket configuration is presented in Appendix D of this report. The designated site: access on Red Hill Avenue will be accessible to both northbound and southbound traffic on Red Hill. Analysis indicates that there is sufficient distance between the project driveway and Walnut Avenue to allow both the existing southbound left -turn pocket at Redhill/Walnut as miell as a northbound left -turn pocket at the project entrance. A southbound left -turn pocket on Red Hill of 160 feet in length will be adequate to accommodate all traffic expected to make this move during the peak hours under buildout conditions. This includes left - turn traffic from the project. A northbound left -turn pocket of 80 feet in length at the project driveway will be adequate to accommodate project traffic during the peak hours. Allowing for a 90 -foot southbound transition and a 90 -Foot northbound transition for the turn pockets the total length required would be 4:0.0 feet:. The distance available on Red Hill Avenue between the project driveway centerline and the 3 crosswalk limit line at Walnut Avenue is 450 feet. There is therefore more than adequate distance available to accommodate both turn pockets. The turn pockets can be separated from opposing traffic lanes with a painted median, and can be configured "back to back" to maximize turn pocket vehicle storage capacity. The proposed turn pockets with street dimensions are shown on the site plan in Appendix D of this report. The proposed driveway has sight distance to comply with the Caltrans 7.5 second sight distance criteria for a roadway speed of 40 mph or higher. The proposed Red Hill Avenue access roadway is about 450 feet from the Red Hill/Walnut intersection and has sight distance over 600 feet to the north and 500 feet tc the south. Near-term future expected traffic volumes at Redhill/Walnut indicate that an eastbound left -turn pocket .storage length., of 140 feet will be adequate to accommodate expected traffic volumes in tLe near term, including project traffic. Buildout (post -2020) traffic volumes indicate however thea increased capacity for the eastbound left movement will be required. If projected buildout Katz, Okitsu & Associates City of Tustin Trait Engineers and Transportation Planners 33 Red Hill/Walnut Residential Project Trac Study Resolution No. 07-31 Page 75 of 163 P�, U11 On -Site Circulation and Access volumes occur, split -phase signal timing could be installed to accommodate the increase in traffic volumes, allowing left turns from the adjacent through lane. It should be noted that this signal will soon be converted from the current PPLT operation to protected left- turn operation for eastbound and westbound Walnut Avenue at Red Hill Avenue. The lane configuration of the intersection will also be changed, restriping westbound Walnut to provide dual left -turn lanes. The project site plan was reviewed for internal circulation. The site access roadway to Red Hill Avenue is 25 feet in width. This is adequate to allow for one outbound lane and one inbound lane. Parking must be prohibited on the north side of this roadway. The south side of the roadway has parking 'cutouts" that allow for 3 visitor parking spaces on the south side while maintaining the 25 -foot roadway width for the traffic lanes. Parking should be prohibited on all other 25 -foot width project streets. Concern over 'dead end" drive aisles has been addressed through a Waste Management Plan documented in the Design Review package. Maximum outbound project traffic volume is expected to be 42 vehicles in the AM peak hour. Approximately 40%, or 17 of these vehicles are expected to turn left from the project driveway. This is only one vehicle every 3.5 minutes. The low expected volume of left turns indicates that a separate left -turn pocket will not be required at the project entrance in the near-term future. Level of service is indicated as Level D or better for the project entrance in the near-term future with one inbound and one outbound lane and STOP sign control. Projected traffic volumes under buildout conditions (from the MCAS Tustin Legacy study) indicate Level of Service F for the project driveway with one inbound and one outbound lane. The level of service reported is for a relatively small number of vehicles turning left from the driveway onto Red Hill. The AM and PM peak conditions at this intersection are expected to be adequate due to the effect of platooning traffic from the nearby signalized intersection at Red Hill/Walnut. The condition can be mitigated in the future by prohibiting the left tum from the project driveway onto Red Hill. The interior street running roughly parallel with Red Hill Avenue is 36 feet in width, and is therefore adequate for vehicles to pass each other and to allow for curbside parking on both sides of the street. Parking should be prohibited on all other project streets except the south side of the project entry roadway, as noted above. This restriction will allow adequate space for vehicles to pass each other and emergency vehicle access. ADA access is provided from the public right-of-way at the site's Red Hill Avenue entry to all of the development's accessible units as well as the pool area. Curb ramps will be provided Katz, Okitsu & Associates City of Tustin TrafficEngineers and Transportation Planners 34 Red Hill/Walnut Residential Project Traffic Study Resolution No. 07-31 Page 76 of 163 Ulm On -Site Circulation and Access throughout the development per City of Tustin Standard Drawings. Two handicap piarking stalls are also provide near the development's private pool area. An ADA accessible path will also be provided into the community from the Walnut Avenue pedestrian entry. Parking Distribution The City of Tustin has established parking space requirements for the multi -family residential land use category (Tustin Municipal Code Chapter 9224 P -D, Section G7). The requirements vary by number of units, and are shown for the proposed project in Table 11. Table 1 i — City Parking Code Requirements for the Proposed Project Red Hill Townhomes Project Units City Requirement Project Requirement [Residential esident Spaces 2 Spaces per Unit 150 Spaces isitor Spaces 1 Space per 4 Units 19 Spaces Total Project 75 Units 169 Spaces As shown in the table, the parking code requirement for the proposed project is a minimum of two assigned covered parking spaces per unit, plus one visitor parking space for every 4 residential units (Ord. No. 573, Sec. 2; Ord. No. 906, Sec. 2, 2-21-84). The project provides 150 resident and 27 visitor parking spaces. The project parking supply is therefore adequate for the use per City code. All parking stalls are accessible, and all parking areas comply with accepted design standards for stall and aisle width. Parking is distributed relatively evenly throughout the project. Katz, Okitsu & Associates City of Tustin Tiaffit Engineers and Transpvrratan Planners 35 Red HiWWalnut Residential Project Trac Study Resolution No. 07-31 Page 77 of 163 Mitigation measures are required if approval and construction of the project will result in or significantly increase unacceptable traffic conditions. They are also appropriate if cumulative traffic conditions will result in an unsatisfactory level of service and the proposed development contributes to these conditions significantly. Although the intersection of Red Hill Avenue and ` Walnut Avenue will operate at an unacceptable level of service under Buildout(Postp p 2020) conditions, the project does not significantly contribute to these conditions. The poor level of service at the project driveway under buildout conditions can be mitigated by prohibiting the left turn from the project driveway onto Red Hill. Traffic exiting the project to travel north on Red Hill would be required to make a U-turn at Walnut or use an alternate route. Katz, Okitsu & Associates Traffic Engin ers and Transportation PlanMcrs Resolution No. 07-31 Page 78 of 163 City of Tustin 36 Red HiWWalnut Residential Project Traffic Study The subject of this traffic study is a proposed residential project known as "Red Hill Townhomes", consisting of a 75 -unit condominium/townhome complex in the City of Tustin. The proposed project is located on Red Hill Avenue north of Walnut Avenue. The City requested a trip generation analysis to show the difference in trips from the site due to the proposed development, a level of service analysis for one study intersection, an analysis of on- site circulation, and an analysis of access to Red Hill .Avenue and Walnut Avenue. Tl ie intersection studied was Red Hill Avenue and Walnut Avenue. Tho: results of the trip generation analysis showed that the project is expected to generate 4 :lx approximately 718 daily trips. Of this amount, 56 are expected to be in the AM peak hour, VMS including 14 trips entering and 42 trips exiting the site. There are expected to be 76 -trips during f the PM peak hour, including 48 trips entering and 28 trips exiting the site. The analysis showed, that the existing apartment complex on the site currently generates 376 daisy trips, including 26 grips in the AM peak hour and 33 trips in the PM peak hour. These are tl ►e existing use "trip credits". The: net daily trips from the proposed project are the project -generated trips less the existing u e "trip credits". The net daily trips due to the proposed project less the existing use trip credit a, -.e therefore 342 daily trips, including 30 trips in the AM peak hour and 43 trips in the PM peak hour. These are the traffic volume increases on Red Hill Avenue and Walnut Avenue that can be expected as a result of the project. The level of service analyses for the near-term future year (2008) conditions showed that the '3 study intersection will operate at Level of Service B or better (good), including project trips, during both the AM and PM peak hours. The analysis for buildout (post -2020) conditions showed that the study intersection will operate at Level of Service F (fail) during the AM and PM peC-..k hours. The project does not significantly contribute to this condition however. The on-site circulation analysis showed that traffic conditions should be adequate and the entrance/exit on Recd Hill should provide adequate width for one outbound and one inbound Ian!. Level of service is indicated as Level D or better for the project entrance in the near-term future with one inbound ar.d one outbound lane and STOP sign control. 1 Katz, Okitsu & Associates City of Tustin TrA ft Engiaurs and Transportation Planners 37 Red HilIlWalnut Residential Project Traffic Study Resolution No. 07-31 Page 79 of 163 Conclusions Expected future traffic volumes at Walnut Avenue and Red Hill Avenue indicate that the southbound left -turn pocket storage length required to accommodate the expected queue of vehicles turning left from southbound Red Hill Avenue onto eastbound Walnut Avenue is 160 feet. The recommended northbound left -tum pocket storage length at the project driveway is 80 feet. Expected near-term future (2008) volumes indicate that aleft -turn pocket length of 140 feet will be required for eastbound Walnut Avenue to northbound Red Hill Avenue. Buildout (post 2020) traffic volumes indicate that increased capacity for the eastbound left movement will be required. If projected buildout volumes occur, split -phase signal timing could be installed to accommodate the increase in traffic volumes, allowing left turns from the adjacent through lane. The designated site access on Red Hill Avenue will be accessible to both northbound and southbound traffic on Red Hill. Analysis indicates that there is sufficient distance between the .t project driveway and Walnut Avenue to allow both the existing southbound left -turn pocket at Redhill/Walnut as well as a northbound left -turn pocket at the project entrance. Traffic M conditions at the project driveway in the near-term future are adequate with this configuration. Buildout conditions however indicate a poor level of service for traffic turning left onto Red Hill from the project driveway with this configuration. This condition can be mitigated by prohibiting the left turn from the project driveway onto Red Hill. The traffic impact study for the proposed project will be submitted to the City of Tustin, who { will review the plan for compliance with applicable City standards. We anticipate that any minor internal circulation issues will be addressed in conjunction with this review. Katz, Okitsu & Associates recommends that the City find that the traffic impacts of the project have no adverse effect on the surrounding street system for the future year. Katz, Okitsu & Associates Traffic Engineers and Transperratron Planners Resolution No. 07-31 Page 80 of 163 City of Tustin 38 Red Hill/Walnut Residential Project Trac Study r N Appendix A Existing Traffic Counts Katz, Okitsu & Associates Traffic Engineers and Transportation Planners City of Tustin Red Hill/Walnut Residential Project Trac Study Resolution No. 07-31 Page 81 of 163 Resolution No. 07-31 Page 82 of 163 TRAFFIC DATA SERVICES, INC. t#►l�rr�tr�irrii+►##wrr►►►►r#►rir#►t►##ttti►r►►►rri►r►r►r##r�►###rtr+it►tr►#r►ttrrrrlrrrr!l►ttrr LOCATION CODE C1519.111 r►►#ti►ir#r#!#*iii#i►#► LOCATION RED HILL -BTW WALNUT/NISSON VOLUMES FOR • TUESDAY 1/31/06 •+rrrr#�Rt+rr�rrilrtrritrr• ANr►i#ir#�r!*lrrrr�►r#rtrrrrt TIME N6 so ♦rirt#rrr#iR�►►•#►►##�►ii►►� PM •rrii4►i!#►4►tiil►iir►tlir TOTAL ##R►fi►►rii!*►wrrst►rri#i►•►t►#r►►rtiiilrr►t�►##►i►rr►•►iir#iri►►r#tAtTIME TOTAL 12:00 - 12:15 23 16►##►►►#.r►##tttt# 39 �ttrti►tR►iir►iei►iiiRt#t#r#►ioit 12:15 - 12:30 20 18 38 12:00 - 12:15 209 172 381 12:30 - 12:45 17 10 12:15 - 12:30 189 190 379 12:45 - 1:00 9 69 9 S3 �T 8 122 12:30 - 12:45 180 196 376 12:45 - 1:00 206 784 193 751 399 1535 1:00 • 1:15 12 7 19 1:15 - 1:30 10 10 20 1:00 - 1:15 186 197 383 1:30 - 1:45 14 9 23 1:15 . 1:30 183 191 374 1:45 - 2:00 8 64 S 31 13 � 1:30 - 1:45 164 197 361 1:45 - 2:00 216 749 159 744 375 1493 2:00 2:15 9 8 17 2:15 - 2:30 82:00 5 13 - 2:15 184 171 355 2:30 - 2:45 . 9 S 14 2:15 - 2:30 202 192 394 2:45 - 3:002 28 4 22 6 SO 2:30 • 2:45 224 190 414 2:45 - 3:00 296 904 174 727 468 1631 3:00 - 3:15 3:15 - 3:30 7 T 10 T 17 3:00 3 :1 5 232 173 405 3:30 - 3:45 12 6 14 18 3:15 - 3:30 278 188 666 3:45 - 4:00 T 33 9 32 16 6S 3:30 - 3:45 257 155 412 3:45 - 4:00 286 1053 158 674 444 1727 4:00 - 4:15 10 13 23 4:15 - 4:30 12 15 27 4:00 - 4:15 278 182 460 4:30 - 4:45 10 1e 28 4:15 - 4:30 267 160 4 2T 4:45 - 5:00 16 48 31 T7 4T 125 4:30 4:45 308 150 458 4:45 - 5:00 318 1171 184 676 502 1847 5:00 - 5:15 5:15 5:30 18 28 30 36 48 5:00 - 5:15 324 184 508 5:30 - 5:45 30 63 6 y 93 5:15 - 5:30 334 184 5:45 - 6:00. 48 126 101 230 149 354 5:30 5:45 5:65 6:00 296 184 480 288 1242 212 764 500 2006 6:00 6:15 6:15 - 6:30 56 SS 116 112 172 6:00 6:15 320 168 y88 6:30 • 6: 45 81 143 167 224 6:15 6:30 292 176 468 6:45 - 7:00 88 280 206 STT 294 857 6:30 • 6:45 6:45 7:00 286 230 160 446 1128 150 654 380 1782 7:00 - 7:15 7:15 - 7:30 112 142 238 280 350 7:00 - 7.1 5 196 122 318 7:30 • 7:45 191 323 422 514 7:15 - 7:30 158 121 279 T:4S 8:00 180 625 379 1220 559 1845 :: 730 • 745 T,4S - • 8.A0 156 124 119 2>5 634 104 .464 228 1100 ?; 8:00 - 8:15 8:15 - 8:30 166 138 327 276 493 8:00 8:15 119 90 209 8:30 -8:45 126 263 414 39 8115 - 8:30 93 88 181 8:45 - 9:00 162 572 248 1114 390 0 1686 8:30 - BAS 8:65 9:00 84 74 94 178 370 87 359 161 729 9:00 - 9:1 S 9:15 - 9:30 136 120 241 196 377 9:00 - 9:15 71 94 165 9:30 - 9:45 122 181 316 303 9:15 - 9:30 74 60 134 9:45 - 10:0o 114 492 190 808 304 1300 9:30 • 9;45 9:45 - 10:00 56 72 128 54 255 64 290 118 545 10:00 - 10:15 120 176 296 10:15 10:30 131 Z6310:30109 10:00 • 10:15 53 56132 10:30 • 10:4s 114 158 272 10:1 S • 42 by 102 10:45 - 11: 00 126 491 136 602 262 1093 10:30 - 10:45 10:45 11:00 36 26 34 70 157 60 190 66 347 11:00 - 11:15 11:15 • 11:30' 158 154 144 302 11:00 • 11:15 34 32 11:30 - 11:45 169 1SS 170 309 11:15 - 11:30 22 31 66 53 11:45 • 12:00 192 673 157 626 339 3yq X299 11:30 • 11:45 27 26 53 itirrrr�r#r*t�##�rrr�s�rtrrr•wrr*rr�#r4•�rir�rAr�4�frsirtr►�wArrrr*rrrtr�rr�rl�r00�rr 24 107 12 101 36 208 TOTALS 3.479 51,392 88871 *ttr!•�#il4��rrr+trrr�rr+rirsr��r��•�r►rr�r 8,554 6,396 6 14, 950 ADT' S •rr'*rrr�►t��r�ri4+►r►�tii�rrtArtr���itrti#irrtrtrl�ttrt�r�rr►��rtrr�►irritrtr! 12j033 •i#rrii►itli►t►#trrr►i#►i►!#lrrf+t#r•`►tAtrrrr#!• 11j788 23o&21 Resolution No. 07-31 Page 82 of 163 TRAFFIC DATA SERVICES, INC. LOCATION CODE C1519.147 ••4itttriri♦lrrt•ti♦trtrww,►r.r.•rr•4irifriwlr.trrtrritw�trlrr.if.ir•rrrr*iiitr+••fir♦.r•r4trtlrrtr•twift.i#r4rtr•*tort LOCATION - WALNUT-6TN RED HILL/NEWPORT VOLUMES FOR - TUESDAY 11/22/05 rr4�A•fiif•w.rrif•irr••it•ir TIME fift4►rirwrr PM riitrirrtlfirt*rt•iirf.ti ri4r4.4i•�Atf4�•A4i•••••••rrfift4fi•4«•iMNfii*iiftt•firw4riii•f EO we TOTAL .TIME E6 We TOTAL ••�t•ifi•itr•1frf4trtiiiif ltiii••t.rriitrttrttf 12:00 - 12:15 12:15 12:30 11 14 25 12:00 - 12:15 1204 1 8 irt4fi•i4 268 12:30 12:45 6 8 10 6 16 12:15 - 12:30 136 118 252 12:45 1:00 10 35 10 40 14 20 75 12:30 • 12:45 145 100 245 12:45 - 1:00 133 532 128 494 261 1026 1:00 - 1:15 1:15 - 1:30 9 4 S 16 1:00 - 1:15 118 105 223 i 1:30 - 1:45 7 12 6 16 1:15 1:30 130 110 240 1:45 • 2:00 3 23 9 32 13 12 SS 1:30 - 1:45 153 110 2 63 1:45 • 2:00 139 540 111 436 25500 976 2:00 - 2:15 2:15 - 2:30 6 1 3 9 2:00 2:15• 114 132 246 2:30 2:65 3 3 ; 6 2:15 • 2:30 128 128 256 2:45 3:00 10 20 2 11 6 12 31 2:30 2:45 129 154 283 2:45 • 3:00 100 471 148 562 248 1033 3:00 - 3:15 3:15 - 3:30 3 4 S e 3: W- 3:15 111 168 279 3:30 - 3:45 7 9 3 13 3:15 - 3• .30 98 149 .247 3:45 - 4:00 16 30 2 19 10 18 49 3:30 - 3:45 3:45 - 4:00 104 128 441 180 205 702 284 333 1143 4:00 - 4:15 4:15 - 4:30 12 15 3 15 6:00 - 4:15 110 218 328 4:30 - `; 4S 1 s 4 8 19 4:15 - 6:30 116. 226 342 4:45 • 5:00 28 70 11 26 23 39 96 4:30 - 4:45 4:45 - 5:00 120 134 480 259 270 973 179 404 1453 5:00•- 5:15 5;15 - 5:30 26 33 11 37 5:00 - S- .1S 126 269 395 5:30 - 5;45 TS 12 17 45 S:1S - 5:30 148 280 428 5:45 - 6:00 81 215 24 64 92 105 279 5:30 • 5:45 5:45 - 6.:00 176 168 618 270 258 1077 446 426 1695 6:00 - 6:15 6:15 6:30 6:30 - 6:65 76 94 140 28 34 104 128 6:00 - 6:15 6:15 6:30 138 138 282 234 420 3 72 62 182 6:45 137 .�, 6:45 • 7:00 183 693 66. 170 269 663 S 7:00 210 347 93 506 192 918 285 1424 7:00 - 7:15 7:15 - 7:30 174 206 78 252 7:00 • 7:15 96 162 258 �• 7:30 7:45 240 120 112 326 352 7:15 • 74-30 106 128 234 7:45 - 8:00 2S.4 876 142 452 396 1326 7: 30— - 7:45 7:45 - 8:00 80 112 192 96 378 85 487 181 865 8:00 - 8:15 8:15 - 13:30 192 174 128 320 8:00 - 8:15 70 72 142 8:30 - 8:45 153 110 100 286 253 8 :1 S - 3:30 66 70 136 8:45 5�:00 128 64 T 82 420 210 1067 8:30 - 8:4S 8:65 9:00 5� 60 124 � 250 53 255 103 SOS 9:00 • Sp: 15 9:15 - S►: 30 87 92 ST 144 9:00 - 9:15 59 58 117 9'30 - �' 4S 82 174 9:15 • 9:30 • 56 54 110 9:45 - 10:00 90 359 70 275 156 160 634 9:30 9:45 9:45 • 10:00 41 49 90 38 194 26 187 64 381 10:00 - 10:15 10:15 10; � d6 " 7S 171 10:00 - 10:15 36 S3 89 10:30 - 10165 82 T 59 160 14:15 .• 10:30 32 42 74 10:45 - 11:00 85 316 82 303 141 167 619 10:30 10:65 23 36 59 10:45 - 11:00 123 3278 46 177 78 300 11:00 - 11:15 11:15 11:30 80 86120 68 148 11:00 - 11:15 19 32 S 1 11:30 • 11-45 104 138 206 11:15 - 11:30 12 28 .40 11:45 - 12:00 111 381 123 449 262 234 830 11:30 • 11:65 11:45 13 25 38 - 12:00A i•i• .*r•w•••�•�•��•�•i•wrlrri.••«•r••iAri.•i••i••r••i«ir•r•••••i••«•r•4A•.•.iff i.ia•�t•i.rrf4.if..i..S.A8�►i�ti .21 150 TOTALS 3,4632,261 724 4r-k•iri••• S, 40585 6.366 10, 9S 1 ADT I S4 t••iiir•irrrrrii•i•ir••iii4irt•irr.f•i•rri••ii•iii•rrrrti•t•iri•irtirifr•t•it•itirfit8oO LL 80627 r8riirir•ri • 46:6%5 a7-3 Resolution No. Page 83 of 163 P_� TRAFM DATA SElCVtC�- INC SUMMARY OF VEHICULAR TURNING MOVEMENTS NIS ST: RED HILL. AVE 6/W ST: WALNUT AVE CITY: TUSTIN FILENAME: 0351801 DATE: 3118106 DAY: WEDNESBAY PEJi1K HOUR AT: NORTHBOUND SOUTHBOUND EASTUOUM WESTBOUM 715 ASA PERIOD SEom NL HT NR SL ST SR EL ET ER WL VVT Wit Total LANES: 1 3 0 1 2 0 1 2 0 1 2 0 1:00 AM 10 67 43 23 189 11 18 81 45 60 55 26 628 1S Alin 21 129 66 23 282 8 35 109 78 74 92 27 915 30 AM 14 80 34 19 240 9 25 65 72 50 72 18 698 45 AM 53 104 32 31 261 18 31 107 77 67 107 16 904 8:00 AM 21 92 33 16 206 17 38 113 99 111 165 37 948 15 AM 9 84 31 10 152 7 11 55 44 53 40 19 515 30 AM 14 80 35 22 188 13 10 61 53 69 70 30 635 45 AICA 26 59 21 11 241 13 19 47 56 71 75 28 667 PEJi1K HOUR AT: PHF: 0.91 715 ASA VOLUMES• 109 405 154 91 968 52 129 394 302 4315 96 3465 FILENAME: 0361801P DATE: 3123/W DAY: THURSDAY BEGM NOR NL. THBOUND NT HR gourHeouND SL. ST SR EASTBOUND M, ET ER VAESTSOUND WL WT WR Tata) 4:00 PM 57 260 35 19 139 20 39 70 24 75 195 37 970 15 PM 50 194 38 26 97 16 25 83 20 55 141 19 765 30 Pm 83 217 36 50 100 21 27 67 28 72 187 38 915 45 PIIS 47 242 38 28 97 21 32 86 21 64 180 29 862 5_-vo PM 88 278 38 30 88 22 .28 98 22 68 181 39 958 15 PM 65 272 48 33 140 33 29 102 33 56 170 32 1013 30 PM 60 238 +46 32 112 31 32 107 27 73 198 40 9% 45 PILI 55 276 39 33 131 24 29 91 21 55 150 33 937 PEAK MOM BEGM AT: PNF: 0.96 1700 Pm 3904 VOLUMES 248 1064 171 128 471 110 118 398 103 250 600 144 COMMENTS: Resolution No. 07-31 7.R;�q W of 163 "NUT' 4CgAC VTVR -P1TJJVVT A7A7T%0%T J VVJ aT • TT Ann? iw v inn �f / It 28. bd Hill & VAIMI: . 7mt-2= i� m lYtra� UVO 1 11l PR PX x MOOR MOR LM C11PiCITY . 90L V/C VOL V/C HL 1 1700 60 .04* 150 .0�9 IN 3 5100 150 .04 1900 .43i OR 0 0 120 .07 280 320 SIL Z 3400 40 .01 10 .00 .2T 3 5100 2220 .49# 780 .17 MR 0 0 280 270 80 90 IRL 1 1700 160 .09 390 .23* EBT 2 3400 390 .17* 280 .09 m 0 p 200 260 30 30 N8L 1 1700 200 •120 370 .22 �T 2 3400 470 .14 710 .21* .20* 1 1700 M .01 70 .04 Cly IAtend Charm Inta valL MOMMOMMO - .05* .O5* .0" mm CIP=ff D LIMOS, .97 .92 Post - tin 3- IK PR OU PK PR MOR Lim CIPICM VOL V/C VOL V/C UL 1 1700 50 .03* 150 .09 DT 3 5100 160 .05 1950 .45* m 0 0 120 .07 320 SBL 2 3400 40 .01 20 .01* SS? 3 5100 2330 451* 870 .19 68R 0 0 270 90 ZOL 1 1700 140 .08 410 .24* IBT 2 3400 460 .21* 290 .09 Im 0 0 260 30 OL 1 1700 190 .11* 370 .22 NBT 2 3400 490 .14 670 .20* m 1 1700 20 .01 70 .04 Charm Inta valL MOMMOMMO - .O5* .05� C3P1C1" D'IIGISIlIOr .91 .95 Pott -2020 IBM hltli�edve 2 IK PR OU PK PR MOR L1RBS C1PIIZI VOL V/C VOL Y/C MEL 1 1700 50 .03* 130 .08 JO 3 5100 150 .04 1970 .45* HR 0 0 140 .08 320 SIL 2 3400 30 .O1 10 .00 S8? 3 5100 2300 M .lb Sm 0 0 260 70 88L 1 1700 130 .08 400 .24* Sit 2 3400 410 .19* 290 .09 Hm 0 0 220 30 WIL 1 1700 170 .10* 390 .23 WK 2 ' 3400 470 .14 660 .19* m 1 1700 20 .01 90 .05 Clce Intrel .O5* .05� 'r0 M C1PUM DTA UTIM .81' .93 Resolution No. 07-31 Page 85 of 163 TRAFFIC DATA SERVICES, INC (714) 541-2228 PEDESTRIAN COUNT Resolution No. 07-31 Page 86 of 163 N/S ST: ENV ST: CITY: Time Period Beginning RED HILL AVE WALNUT AVE TUSTIN N -LEG CROSSED AT CORNER S -LEG E -LEG W --LEG FILENAME: 03616PIA DATE: 3/15/06 DAY: WEDNESDAY CROSSED MIDBLOCK N -LEG S -LEG E -LEG W -LEG TOTAL 6:00 AM :15 AM :30 AM :45 AM 7:00 AM 2 10 2 1 15 .15 AM 3 1 0 14 18 :30 AM 0 1 1 6 8 17.1 .45 AM 0 5 5 2 12 8:00 AM 1 1 1 5 8 :15 AM 1 3 5 8 17 :30 AM 1 6 6 2 155 :45 AM 2 4 3 7 1 9:00 AM :15 AM :30 AM :45 AM 10:00 AM :15 AM :30 AM :45 AM 11:00 AM :15 AM :30 AM :45 AM 12:00 PM :15 PM .30 PM :45 PM COMMENTS: Resolution No. 07-31 Page 86 of 163 r7 P, 61, TRAFFIC DATA SERVICES, INC. (714) 541-2228 PEDESTRIAN COUNT N/S ST: RED HILL AVE FILENAME: 03616P1 M E/W ST: WALNUT AVE DATE: 3/15/06 CITY: TUSTIN DAY: WEDNESDAY Time CROSSED AT CORNER CROSSED MIDBLOCK Period Beginning N -LEG S -LEG E -LEG W -LEG N-L.EG S -LEG E -LEG W -LEG TOTAL 9:00 AM :15 AM :30 AM :45 AM 10:00 AM :15 AM :30 AM :45 AM 11:00 AM :15 AM :30 AM :45 ,AM 12:00 PM :15 PM • :30 PM :45 PM 1:00 PM 1 5 3 17 26 :15 PM 1 3 0 5 :30 PM 2 4 1 11 18 8 :45 PM 2 4 0 2 8 2:00 PM 2 5 2 5 14 :15 PM 4 2 1 18 25 :30 PM 5 1 4 24 34 :45 PM 4 8 7 14 33 3:00 PM 7 3 8 10 28 :15 PM 3 8 6 4 21 :30 LPM :45 PM COMMENTS: Resolution No. 07-31 Page 87 of 163 TRAFFIC DATA SERVICES, INC. (714) 541-2228 PEDESTRIAN COUNT COMMENTS: Resolution No. 07-31 Page 88 of 163 N/S ST: RED HILL AVE FILENAME: 03616P1 P ENV ST: WALNUT AVE DATE; 3/15/06 CITY: TUSTIN DAY: WEDNESDAY Time CROSSED AT CORNER CROSSED MIDBLOCK Period Beginning N -LEG S -LEG E -LEG W -LEG N -LEG S -LEG E -LEG W -LEG TOTAL 12:00 PM Evt :15 PM :30 PM :45 PM ' 1:00 PM :15 PM :30 PM :45 PM 2:00 PM :15 PM :30 PM :45 PM 3:00 PM 15 PM :30 PM :45 PM 4:00 PM 4 10 9 14 37 :15 PM 9 4 2 13 28 :30 PM 5 4 4 6 19 :45 PM 4 4 8 2 18 5:00 PM :15 PM 1 3 7 0 13 1 6 27 5 :30 PM 3 3 2 9 17 „ :45 PM 6:00 PM 2 1 3 3 9 :15 PM :30 PM :45 PM COMMENTS: Resolution No. 07-31 Page 88 of 163 Appendix B Intersection Level of Service Worksheets Katz, Okitsu & Associates City of Tustin Traffic FngiKurs and Trunsponatbn PlaMxcrs Red Hill/Walnut Residential Project Traffic Study Resolution No. 07-31 Page 89 of 163 T CD Q 0 (J►i Zxisting AM ----Thu Isar 30, 2006 14:35:22Page 1-i ----------------------- Thu Mar 30, 2006 14:35:22 JA6539 - 76 -Unit Residential Project TIS Page 2-1 City Of Tustin --------------••--------------- Existing AM Scenario: Scenario Report Zxisting AM Command: Existing AM Volume: bcisting AM Geometry: xxisting Impact lee: Default impact tee Trip Generation: AN Trip Distribution: ALL Pathat Default Patha Routes; Default Routes Configuration: aistieg AM Traffix 7.7.1115 (c) 2004 Dowling Assoc. Licensed to Ki1TZ OXITSU, TUSTIN# CA Existing AN Thu Mar 30, 2006 14:35:22 Page 2-1 JA6S39 - 7S -Unit Residential Project TIS - - City of Tustin -------•------•--•---------- lxisting AN ---------•------------------------------ Turning MOvelment Report AM Volume Northbound Type Left Thsu Right Southbound Bastbound Left Thru Right westbound Total Left Thru Right Left Toru Right Volume N1 Red Hill 4 Walnut Sao* 109 405 154 91 969 52 129 394 326 302 436 91 3465 Added 0 0 0 Total 109 405 154 O 0 0 0 0 0 91 969 52 129 394 326 0 0 302 436 0 98 0 3465 02 Driveway On Red Hill Base 0 0 0 0 0 0 0 0 0 0 0 0 0 Added 0 0 O Total 0 0 0 0 0 O 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 •3 Driveway an Walnut Base 0 0 0 0 0 0 0 0 0 0 0 0 0 Added 0 0 0 Total 0 0 0 0 0 0 0 0 O 0 0 O p 0 0 0 0 0 0 0 0 0 0 Traffix 7.7.1115 (c) 2004 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, C# Rxiating AM Thu Mar 30, 2006 14:35:12 Page 4-1 -------------------------------------------------------------------------------- JASS39 - 75 -Unit Residential Project TIS City of Tustin bcisting AM -------------------------------------------------------------------------------- Ispact Analysis Report Level Of Service Intersection Base Future Change Del/ V/ Del/ V/ in IROS Veh C LOS Veh C N 1 Red Hill i Walnut D xxxxx 0.904 D xxxxx 0.404 ♦ 0.000 WC Traffix 7.7.1115 (c) 2004 Darling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA V �Q CD CO N 0 W ( existing AN Thu Mar 30 2006 14:35:22 -----------•---•---JA6539 - 7S -Unit Residential Project TIS---------�--5-1--- City of Tustin existing AM --- ------------------------------------- Level Of Service Cowputation Report ICU 1(1,024 as Cycle Length t) Method (Same Volo" Alternativs) ♦lfffffflff♦flf!!!�!!�!!!!!l�liA!♦fllflf!!f!!f!f!lfffffffff llfff !lfff!!!1!!!!!!! Intersection /1 Red Hill a Walnut •fflflflfff!!!f!l�lfl�f!!!!!!!!f!!f!!!!flfftf!!!!!f!!f !lf fff!l1�flff!!!!f 1lff!!f Cycle (sec): 100 Critical Vol./Cap. (X): 0.404 Loss Time (sec): S (Y.R . 4 sec) Average Delay (sec/veh): Optimal Cycle: 53 Level Of Service: D !fl•!!ff!!fl�lf�flfffffffff!!!!!!!f!!!lfff A!!!!!f lfl!!lffffffflf Street uame: !!f !f lffflf !!!!! Red Hill Ave Walnut Ave Approach: Movement: Worth Bound South Bound seat 20un0 West Sound L- T- -- -I------II------'1------'I R L- T - R L T R L- T R Control: Rights: -------------- ProtectedProtectedprotected ' Protected Min. Gres-: Include Include Include 0 0 0 Lanes: 0 0 0 0 0 0 0 0 0 1 0 2 1 0 1 0 1 1 0 1 0 1 1 0 1 0 1 1 0 --------------- 11 --------------- 1J --------------- Volume module: --------------- � Same Vol: Growth Adj: 109 405 1S4 91 969 52 129 394 326 302 436 91 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Sae: 109 405 154 91 969 S2 129 394 326 302 436 91 User Adj: PHP Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHP Volume: Reduct Vol: 109 405 154 91 969 52 129 394 326 302 436 94 0 0 Reduced Vol. 0 0 0 0 0 0 0 0 0 0 109 403 154 91 969 52 129 394 326 302 436 91 PCs Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ML! Adj: Final Vol.: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 109 405 154 91 969 52 129 394 326 302 436 94 -----11--------------- -----------•--- ---------------� ----ratio- Flow Module: Sat/Lane: 1700 1100 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: Final Sat.: 1.00 2.17 0.13 1.00 1.10 O.iD 1.00 1.09 0.11 1.00 1.63 0.37 1700 �6lS 240S ------•----- 1700 3227 171 1700 1461 1539 1700 2776 624 -----•--------- ---------------11-------••------II Capacity Analysis Module: Vol/Sat: Crit Moves: •!!!! N!f!N f!!•�!!f!l�lff!•ff�f!!�!l�lfflf•ff!•!♦!!fllf!!ff!!�lff�if!!!!!f 0.06 0.11 0.11 O.OS 0.30 0.30 0.04 0.21 0.21 0.11 0.14 0.16 •f!! ft1• !!�! ff!!' lfff! Traffix 7.7.1115 (C) 2004 Dowling Assoc. Licensed to q►TL pjaTSU, TUSTIN, CA D rte► -r...y �.�..� Existing PH Thu Har 30, 2006 14:3S:46 Page 1-1 JAGS39 - 73 -Unit Residential Project TIS City of Tustin Traffix 7.7.1115 (C) 2004 Dowling Assoc. Licensed to KATZ OKITSU. TLSTIN, Ch Cc � 0 CD =3 co Z W O O O -- h —4 Q� w " Existing PH gkistt+ !0"-------------------------------------------------------------------- scenario Report Scenario: Existing PH Command: Existing PH volume: Existing PH Geometry: Existing Impact V-"- Dofatult Impact Pee Trip Generation: PH Trip Distribution: ALL Paths: Default Paths Routes: Default Routes Configuration: Existing PH Traffix 7.7.1115 (C) 2004 Dowling Assoc. Licensed to KATZ OKITSU. TLSTIN, Ch Cc � 0 CD =3 co Z W O O O -- h —4 Q� w " Existing PH Thu Mar 30. 2006 14:35:46 Paye 2-1 -------------------------------------------------------------------------------- JASS39 - 75 -Unit Residential Project TIS City of Tustin -------------------------------------------------------------------------------- Existing PH Turnisg Havement Report PH volume Northbound Southbound Bastbound Westbound Total Type Left Thru Right Left Thru Right Left Thru Right Left Thru Right Volume 61 Red Hill i Walnut same 24. 1064 171 126 471 110 110 396 103 250 699 144 3904 Added 0 0 0 0 0 0 0 O 0 0 0 0 0 Total 240 1064 171 126 471 110 116 390 103 250 699 144 3904 t2 Driveway on Red Hill aa:d 4 u a v 0 0 0 0 0 0 0 0 0 Added 0 0 0 0 0 0 0 0 0 0 0 0 0 Total 0 0 0 0 0 0 0 O 0 0 0 0 0 03 Driveway an Walnut base 0 0 0 0 0 0 0 0 0 0 0 0 0 Added 0 0 0 0 0 0 0 0 0 0 0 0 0 Total 0 0 0 0 0 0 0 0 0 0 0 0 0 Traffix 7.7.1115 (c) 2004 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA misting PM Thu Mar 30, 2006 14:3S:46 -------------------------------------------------------------------------------- Page 4-1 J"539 - 75 -Unit Residential Project TIS City of Tustin ftisting PM -------------------------------------------------------------------------------- Ispact Analysis Report Level Of Service Intersectian Base Future Change Del/ V/ Dei/ V/ in LOS Veh C LOS Veh C S 1 Red Kill i walnut B xxuxx 0.664 B 3PU= 0.664 . 0.000 V/C Traffix 7.7.1115 (C) 2004 Dowling Assoc. Licensed to KATZ OKITSU, TIASTIm, Ch axiating PM Thu Har 30, 2006 14135:46 Page 3-1 JAGS39 - 75 -Unit Residential Project TIS City of Tustin xxicting PH -------------------------------------------------------------------------- Lsnrel Of Service Computation Report ICU 1(11069 as Cycle Length •) Method (ease Values Alternative) AffffffffffAflffffAAAff1Alff1lf ffffAffAlfAAf Af AfAAfff Afffffffff lflAAflf Af Affffff Intersection S1 Red Hill 4 Walnut !!!flflffAAlffffffAAflflffAAAf AfAAf Af Afffff•ff!•f AfffffffffAffflffAfflfffAfAAAff Cycle (sec): 100 Critical Vol./Cap. (X): 0.684 Los& Time (sec): 5 (Y.R - 4 sec) Average Delay (sec/vehl: X3CKXJn Optimal Cycle: 36 Level Of Service: b lffAlAffAAflf lfffffff lffffffffffffffffff Af ffAffAff lfffAfffffffffffffAfffffffffff Street Mame: Red Hill Ave walnut Ave Approach: North Bound South Bound east Bound Ment bound Movement: L- T- R L- T- R L- T- R L- T- R ------------ I --------------- 11 --------------- ��-------- , C7ontrol: Protected Protected Protected �� protected-_ -� Rights: Include Include Include Include Min. Orion: 0 0 0 0 0 O 0 0 0 0 0 0 Lanes, 1 0 2 1 0 1 0 1 1 0 1 0 1 1 0 1 0 1 1 0 --------------- --------------- --------------- --------------- Volume Module� Base Vol: 248 1064 171 128 471 110 118 398 103 350 699 144 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial 5": 248 1064 '171 128 471 110 118 398 103 250 699 14t User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHP Volume: 248 1064 171 128 471 110 118 398 103 250 699 144 Reduct Vbl: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 248 1064 171 128 471 110 118 396 103 2SO 699 144 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MW Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Vbl.. 248 1064 171 128 471 110 118 398 103 2S0 69! 144 ------------I---------------i1--------------- --------------- ---------------� Saturation flow Module: Sat/Lsne: 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes3 1.00 2.58 0.42 1.00 1.62 0.38 1.00 1.59 0.41 1.00 1.66 0.34 Final Sat.: 1700 4394 706 1700 2756 644 1700 2701 699 1700 2819 S81 ------------I---------------11--------------- --------------- ---------------� Capacity Analysis Module: Vol/Mat: O.iS 0.24 0.24 0.08 0.17 0.17 0.07 O.iS O.iS 0.15 0.25 0.2S Crit Nov": +•** ffff f•ff :AA! !f!f!flfffflf!lfAffflfflflffffAAtiffff!!llfffflAffflfflflfffflfflfflfffANfAflfA Traffix 7.7.1115 (c) 2004 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA N CD O C n CD =3 (c) Z Cn O 0 (=) � W W � Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA 11 Existing Plus AN Fri Dec 15, 2006 14:36:28 Page 2-1 -------------------------------------------------------------------------------- JA6539 - 75 -Unit Residential Project TIS City of Tustin Existing Plus Reuse Alternative 1 Without project -------------------------------------------------------------------------------- Turning Movement Report AM Volume Northbound Southbound Eastbound 0) CD Total Type Left Thru Right (Q 07 Existing Plus AN Fri Dec 15, 2006 14:36:28 Page 1-1 CDO -------------------------------------------------------------------------------- Left CO C Volume JA6539 - 75 -Unit Residential Project TIS M O Existing City of Tustin Plus p 0 h----------------------------------------------------------------- Reuse Alternative 1 Without Project Z O Scenario Report W Scenario: Existing Plup AN O Commands Existing Plus AN 4 Volume: Existing AN W Geometry: Hearterm —' Impact Fee: Default Impact Fee 0 Trip Generation: AN 0 Trip Distribution: ALL 0 Paths: Default Paths Total 111 413 157 Routes: Default Routes 53 Configuration: Existing Plus AN Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA 11 Existing Plus AN Fri Dec 15, 2006 14:36:28 Page 2-1 -------------------------------------------------------------------------------- JA6539 - 75 -Unit Residential Project TIS City of Tustin Existing Plus Reuse Alternative 1 Without project -------------------------------------------------------------------------------- Turning Movement Report AM Volume Northbound Southbound Eastbound Westbound Total Type Left Thru Right Left Thru Right Left Thru Right Left Thru Right Volume 91 Red Hill 4 Walnut Base 111 413 157 93 988 53 132 402 333 308 445 100 3534 Added 0 0 0 0 0 0 0 0 0 0 0 0 0 Total 111 413 157 93 988 53 132 402 333 308 445 100 3534 #2 Driveway on Red Hill Base 0 0 0 0 0 0 0 0 0 0 0 0 0 Added 0 0 0 0 0 0 0 0 0 0 0 0 0 Total 0 0 0 0 0 0 0 0 0 0 0 0 0 #3 Driveway on Walnut Base 0 0 0 0 0 0 0 0 0 0 0 0 0 Added 0 0 0 0 0 0 0 0 0 0 0 0 0 Total 0 0 0 0 0 0 0 0 O 0 0 0 0 Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA X CD 0 cQ 0 CD =3 co Z 4 0 0 0 � W W � Existing Plus AN Fri Dec 15, 2006 14:36:28 Page 3-1 ------------------------------------------------------------ JA6S39 - 75 -Unit Residential Project TIS City of Tustin Existing Plus Reuse Alternative 1 Without Project ----------------------------------------------------- Intersection Volume Report Base Volume Alternative ---------------------------------------------------------------------- Northbound Southbound Eastbound Weetbound Node Intersection L -- T -- R L -- T -- R L -- T -- R L -- T -- R 1 Red Hill a Wa 111 413 157 93 968 53 132 402 333 308 445 100 2 Driveway on R 0 0 0 0 0 0 0 0 0 O 0 0 3 Priw� ; y M G G u u v d 0 Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Existing Plus AN Fri Dec 15, 1006 14:36:28 Page 4-1 -------------------------------------------------------------------------------- JA6539 - 7S -Unit Residential Project TIS City of Tustin Existing Plus Reuse Alternative 1 Without Project -------------------------------------------------------------------------------- Impact Analysis Report Level Of Service Intersection Base Future Change Del/ V/ Del/ V/ in LOS Veh C LOS Veh C 0 1 Red Hill a Walnut B xuxxx 0.678 B xnxxx 0.678 + 0.000 V/C 2 Driveway on Ret! Kill 0.0 0.000 0.0 0.000 t 0.000 D/V 3 Driveway on Walnut 0.0 0.000 0.0 0.000 + 0.000 D/V Trafflx 7.8.0715 (C) 3nnc Odin, :`s scc, Licensed to KATZ OKITSU, TUSTIN, CA T X Existing Plus AM Fri Dec 15 2006 14:36:28 0) Page 5 -1 ----------------------------------------------- CD O JA6539 - 75 -Unit Residential Project TIS City of Tustin OCfl E Existing Plus Reuse Alternative 1 Without Project 0' -------------------------------------------•------------------------------------ 0 :3Threshold Report (Base Alternative) W--L Z Threshold Criteria (Ops LOS (Plan LOS (Delay >= 60.000]IV/C >• 1.0001 � Intersection Movement LOS Delay V/C W Traffix 7.8.0715 (c) 2006 Dowling ASSOC. Licensed to KATZ OKITSU, TUSTIN, CA Existing Plus AM Fri Dec 15, 2006 14:36:28 Page 6-1 ------------------ JA6539 - 75 -Unit Residential Project TIS City of Tustin ----------------Rxisting-Plus-Reuse-Alternative-l-Without-Project--------------- Threshold Report (Future Alternative) Threshold Criteria (Ops LOS >_ *)(Plan LOS >_ *) IDelay ),.- 60.0001(V/C >= 1.000) Intersection Movement LOS Delay V/C Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA N 0 W 0 cQ 0 0 :3 co Z CO 0 0 0 0) W W --L Existing Plus AM Fri Dec 15, 2006 14:36:28 Page 7-1 JA6539 - 75 -Unit Residential Project TIS City of Tustin Existing Plus Reuse Alternative 1 Without Project ---------------------------------------------- Level Of Service Computation Report ICU Moss as Cycle Length 0) Method (Base Volume Alternative) iwww!!*lwtwwwwlw!l4ii#wtlt4iwlwlwtlittltw•itwiwAiiwiilitA*!**i*A!!wlfiliwitwwiw! Intersection #1 Red Hill Q Walnut ♦!!!liiwwwt•wwtw#•wwlwAAwlwlwwiwtwtttw!•w!t!t!#wti*t!t**********twwAiliAwwwwwwii Cycle (sec)s 100 Critical Vol./Cap.(X)x 0.678 Loss Time (sec) s 0 (Y+R-4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 71 Level Of Service: H +rwwi!#ww#iww!#ww•wwwswwwww*w+►#wwtwwwwiitt#!litwti•*****w*w*****wwwiww*#Aww#wwwiw Street Wants Red Hill Ave Walnut Ave Approach: North Hound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L- T - R ------------ I ---------------11---------------11---------------11------------� Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 2 1 0 1 0 1 1 0 1 0 1 1 O 2 0 1 1 0 ------------------------ ------------ ��--------------- Volume Module:� Base Vol: 109 405 154 91 969 52 129 394 326 302 436 98 Growth Adj: 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 Initial Bass 111 413 157 93 988 53 132 402 333 308 445 100 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adis 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PKF Volume: 111 413 157 93 988 53 132 402 333 306 445 100 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vols 111 413 157 93 988 53 132 402 333 306 445 100 PCR Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.'00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Vol.: 111 413 157 93 988 53 132 402 333 308 445 100 Saturation Flow Module:----- ---------------11--------------------� Sat/Lane: 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 2.17 0.63 1.00 1.90 0.10 1.00 1.09 0.91 2.00 1.63 0.37 Final Sat.: 1700 3695 1405 1700 3227 173 1700 1861 1539 3400 2776 • 624 ------------ I --------------- --------------- 11 --------------- ---------------) Capacity Analysis Module: Vol/Bats 0.07 0.11 0.11 0.05 0.31 0.31 0.08 0.22 0.22 0.09 0.16 0.16 Crit Moves: +*•* •!w! #Ai! !A#! wlwiw***********A*******w*+**w#www#wwwllwiii#iwwwwiwlw#ww*Awiwwitt!!ttli!!!!tlwA Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Existing Plus AM Fri Dec 15, 2006 14:36x28 Page 8-1 JA6539 - 75 -Unit Residential Project TIS City of Tustin Existing Plus Reuse Alternative 1 Without Project -------------------------------------------------------------------------------- Level Of Service Computation Report ICU Moss as Cycle Length •) Method (Future Volume Alternative) wwiwwit###A##itiiwwlwit#iwwltli!#iilAwtAiwi#Awww#!t!!t!!!iw!!lwwiitwlwiwwwAiwww# Intersection #1 Red Hill 6 Walnut wwwA!!!•fit#Aii#!w!!#ltwilAAt!•AlfwtwwwwwAfiiwwwAwlwwww#wwwiw#wwwwwwwiwi!!#twiwA Cycle (sec)& 100 Critical Vol./Cap.(X): 0.678 Loss Time (sec): 0 (Y+R•4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 71 Level Of Service: B iwiitw#•i!i•!t!lwwiw#Aw•w•i#wwwwwrw•wwwwwwwwwwrwwwwwww#wwwwwwwwwwtwwwwwwwwwwwwwt Street Name: Red Hill Ave Walnut Ave Approach: North Bound South Bound East Bound West Bound Movements L - T - R L - T - R L - T - R L - T - R Control: ------------ ) Protected --------------- I) Protected --------------- I) Protected --------------- II Protected I Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 O 2 1 0 1 0 1 1 0 1 0 1 1 0 2 0 1 1 0 ------------ I --------------- --------------- --------------- ---------------� Volume Module: Base Vol: 109 405 154 91 969 52 129 394 326 302 436 98 Growth Adj: 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 Initial Bse: 111 413 157 93 988 53 132 402 333 308 445 100 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVols 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 111 413 157 93 988 53 132 402 333 308 445 100 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Pity Adjs 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 111 413 157 93 968 53 132 402 333 308 44S 100 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 111 413 157 93 988 53 132 402 333 308 44S 100 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Vol.: 111 413 157 93 988 53 132 402 333 308 445 100 ------------ I --------------- --------------- --------------- ---------------� Saturation Flow Module: Sat/Lane: 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 2.17 0.83 1.00 1.90 0.10 1.00 1.09 0.91 2.00 1.63 0.37 Final Sats 1700 3695 1405 1700 3227 173 1700 1861 1539 3400 2776 624 ------------ I --------------- --------------- --------------- ---------------� Capacity Analysis Modules Vol/Sat: 0.07 0.11 0.11 0.05 0.31 0.31 0.08 0.22 0.22 0.09 0.16 0.16 Crit Moves: ***• iww• wwwi wAwi #i##wwi#wwwlwiwiliiwwwwwwww#wwwwwwwwwwwwwwww+wAwrwwAAiwlw#rwwiwwiwwiiAwAwwwilwww Traffix 7.8.071S (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA CD cc U) Existing Plus AM Fri Dec 15, 2006 14:36:28 Page 9-1 CDO -------------------------------------------------------------------------------- -.L E JA6539 - 75 -Unit Residential Project TIS O '_•'': City of Tustin O O Existing Plus Reuse Alternative 1 Without Project O z Report •-------------------- Level Of Service Computation Re rt O 2000 HCM Unsignalized Method (Base Volume Alternative) • ###w•##AA#rwwlwwAAwr#A#wAAAA#lwAw##lAAAAA##A#A##•#A!*##A*#AAAA•#A#AAA#AAA#wA#ASA W O Intersection 82 Driveway on Red Hill #IAAAAw#A##AAA#AA########AAA#AAAAw#A!A!#rAAAArrAA##!#Atw#####AAA###AAtA#r#A#lAtA W Average Delay (sec/veh): 0.0 Worst Case Level Of Service: I 0.0) � lwAArArlwwrrfwrwAAAwrw# 1wA!#wAIAAAAtAAArAA#AlAAA#A#AAA#Art#AAAAArAAAtA!#rArr#AAr Approach: North Bound South Bound East Bound West Bound movements L - T - R L - T - R L - T - R L - T - R ------------ --------------- --------------- --------------- ---------------� Control: Stop Sign Stop Sign Uncontrolled Uncontrolled Rights: Include Include include Include Lanes: 0 0 2 0 0 0 0 1 1 0 0 0 0 0 1 0 0 0 0 0 -------------- --------------- --------------- --------------- Volume Module, ) Base Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Growth Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Initial Bse: 0 0 0 0 0 0 0 0 0 0 0 0 User Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 PHF Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 PHF Volume: 0 0 0 0 0 0 0 0 0 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Final Vol.: 0 0 0 0 0 O 0 0 0 O 0 0 l-------- --------------- --------------- --------------- Critical GapModules� Critical Gp: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 FollowUpTim: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ------------ --------------- --------------- --------------- ---------------� Capacity Module: Cnflict Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Potent Cap.: 0 0 0 0 0 0 0 0 0 O 0 0 Move Cap.: 1 1 1 1 1 1 1 1 1 1 1 1 Volume/Cap: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 : ') --------------- " ---------------II -•-------- Laval Of Service Module� 2Nay95thQ: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Control Del: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 LOS by Move: Movement: IT - LTR - RT LT - LTR'- RT LT - LTR - RT LT - LTR - RT Shared Cap.: 0 0 0 0 0 0 0 0 0 0 0 0 SharedQueue: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0..0 0.0 0.0 0.0 0.0 Shrd ConDel: 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Shared LOS: ApproachDel: 0.0 0.0 0.0 0.0 ApproachLOS: AA•####•A####wAA►r##!A#AAAlrr4w#AAArtttrAttwA!#tt#}}♦##A##AA•A#!A !!AAltiwrAlr4A# Note: Queue reported is the number of care per lane. #}wlArriAr}AAwlAtrwA#AArAt}r#AlwflArrlA!lAAw#t/AtlA#AwwlAA#•AAAA#AAwAtt4#t!!##A# Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Existing Plus AM Fri Dec 15, 2006 14:36:28 Page 10-1 JA6539 - 75 -Unit Residential Project TIS City of Tustin Existing Plus Reuse Alternative 1 Without Project -------------------------------------------------------------------------------- Level Of Service Computation Report 2000 HCM Unsignalized Method (Future Volume Alternative) lAftAA!###i#!#A######AA•A}####AA#!AlAr#A##•AAw♦}♦A!##••AAAA#!AA#ArilwrAiwArArAw4 Intersection *2 Driveway on Red Hill !w#Ar###1AAA#AArlAlAAAA#A1Al}#r!#rAr!#AAltwt#rAAwlAArA#AtA#r#t!w###A###A#}AltAA# Average Delay (sec/veh): 0.0 Worst Case Level Of Service: [ 0.01 w##Aw#!A#wlrwrlA#wAA♦wrrrwAlrrArwAwArrwlwlwAA•rwrrw+wwAwrwAwrAAwwwwwrtAlwArrrrwr Approach: north Bound South Bound East Bound West Bound Movements L - T - R L - T - R L - T - R L - T - R ------------ --------------- --------------- --------------- ---------------� Control: Stop Sign Stop Sign Uncontrolled Uncontrolled Rights: Include Include Include Include Lanes: 0 0 2 0 0 0 0 1 1 0 0 0 0 0 1 0 0 0 0 0 ------------ --------------- --------------- --------------- ---------------� Volume Module: Base Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Growth Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Initial Bse $ 0 0 0 0 0 0 0 0 0 0 0 0 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 0 0 0 0 0 O 0 0 0 0 0 0 User Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 PHF Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 PHF Volume: 0 0 0 0 0 0 0 0 0 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Final Vol.: 0 0 0 0 0 0 0 0 0 0 0 0 Critical Gap Module: Critical Gp: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 FollowUpTim: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ------------ ----- ---- - --------------- Capacity Module: Cnflict Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Potent Cap.: 0 0 0 0 0 0 0 0 0 0 0 0 Move Cap.: 1 1 1 1 1 1 1 1 1 1 1 1 Volume/Cap: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ------------ I --------------- --------------- --------------- ---------------� Level Of Service Module: 2Way95th0: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Control Del: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 LOS by Move: Movement: LT - LTR - RT LT - LTR - RT LT - LTR - RT LT - LTR - RT Shared Cap.: 0 0 0 0 0 0 0 0 0 0 0 0 SharedQueue: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Shrd ConDeI: 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Shared LOS: ApproachDol: 0..0 0.0 0.0 0.0 ApproachLOS: Note: Queue reported is the number of cars per lane. Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA X CD 07 -� O CD O Z O O O -�,, -4 � W W � Existing Plus AM . Fri Dec 15, 2006 14:36:28 page 11-1 JA6539 - 75 -Unit Residential Project TIS Cite GA' a .fiL.1u Existing Plus Reuse Alternative 1 Without project -------------------------------------------------------- Level Of Service Computation Report 2000 HCH Unsignalized Method (Base Volume Alternative) Intersection #3 Driveway on walnut Average Delay (sec/veh): 0.0 Worst Case Level Of Services ( 0.01 Approach: North Bound South Bound Bast Bound West Bound Movements L - T - R L - T - R L - T- R L - T - R ------------ i--------------- �j--------------- II--------------- {{---------------I Control: Stop Sign Stop Sign Uncontrolled Uncontrolled Rights: Include Include Include Include Lanes: 0 0 0 0 0 1 0 0 O 1 1 0 2 0 O 0 0 1 1 0 ------------{---------------{{---------------11--------------- ---------------I Volume Module: Base Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Growth Adj: 0.00 o.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Initial Bae: 0 O 0 0 0 0 0 0 0 0 0 0 User Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 PHF Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 0.00 PHF Volume: 0 0 0 0 0 0 0 0 0 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Final Vol.: 0 0 0 0 0 0 0 0 0 0 0 0 ------------{---------------{---------------{{---------------{{---------------i Critical Gap Module: Critical Gp: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 FollowUpTim: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ------------ I --------------- ---------------11---------------i{---------------i Capacity Module: Cnflict Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Potent Cap.: 0 0 0 0 0 0 0 0 0 0 0 0 Move Cap.: 1 1 1 1 1 1 1 1 1 1 1 1 Volume/Cap: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ------------I---------------I{---------------11---------------I{---------------i Level Of Service Module: 2Way95thQ: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Control Dei: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 LOS by Moves Movement: LT - LTR - RT LT - LTR - RT LT - LTR - RT IT - LTR - RT Shared Cap.: 0 0 0 0 0 0 0 0 0 0 0 0 SharedQueue: o.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Shrd ConDels 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Shared LOS: ApproachDel: 0.0 0.0 0.0 0.0 ApproachLOS: Notes Queue reported is the number of cars per lane. Traffix 7.8.0715 (c) 2006 Dowling Assoc... License to KATY OYTTStt. 1"JeT.u. C. Existing Plus AM Fri Dec 15, 2006 14:36:28 Page 12-1 JA6539 - 75 -Unit Residential Project TIS City of Tustin Existing Plus Reuse Alternative 1 Without Project --------------------------------------------------------------------------------- Level Of Service Computation Report 2000 HCH Unsignalized Method (Future Volume Alternative) Intersection #3 Driveway on walnut Average Delay (sec/veh): 0.0 worst Case Level Of Service: ( 0.01 Approach: North Bound South Bound Bast Bound West Bound ------------{---------------I{---------------11---------------{I---------------I Control: Stop Sign Stop Sign Uncontrolled Uncontrolled Rights: Include Include Include Include Lanes: 0 0 0 0 0 1 0 0 0 1 1 0 2 0 0 0 0 1 1 0 --------------{{---------------{{---------------{{-------------- Volume Module { Base Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Growth Adj: 0.00 0.00 0.00 0.00 o.00 o.00 o.00 o.00 o.00 0.00 0.00 0.00 Initial Bass 0 0 0 0 0 0 0 0 0 0 0 0 Added Vol: 0 O 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 O 0 0 0 0 0 0 0 0 0 0 initial Fut: 0 0 0 0 0 0 0 0 0 0 0 0 User Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 PAF Adjs 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 PHP Volume: 0 0 0 0 0 0 0 0 0 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Final Vol.: O 0 0 0 0 0 0 0 0 0 0 0 Critical Gap Module: Critical Gps 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 FollowUpTim: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ------------i--------------II---------------11---------------11--------------I Capacity Module: Cnflict Vol: 0 0 0 0 O 0 0 0 0 0 0 0 Potent Cap.: 0 0 O 0 0 0 0 0 0 0 0 0 Move Cap.: 1 1 1 1 1 1 1 1 1 1 1 1 Volume/Cap: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Level of Service 11---------------H---------------11---------------I e ce Module: 2Way95thQ: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Control Del: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 LOS by Moves Movement: IT - LTR - RT LT - LTR - RT IT - LTR - RT IT - LTR - RT Shared Cap.: 0 0 0 0 0 0 0 0 0 0 0 0 SharedQueue: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Shrd ConDel: 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Shared LOS: ApproachDels 0.0 0.0 0.0 0.0 ApproachLOSs Note: Queue reported is the number of cars per lane. 1.raffix 7.6.0715 (c) 2006 bowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA a) CD co Cn Existing Plus AM Fri Dec 15, 2006 14 06,28 Page 13-1 CDO -------------------------------------------------------------------------------- -.L E JA6539 - 75 -Unit Residential Project TIS C:) = City of Tustin N 0 Existing Plus Reuse Alternative 1 Without Project 0 -------------------------------------------------------------------------------- h Z Base Queue Report (cars) p-------------------------------------------------------------------------------- W 0 Northbound Southbound Eastbound Westbound 4 Node Intersection L -- T -- R L -- T -- R L -- T -- R L -- T -- R W 82 [21Way95thQJt 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 63 [2Way95thQJ3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA 4a Existing Plus AN Fri Dec 15, 2006 14:36s28 Page 14-1 - JA6539 - 75 -Unit Residential Project TIS City of Tustin Existing Plus Reuse Alternative 1 without Project - Future Queue Report (cars) ------------------------------------------------------------- Northbound Southbound Bastbound Westbound Node Intersection L -- T -- R L -- T -- R L -- T -- R L -- T -- R 62 (2Way95thQJ: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 93 [2Way95thQJt 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA X CD T O 0) C CD 0 O Z W O O O 1 i CF) W W Existing Plus PM Fri Dec 15, 2006 14:36:22 Page 1-1 ---------------------------------------------------------------- JA6539 - 75 -Unit Residential Project TIS City of Tustin Existing Plus Reuse Alternative 1 Without Project --------------------------------- ---------------------------------------------- Scenario Report Scenario: Existing Plus PH Coaaand: Existing Plus PH Volume. axisLing FM Geometry: Nearterm Impact Fee: Default Impact Fee Trip Generations PM Trip Distribution: ALL Paths: Default. Pa!= Routes: Default Routes Configuration: Existing Plus PH Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATL OKITSU, TUSTIN, CA Existing Plus PM Fri Dec 15, 2006 14:36:22 Page 2-1 JA6539 - 75 -Unit Residential Project TIS City of Tustin Existing Plus Reuse Alternative 1 Without Project -------------------------------------------------------------------------------- Turning Movement Report PM Volume Ncz.-th:.ound Southbound Eastbound Westbound Total Type Left Thru Right Left Thru Right Left Thru Right Left Thru Right Volume 61 Red Hill i Walnut Base 253 1085 174 131 480 112 120 406 105 255 713 147 3982 Added 0 0 0 4 0 0 0 0 0 0 C G 0 Total 253 1085 174 131 480 112 120 406 105 255 713 147 3982 82 Driveway on Red Hill Base 0 0 0 0 0 0 0 0 0 0 0 0 0 Added 0 0 0 O 0 0 0 0 0 0 0 0 0 Total 0 0 0 0 0 0 0 0 0 0 0 0 0 #3 Driveway on Walnut Base 0 0 0 0 0 0 0 0 0 0 0 0 0 Added 0 0 0 0 0 0 0 0 0 0 0 0 0 Total 0 0 0 0 0 0 0 0 0 0 0 0 0 Trzffir-r...C7:` %�.�_,+ ��... �1;ry Absoc. Lioenied to KATE OKITSU, TUSTIN, CA rvVV Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Nxisting Plus PM Fri Dec 15, 2006 14:36:22 -------------------------------------------------------------------------------- Page 4-1 JA6539 - 75 -Unit Residential Project TIS City of Tustin CD Impact Analysis Report (Q C/) Zxisting Plus PM Fri Dec 15, 2006 14:36:22 Page 3-1 (D O -------------------------------------------------------------------------------- Del/ V/ Del/ V/ -3. C JA6539 - 75 -Unit Residential Project TIS O = O City of Tustin # 2 Driveway on Red Hill 0.0 0.000 0.0 0.000 .j�' O=3 Rxisting Plus Reuse Alternative 1 without Project ------------------------- ---- + 0.000 D/V h Z ----- Intersection Volume Report --L O C) ' Base Volume Alternative ------------------------------------------------------- CWp ------------------------- ~ W A. Northbound Southbound 8astbound Node Intersection L -- T -- R L -- T -- R L T -- R -- Westbound -- L -- T R 1 Red Hill 4 Wa 253 1085 174 131 480 112 120 406 105 255 713 147 2 Driveway on R 0 0 0 0 0 0 0 0 0 0 0 0 3 Driveway on W 0 0 0 0 0 0 0 0 0 0 0 0 Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Nxisting Plus PM Fri Dec 15, 2006 14:36:22 -------------------------------------------------------------------------------- Page 4-1 JA6539 - 75 -Unit Residential Project TIS City of Tustin Rxisting Plus Reuse Alternative 1 without Project ----- Impact Analysis Report Level Of Service Intersection Base Future Change Del/ V/ Del/ V/ in LOS Veh C LOS Veh C 8 1 Red Hill i walnut B xxxxx 0.648 B xxxxx 0.648 + 0.000 V/C # 2 Driveway on Red Hill 0.0 0.000 0.0 0.000 + 0.000 D/V 8 3 Driveway on Walnut 0.0 0.000 0.0 0.000 + 0.000 D/V Traffix 7.8.0715 (e) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA X CD 0 -� O CQ =� CD 0 O Z U1 O O O C� W Existing Plus PM Fri Dec 15, 2006 14:36:22 Page 5-1 --------------------------------------- JA6539 - 75 -Unit Residential Project TIS City of Tustin Existing Plus Reuse Alternative 1 without Project ---------------------------------------- Threshold Report (Base Alternative) Threshold Criteria (Ops LOS >- *][Plan LOS >= *] (Delay >• 60.0001 (V/C >- 1.000) Intersection Movement LOS Delay V/C Traff ix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU. TUSTIN, CA Existing Plus PM Fri Dec 15, 2006 14:36:22 Page 6-1 -------------------------------------------------------------------------------- JA6539 - 75 -Unit Residential Project TIS City of Tustin Existing Plus Reuse Alternative 1 without Project -------------------------------------------------------------------------------- Threshold Report (Future Alternative) Threshold Criteria [Ops LOS >• *][Plan LOS >= *] iueiay >- 60.o00)[V/C >- 1.0001 Intersection Movement LOS Delay V/C 7-i-0713 ic1 2u0o Uowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Existing Plus PM Fri Dec 15, 2006 14:36:22 -------------------------------------------------------------------------------- Page 6-1 JA6539 - 75 -Unit Residential Project TIS City of Tustin Zxisting Plus Reuse Alternative 1 Without Project Level Of Service Computation Report CD co Existing Plus PM , 9 Fri Dec 15, 2006 14.36:22 Page 7-1 CDO ------------------------------- ----------------------------------------------- _, E JA6539 - 75 -Unit Residential Project TIS Loss Time (sec): 0 (Y+R-4.0 sec) Average Delay (sec/veh)s xxxxxx O = City of Tustin B ;treetNames Red Hill Ave Walnut Ave O O Existing Plus Reuse Alternative 1 Without Project Nest Bound Movements L - T - R L - T - R L - T - R I - II ------ O:3 -------------------------------------------------------------------------------- II ----- II Controls Protected Protected Protected --------------- ) Protected -*+ Z Level Of Service Computation Report Min. Green: 0 0 0 0 0 0 0 0 0 0 0 O ICU 1(Loss as Cycle Length i) Method (Base Volume Alternative) 2 0 1 1 0 +wl+www+#wwwww!wwwww#!«wiwwwwlwwwlww#«w++++w+w«ww#wwwwwwlwwwww#wwwwfww++wwt+!www I W O Intersection 01 Red Hill a Walnut 144 Growth Adje 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 rw+wwwwwlw#liwtrwwwwwwww++#+++wwwwwli«wwwl+wrwwi+t+w+wwwwwwwr*rw*w+w+++www+lwrwlw Initial Baas 253 1085 174 131 480 112 120 406 105 255 713 Gy J Cycle (sec): 100 Critical Vol. /Cap.(X) 0.648 0 -� Loss Time (sec): 0 (Y+R•4.0 sec) Average Delay (sec/veh): X3000M 0 Initial Fut: 253 1085 174 131 480 112 120 406 105 Optimal Cycles 65 Level Of Services 147 B 1.00 1.00 •#www!++ww+wiw«#wiwwwwwwwwwwwwrwwwwwwwwwwwwwwiwwwwwwi4wwwwwwwwwwwww.*+++iww#ww!# pulp Ad)• 1.06 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Street Name: Red Hill Ave Walnut Ave 255 713 147 Approach: North Bound South Bound East Bound West Bound 0 Movements L- T- R L- T- R L- T- R --•---------------------------------II-i L T- R PCB Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ---��--•------------II-- Control: Protected Protected Protected Rights: Include Protected MLF Adjs 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Include Include Min. Green: O 0 0 0 0 Include Final Vol.: 2S3 1085 174 131 480 112 120 406 105 II --------------- 0 0 0 0 Lanes: 1 0 2 1 0 1 0 1 1 0 1 0 1 1 0 --------------II---------------II---------------II--------------- 0 0 2 0 1 0 1 0 Volume Modules Sat/Lanes 1700 1700 1700 1700 1700 1700 1700 1700 1700 ) 1700 Base Vole 248 1064 171 128 471 110 118 398 103 Growth Adjs 1.02 1.02 1.02 1.02 1.02 1.02 250 699 144 Lanes: 1.00 2.S8 0.42 1.00 1.62 0.38 1.00 1.59 0.41 1.02 1.02 1.02 Initial Bse: 253 1085 174 131 480 112 120 406 105 1.02 1.02 255 713 1.02 147 3400 2819 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PKF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHP Volume: 2S3 1085 174 131 460 1.00 1.00 1.00 Crit Moves: +*++ wwwr «wrr w+«w#www++#w#ww+wwwww«ww«rww«t#ww+«wi+««r*r+wirwww««««w«rwr#«««««!««+w+w+wwfw++w 112 120 406 10S Reduct vols 0 0 0 0 0 0 2SS 713 147 0 0 0 Reduced Vol: 2S3 1085 174 131 480 112 120 406 105 0 0 25S 713 0 141 PCR Adjs 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Vol s 253 1085 1.00 1.00 1.00 174 131 460 112 120 406 105 25S 713 147 Saturation Flow Module:-----II---------------II-II---------------) Sat/Lane: 1700 1700 1700 1700 1700 1700 1700 1700 1700 Adjustment: 1.00 1.00 1.00 1.00 1.00 1700 1700 1700 1.00 1.00 1.00 1.00 Lanes: 1.00 2.S8 0.42 1.00 1.62 0.38 1.00 1.59 0.41 1.00 1.00 2.00 1.66 1.00 0.34 Final Sat.: 1700 4394 706 1700 2756 644 1700 2701 699 ---II---------------II---------------+I--------------- 3400 2819 581 Capacity Analysis Modules I vol/sat: 0.15 0.25 0.2s 0.08 0.17 0.17 0.07 0.15 0.15 Crit Moves: wwww wwlw ww!• w!wlwwwwwtwiw«w+rwwwwww«+wwwwwwwtw««wwrwww+ir«!«wwwwwtfwi++w++www+lw+wl+w+w!!!rw« 0.08 0.25 w+w# 0.25 Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Existing Plus PM Fri Dec 15, 2006 14:36:22 -------------------------------------------------------------------------------- Page 6-1 JA6539 - 75 -Unit Residential Project TIS City of Tustin Zxisting Plus Reuse Alternative 1 Without Project Level Of Service Computation Report ICU Moss as Cycle Length 40 Method (Future Volume Alternative) +w www#lwwwwwwwwwwww#wwwwwwwwwwwwww#wwwwwwwwwwws#wwr:#w#:#w«wwwrwwwrwww*w*wwrwrw« Intersection #1 Red Hill 6 walnut ww#wwww#www#wwwtwwlww#wwwwwwwwwwwwwwwwiw«wr«wrwwl+4w#lwww#www#ww#w«++#!www#wwwww Cycle (sec)s 100 Critical Vol./Cap.(X): 0.648 Loss Time (sec): 0 (Y+R-4.0 sec) Average Delay (sec/veh)s xxxxxx Optimal Cycle: 65 Level Of Service: B ;treetNames Red Hill Ave Walnut Ave Approach: North Bound South Bound Bast Bound Nest Bound Movements L - T - R L - T - R L - T - R I - II ------ L - T - R II ----- II Controls Protected Protected Protected --------------- ) Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes s 1 0 2 1 0 1 0 1 1 0 1 0 1 1 0 --------------II---------------II---------------II--------------- 2 0 1 1 0 Volume Module: I Base Vol: 248 1064 171 128 471 110 118 398 103 250 699 144 Growth Adje 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 Initial Baas 253 1085 174 131 480 112 120 406 105 255 713 147 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVo1: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 253 1085 174 131 480 112 120 406 105 255 713 147 User Adis 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 pulp Ad)• 1.06 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volumes 2S3 1085 174 131 480 112 120 406 105 255 713 147 Reduct Vol: O 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 2S3 1085 174 131 480 112 120 406 105 255 713 147 PCB Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adjs 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Vol.: 2S3 1085 174 131 480 112 120 406 105 II --------------- 255 713 147 Saturation Flow Modules---- II II -----� Sat/Lanes 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 2.S8 0.42 1.00 1.62 0.38 1.00 1.59 0.41 2.00 1.66 0.34 Final Sats 1700 4394 706 1700 2756 644 1700 2701 699 ------------ I --------------- II --------- 3400 2819 581 ----II-------- Capacity Analysis Modules Vol/Sats 0.1S 0.25 0.25 0.08 0.17 0.17 0.07 0.15 0.15 0.08 0.25 0.25 Crit Moves: +*++ wwwr «wrr w+«w#www++#w#ww+wwwww«ww«rww«t#ww+«wi+««r*r+wirwww««««w«rwr#«««««!««+w+w+wwfw++w «*«« Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA X CD -D O CD O 0 O Z 40 O O � W W � Existing Plus PM Fri Dec 15, 2006 14:36:23 Page 9-1 JA6539 - 75 -Unit Residential Project TIS City of Tustin Existing Plus Reuse Alternative 1 Without Project Level Of Service Computation Report 2000 HCH Unsignalized Method (Base Volume Alternative) !!#latttlafi##!##!!ta!!### !4####a•a#t#At#!ii#iiala##iAit!#i#i!#!!a!##Attti!!ii#! Intersection #2 Driveway on Red Hill !##lAtt#A#####aAi!lift*iiia#ia###!!t#!AtlfAt#aAtaAA*Alit###!##ani#t#a#!A#aaAitaa Average Delay (sec/veh): 0.0 Worst Case Level Of Services ( 0.01 ii#liana####i#a##aa#*##a##A#!alis#t1►iltaAa!!a#aa♦aaaAA#tai#a#!!ai##r!#alrila!#!a Approach: North Bound South Bound Mast Bound West Bound Movement s L - T - R L - T - R L- T - R L - T - R ------------ ------------------------------ II - ��-------------- il-•-------------I Controls Stop Sign Stop Sign UncontrolledUncontrolled Rights Include Include Include Include Lanes: 0 0 2 0 0 0 0 1 1 0 0 0 0 0 1 0 0 0 0 0 ------------i---------------11---------------11---------------11--- ------------ Volume Module:I Base Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Growth Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Initial Bee: 0 0 0 0 0 0 0 0 0 0 0 0 User Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 PHF Adj, 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 '0.00 0.00 0.00 PHF Volume: 0 0 0 0 0 0 0 0 0 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Final Vol.: 0 0 0 0 0 0 0 0 0 0 0 0 ------------I---------------11---------------II Critical Chap Modules Critical Gpt 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 FollowUpTio: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ------------ I--------------- 11 --------------- II--------------- Capacity Module: Cnflict Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Potent Cap.& 0 0 0 0 0 0 0 0 0 0 0 0 Move Cap.: 1 1 1 1 1 1 1 1 1 1 1 1 Volume/Cap: 0.00 o.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ------------I---------------t1---------------II Level Of Service Modules 2Way95thQ& 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Control Del: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 LOS by Have, Movement: LT - LTR - RT LT - LTR - RT LT - LTR - RT LT - LTR - RT Shared Cap.: 0 0 0 0 0 0 0 0 0 0 0 0 SharedQueue: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Shrd ConDels 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Shared LOss ApproachDels 0.0 0.0 0.0 ApproachLOS: 0.0 Note: Queue reported is the number of cars per lane. alas#aA#t#asA#aA##aa#slAilAli#AAA###A##A#A#A#!#tis#� Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OXITSU, TUSTIN. CA Existing Plus PM Fri Dec 15, 2006 14:36:23 Page 10-1 JA6539 - 75 -Unit Residential Project TIS City of Tustin Rxisting plus Reuse Alternative 1 Without Project -------------------------------------------------------------------------------- Level Of Service Computation Report 2000 HCH Unsignalised Method (Future Volume Alternative) !!###t##a##A#AiiiR#a#i!liiilAala##ttAA#!#aa!!Aa##f!#t!#RlAa#a!t#!#alt#AA#ttAtAtt Intersection 92 Driveway on Red Hill !!#!i!!#iii!!*i#i!!!Ai•#!#!!Ai##!##!at#attA##aa###aif!###alt#!A#At###ttttttt#t## Average Delay (sec/veh): 0.0 Worst Case Level Of Service: ( 0.01 ####a!i#!#!!#4laaltliai.#ai##!t#!#!ii#t####!!f!!###!iilfiitiiilfia###iii#i#iii#ii Approach& North Bound South Bound East Bound West Bound Movement : h - T - R L - T - a L - T - R L - T - R ------------1---------------II---------------II--------------- ---------------1 Controls Stop Sign Stop Sign Uncontrolled Uncontrolled Rights: Include Include Include Include Lams: 0 0 2 0 0 0 0 1 1 0 0 0 0 0 1 0 0 0 0 0 ------------ I --------------- ---------------II---------------II---------------I Volume Modules Base Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Growth Adjs 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Initial axes 0 0 0 0 0 0 0 0 0 0 0 0 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVols 0 0 0 0 0 0 0 0 0 0 0 0 Initial Puts 0 0 0 0 0 0 0 0 0 0 0 0 User Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 PHF Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 PHF Volumes 0 O 0 0 0 0 0 0 0 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Final Vol s 0 0 O 0 0 0 0 0 0 0 0 0 Critical Gap Module: Critical Op: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 FollowUpTims 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Capacity Module:------------11---------------II---------------II---------------I Cnflict Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Potent Cap.: 0 0 0 0 0 0 0 0 0 0 0 0 Move Cap.: 1 1 1 1 1 1 1 1 1 1 1 1 Volume/Cap: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ---------------II- '-II---------------I Level Of Service Module: 2Way95thQs 0.0 0.0 0.0 0_.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Control Del& 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 LOS by Moves Movement: LT - LTR - RT LT - LTR - RT LT - LTR - RT LT - LTR - RT Shared Cap.& 0 O 0 0 0 0 0 0 0 0 0 0 SharedQueue& 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Shrd ConDel: 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Shared LOS& ApproachDel& 0.0 0.0 0.0 0.0 ApproachLOSs Notes Queue reported is the number of cars per lane. Traffix 7.8.0715 (c) 2005 Dowling Asec,:. Licensed to KATZ OKITSU, TUSTIN, CA �p Existing Plus PM - Fri Dec 15, 2006 14:36:23 ------------------ ------ --------------------------------- Page 11-1 Existing Plus PM Fri Dec 15, 2006 14:36:23 Page 11-2 cc Cn CD 0 A 5 9 - 75 -Unit Residential Project TIS City of Tustin -------------------------- JA6539 - 75 -Unit Residential Project TIS --L E Existing Plus Reuse Alternative 1 Without Project City of Tustin Existing Plus Reuse Alternative 1 Without Project 0 :3Level Of Service Computation Report fwwwwffwwfwtwf:f*f*A+►fwwfwww#www#fffwffwwwAwwlfAw#wtww#fww*!*w#twf*#*wAwltlt#twf z 1994 HCM Unsignalised ##!#t#!ww##AlwtA!!flwwf!!lfwffwwwflwf#ff!•f♦A##Aw#lAtflffflft.fffAAflflfwwAwwtwft Method (Base Volume Alternative) Intersection #3 Driveway on Walnut � O Awww#wwwwwwrw#ffff#wltwAfw#Aw#tff#!ltffwfffflwwrwAAAAff#ffww#wwfwwtf#AwltA#!flfw 4 Average Delay (sec/veh)s w!lwwfflflwfff:•fwwwfww#fwfww#wfltw+►wffwwlrwwtww!#wf*f!!#:wffww+twtwf:wftrwwwwwfw 0.0 Worst Case Level Of Service: � Approach: North Bound South Bound Rant Bound West Bound Movment s L - T - R ------------ --------------- L - T - R L - T - R II--------------- L - T - R Control: Stop Sign Ila --------------II Stop Sign Uncontrolled --------------- 1 Uncontrolled Rightss Include Include Include include Lanes: 0 0 0 0 0 ---------------------------II--------------- 1 0 0 0 1 1 0 2 0 0 0 0 1 1 0 Volume Module II --------------- II -------------- I Base Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Growth Adj= 0.00 o.00 o.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Initial Bse: 0 0 0 0 0 0 0 0 0 0 0 O User Adj# 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0.0 0.00 0.00 0.00 0.00 PHF Adjs 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 PHF Volume: 0 0 0 0 0 0 0 0 0 0 0 O Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Final Vol.: 0 0 0 ------------ 0 0 0 0 0 0 0 0 0 Adjusted Volume Module:-----II---------------II--------•------I) ---------I Grades 04 Oi 01 04r & Cycle/Cares xxxx xxxx xXxx Xxxx XXXX xxxx 8 Truck/Comb: xxxx xxxx xxxx xxxX xxxx xxxx xxxx xxxx xxxx PCE Adj# 0.00 0.00 0:00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 xxxx 0.00 0.00 CyCl/Car PCB: xxxx xxxx xxxx xxxx xxxx Trck/Cmb PCE: xxxx xxxx xxxx xxxx xxxx XXXX XXXX xxxx xxxx Ad j vol .# 0 0 0 ------------I---------------II---------------il 0 0 0 0 0 0 xxxx 0 xxxx 0 0 Critical Gap Module: MoveUp Time: 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Crit Op Adjs 0.00 0.00 o.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Critical Gps 0.0 0.0 0.0 ------------II---------------II---------------II--------------- 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Capacity Module: I Cnf lict Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Potent Cap.# 0 0 0 0 0 0 0 0 0 0 0 0 Adj Cap= 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Move Cap.: 1 1 1 ------------I---------------II---------------II------------ 1 1 1 1 1 1 1 1 1 Level Of Service Modules Control Deli 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 LOS by Moves Movements IT - LTR - RT LT - LTR - RT LT - LTR - RT LT - LTR - RT Shared Cap.: 0 0 0 0 0 0 0 0 0 0 0 0 Shrd ConDels 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Shared LOS: ApproachDel: 0.0 0.0 0.0 0.0 Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Traffix 7.9.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Existing Plus PM Fri Dec 15, 2006 14:36:23 Page 12-1 -- ------------------------------ JA6539 - 75 -Unit Residential Project TIB City of Tustin Existing Plus Reuse Alternative 1 Without Project ----------------------------------- Level Of Service Computation Report 1994 RCM Unrignalised Method (Future Volume Alternative) 1111!/l11w11#!1«1It1#«wrwlll•111«Iw1111111/«111«111lIr1«/«««««#111«/*«1!111.1111 Intersection #3 Driveway on Walnut •!!1#w1111/#1lIRII/w#1#11111«11!11/ww«#!«wlwlww«11#111/«111l1/11•Iw/11«f11lflwlw Average Delay (sec/veh)s 0.0 Worst Case Levet Of Service: !##«#!«/r1«IRI#*!11111#1111#!11#411111tlIw111111tIw«««111«###♦I«1«•1111111111111 Approach: North Bound South Bound Bast Bound West Bound Movements L - T - R L - T - R L - T - R ------------------- --------------- ��---------------��--------------- Control, � Stop Sign Stop Sign Uncontrolled Uncontrolled Rights: Include Include Include Include Lanes s 0 0 0 0 0 1 0 0 0 1 1 0 2 0 O 0 0 1 1 0 ------------ --------------- --------------- --------------- --------------- Volume Module,� Base Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Growth Adj: 0.o0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Initial Bse: 0 0 0 0 0 0 0 0 0 0 0 0 Added Vol: 0 0 0 0 0 0 0 0 0 0 0 O PasserByVols 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 0 0 0 0 0 0 0 0 0 0 0 0 User Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 PRF Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 PRY Volume: 0 0 0 0 0 0 0 0 0 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 O 0 O 0 0 Final Vol.: 0 0 0 0 0 0 0 0 0 0 O 0 Adjusted volume Module: Grade: 04 04 Of of t Cycle/Care: xxxx xxxx xxxx xxxx xxxx xxxx xxXc xxxx t Truck/Coubs xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxXac PCE Adis 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Cycl/Car PCS: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx Trck/Cab PCS, xxxx xxxx xxxx X3= xxxx xxxx xxxx xxxx Adj Vol.s 0 0 0 0 0 0 0 0 0 0 0 0 Critical Gap Module: MoveUp Time: 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Critical Gp: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ------------ I --------------- ------------- Capacity Module: Cnflict Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Potent Cap.: 0 0 0 0 0 0 0 0 0 0 0 0 Adj Caps 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Move Cap.: 1 I 1 1 1 1 1 1 1 1 1 1 Level Of Service Module: ----II--------------- --------------- ---------------� Control Del: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 LOS by Move: Movements LT - LTR - RT LT - LTR - RT LT - LTR - RT LT - LTR - RT Shared Cap.: 0 0 0 0 0 0 0 0 0 0 0 0 Shrd ConDels 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Shared LOS: ApproachDels 0.0 0.0 0.0 0.0 CDTraffix 7.3.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA O T) E CD OZ O O O -+, - -.L 0) W W --, Existing Plus PM Fri Dec 15, 2006 14:36:23 Page 12-2 -------------------------------------------------------------------------------- JA6539 - 75 -Unit Residential Project TIS City of Tustin Existing Plus Reese Alternative 1 Without Project -------------------------------------------------------------------------------- IIfA//!11lw1111«#1111411###«/w11111l1#!!!!#1!#1111!!114!!*#!!!11!!!!!!1!!!!1!4!1 Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA mm V (Q U) Existing Plus PM Fri Dec 15, 2006 14:36s23 Page 13-1 Existing Plus PM Fri Dec 15, 2006 14:36:23 Page 14-1 (D O------------------------------------------------------------------------------- ---------------------------------- --------------------------E JA6539 - 75 -Unit Residential Project TIS JA6539 - 75 -Unit Residential Project TIS = City of Tustin City of Tustin O O Existing Plus Reuse Alternative 1 Without Project Existing Plus Reuse Alternative 1 Without Project O-------------------------------------------------------------------------------- -------------------------------------------------------------------------------- Z Base Queue Report (cars) Future Queue Report (cars) 0')O-------------------------------------------------------------------------------- -------------------------------------------------------------------------------- W O Northbound Southbound Rastbound Westbound Northbound Southbound Eastbound Westbound Node Intersection L -- T -- R L -- T -- R L -- T -- R L -- T -- R Node Intersection L -- T -- R L -- T -- R L -- T -- R L -- T -- R W #2 (2Way95thQ): 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $2 (2Way95thQ): 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA X CD CnO OJ E CQ CD O Z -� O 0 0 rnw Existing Plus AIM Fri Dec 15, 2006 11:20,17 Page 1-1 JA6539 - 75 -Unit Residential Project TIS City of Tustin Existing Plus Reuse Alternative 1 With Project ---------------------------------------------------------- Scenario Report Scenarios Existing Plus AN Commands Existing Plus AN Volumes Existing AN Geometry: Nerrte m, Impact Fee: Default Impact Fee Trip Generation, AN Trip Distributions ALL Pathos Default Paths Routess Default Route! Configurations Existing Plus AN Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to K#TZ OKITSU, TUSTIN, CA Existing Plus AN Fri Dec 1S, 2006 11:20:17 Page 2-1 -------------------------------------------------------------------------------- JA6539 - 75 -Unit Residential Project TIS City of Tustin txirting Plus Reuse Alternative 1 With Project -------------------------------------------------------------------------------- Trip Generation Report Forecast for AN Zone Rate Rate Trips Trips Total t Of # Subsone Amount Units In Out In Out Trips Total ------------------------------------- ------ ------ ----- ----- ----- ----- 1 81 -Unit Resi 1.00 Townhomes 8.00 22.00 8 22 30 100.0 sone 1 gubtotal ............................. 8 22 30 100.0 -------------------------------------------------------------------------------- TOTAL.................................0................ 8 22 30 100.0 Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN. CA -0 X 0) CDD CQ U) Existing Plus AN Fri Dec 15, 2006 11:20:17 Page 3-1 CD0 ------------------------- -7- - --------------------------------- 5 -Unit Residential Project TIS —' = - City of Tustin N ----------------Existing Plus Reuse Alternative 1 With Project O---------------------------------------------------------- Z Trip Distribution Report O Percent Of Trips Townhouses W O 4 To Gates 1 2 4 5 6 Zone----- ----- ----- ----- ----- I 15.0 15.0 5.0 10.0 55.0 Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Existing Plus AN Fri Dec 15, 2006 11:20:17 ---- ------------------------------- Page 4-1 JA6539 - 75 -Unit Residential Project TIS City of Tustin -------------------------------------------------------------------------------- Existing Plus Reuse Alternative 1 With Project Turning Movement Report AN Volume Northbound Southbound Eastbound Westbound Total Type Left Thru Right Left Thru Right Left Thru Right Left Thru Right Volume 61 Red Hill & Walnut Base 111 413 157 93 988 53 132 402 333 308 445 100 3534 Added 1 0 0 5 2 2 4 1 1 0 1 0 17 Total 112 413 157 98 990 55 136 403 334 308 446 100 3551 92 Driveway on Red Hill Base 0 0 0 0 0 0 0 0 0 0 0 0 0 Added 2 4 0 0 0 3 9 0 9 0 0 0 27 Total 2 4 0 0 0 3 9 0 9 0 0 0 27 #3 Driveway on Walnut Base 0 0 0 0 0 0 0 0 0 0 0 0 0 Added 0 0 O 4 0 0 0 2 0 0 2 2 10 Total 0 0 0 4 0 0 0 2 0 0 2 2 10 Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA X CD -� O CD 0 .a Z W O C:)O -�, -4 C) W W -I dor.•-:.: 404 Existing Plug AN Fri Dec 15, 2006 11:20:17 Page 5-1 ------- ----------------------------------------------------------------------- JA6539 - 75 -Unit Residential Project TIS City of Tustin Existing Plus Reuse Alternative 1 With Project ----------------------------------------------------------------- Intersection Volume Report Base Volume Alternative ------------------------------------------------------------- Northbound Southbound Eastbound Mestbound Node Intersection L -- T -- R L -- T -- R L -- T -- R L -- T -- R 1 Red Hill a Wa 111 413 157 93 988 53 132 402 333 308 445 100 2 Driveway on R O O 0 0 0 0 0 0 0 0 0 0 3 Driveway on W 0 0 0 0 0 0 0 0 0 0 0 0 Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN. CA Existing Plus AN Fri Dec 15, 2006 11:20:17 Page 6-1 -------------------------------------------------------------------------------- JA6539 - 75 -Unit Residential Project TIS City of Tustin Existing Plus Reuse Alternative 1 With Project -------------------------------------------------------------------------------- Intersection Volume Report Future Volume Alternative -------------------------------------------------------------------------------- Northbound Southbound Eastbound Westbound Node Intersection L -- T -- R L -- T -- R L -- T -- R L -- T -- R 1 Red Hill a Wa 112 413 157 98 990 55 136 403 334 308 446 100 2 Driveway on R 2 4 0 0 0 3 9 0 9 0 0 0 3 Driveway on N 0 0 0 4 0 0 0 2 0 0 2 2 Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Y.NCD co U) Existing Plus AM Fri Dec 15, 2006 11e20:17 Page 7-1 (D O -------------------------------------------------------------------------------- -� C JA6539 - 75 -Unit Residential Project TIS -� = City of Tustin O Existing Plus Reuse Alternative 1 With Project O:3 -------------------------------------------------------------------------------- h Z Impact Analysis Report 0 Level Of Service W O) Intersection Base Future Change ' Del/ V/ Del/ V/ in W LOS Veh C LOS Veh C # 1 Red Hill 4 Walnut B xxxxx 0.678 B xxxxx 0.681 + 0.002 V/C 6 2 Driveway on Red Hill 0.0 0.000 A 9.0 0.000 + 9.040 D/V # 3 Driveway on Walnut 0.0 0.000 A 8.5 0.000 + 8.534 D/V Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KKTZ OXITSU, TUSTIN, CA E] Rxisting Plus AM Fri Dec 15, 2006 11:20:17 Page 8-1 -------------------------------------------------------------------------------- JA6539 - 75 -Unit Residential Project TIS City of Tustin Existing Plus Reuse Alternative 1 With Project -------------------------------------------------------------------------------- Threshold Report (Base Alternative) Threshold Criteria (Ops LOS >- *)(Plan LOS >- *] (Delay >- 60.0001(V/C 3,- 1.000) Intersection Movement LOS Delay V/C Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA X CD W 0 C CQ =� CD 0 �Z al 0. 0 O � W W � Existing Plus AM Fri Dec 15, 2006.11:20:17 Page 9-1 ------------------------------------------------------------------------ JA6539 - 75 -Unit Residential Project TIS City of Tustin Existing Plus Reuse Alternative 1 With Project --------------------------------------------- Threshold Report (Future Alternative) Threshold Criteria [Ops LOS >- *)[Plan LOS >- *) [Delay >- 60.000) [V/C >- 1.000) Intersection Movement LOS Delay V/C Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KhTE OKITSU, TUSTIN, CA Existing Plus AM Fri Dec 15, 2006 11:20:17 Page 10-1 JA6539 - 75 -Unit Residential Project TIS City of Tustin Existing Plus Reuse Alternative 1 With Project -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length 8) Method (Base Volume Alternative) AAft#ff#f!•f!#AAA!!AlfAAffl4l�lf#!#lAtf!*#!AA##AA!#lAAAAlfA!#AAAA#Af!##A#lAAAtfA Intersection. #1 Red Hill 4 Walnut lAft!#fAiflf#•flfA#•#liffflfAlf##AAA#fAfflAf•!##f#A###AAAA#fflflfAlflfAfflf!!#AA Cycle (sec): 100 Critical Vol./Cap.(X): 0.678 Loss Time (sec): 0 (Y+R-4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 71 Level Of Service: B #AA!##A#AAA!##AA#AAA#######i#Af####A#Aff#AAf#A#•ff#fAfAlAfA#fff#A##♦Af##AtA#!#f# Street Name: Red Hill Ave Walnut Ave Approach: North sound South Bound Bast Bound West Bound movement: L - T - R L - T - R L - T - R L - T - R ----I------I'------1,------II------ Control:ProtectedProtectedProtectedProtected ' Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes s 1 0 2 1 0 1 0 1 1 0 1 0 1 1 0 2 0 1 1 0 ------------I---------------11---------------11--------------- ---------------� Volume Module: Base vol: 109 405 154 91 969 52 129 394 326 302 436 98 Growth Adj: 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 Initial Sze: 111 413 157 93 988 53 132 402 333 308 445 100 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 111 413 157 93 988 53 132 401 333 308 445 100 Reduct Vol: O 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 111 413 157 93 988 53 132 402 333 308 445 100 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Vol s 111 413 157 93 988 53 132 402 333 308 445 100 ------------ --------------- --------------- --------------- ---------------� Saturation Flow Module: Sat/Lane: 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 Adjustments 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 2.17 0.83 1.00 1.90 0.10 1.00 1.09 0.91 2.00 1.63 0.37 Final Sat.: 1700 3695 1405 1700 3227 173 1700 1861 1539 3400 2776 624 -�i---------------��---------------��---------------��--------------- Capacity � Analysis Module: Vol/Sat: 0.07 0.11 0.11 0.05 0.31 0.31 0.08 0.22 0.22 0.09 0.16 0.16 Crit Movesf lAff #A!t A#Af A!#f !A#f#AAAfA!!lffffA#AfAAftAAAAAlA#!!#fA#A!#f##f##A##A##A!##AAfff#####ffAi**AlAfA# Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN. CA Note: Queue reported is the number of cars per lane. Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA T Existing Plus AM Fri Dec 15, 2006 11:20:17 Page 11-1 Existing Plus AM Fri Dec 15, 2006 11:20:17 Page 12-1 CO------------------------- --------------------- -------------------------------------------------------------------------------- (D p - 75 -Unit Residential Project TIS JA6539 75 -Unit Residential Project TIS E City of Tustin City of Tustin = p-------------------- Existing Plus Reuse Alternative 1 With Project ----------------------------------------------------------- Existing Plus Reuse Alternative 1 With Project p =3 0 -�+ z ICU 1(Lose ------ -- Level Of Service Computation Report as Cycle Length #) Method (Future Volume Alternative) -------------------------------------------------------------------------------- Level Of Service Computation Report ----------------- 2000 HCH Unsignalized Method (Base Volume Alternative) Intersection #1 Red Hill G walnut W O A# ##*##!###### #######!!##!A##A###A#!#AAAAAA#A#####AA#A#####!•AA###!#♦####A###### Intersection MZ Driveway on Red Hill ~ W Cycle (sec): Loss Time (sec): 100 Critical Vol./Cap.(X): 0 (Y+R-4.0 sec) Average 0.681 •####!####A#A##Al#AAlAiA•#A#A#A#AAlAlAAA##AAAAA###!##AAAAAAAAAA#A#AA#A#AA##A!### Average Delay (sec/veh): 0.0 Worst Case Level Of Service: ( 0.01 Optimal Cycle: AA!##AAAAAlAAAAA###A###AA###AAA##AAA#A#!A##!A#AAA##A###A#AA##AAA######A##!#!#!## Delay (sec/veh): 71 Level Of Service: XXX B A###AAAA♦##A###AR#!AA#A!#!#lAAA•#lAAf#A##A##A!A#A##A#####AAAA#•##AAAAAAAA##AAAA# Approach: North Bound South Bound Bast Bound West Bound Street Name: Red Hill Ave Walnut Ave Movement: ------------ L- T- R --------------- L- T- R --------------- L- T- R L- T- R Approach: North Bound South Bound East Bound hest Bound Control: Stop Sign Stop Sign ---------------1j---------------1 Uncontrolled Uncontrolled Movement: L - T - R L - T - R L - T - R L - T - R Rights: Include Include Include Include ------------ ---------------11--------------- Control: Protected ---------------11--------------- Protected Protected Protected Lanes: ____________ 0 1 1 0 0 _______________ 0 0 1 1 0 --------------- 0 0 11 0 0 0 0 0 0 0 Rights: include Include Include Include Volume Module __ _�' -) Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Base Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 -------•----I --------------- 0 2 1 0 1 0 1 1 0 1 0 1 1 0 2 0 1 1 0 --------------- --------------- Growth Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Volume Module: --------------- Initial ase: 0 0 0 0 0 0 0 0 0 0 0 0 Base Vol: 109 405 154 91 969 52 129 394 326 302 436 98 User Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Growth Adj: 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 PHF Adj: PHF Volume: 0.00 0.00 0.00 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Initial Bee: 111 413 157 93 988 53 131 402 333 308 445 100 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Added Vol: 1 0 0 5 2 2 4 1 1 O 1 0 Final Vol.: 0 0 0 0 0 0 0 0 0 0 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 ------------ _______________11____-_________ Initial Fut: 112 413 157 98 990 55 136 403 334 308 446 100 Critical Gap Module: 11 11 1 User Adj: 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Critical Op: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 PHF Volumes 112 1.00 1.00 1.00 1.00 1.00 1.00 413 15 7 98 990 55 136 403 334 308 1.00 1.00 Follo UpTim: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Reduct Vol: O O 0 0 0 0 0 0 0 O 446 100 0 0 ____________ I --------------- 11 Capacity Module: --------------- 11_______________ Reduced Vol: 112 413 157 98 990 S5 136 403 334 308 446 100 Cnflict Vol: 0 0 0 0 0 0 0 0 0 0 0 0 PCB Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Potent Cap.: 0 0 0 0 0 0 0 0 0 0 0 0 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Move Cap.: 1 1 1 1 1 1 1 1 1 1 1 1 Final Vol.: 112 413 157 98 990 55 136 403 334 308 -----11---------------11---------------11------------- 446 100 -) Volume/Cap: ------------ I 0.00 0.00 0.00 --------------- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Saturation Flow Module: Sat/Lane: 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 +--------------- Level Of Service Module 2Way95thQ: 0.0 0.0 0.0 ��--------------- 0.0 ��--------------- � Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Control Del: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Lanes: 1.00 2.17 0.83 1.00 1.89 0.11 1.00 1.09 0.91 2.00 1.63 0.37 LOS by Move: Final Sat.: 1700 ------------I ---------------, 3695 1405 1700 3221 179 1700 1860 1540 3400 2777 623 Movement: LT - LTR - RT LT - LTR - RT LT - LTR - RT LT - LTR - RT Capacity Analysis --------------- --------------- --------------- Module: Shared Cap.: 0 0 0 0 0 0 0 0 0 0 0 0 Vol/Sat: 0.07 0.11 0.11 0.06 0.31 0.31 0.08 0.22 0.22 0.09 0.16 0.16 SharedQueue: Shrd ConDel: 0.0 0.0 0.0 1.0 1.0 1.0 0.0 0.0 0.0 1.0 1.0 1.0 0.0 0.0 0.0 1.0 1.0 1.0 0.0 1.0 0.0 1.0 0.0 1.0 Crit Moves: ++** ***+ ••*+ **++ Shared LOS: AAAA#AAAAlA####AAAA#!A#A#####tit##A##A#+AAA###ifAA#AlAAAAA#AAA######AA#####A##A# ApproachDeli 0.0 0.0 0.0 0.0 ApproachLOS: Note: Queue reported is the number of cars per lane. Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA X CD 0 O (O � CD O 0 Z -I O 0 0 �--4 a) w W -X Existing Plus AM Fri Dec 15, 2006 11:2.0:17 Page 13-1 JA6539 - 75 -Unit Residential Project TIS City of Tustin Existing Plus Reuse Alternative 1 With Project ----------------------------------------------------------- Level Of Service Computation Report 2000 HCM Unsignalized Method (Future Volume Alternative) •!#r#r!##•!!!ww#!A••wwlw!#•i•*ww!!iw#lwww#•rwwww#!!!!w#w*AlrAAArlwrww•w•!#lwwwwA Intersection 92 Driveway on Red Hill lwiwwiwwA#w!•!!w###ww#r##A!lAAAlAAwlf#!w•wi•#wwwwlw*wwwtlA#*w#!lwAwwA!!#wAlAAAAA Average Delay (sec/veh)s 6.0 Worst Case Level Of Service: At 9.01 lAAwwwAwlAAw!#!wwlAw!!wr!#!!##w#!#•#••##wrwAw!!wA•www!##*A**wwiiAw•#w#•w•##!w•ww Approach: North Bound South Bound Bast Bound West Bound Movement : L - T - R L - T - R L - T - R L - T - R ------------I---------------II--------------- ---------------II---------------I Control: Stop Sign Stop Sign Uncontrolled Uncontrolled Rights: Include Include Include Include Lanes a 0 1 1 O 0 0 0 1 1 0 0 0 11 0 0 0 0 0 0 0 ------------ I--------------- II--------------- II--------------- il---------------I Volume Module: Base Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Growth Adj: 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.03 1.02 1.01 1.02 Initial Bee: 0 0 0 0 0 0 0 0 0 0 0 0 Added Vol: 2 4 0 0 0 3 9 0 9 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 6 Initial Fut: 2 4 0 0 0 3 9 0 9 0 0 0 User Adj: 1.00 1.00. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PKF Volumes 2 4 0 0 0 3 9 O 9 0 0 0 Reduct Vols 0 0 0 0 0 0 0 0 0 0 0 0 Final Vol.: 2 4 0 0 0 3 9 0 9 0 0 0 Critical Gap Module: Critical Gp s 7.1 6.5 xxxxx xxxxx xxxx 6.2 4.1 xxxx xxxxx noocx xxxx xxxxx FollowUpTix: 3.5 4.0 xxxxx xxxxx xxxx 3.3 2.2 xxxx xxxxx xxxxx xxxx xxxxx -------------II---------------II-------------- II--------------- Capacity ModuleI Cnf l i ct Vol: 13 23 xxxxx xxxx xxxx 0 0 xxxx Xootxx xxxx xxxx xxxxx Potent Cap.s 995 875 xxx= xxxx xxxx 900 900 xxxx xxxxx xxxx xxxx xxxxx Move Cap.: 984 866 xxxxx xxxx xxxx 900 900 xxxx xxxx xxxx x33nac Volume/Cap: 0.00 0.00 xxxx xxxx xxxx 0.00 0.01 XXXX xxxx xxxx xxxx X3= Level of Service Module: ----II (I II---------------) 2Way95th0: Xxxx 0.0 xxxxx xxxx xxxx xxxxx 0.0 xxxx XXXXX xxxx xxscn xXcxx Control Del : xxxxx 9.2 xxxxx xxx= xxxx xxxxx 9.0 xxxx XXXXX XXXXX XWK xxx�ac LOS by Move: * A * w # ! A w w r w w Movement: LT - LTR - RT LT - LTR - RT LT - LTR - RT IT - LTA - RT Shared Cap.: 921 xxxx xxxxx xxxx xxxx 900 xxxx xxxx xxxxx xxxx xxxx XXXXX SharedQueue: 0.0 xxxx xxxxx xxxxx xxxx 0.0 xxxxx xxxx Xxxxx xxxxx xxxx xx'xxx Shrd ConDel: 8.9 xxxx xxxxx xxxxx xxxx 9.0 X== xxxx xxxxx XXX= xxxx Xoocxx Shared LOS: A * * * # A w ! • • • A ApproachDel s 9.0 9.0 Xo30= ApproachLOSs A A . • Note: Queue reported is the number of cars per lane. Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITBU, TUSTIN, CA Existing Plus AM Fri Dec 15, 2006 11:20,17 Page 16-1 JA6539 - 75 -Unit Residential Project TIS City of Tustin Existing Plus Reuse Alternative 1 With Project -------------------------------------------------------------------------------- Level Of Service Computation Report 2000 HCH Unsignalized Method (Base volume Alternative) #!!!!!!!!##!#wlwAwwlAwAAwAwAAwAAAAAwAAAA!#wlA.A!!!i!#!!!!!#!lwwwAlAwlwAlr!#!#!i#! Intersection #3 Driveway on Walnut !!##!!!!Aw♦wwAwAAlwrlAAw#A!!#!##!!#!w!w####!#fit!#w#twlw#!!!#!wAlAARlAwAwwwttA#! Average Delay (sec/veh): 0.0 Worst Case Level Of Service: [ 0.01 lwwwlwlfwlwlw#Aw•#!wr#wifrrr#rriii#i###r##ii#r•i•••iir!#i#rii!#i!###•rw#if#rlwr# Approach: North Bound South Bound Bast Bound West Bound Movement: L - T - R L - T - R L - T it L - T - R ------------I---------------II---------------II---------------II---------------I Control: Stop Sign Stop Sign Uncontrolled Uncontrolled Rights: Include Include Include Include Lanes : 0 0' 0 0 0 1 0 0 0 1 1 0 2 0 0 0 0 1 1 0 --------------II---------------II---------------II--------------- Volume Module:I Base Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Growth Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Initial Beat 0 0 0 0 0 0 0 0 0 0 0 0 User Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 PHF Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 PHF Volume: 0 0 0 0 0 0 0 0 0 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Final Vol.s 0 0 0 0 0 0 0 0 0 0 0 0 ------------I---------------II---------------II---------------II---------------I Critical Gap Modules Critical Gp: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 FollowUpTim: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ------------I---------------II---------------II---------------II---------------I Capacity Modules Cnflict Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Potent Cap.: 0 0 0 0 0 0 0 0 0 0. 0 0 Move Cap.: 1 1 1 1 1 1 1 1 1 1 1 1 Volume/Cap: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ------------ I ---------------II---------------II---------------II---------------I Level Of Service Module: 2Way95thQ: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Control Del: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 LOS by Move: Movement: IT - LTR - RT LT - LTR - RT LT - LTR - RT LT - LTR - RT Shared Cap.: 0 0 0 0 0 0 0 0 0 0 0 0 SharedQueue: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Shrd COnDel: 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Shared LOS: ApproachDel: 0.0 0.0 0.0 0.0 ApproachLOS: Notes Queue reported is the number of cars per lane. r#i•w#!!♦w•www!liiiwr•riiilili!•••r#•#•##r#r!•r•lri� Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU. TUSTIN, CA CD CQ (n Existing Plus AM Fri Dec 15, 2006 11s20s17 Page 15-1 CDO -------------------------------------------------------------------------------- _a E JA6539 - 75 -Unit Residential Project TIS -� = City of Tustin CO O Existing Plus Reuse Alternative 1 With Project O:3 -------------------------------------------------------------------------------- -h Z Level Of Service Computation Report -.L O 2000 HCM Unsignalixed Method (Future Volume Alternative) C) 1###!•AAA♦AA#AAA#AA!!#!A!•r•!A!#A!!!!A!!!!•!•#*aAA!•A#•A#*••}•A!•!A!•••##!••••A•• W 00 Intersection $3 Driveway on Walnut ' !•!!••!•!•A•A•*#AAA!•#!••#•AA!•AA#AAAA#•A#A###AA#to#••!•!•AAA!!AA#}••}♦#}#•AAA#A W Average Delay (sec/veh): 3.4 Worst Case Level Of Service, A[ 8.5] �� AlAAAAAAA######}}}####}}#A••!A!•!#AAA#AAA•tlAA!#•AA#lA4A!!•fltAlA##A•lAAA!!A•##! Approach: North Bound South Bound east Bound Nest Bound Movement : L - T - R L - T - R L - T - R L - T - R ---- ---Sc�-Sign---��---Stop-Sign---��--Vncon�rolled-��--------------- ControlsVncontrolled Rights: Include Include Include Include Lanes: 0 0 0 0 0 1 0 0 0 1 1 0 2 0 0 0 0 1 1 0 -------------- --------------- --------------- --------------- volume Modui::� Base Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Growth Adj: 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 Initial Bee: 0 0 0 0 0 0 0 0 0 0 0 0 Added Vol: 0 0 0 4 0 0 0 2 0 0 2 2 PasserByVols 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 0 0 0 4 0 0 0 2 0 0 2 2 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 0 0 4 0 0 0 2 0 0 2 2 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Final Vol-: 0 0 0 4 O 0 0 2 0 0 2 2 Critical Gap Module: Critical Gp:xxxxx xxxx xxxxx 6.9 xxxx xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx FollowUpTim:xxxxx xxxx xxxxx 3.5 xxxx xxxxx xxxxx xxxx xxxxx xxxxx xxxx x30cxx ------------��------------- 11 --------------11 -------------- Capacity Module:) Cnflict Vol: xxxx xxxx xxxxx 4 xxxx xxxxx xxxx xxxx xxxxx xxxx xxxx xxxxx Potent Cap-: xxxx xxxx xxxxx 1023 xxxx xxxxx xxxx xxxx xxxx xxxx xxoom Move Cap.s xxxx xxxx xxxxx 1023 xxxx xxxxx xxxx xxxx xxxxx xxxx xxxx xxxxx Volume/Caps xxxx xxxx xxxx 0.00 xxxx xxxx xxxx moa xxxx xxxx xxxx XXXX ---- ---------------11------------ --11-- ------------ Level Of Service Module,� 2Way95thQ s xxxx xxxx xx3ocx 0.0 xxxx xxxxx xxxx xxxx xxxx xxxx X23= Control Del : xxxxx xxxx xxxxx 8.5 xxxx XX3= x' 23acx 300= x30otx xxxx 300= LOS by Moves ! ! • A A ! A • • ! • ! Movement: LT - LTR - RT LT - LTR - RT LT - LTR - RT LT - LTR - RT Shared Cap.s xxxx xxxx xxxxx xxxx xxxx xxxxx xxxx xxxx xxxxx xxxx xxxx xxx= SharedQueue:xxxxx xxxx xxxxx xxxxx xxxx xxxxx xxxxx xxxx Xxxxx xxxxx xxxx Xxxxx Shrd ConDelsxxxxx xxxx xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx Shared LOS: # +► • * • • • ! • # ! * ApproachDels xxxxxx 8.5 x300xx roachLOS : •O°� a►PP A } • #A•!••••!#•!!!A!•AA•AA#}}AA#A#AAAAA}AAAlAlAAA}!••!!!#•AAA!!!•!A•!!!A!!!lAAAAA}#} Note: Queue reported is the number of cars per lane. Existing Plus AN Fri Dec 15, 2006 11:20:17 Page 16-1 -------------------------------------------------------------------------------- JA6539 - 75 -Unit Residential Project TIS City of Tustin Existing Plus Reuse Alternative 1 With Project -------------------------------------------------------------------------------- Base Queue Report (cars) --------------------------------------------- ------------------------------ Northbound Southbound Eastbound Westbound Diode Intersection L -- T -- R L -- T -- R L -- T -- R L -- T -- R $2 [2Way95th0)s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 #3 [2Way95thQ]s 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Traff ix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Existing Plus AN Fri Dec 15, 2006 11:20117 Page 17-1 -------------------------------------------------------------------------------- JA6539 - 75 -Unit Residential Project TIS City of Tustin Existing Plus Reuse Alternative 1 With project -------------------------------------------------------------------------------- Future Queue Report (cars) -------------------------------------------------------------------------------- Northbound Southbound Eastbound Westbound Node intersection L -- T -- R L -- T -- R L -- T -- R L -- T -- R #2 [2Way95thQ]s 0.0 0.0 xxxx xxxx 0.0 0.0 0.0 xxxx xxxx xxxx xxxx xxxx #3 (2Way95thQ] : xxxx xxxx xxxx 0.0 M= X)= xxxu Xmm xxxx X3= xxroc Xocxx X CD Cl) 0 Traffix 7.6.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA (c = CD 0 Z coo 0 0 �� 0)w W� O CD CQ Cn Existing Plus PM Fri Dec 15, 1006 11:20:10 CD O -----------------------------------•---------------------------------Page -1-1--- —� C JA6539 - 75 -Unit Residential Project TIS IV = City of Tustin 0 Existing Plus Reuse Alternative 1 With Project O-------------------------------------------------------------------------------- h Z Scenario Report �O Scenario: Existing Plus PM W O Command: Existing Plus PM 4 volumes Existing PM C Geometry: Nearterma Impact Fee: Default Impact Fee Trip Generation: PM Trip Distributions ALL Paths,. Default Paths Routes& Default Routes Configuration: Existing Plus PM Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN. CA Existing Plus PM Fri Dec 15, 2006 11:10:10 Page 2-1 -------------------------------------------------------------------------------- JA6539 - 75 -Unit Residential Project TIS City of Tustin Existing Plus Reuse Alternative 1 With Project Trip Generation Report Forecast for PM Zone Rate Rate Trips Trips Total 4 Of # Subsone Amount Units In Out In Out Trips Total ------------------------------------- ------ ------ ----- ----- ----- ----- - 1 81 -Unit Resi 1.00 Townhomes 26.00 17.00 26 17 43 100.0 Zone 1 Subtotal ............................. 26 17 43 100.0 -------------------------------------------------------------------------------- TOTAL.................................................. 26 17 43 100.0 Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA X CD O W E CD N Z O 0 0 � w w� Existing Plus PM Fri Dec 15, 2006 11:20:10 Page 3-1 -------------------------------------------------------------------------------- JA6539 - 75 -Unit Residential Project TIS City of Witi Existing Plus Reuse Alternative 1 With Project ------------------------------------------------------------------- Trip Distribution Report Percent Of Trips Townhouses To Gates 1 2 4 5 6 Zone ----- ----- ----- ----- ----- 1 15.0 15.0 5.0 10.0 55.0 Tratfix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU. TUSTIN, C4 Rxisting Plus PM Fri Dec 15, 2006 11:20:10 Page 4-1 JA6539 - 75 -Unit Residential Project TIS City of Tustin Existing Plus Reuse Alternative 1 With Project -------------------------------------------------------------------------------- Turning Movement Report PM :':.1ivenve Martrbo i d Southbound Eastbound Westbound Total Type Left Thru Right- Left Thru Right Left Thru Right Left Thru Right Volume #1 Red Hill s Walnut Base 253 1085 174 131 460 112 120 406 105 255 713 147 3982 Added a n 0 4 2 2 6 1 1 0 4 0 26 Total 257 1085 174 135 482 114 128 407 106 255 717 147 4008 82 Driveway on Red Hill Base 0 0 0 0 0 0 0 0 0 0 0 0 0 Added 7 3 0 0 0 11 7 0 7 0 0 0 35 Total 7 3 0 0 0 11 7 0 7 0 0 0 35 83 Driveway on Walnut Base 0 0 0 0 0 0 0 0 0 0 0 0 0 Added 0 0 0 3 0 0 0 7 0 0 2 8 20 Total 0 0 0 3 0 0 0 7 0 0 2 B 20 T=affir. ?.°.:?:5 na6 Ooulirg Assoc. Licensed to KATZ OKITSU, TUSTIN, CA CD (Q Cn Existing Plus PH Fri Dec 15, 2006 11:10:10 Page 5-1 CDO -------------------------------------------------------------------------------- E JA6539 - 75 -Unit Residential Project TIS N = City of Tustin N 0 Existing Plus Reuse Alternative 1 With Project 0=3 -------------------------------------------------------------------------------- 'h Z Intersection Volume Report �O Base Volume Alternative C) O -------------------------------------------------------------------------------- ~ Northbound Southbound Eastbound Westbound GJ Node Intersection L -- T -- R L -- T -- R L -- T -- R L -- T -- R 1 Red Hill 4 Wa .253 1085 174 131 480 112 120 406 105 255 713 147 2 Driveway on R 0 0 0 0 0 0 0 0 0 0 0 0 3 Driveway On W 0 0 0 0 0 0 0 0 0 0 0 0 + rys• ii M� :Yin: •t!� Existing Plus PH Fri Dec 15, 2006 11:20s10 Page 6-1 -------------------------------------------------------------------------------- JA6539 - 75 -Unit Residential Project TIS City of Tustin Existing Plus Reuse alternative 1 With Project -------------------------------------------------------------------------------- Intersection Volume Report Future Volume Alternative -------------------------------------------------------------------------------- Northbound Southbound Eastbound Westbound Node Intersection L -- T -- R L -- T -- R L -- T -- R L -- T -- R 1 Red Hill 6 Wa 257 1085 174 135 482 114 128 407 106 255 717 147 2 Driveway on R 7 3 0 0 0 it 7 0 7 0 0 0 3 Driveway on W 0 0 0 3 0 0 0 7 0 0 2 8 Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to S71TZ OKITSU, TUSTIN, CA Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA X CD 0 CQ =� CD 0 N Z W 0 0 0 a� w Existing Plus PM Fri Dec 15, 2006 11:20:10 Page 7-1 -------------------------------------------------------- JA6539 - 75 -Unit Residential Project TIS City of Tustin Existing Plus Reuse Alternative 1 With Project ------------------------------------------------------- Impact Analysis Report Level Of Service intersection Base Future Change Del/ V/ Del/ V/ in LOS Veh C LOS Veh C 6 1 Red Hill i Walnut B xxxxx 0.648 B xxXoxx 0.656 + 0.008 V/C # 2 Driveway on Red Hill 0.0 0.000 A 9.0 0.000 + 9.049 D/V # 3 Driveway on Walnut 0.0 0.000 A 0.6 0.000 + 0.000 D/V Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OXITSU, TUSTIN, CA Existing Plus PM Fri Dec 15, 2006 11:20:10 Page 8-1 -------------------------------------------------------------------------------- JA6539 - 75 -Unit Residential Project TIS City of Tustin Existing plus Reuse Alternative 1 With Project -------------------------------------------------------------------------------- Threshold Report (Base Alternative) Threshold Criteria (Ops LOS >- *)(Plan LOS >- *) (Delay )P• 60.000)(V/C >a 1.000) Intersection Movement LOS Delay V/C Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA 0)CD (a Cn Existing Plus PM Fri Dec 15, 2006 11120:10 Page 9-1 CDO ----------------------------------------------------------------------------- _a C JA6539 - 75 -Unit Residential Project TIS N = City of Tustin -Pl. O Existing Plus Reuse Alternative 1 With Project O=3 ----------------------------------------------------------------------------- '-'� Z Threshold Report (Future Alternative) -� O W O Threshold Criteria (Ops LOS >• *](Plan LOS >• •j (Delay )1'• 60.0001 (V/C >• 1.000] W Intersection Movement LOS Delay V/C Existing Plus PM Fri Dec 15, 2006 11:20:10 Page 10-1 JA6539 - 75 -Unit Residential Project TIS City of Tustin Existing Plus Reuse Alternative 1 With Project -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length 4) Method (Base Volume Alternative) ##rtr#rAlrrAAAA!!lAAAArlAAAIAA!!!!r!r!♦AAAAAr•A!!tlArlAAA!!!!r##!!rrlrlrrlttt#!r Intersection Red Hill 6 Walnut lrrr•rrArArrrrtrr•rrrAArrrrrrrrrrr*rrrr#rrt##rrrr###r##rrr##trrrr##rr#t##rrr###• Cycle (sec): 100 Critical Vol./Cap.(X): 0.646 Loss Time (sec): 0 (Y♦R-4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 65 Level Of Service: B rAri#•rrrrrirlrrrrrrrAirrr#rrr#t#r##r#t#r#rrrt#r#r##rrrr*!r##########tt######♦rr Street Name: Red Hill Ave Walnut Ave Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ I --------------- 11 --------------- 11 --------------- 11---------------� Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 2 1 0 1 0 1 1 0 1 0 1 1 0 2 0 1 1 0 --------------11---------------11---------------11--------------- Volume Modules � Base Vol: 248 1064 171 128 471 110 118 398 103 250 699 144 Growth Adj3 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 Initial Bae: 253 1085 174 131 480 112 120 406 105 255 713 147 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.410 1.00 1.00 1.00 1.00 1.00 PHF Volume: 253 1065 174 131 480 112 120 406 105 255 713 147 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol, 253 1085 174 131 480 112 120 406 105 255 713 147 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: .1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Vol.: 253 1085 174 131 480 112 120 40i JOS 255 713 147 ---- 11 11--------------- -------------- Saturation Flow Module: � Sat/Lane: 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 2.58 0.42 1.00 1.62 0.38 1.00 1.59 0.41 2.00 1.66 0.34 Final Sat.: 1700 4394 706 1700 2756 644 1700 2701 699 3400 2819 581 ------------ I --------------- 11 --------------- 11 --------------- ---------------� Capacity Analysis Module: Vol/Sat: 0.15 0.25 0.25 0.08 0.17 0.17 0.07 0.15 0.15 0.08 0.25 0.25 Crit Moves: ♦rrr rrr# ##r# #tt# rrr##r*rrrr#rt#rr#r!r#r##ttr#rtr##irtk#r#rlttkrrr#rttrrrrr#!#rrlrr##A#t #!r###### Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OYITSU, TUSTIN, CA Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA N CD Cn -� O E CQ CD N Z Ln O O O a) W W ---� Existing Plus PM Fri Dec 15, 2006 11:20:10 Page 11-1 JA6539 - 75 -Unit Residential Project TIS Cit- of actin Existing Plus Reuse Alternative 1 With Project ---------------------------------------------------- Level Of Service Computation Report ICU Moss as Cycle Length 4) Method (Future Volume Alternative) wrwwwwrw####!w##w!#www#rw!##fwr##!r###www#wflw#!w!#rwrfr#!r#!w##r!#!#!!#!#*#!wr! Intersection #1 Red Hill 4 Walnut r!w#!rr*r+rrr+►w!lrwwrrrrrwwrrr#!r!##w###!####!rlrrwrtrrrr rrrrsrr##1+wrwwlrwrrwrw Cycle (sec): 100 Critical Vol./Cap.(X): 0.656 Loss Time (sec): 0 (Y+R-4.0 sec) Average Delay (sec/veh): �ooac�oc Optimal Cycles 66 Level Of Service: B •w!#rwrlwwrr##wwrrwrr!##rr#!#ww#!r##r#w#wrtrrw#wrrrrrrrw#rrrrr#wwrwrwwwwwwwwwrr# Stree . Kama: heck bill Ave Walnut Ave Approach: North Bound South Bound Bast Bound West Bound Movement:L- T- R L- T- R L- T- R L- T- R ------------I ---------------11-------------11---------------11------------•--� Control: protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 2 1 0 1 0 1 1 0 1 0 1 1 0 2 0 1 1 0 -------------- --------------- --------------- --------------- --lose Module:� Base Vol: 24. 1064 171 128 471 110 118 398 103 250 699 144 Growth Adj: 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 Initial Baez 253 1085 174 131 480 112 120 406 105 255 713 147 Added Vol: 4 0 0 4 2 2 8 1 1 0 4 0 PasserByVol: 0 0 0 O 0 0 0 0 0 0 0 0 Initial Fut: 257 1085 174 135 482 114 126 407 106 255 717 147 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 257 1085 174 135 482 114 128 407 106 255 717 147 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 257 1085 174 135 482 114 128 407 106 255 717 147 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLP Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Vol.: 257 1085 174 135 482 114 128 407 106 255 717 147 ----- --------------- 'I --------------- Saturation Flow Module:� Sat/Lase: 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 Adjustment: 1.00 1.00 1.u0 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 2.58 0.42 1.00 1.62 0.38 1.00 1.59 0.41 2.00 1.66 0.34 Final Sat.: 1700 4394 706 1700 2749 6S1 1700 2697 703 3400 2822 578 --- --------------- 11 Capacity Analysis Module:� Vol/Sat: 0.15 0.25 0.25 0.08 0.18 0.18 0.08 0.15 0.15 0.08 0.2S 0.25 Crit Moves: ww#r r#wr ww## ww#w #rrwr#!r#rrwwrw#wrww#w#rww#w#r!#wrr#r#+rrr#r!#rwr#!#rrwr+wrr+wwlrwwlwwr#wwr#wrrr Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU TUSTIN, CA Existing Plus PM Fri Dec 15, 2006 11:20:10 Page 12-1 JA6539 - 75 -Unit Residential Project TIS City of Tustin Existing Plus Reuse Alternative 1 With Project -------------------------------------------------------------------------------- Level Of Service Computation Report 2000 HCM Unsignali:ed Method (Base Volume Alternative) wlwrlwww!#wrrw#r!lrrrrwtr#wrwww##!##ri#wwlr#rrwww#ww#ww!lwwwlwilwww#rwrwr##rw#w! Intersection 67 Driveway on Red Hill www###w#rwr#wrrrrw##lwrtr•www!##!r#wlrfrlf!#rtr#wrww#r#wrrrr##w#r#wr#wwwr#wwt##w Average Delay (sec/veh): 0.0 Worst Case Level Of Service: ( 0.01 #rw#rrrwwrwrr#wrwwwlwwr#rrw#rwwwwwwwwr#wrrrwwwwwwrwwwwrrwwwwwrw#rwwrrrrwrrwwwwww Approach: North Bound South Bound Bast Bound West Bound mov=tn t • L - T - -. :. T - =. L - T - R L - T - R ------------'---------------"---------------II---------------I'------ I Control: Stop Sign Stop Sign Uncontrolled Uncontrolled Rights: Include Include Include Include Lanes: 0 1 1 0 0 0 0 1 1 0 0 0 11 0 0 0 0 0 0 0 ------:--------------��---------------��---------------��--------------- Volume Module� Base Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Growth Adj: 0.00 0.00 0.00 0.00 0.00 o.00 o.00 o.00 o.0o 0.00 0.00 0.00 initial Bse: 0 0 0 0 0 0 0 0 0 0 0 0 User Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 PHF Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 PHF Volume: 0 0 0 0 0 0 0 0 0 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Final Vol.: 0 0 0 0 O 0 0 0 0 0 0 0 l-------- --------------- --------------- --------•------ Critical GapModules� Critical Gp: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 FollowUpTim: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ------------ --------------- --------------- --------------- Capacity Modular� Cnflict Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Potent Cap.: 0 0 0 0 0 0 0 0 0 0 0 0 Move Cap.: 1 1 1 1 1 1 1 1 1 1 1 1 Volume/Capi 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 - -------------------------- --------------- --------------- ---------------� Level Of Service Module: 2Way95thQ: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Control Del: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 LOS by Move: Movement: LT - LTR - RT LT - LTR - RT IT - LTR - RT LT - LTR - RT Shared Cap.: 0 0 0 0 0 0 0 0 0 0 0 0 SharedQueue: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Shrd ConDel: 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Shared LOS: ApproachDel: 0.0 0.0 0.0 0.0 ApproachLos: Note: Queue reported is the number of cars per lane. r#r###lrwwwrwwlrrlrlrrrwrrrwwrrrwrrrwwwrwrwwwwwwwrrr Traffix :.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU. TUSTIN. CA Existing Plus PM Fri Dec 15, 2006 11:20:10 Page 14-1 6TA6539 - 75 -Unit Residential Project TIS City of Tustin Existing Plus Reuse Alternative 1 With Project -------------------------------------------------------------------------------- Level Of Service Computation Report 1994 HCM Unsignalised Method (Base Volume Alternative) #!«A#A«!«!«AtA**!t«*«#**«!*«!«*««#•A!!t«*!#!#AA##A##Ati**«##i!#*#««#t##fit««!R*! Intersection #3 Driveway on Walnut ««A«!tt«*«**#***#*#**##«**#tort*****##****tR#!**tt*«!*##*lAtAw##*#!#*#ARRrt#t*tt Average Delay (sec/veh): 0.0 Worst Case Level Of Service: Approach: North Bound South Bound East Bound West Bound Movement : L - T - R L - T - R L - T - RL - T - R ------------ I ---------------11---------------11----------- 11 -------- Control: Stop Sign Stop Sign Uncontrolled Uncontrolled Rights: Include Include include Include Lanes: 0 0 0 0 0 1 0 0 0 1 1 0 2 0 0 0 0 1 1 0 ------------ I --------------- 11 --------------- 11 --------------- 11 --------------- � Volume Module: Bass Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Growth Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 o.00 0.00 0.00 0.00 Initial Bse: 0 0 0 0 0 0 0 0 0 0 0 0 User Adjs 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 PHF Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 PHF Volume: O 0 0 0 0 0 0 0 0 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Final Vol.: 0 0 0 0 0 0 0 0 0 0 0 0 ------------ I --------------- --------------- if --------------- ---------------I Adjusted Volume Module: Grade: Olt 06 04 0• t Cycle/Cars: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx t Truck/Cosh: xxxx Xxxx xxxx xxxx xxxx xxxx xxxx xxxx PCE Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Cycl/Car PCE: xxxx xxxx xxxx xxxx xxxx 30= xxxx xxxx Trck/Cmb PCE: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx Adj Vol.: 0 0 0 0 0 0 0 0 0 0 0 0 ------------ ------------------------- --------------- ---------------� Critical Gap Module: MoveUp Time: 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Crit Gp Adj: 0.00 0.00 0.00 o.00 o.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Critical Gp: 0.0 0.0 0.o 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ------------ --------------- --------------- --------------- ---------------� Capacity Module: Cnflict Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Potent Cap.: 0 0 0 0 0 0 0 0 0 0 0 0 Adj Cap: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Move Cap.: 1 1 1 1 1 1 1 1 1 1 1 1 ----II---------------��---------------II-------------- Level of Service Modula: Control Del: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 LOS by Move: Movement: LT - LTR - RT LT - LTR - RT LT - LTR - RT LT - LTR - RT Shared Cap.: 0 0 0 0 0 0 0 0 0 0 0 0 Shrd ConDel: 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Shared LOS: ApproachDel: 0.0 0.0 0.0 0.0 Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TU IN, CA Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU. TUSTIN, CA CD (o Existing Plus PM Fri Dec 15, 2006 11:20:10 Page 13-1 (D O -------------------------------------------------------------------------------- ,-L C JA6539 - 75 -Unit Residential Project TIS N)= City of Tustin M O Existing Plus Reuse Alternative 1 With Project O=3 -------------------------------------------------------------------------------- -*+ Z Level Of Service Computation Report O 2000 HCH Unsignalized Method (Future Volume Alternative) W O Intersection #2 Driveway on Red Hill 1 W � Average Delay (sec/veh): 7.2 Worst Case Level Of Service: A( 9.01 !##!****!♦!*«#A!*t«♦#*«tt«t!«!!##«A#«!*#«!##«!Ar«!A«««««ttt!«#!«t!!*At«*!•«!«#r« Approach: North Bound South Bound Sant Bound West Bound Movements ------------ L - T - R L - T - R --------------- L - T - R L - T - R Control: --------------- Stop Sign Stop Sign --------------- ---------------� Uncontrolled Uncontrolled Rights: Include Include Include Include Lanes: 0 1 1 0 0 0 0 1 1 0 -------------- 0 0 11 0 0 0 0 0 0 0 --------------- ��---------------��--------------- Volume Module: � Base Vol: 0 0 0 0 O 0 0 0 0 0 O 0 Growth Adj: 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 Initial Bse: 0 0 0 0 0 0 0 0 0 0 0 0 Added Vol: 7 3 0 0 0 11 7 0 7 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 O 0 0 Initial Fut: 7 3 0 0 0 11 7 0 7 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 7 3 0 0 0 11 7 0 7 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Final Vol.: 7 3 0 0 0 11 7 0 7 0 0 0 Critical Gap Module: Critical Gp: 7.1 6.5 xxxxx xxxxx xxxx 6.2 4.1 xxxx xxxxx xxxxx xxxx xxxxx FollowUpTia: ------------ 3.5 4.0 xxxxx Xxxxx xxxx 3.3 --------------- --------------- 2.2 xxxx xxxxx xxxxx xxxx X== 11 Capacity Module: --------------- ---------------� Cnfiict Vol: 1s 18 xxxxx xxxx xxxx 0 0 xxxx xxxxx xxxx xxxx xxxxx Potent Cap.: 1001 881 xxxxx xxxx xxxx 900 900 xxxx xxxx xxxx XXXXX Move Cap.: 984 874 xxxxx xxxx xxxx 900 900 xxxx xxxxx xxxx xxxx xxxxx Volume/Cap: 0.01 0.00 xxxx xxxx xxxx 0.01 0.01 xxxx xxxx xxxx xxxx xxxx ----��--------------- ��-----------•---��--------------- Level Of Service Module, � 2Way95thQ: xxxx 0.0 xxxxx xxxx xxxx xxxxx 0.0 xxxx Xxxxx xxxx xxxx xxxxx Control Del:xxxxx 9.1 xxxxx x3cKxx xxxx xxxxx 9.0 xxxx xxxxx xxxxx xxxx xxxxx LOS by Move: * A * �► * « A « * * ! Movement: IT - LTR - RT LT - LTA - RT LT - LTR - RT LT - LTA - RT Shared Cap.: 963 xxxx xxxxx xxxx xxxx 900 xxxx xxxx xxxxx xxxx xxxx xxxxx SharedQueue: 0.0 xxxx xxxxx xxxxx xxxx 0.0 xxxxx xxxx xxxxx X== xxxx xxxxx Shrd ConDels 8.8 xxxx xxxxx xxxxx xxxx 9.0 xxxxx xxxx xxxxx xxxx xxxxx Shared LOS: A • * ! « A « • * ! « ! ApproachDel : 8.8 9.0 1000= X300= ApproachLOS: A A « ! Note: Queue reported is the number of cars per lane. Existing Plus PM Fri Dec 15, 2006 11:20:10 Page 14-1 6TA6539 - 75 -Unit Residential Project TIS City of Tustin Existing Plus Reuse Alternative 1 With Project -------------------------------------------------------------------------------- Level Of Service Computation Report 1994 HCM Unsignalised Method (Base Volume Alternative) #!«A#A«!«!«AtA**!t«*«#**«!*«!«*««#•A!!t«*!#!#AA##A##Ati**«##i!#*#««#t##fit««!R*! Intersection #3 Driveway on Walnut ««A«!tt«*«**#***#*#**##«**#tort*****##****tR#!**tt*«!*##*lAtAw##*#!#*#ARRrt#t*tt Average Delay (sec/veh): 0.0 Worst Case Level Of Service: Approach: North Bound South Bound East Bound West Bound Movement : L - T - R L - T - R L - T - RL - T - R ------------ I ---------------11---------------11----------- 11 -------- Control: Stop Sign Stop Sign Uncontrolled Uncontrolled Rights: Include Include include Include Lanes: 0 0 0 0 0 1 0 0 0 1 1 0 2 0 0 0 0 1 1 0 ------------ I --------------- 11 --------------- 11 --------------- 11 --------------- � Volume Module: Bass Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Growth Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 o.00 0.00 0.00 0.00 Initial Bse: 0 0 0 0 0 0 0 0 0 0 0 0 User Adjs 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 PHF Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 PHF Volume: O 0 0 0 0 0 0 0 0 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Final Vol.: 0 0 0 0 0 0 0 0 0 0 0 0 ------------ I --------------- --------------- if --------------- ---------------I Adjusted Volume Module: Grade: Olt 06 04 0• t Cycle/Cars: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx t Truck/Cosh: xxxx Xxxx xxxx xxxx xxxx xxxx xxxx xxxx PCE Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Cycl/Car PCE: xxxx xxxx xxxx xxxx xxxx 30= xxxx xxxx Trck/Cmb PCE: xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx Adj Vol.: 0 0 0 0 0 0 0 0 0 0 0 0 ------------ ------------------------- --------------- ---------------� Critical Gap Module: MoveUp Time: 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Crit Gp Adj: 0.00 0.00 0.00 o.00 o.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Critical Gp: 0.0 0.0 0.o 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ------------ --------------- --------------- --------------- ---------------� Capacity Module: Cnflict Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Potent Cap.: 0 0 0 0 0 0 0 0 0 0 0 0 Adj Cap: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Move Cap.: 1 1 1 1 1 1 1 1 1 1 1 1 ----II---------------��---------------II-------------- Level of Service Modula: Control Del: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 LOS by Move: Movement: LT - LTR - RT LT - LTR - RT LT - LTR - RT LT - LTR - RT Shared Cap.: 0 0 0 0 0 0 0 0 0 0 0 0 Shrd ConDel: 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Shared LOS: ApproachDel: 0.0 0.0 0.0 0.0 Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TU IN, CA Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU. TUSTIN, CA X CD y -� O CO O� CD � N Z 4 O Existing Plus PM Fri Dec 15, 2006 11:20:10 page 14-2 ------------------------------------------------------------------------------ JA6539 - 75 -Unit Residential Project TIS City of Tustin Existing Plus Reuse Alternative 1 With Project ---------------------------------------------------------- •w#ww•r*rw•rw•r*•rwwwrAwlwlrw•#!•rww••fwww#•www##rwi•##rfwww•#wA*#••!t#•wfrAAw#f Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Rxisting Plus PM Fri Dec 15, 2006 lls20:10 Page 15-1 JA6S39 - 75 -Unit Residential Project TIS City of Tustin Existing Plus Reuse Alternative 1 With Project -------------------------------------------------------------------------------- Level Of Service Computation Report 1994 HCM Unsignalised Method (Future Volume Alternative) a•••!••w!##•#rf•A#iffAr•f#fwwlrffArw!#!wr#f•##Aw##•rrf•••r#wr•r••ww•wwr•w•www•#• Intersection B3 Driveway on Walnut w#wf!!!A#!ltifffff#AiAAAA*A##!•w•#fr•w••fwww•f•♦www#rfwfwwr•Ar#r•rwf••r••#flfi!# Average Delay (sec/veh): 0.6 Worst Case Level Of Service: A wAwwfwA•rwffArlfA•wAwA•!ww•wr#••w•!r•rwwwwr••rf•wwrr#lwwr##•Aw•r••wwrwrww•r••wr• Approach: North Bound South Bound Bast Sound West Bound Movements I. - T - R L - T - R L - T - R T - T - R ------------ i--------------- i i--------------- i i--- i i i ----•------- -------•------- Control: Stop .Sign Stop Sign Uncontrolled Uncontrolled Rights: Include Include Include Include Lanes: 0 0 0 0 0 1 0 0 0 1 1 0 2 0 0 0 0 1 1 0 ------------ --------------- --------------- --------------- ---------------� Volume Modules Base Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Growth Adj: 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 Initial Bse: 0 0 0 0 0 0 0 0 0 0 0 0 Added Vol: 0 O 0 3 0 0 0 7 0 0 2 8 PasserByVol: 0 O 0 0 0 0 0 0 0 0 0 0 Initial ruts 0 0 0 3 0 0 0 7 0 0 2 8 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 0 0 0 3 0 O 0 7 0 0 2 8 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Final Vol.: 0 0 0 3 0 0 0 7 0 0 2 8 Adjusted Volume Module: Grades Oi 0# 08 0# 8 Cycle/Carse xxxx xxxx xxxx xxxx xxxx xxxx xxnx xxxx t Truck/Coabs xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx PCS Adj: 1.10 1.10 1.10 1.10 1.10 1.10 1.10 1.00 1.00 1.10 1.00 1.00 Cycl/Car PC$s xxxx xxxx xxxx xxxx xxxx xx3oc xxxx xxxx Trck/Cob PCEs XXXX xxxx xxxx xxxx xxxx xxxx xxxx xxxx Adj Vol.e 0 0 0 3 0 0 0 7 0 0 2 8 Critical Gap Modules MoveUp Timesxxxxx xxxx xxxxx 3.4 xxxx xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx Critical Gpaxxxxx xxxx xxxxx 7.0 xxxx xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx ------------ I --------------- --------------- 11 --------------- ---------------� Capacity Module: Cnflict Vol: xxxx xxxx xxxXc 13 xxxx xxxxx xxxx xxxx xxxxx xxxx xxxx xxxxx Potent Cap.: xxxx xxxx xxxxx 1039 xxxx xxxxx xxxx xxxx xxxxx xxxx xxxx xxxxx Adj Cape xxxx xxxx xxxxx 1.00 xxxx xxxxx xxxx xxxx X== xxxx xxxx xxxxx Move Cap a xxxx xxxx xxxxx 1039 xxxx xxxxx xxxx xxxx xxxxx xxxx xxxx xxxxx ------------I --------------- --------------- 11 --------------- ---------------� Level Of Service Modules Control Delexxxxx xxxx xxxxx 3.5 xxxx xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx LOS by Moves • • • A # ! • • r • • • Movements LT - LTR - RT LT - LTR - RT LT - LTR - RT LT - LTR - RT Shared Cap.: xxxx xxxx xxxxx xxxx xxxx xxxxx xxxx xxxx xxxxx xxxx xxxx xxxxx Shrd ConDel:xxxxx xxxx xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx xxxxx xxxx xxxxx Shared LOS: r # # • w w # • • • • • ApproachDels xxxxxx 3.5 0.0 0.0 Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA i1I CD CQ On CD O E ONO O O:3 --h Z —' O CA . W O 4 W Existing Plus PM Fri Dec 15 2006 11:20:10 --------------------------------------------------------------------pagel5 ------ JA6539 - 75 -Unit Residential Project TIS City of Tustin Existing Plus Reuse Alternative 1 With Project -------------------------------------------------------------------------------- #!!A###AAAAA#!•!!!A!!!!AA###At#A#!#A##!#!A!!#A!#!#A!!!A!!AA!!AA!##!#!!A#t!A#!A!! Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Existing Plus PM Fri Dec 15, 2006 1120:11 Page 16-1 ---- JA6539 - 75 -Unit Residential Project TIS City of Tustin Existing Plus Reuse Alternative 1 With Project ------------------------ -------------------- Base Queue Report (cars) -------------------------------------------------------------------------------- Northbound Southbound Eastbound westbound Node Intersection L -- T -- R L -- T -- R L -- T -- R L -- T -- R *2 (2May95thQIs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA X CD -0 0 � . CD O 0 N Z co 0 0 0 � w w� Existing Plus PM Fri Dec 15, 2006 11:20:11 Page 17-1 -------------------------------------------------------- JA6539 - 75 -Unit Residential Project TIS City of Tustin Existing Plus Reuse Alternative 1 With Project ----- ------------------------------------------------------------ Future Queue Report (cars) --------------------------------------------------------- Northbound Southbound Rastbound Westbound Node Intersection L -- T -- R L -- T -- R L -- T -- R L -- T -- R R2 [2Way95thQ]: 0.0 0.0 xxxx xxxx 0.0 0.0 0.0 xxxx xxxx xxxx xxxx xxxx Traffix 7.6.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA V O O Post 2020 AN Alternative i e 1 Fri Dec 15, 2006 11:26:22 Page 1-1 tDO -------------------------------------------------------------------------------- E JA6539 - 75 -Unit Residential Project TIS W = City of Tustin O O Post 2020 AN Alternative 1 with Project O:3 -------------------------------------------------------------------------------- Scenario Report -� O Scenario: Post 2020 AN Alternative 1 O W O 4 Command: Post 2020 AN Alternative 1 i Volume: Post 2020 AN Alternative 1 W Geometry: Future -, Impact Fee: Default Impact Fee Trip Generation: AN Trip Distribution: ALL Paths: Default Paths Routes: Default Routes Configuration: Post 2020 AN Alternative 1 Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OXITSU, TUSTIN, CA t Post 2020 AN Alternative 1 Fri Dec 15, 2006 11:26:22 Page 2-1 -------------------------------------------------------------------------------- JA6539 - 75 -Unit Residential Project TIS City of Tustin -----Post 2020 AN Alternative 1 With Project --------------- -------------------------------------------------------- Trip Generation Report Forecast for AN Zone Rate Rate Trips Trips Total 0 Of S Subzone Amount Units In Out In Out Trips Total ------------------------------------- ------ ------ ----- ----- ----- ----- 1 81 -Unit Resi 1.00 Townhomes 8.00 22.00 8 22 30 100.0 Zone 1 Subtotal ............................. 8 22 30 100.0 -------------------------------------------------------------------------------- TOTAL.................................................. 8 22 30 100.0 Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA X CD D7 T O ivC (C) (D O 0 W Z —� O O O -+, -4 �W W� Post 2020 AN Alternative 1 Fri Dec 15, 2006 11:26:22 Page 3-1 --------------------------------------------------------------------------- JA6539 - 75 -Unit Residential Project TIS City of Tustin Post 2020 AN Alternative 1 With Project -------------------------------------------------------------------- Trip Distribution Report Percent Of Trips Townhouses To Gates 1 2 4 5 6 Zone ----- ----- ----- ----- ----- 1 15.0 15.0 5.0 10.0 55.0 Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Post 2020 AN Alternative 1 Fri Dec 15, 2006 11:26:22 Page 4-1 JA6539 - 75 -Unit Residential Project TIS City of Tustin Post 2020 AN Alternative 1 With Project ------------------------- ------------------------------------------------------ Turning Movement Report AN V01-0Me Northbound Southbound Eastbound Westbound Total Type Left Thru Right Left Thru flight Left Thru Right Left Thru Right Volume #1 Red bill 4 Walnut Base 125 466 177 105 2220 280 160 453 375 347 501 113 5321 Added ] 0 0 5 2 2 1 3 1 0 0 17 Total 126 466 177 110 2222 282 164 454 376 347 502 113 5339 #2 Driveway on Red Hill Base 0 0 0 0 0 0 0 0 0 0 0 0 0 Added 2 4 0 0 0 3 9 0 9 0 0 0 27 Total 2 4 0 0 0 3 9 0 9 0 0 0 27 #3 Driveway on Walnut Base 0 0 0 0 0 0 0 0 0 0 0 0 0 Added 0 0 0 4 0 0 0 2 0 0 2 2 10 Total O 0 0 4 0 0 0 2 0 0 2 2 10 Traffir. 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN. CA Post 2020 Art Alternative 1 Fri Dec 1S, 2006 11:26:23 Page 5-1 ------------------------------------------------------- JA6539 - 75 -Unit Residential Project TIS City of Tustin Post 2020 AN Alternative 1 With Project ------------------------------------- Intersection Volume Report Base Volume Alternative ----------------------------------------------------- Northbound Southbound Eastbound Westbound Node Intersection L -- T -- R L -- T -- R L -- T -- R L -- T -- R 1 Red Hill a Wa 125 466 177 105 2220 280 160 453 375 347 501 113 2 Driveway on R 0 0 0 0 0 0 0 0 0 0 0 0 3 Driveway on W 0 0 0 0 0 0 0 0 0 0 0 0 Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Post 2020 AN Alternative 1 Fri Dec 15, 2006 11:26:23 Page 6-1 -------------------------------------------------------------------------------- JA6539 - 75 -Unit Residential Project TIS City of Tustin Post 2020 AN Alternative 1 With Project -------------------------------------------------------------------------------- Intersection Volume Report Future Volume Alternative -------------------------------------------------------------------------------- Northbound Southbound Eastbound Westbound Node Intersection L -- T -- R L -- T -- R L -- T -- R L -- T -- R 1 Red Hill a Wa 126 466 177 110 2122 282 164 454 376 347 502 113 2 Driveway on R 2 4 0 0 0 3 9 0 9 0 0 0 3 Driveway on W 0 0 0 4 0 0 0 2 0 0 2 2 Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN. CA Post 2020 AM Alternative 1 Fri Dec 15, 2006 11:26:23 Page 7-1 ---------------------------------------------------------------- JA6539 - 75 -Unit Residential Project TIS City of Tustin Post 2020 AM Alternative 1 With Project ----------------------------------------------------------- Impact Analysis Report Level Of Service Intersection Base Future Chance Del/ V/ Del/ V/ in� LOS Veh C LOS Veh C # 1 Red Hill 4 Walnut S xxxxx 0.959 B xxxxx 0.961 + 0.002 V/C # 2 Driveway on Red Hill 0.0 0.000 A 9.0 0.000 + 9.040 D/V # 3 Driveway on Walnut 0.0 0.000 A 8.5 0.000 + 8.534 D/V X CD O7 0 Traff ix 7.6.0715 (c) 2006 Dowling Assoc. Licensed to rATZ OKITSU, TUSTIN. CA (o = CD 0 w Z w0 0 0 �y 0� w Post 2020 AM Alternative 1 Fri Dec 15, 2006 11:26:23 Page 8-1 -------------------------------------------------------------------------------- JA6539 - 75 -Unit Residential Project TIS City of Tustin Post 2020 AM Alternative 1 With Project -------------------------------------------------------------------------------- Threshold Report (Base Alternative) Threshold Criteria (Ops LOS >- *1 (Plan LOS >- +1 (Delay i= 60.0001 (V/C >S 1.0001 Intersection Movement LOS Delay V/C Traffix 7.8.0715 (c) 1006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA CD CO Cn CD O E O O = Z -.'o CEJ p 1 GJ Post 2020 AM Alternative 1 Fri Dec 15, 2006 ll126:23 Page 9-1 -------------------------------------------------------------------------------- JA6539 - 75 -Unit Residential Project TIS City of Tustin Post 2020 AM Alternative 1 with Project -- Threshold Report (Future Alternative) Threshold Criteria (Ops LOS >- *)(Plan LOS >- *j (Delay >- 60.o0o)(V/C >- 1.0001 Intersection Movement LOS Delay V/C Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Post 2020 AM Alternative 1 Fri Dec 15, 2006 11:26:23 Page 10-1 JA6539 - 75 -Unit Residential Project TIS City of Tustin Post 2020 AM Alternative 1 with Project -------------------------------------------------------------------------------- Level Of Service Computation Report ICU Moss as Cycle Length t) Method (Base Volume Alternative) w##ww#w!w!w#!!f#!!#ww!!!!!!!w!!!#t!#!f!!!##!!#!!!•!R!!!!!!!##**#!#!#!#######*### Intersection #1 Red Hill 6 walnut #wrw#!!##!!#!!!#!*#i•!!!#!!A#w##*www!#**###w####!##w!!ww###wi!#w###•#####w###!!# Cycle (sec)s 100 Critical Vol./Cap.(X): 0.959 Loss Time (sec), 5 (Y+R-4.0 sec) Average Delay (sec/veh), xXXX-XX Optimal Cycle: 143 Level Of Service: B #wwww#rww#w#+www#wwww#wwww#wwwwwwwww:wwwwwww#wwww#ww#rw##wwwww#wwwww#wwwwwwwwww# Street Name: Red Hill Ave Walnut Ave Approachs North Bound South Bound East Bound hest Bound Movements L - T - R L - T - R L - T - R L - T - R ------------ I --------------- 11 --------------- 11 --------------- 11---------------� Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 2 1 0 1 0 2 1 0 1 0 1 1 0 2 0 2 0 1 ------------ VolumeModule: --------------- 11 --------------- 11 --------------- 11--------------- Base Vol: 12S 466 177 105 2220 280 160 453 375 347 501 113 Growth Adj, 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse, 125 466 177 105 2220 240 160 453 375 347 501 113 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volumes 12S 466 177 105 2220 290 160 453 375 347 501 113 Reduct Vols 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 125 466 177 105 2220 280 160 453 375 347 501 113 PCE Adj, 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Vol.: 125 466 177 105 2220 280 160 453 375 347 501 113 ------------ I --------------- 11 --------------- ----------------------------- Saturation Flow Module, I Sat/Lane, 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanes, 1.00 2.17 0.83 1.00 2.66 0.34 1.00 1.09 0.91 2.00 2.00 1.00 Final Sat.: 1700 3696 1404 1700 4529 571 1700 1860 1540 3400 3400 1700 Capacity Analysis Modules--------------- 11 odulen---'f 'I ------ I' --•--- � Vol/Sats 0.07 0.13 0.13 0.06 0.49 0.49 0.09 0.24 0.24 0.10 0.15 0.07 Crit Moves, !w!! www# www# #www #ww#w#wlt#w!w##•!#w##w##taw####wwwww♦w*#wwww#####www####ww#ww#Rw##w#####w####### Traffix 7.9.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA X CD T U) V O O C CQ = CD 0 W Z CJl O O O -1, -4 CY) W W -.L Post 2020 AM Alternative 1 Fri Dec 15, 2006 11:26:23 Page 11-1 JA6539 - 75 -Unit Residential Project TIS City of Tustin Post 2020 AM Alternative 1 With Project ----------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length f) Method (Future Volume Alternative) AAAAAA#AA«A!«iA«#wAt#«#AAw«A!«w#•A#AA«tArftw#A#AlAAlA!!*!wA#####�.##!#«#A!#A!A### Intersection *1 Red Hill 6 Walnut wr#«l�.rs*.«.••«###«AlwAw#Aw#A##!w#A#!#AAA#A!!«Ar#A!A#•Awwr##wwwAAw«#Aw«www##««# Cycle (sec): 100 Critical Vol./Cap.(Y): 0.961 Loss Time (sec) : S (Y+R-4.0 sec) Average Delay (sec/veh) : �onoc�ot Optimal Cycle: 147 Level Of Service: g wra#!w«!♦#Aw##www#«A!«www«wAA###Ar#«####wAlArrwlww#wlrr:#wlwwAww#rw#Ar#«wwww#A#« Street Wei : ::- '* *-; • . Walnut Ave ..0 .»aaY •r�i� Approach: North Bound South Bound Zast Bound West Bound Movements L - T - R L - T - R L T - R L - T - R ------------ I --------------- --------------- 11 --------------- --------- - Control: Protected Protected Protected (I Protected I Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 O 0 0 0 O 0 Lanes. 1 0 2 1 0 1 0 2 1 0 1 0 1 1 0 2 0 2 0 1 ------------ I --------------- --------------- --------•------ ---------------� Volume Module: Base Vol: 12S 466 177 10S 2220 280 160 453 375 347 S01 113 Growth Adj: 1.0o l.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial 65e: 125 466 177 10S 2220 280 160 453 375 347 SOI 113 Added VO1: 1 0 0 S 2 2 4 1 1 0 1 0 PasserByVol: 0 0 0 0 0 0 0 0 O 0 0 0 Initial Fut: 126 466 177 110 2222 282 164 434 376 347 S02 113 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 126 466 177 110 2222 182 164 4S4 376 347 502 113 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 126 466 177 110 2222 382 164 454 376 347 S02 113 PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Vol.: 126 466 177 110 2222 282 164 4S4 376 347 S02 113 ------------ i --------------- ---------------II Saturation Flow Module: Sat/Lane: 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 Adjustmec:: _.00 1.00 1.CC 1.00 1.00 1.00 1.00 1.00 1,00 1.00 1.00 1.00 Lanes: 1.00 2.17 0.83 1.00 2.66 0.34 1.00 1.09 0.91 2.00 2.00 1.00 Final Sat.: 1700 3696 1404 1700 4526 S74 1700 1860 1540 3400 3400 1700 Capacity Analysis Module:--- --------------- 11 --------------- ---------------� Vol/Sat: 0.07 0.13 0.13 0.06 0.49 0.49 0.10 0.24 0.24 0.10 0.15 0.07 Crit Moves: w##• AA«A #!w! ##!A •#awA#r##«««AAAA#AAAlw4A#AAA«!A#!AA#««#A#Aw!«#!♦r«AA#•«Aww#«wwww#w«w!#w!w#wwA##« Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU. TUSTIN, CA Post 2020 AM Alternative 1 Fri Dec 15, 2006 11:26:23 Page 12-1 JA6S39 - 75 -Unit Residential Project TIS City of Tustin Post 2020 AM Alternative i With Project -------------------------------------------------------------------------------- Level Of Service Computation Report 2000 HCM Unsignalized Method (Base Volume Alternative) ##!#A#AA#!w#wA##wa#wwlwAAw#!ww«wwrww«!#wArw##A«#w!##!Aw####w!«Af#«#!A##AAr#wA#AA Intersection $2 Driveway on Red bill AA#a«#waw#.walww#wwA#wwww#www#wA####Ar«AAww#w«###AAA#AA!##A###wwww+##w•####wA«A! Average Delay (sec/veh): 0.0 Worst Case Level Of Service: ( 0.01 #r###wwr►#w##ww###A##A###A##w#########A SAA#w##w########Aww##A#s##ww#A##A««###r### Approach: North Bound South Bound East Bound heat Bound Movements L - T - R L• - T - R L - T - R L - T - R ------- --------------- 11 --------------- 11 --------------- 11---------------� Control: Stop Sign Stop Sign Uncontrolled Uncontrolled Rights: Include Include Include Include Lanes: 0 1 2 0 0 0 0 2 1 0 0 0 1! 0 0 0 0 0 0 0 ------------ I --------------- 11 --------------- 11 --------------- 11--------------- Volumtie Module: Base Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Growth Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Initial ese: 0 0 O 0 0 0 0 0 0 0 0 0 User Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 PUF Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 PHF Volume: 0 0 0 0 0 0 0 0 0 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Final Vol.: 0 0 0 0 0 0 0 0 0 0 0 0 ------------ --------------- --------------- --------------- ---------------� Critical Gap Module: Critical Gp: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 FollowUpTim: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ------------ --------------- --------------- --------------- Capacity Module:� Cnflict Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Potent Cap.: O 0 0 0 0 0 0 0 0 0 0 0 Move Cap.: 1 1 1 1 1 1 1 1 1 1 1 1 Volume/Cap: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ------------ I --------------- --------------- --------------- --------------- Level Of Service Module: 2Way95th0: 0.0 A.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Control Del: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 LOS by Move: Movement: IT - LTR - RT LT - LTR - RT LT - LTR - RT LT - LTR - RT Shared Cap.: 0 0 0 0 0 0 0 0 0 0 0 0 SharedQueue: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Shrd ConDel: 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Shared LOS: ApproachDel: 0.0 0.0 0.0 0.0 ApproachLOS: Mote: Queue reported is the number of cars per lane. A##wr#!w«##!r#•wwAlwAwA#wfwwAAA#AA##f#wA#AAA«A##wrAA Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA _U X Post 2020 AM Alternative 1 Fri Dec 15, 2006 11:26:23 Page 13-1 ------------------- � � �) p JA6539 - 75 -Unit Residential Pro----------------•------------ Project TIS E City of Tustin Post 2020 AM Alternative 1 with Project -------------------------------------------------------------------------------- :3 Level Of Service Computation Report 0 Z 2000 HCH Unsignalized Method (Future Volume Alternative) trrwlwwwrtwrwrwwtwtww#rtwrr##r##rtrtwrlw!♦rrwwwwwlw!!tt!#ww!!r#ltrr!lrrttrr#!#t# Intersection #2 Driveway on Red Hill W p r!#!*#rwr#rrwwwr!!!rwlwwrwrwwlrrtwtttwwlrrr####rutt#wwrrrwrw*rrtrtlwtrrrwwwttrwr 4 Average Delay (sec/veh): 6.0 Worst Case Level Of Service: A( 9.0) rwwwwrw*ttrrww+wwrwrwlw# Approach: rrr*tw#ttrr*www+wwrwlwrwttttlttrwrwr##rlrrrlwwrwrr#wwwww North Bound South Bound Mast Bound West Bound Movements - L - T - R L - T - R � -,I L - T - R L - T - R Control: - Stop Sign Stop Sign I` -- Uncontrolled Uncontrolled) Rights: Include Include Include Include Lanes: 0 1 2 0 0 0 0 2 1 0 -------------- --------------- 0 0 11 0 O 0 O 0 O 0 Volume Module. --------------- -------------- Base Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 0 0 0 0 0 0 0 0 0 0 0 Added Vol: 2 4 0 0 0 3 9 0 9 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 2 4 0 0 0 3 9 0 9 0 0 0 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 2 4 0 0 0 3 9 O 9 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Final Vol.: 2 4 0 0 0 3 9 0 9 0 0 0 Critical Gap Module: Critical Gp: 7.1 6.5 xxxxx xxxxx xxxx 6.2 4.1 xxxx xxxxx xxxxx xxxx xxxxx FollowUpTim: ------------ 3.S 4.0 xxx= xxxxx xxxx 3.3 --------------- 11 2.2 xxxx xxxxx xxxxx xxxx xXXxx --------------- 11 Capacity Module: --------------- ---------------) Cn f l i c t Vol: 23 23 xxxxx xxxx xxxx 0 0 X3(= x00cxx xxxx xxxx x30= Potent Cap.: 99S 87S xxxxx xxxx xxxx 900 900 xxxx xxxxx xxxx xxxx xxxxx Move Cap.: 984 866 xxxxx xxxx xxxx 900 900 xxxx xxxxx xxxx xxxx xxx= Volume/Cap: 0.00 0.00 xxxx xxxx xxxx 0.00 0.01 xxxx xxxx xxxx xxxx xxxx ----11---------------��---•-----------��--------------- Level Of Service Module: � 2Way9SthQ: xxxx 0.0 xxxxx xxxx xxxx xxxxx 0.0 xxxx xxxxx xxxx xxxx xxxxx Control Del:xxxxx 9.2 xxxxx xxx= xxxx xxxxx 9.0 xxxx xxxxx xxxxx xxxx xxxxx LOS by Move: • A. ! r w ! A # • r r. w Movement: IT - LTR - RT LT - LTR - RT LT - LTR - RT LT - LTA - RT Shared Cap.: 933 xxxx xxxxx xxxx xxxx 900 xxxx xxxx xxxxx xxxx xxxx xxxxx SharedQueue: 0.0 xxxx xxxxx xxxxx xxxx 0.0 xxxxx xxxx xxxxx xxxxx xxxx xxxxx Shrd ConDel: 8.9 xxxx xxxxx xxxxx xxxx 9.0 xxxxx xxxx xxxxx xxxxx xxxx xxxxx Shared LOS: A ! # # ! A # ! ! r # # ApproachDel : 9.0 9.0 X300= X000= ApproachLOS: rwlrtwrw#wrrwwwtwrtrlw#wtltrwrrw#!!trlrwttrirwrrwlrlrwwwlwwtwrrrtrtwrtlttwtw#!## A A . w Note: Queue reported is the number of cars per lane. Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Post 2020 AM Alternative 1 Fri Dec 1S, 2006 11:26:23 Page 14-1 JA6539 - 75 -Unit Residential Project TIS City of Tustin Post 2020 AN Alternative 1 With Project -------------------------------------------------------------------------------- Level Of Service Computation Report 2000 RCM Unsignalized Method (Base Volume Alternative) trrrrlwrtr#r#tt!!w#!###t www!!rr#ttrrwr!#t#######t#r###!!###w####!###wr#rltrwwrwt Intersection #3 Driveway on Walnut lrrrwrwlwwr##wwrwwwwwwtrwwww#wwr♦rr+trwwwwwlwwlwttrwrrwwtwrwwttrwrtwrttrlwtttrr# Average Delay (sec/veh): 0.0 Worst Case Level Of Service: ( 0.o) #twwwtittwrwrrrr#ttrtftrtf#flrftrrrwtwtwwrrrwwrrwwwwwrwwwrwwwwwwttwwwwwwwwwwwriw Approach, North Bound South Bound East Bound West Bound Movements L - T - R L - T - R L - T - R L - T - R ------------ --------------• --------------- --------------- -------------- Control: Stop Sign Stop Sign Uncontrolled Uncontrolled Rights: Include Include include Include Lanes : 0 0 0 0 0 1 0 0 0 1 1 0 2 0 0 0 0 1 1 0 ------------ --------------- --------------- --------------- ---------------� Volume Module: Base Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Growth Adj: 0.00 0.00 0.00 o.0o 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Initial Bse: 0 0 0 0 0 0 0 0 0 0 0 0 User Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 PHF Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 PHF Volumes 0 0 0 0 0 0 0 0 0 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Final Vol.: 0 0 0 0 0 0 0 0 0 0 0 0 --------------------------- --------------- --------------- --------------- Critical GapModule,� Critical Gp: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 FollowUpTim: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ------------ --------------- --------------- -------------- Capacity Module: Cnflict Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Potent Cap.: 0 0 0 0 0 0 0 0 0 0 0 0 Move Cap.: 1 1 1 1 1 1 1 1 1 1 1 1 Volume/Cap: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ------------ I --------------- --------------- --------------- --------------- Level Of Service Module: 2Way9SthQ: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Control Del: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 LOS by Move: Movement: LT - LTR - RT LT - LTR - RT LT - LTR - RT LT - LTR - RT Shared Cap.: 0 0 0 0 0 0 0 0 0 0 0 0 SharedQueue: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Shrd ConDel: 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Shared LOS: ApproachDel: 0.0 0.0 0.0 0.0 ApproachLOS: Note: Queue reported is the number of cars per lane. wwlw!ltlww#!#!!w!##twlww##!t!r#rsr#tltt!ltrwrwwrwrrr Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA X CD W O Cc CD 0 WZ 40 0 (=) � W W -� Post 2020 AM Alternative 1 Tue Dec 12, 2006 15:39:02 Page 13-1 JA6539 - 75 -Unit Residential Project TIS City of Tustin Post 2020 AM Alternative 1 With Project -------------------------------------------------- Level Of Service Computation Report 2000 HCM Unsignalised Method (Future Volume Alternative) tt!#•ftttlt!•#!••t##t#•t!t!ltttlAlt!!tt!##t!•!tt!*•#••#t••••••f••••f••!!•!•t!!#! Intersection 62 Driveway on Red Hill ♦tt#••#!!!!•ttttt!•+t•#t!lttltt!•••tt••#!t!t!!4!!!4!•t!!tt••1••!tt#•!•ltt/t•tAltt Average Delay (sec/veh): 8.8 Worst Case Level Of Service: F(709.3) •lttt•#•••t##•#••f•ttt!##t••!i•ttttttt#••tlt#t##!#••#•••••!t••tf•••ttt!!tt!!#•#it Approach: North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- --------------- -------- ---- Controls Uncontrolled Uncontrolled Stop Sign Stop Sign Rights: Include Include Include Include Lanes: 1 '0 1 1 0 1 0 1 1 0 0 0 1! 0 0 0 0 1 0 0 ------------ --------------- --------------- -------- Volume Module: Base Vol: 3 739 0 0 2605 3 8 0 12 0 0 0 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 3 739 0 0 2605 3 8 0 12 0 0 0 Added Vol: 5 0 0 0 0 3 9 0 13 0 0 0 PasserByvol: 0 0 0 0 0 0 0 0 0 0 0 0 Initial Futi 8 739 0 0 2605 6 17 0 25 0 0 0 User Adis 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volumes 8 739 0 0 2605 6 17 O 25 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Final Vol.: 8 739 0 0 2605 6 17 0 25 0 0 0 Critical Gap Modules Critical Gp: 4.1 xxxx xxxxx xxxxx xxxx xxxxx 6.8 xxxx 6.9 xxxxx xxxx xxxxx FollowUpTime 2.2 xxxx xxxxu xxxxx xxxx xxxxx 3.5 xxxx 3.3 xxxxx xxxx xxx= --------------------------- --------------- if --------------- II Capacity Module: Cnflict Vol: 2611 xxxx xxxxK xxxx xxxx xxxxx 2994 xxxx 1306 xxxx xxxx X00cxx Potent Cap.: 167 xxxx xxxxx xxxx xxxx xxxxx 11 xxxx 153 xxxx xxxx xxxxx Move Cap.s 167 xxxx xxxxx xxxx xxxx xxxxx 11 xxxx 153 xxxx xxxx xxxxx Volume/Cap: O.OS xxxx xxxx xxxx xxxx xxxx 1.S9 xxxx 0.16 xxxx xxxx xxxx ------------ I --------------- ---------------11--------------- Level Of Service Modules 2Way95thQ: 0.1 xxxx xxxxx xxxx xxxx xxxxx xxxx xxxx xxx= xxxx xxxx xxocxx Control Del: 27.6 xxxx xxxxx xxxxx xxxx x000oc xxxxx xxxx X300oc XXX= xaocx XXX W9 by Move: D • # • • # # # * • • • Movement: LT - LTR - RT LT - LTR - RT IT - LTR - RT IT - LTR - RT Shared Cap.: xxxx xxxx xxxxx xxxx xxxx xxx= xxxx 24 xXocxx xxxx xxxx XXXxX SharedQueuesxxxxx xxxx xxxxx xxxxx xxxx xxxxx xxxxx 5.3 xxxxx xxxxx xxxx xxxxx Shrd ConDel s xxxxx xxxx xxxxx xxxxx xxxx xxa0oc xxxxx 709 xxxmc Xxxxx xxxx xxxxx Shared LOSe • • • • +► # # F • • • ApproachDel: xxxxxx X300= 709.3 Jo0ucxx ApproachLOS: • • F # Note: Queue reported is the number of cars per lane. Traff ix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OXITSU, TUSTIN, CA Post 2020 AM Alternative 1 Tue Dec 12, 2006 15:39:02 Page 14-1 -------------------------------------------------------------------------------- JA6539 - 75 -Unit Residential Project TIS Citi of Tustin Post 2020 AM Alternative 1 With Project -------------------------------------------------------------------------------- Base Queue Report (cars) -------------------------------------------------------------------------------- Northbound. Southbound Eastbound Westbound Node Intersection L -- T -- R L -- T -- R L -- T -- R L -- T -- R 62 (2Way95thQl: 0.1 xxxx xxxx xxxx xxxx xxxx 2.4 2.4 2.4 xxxx xxxx xxxx Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA �`�Ai%w � A7Aa.�.... •:z....:�1� c. .lhe�i,.Stiw` CD (Q U) Post 2020 AM Alternative 1 Fri Dec 15 2006 11:26:23 Page 17-1 (D O -------------------------------------------------------------------------------- -L E JA6539 - 75 -Unit Residential project TIS W O City of Tustin Post 2020 AN Alternative 1 With Project p------------------------------------------------------ Z Future Queue Report (care) O-------------------------------------------------------------------------------- W O Northbound Southbound Rastbound Westbound ~ -- -- 6 Node Intersection L -- T -- R L -- T -- R L -• T R L T -- R X12 (2Way95thQ]: 0.0 0.0 xxxx xxxx 0.0 0.0 0.0 xxxx xxxx xxxx xxxx xxxx 03 [2Way95thQ]: xxxx xxxx xxxx 0.0 xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA X CD -D O (Q . CD O 0 WZ (O O 0 O � W W � Post 2020 PM Alternative 1 Fri Dec 15, 2006 11:26:55 Page 1-1 Traff ix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN. CA Post 2020 PM Alternative 1 Fri Dec 15, 2006 11:26:55 Page 2-1 -------------------------------------------------------------------------------- JA6539 - 75 -Unit Residential Project TIS City of Tustin Post 2020 PM Alternative 1 With Project -------------------------------------------------------------------------------- Trip Generation Report Forecast for PM Zone Rate Rate Trips Trips Total 4 Of # Sub:one Amount Units In Out In Out Trips Total ------------------------------------- ------ ------ ----- ----- ----- ----- 1 81 -Unit Resi 1.00 Townhomes 26.00 17.00 26 17 43 100.0 Zone 1 Subtotal ............................. 26 17 43 100.0 -------------------------------------------------------------------------------- TOTAL.................................................. 26 17 43 100.0 Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA JA6539 - 75 -Unit Residential Project TIS City of Tustin Post 2020 PM Alternative 1 With Project -------------------------------------------------------- Scenario Report Scenario: Post 2020 PM Alternative 1 Command: Post 2020 PH Alternative 1 Volume: post 2020 PM Alternative 1 Geometry: Future Impact Fee: Default Impact Fee Trip Generations PM Trip Distributions ALL Paths: Routes Default Routes Configuration: Post 2020 PM Alternative 1 Traff ix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN. CA Post 2020 PM Alternative 1 Fri Dec 15, 2006 11:26:55 Page 2-1 -------------------------------------------------------------------------------- JA6539 - 75 -Unit Residential Project TIS City of Tustin Post 2020 PM Alternative 1 With Project -------------------------------------------------------------------------------- Trip Generation Report Forecast for PM Zone Rate Rate Trips Trips Total 4 Of # Sub:one Amount Units In Out In Out Trips Total ------------------------------------- ------ ------ ----- ----- ----- ----- 1 81 -Unit Resi 1.00 Townhomes 26.00 17.00 26 17 43 100.0 Zone 1 Subtotal ............................. 26 17 43 100.0 -------------------------------------------------------------------------------- TOTAL.................................................. 26 17 43 100.0 Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA 0) (ti CQ 07 Post 2020 PM Alternative 1 Fri Dec 15 2006 11:26:55 CDO - ---------------------------------------------------------------------page-3-1--- IJA6539 - 75 -Unit Residential Project TIS = City of Tustin O 0 Post 2020 PM Alternative 1 With Project 0-------------------------------------------------------------- h Z Trip Distribution Report -..x O O Percent Of Trips Townhouses WO 4 To Gates W 1 2 4 5 6 Zone ----- ----- ----- ----- ----- 1 15.0 15.0 5.0 10.0 55.0 Post 2020 PM Alternative 1 Fri Dec 15, 2006 11:26:55 Page 4-1 Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA JA6539 - 75 -Unit Residential Project TIS City of Tustin ------------------------------------------------------------------------------- Post 2020 PM Alternative 1 With Project Turning Movement Report Ph Volume Northbound Southbound Eastbound Westbound Total Type Left Thru Right Left Thru Right Left Thru Right Left Thru Right Volume #1 Red Hill 4 Walnut Base 285 1900 280 147 760 126 390 458 118 370 804 166 5824 Added 4 0 0 4 2 2 a 1 1 0 4 0 26 Total 289 1900 280 151 782 128 398 459 119 370 808 166 5850 #2 Driveway on Red Hill Base 0 0 0 0 0 0 0 0 0 0 0 0 0 Added 7 3 0 0 0 11 7 0 7 0 0 0 35 Total 7 3 0 0 O 11 7 0 7 0 0 0 35 #3 Driveway on Walnut Base 0 0 0 0 0 0 0 0 0 0 0 0 0 Added 0 0 0 3 0 0 0 7 0 0 2 8 20 Total 0 0 0 3 0 0 0 7 0 0 2 8 20 Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA X CD O CO CD 0 �Z O O p CY) W W --x Post 2020 PH alternative 1 Fri Dec 15, 2006 11x26,55 Page 5-1 ----------------------------------------------------- JA6539 - 75 -Unit Residential Project TIS City of Tustin Post 2020 PH Alternative 1 With Project ------------------------------------------------- Intersection Volume Report Base Volume Alternative -------------------------------------------------- Northbound Southbound Rastbound Westbound Node Intersection L -- T -- R L -- T -- R L -- T -- R L -- T -- R 1 Red Hill a Wa 285 1900 280 147 780 126 390 458 118 370 804 166 2 Driveway on R 0 0 0 0 0 0 0 0 0 0 0 0 "ew=i ;.-z.w 1 � v v 0 0 0 0 0 0 0 0 Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Ppst 2020 PH Alternative 1 Fri Dec 15, 2006 11:26:55 Page 6-1 -------------------------------------------------------------------------------- JA6539 - 75 -Unit Residential Project TIS City of Tustin Post 2020 PH Alternative 1 With Project -------------------------------------------------------------------------------- Intersection Volume Report Future Volume Alternative -------------------------------------------------------------------------------- Northbound Southbound Rastbound Westbound Node Intersection L -- T -- R L -- T -- R L -- T -- R L -- T -- R 1 Red Hill R Wa 289 1900 280 151 782 128 398 459 119 370 808 166 2 Dri vewty cwt D 7 14 0 n n ii 7 0 7 0 5 0 3 Driveway on W 0 0 0 3 0 0 0 7 0 0 2 8 Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA s V O O Cn Post 202 Alternative 0 PM f ave 1 Fri Dec 15, 2006 11x26,55 Page 7-1 CDO -------------------------------------------------------------------------------- XJA6539 - 75 -Unit Residential Project TIS �► = City of Tustin N 0 O-------------------------------- Post 2020 PM Alternative 1 With Project -----------•------------- Z Impact Analysis Report O Level Of Service W 0 Intersection Base Future Change IDel/ V/ Del/ V/ in LOS Veh C LOS Veh C # 1 Red Hill a Walnut F xxxxx 1.030 F xxxxx 1.038 + 0.008 V/C # 2 Driveway on Red Hill 0.0 0.000 A 9.0 0.000 + 9.049 D/V # 3 Driveway on Walnut 0.0 0.000 A 8.6 0.000 + 8.557 D/V Post 2020 PM Alternative 1 Fri Dec 15, 2006 11:26,55 Page 8-1 -------------------------------------------------------------------------------- JA6539 - 75 -Unit Residential Project TIS City of Tustin Post 2020 PM Alternative 1 With Project -------------------------------------------------------------------------------- Threshold Report (Base Alternative) Threshold Criteria [Ops LDS >- *][Plan LOS >- *1 (Delay >- 60.000J(V/C >- 1.0001 Intersection Movement IAS Delay V/C # 1 Red Hill & Walnut NO TH XXXXXX 1.031 # 1 Red Hill R Walnut NB RT XXXXXX 1.031 # 1 Red Hill & Walnut SB LT XXXXXX 1.031 # 1 Red Hill 4 Walnut SS LT XXXXXX 1.031 # 1 Red Hill i Walnut WB Tai XXXXXX 1.031 Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA N CD W O � . CD O 0 Z W O C:) O -+, -4 CA W W --%, Post 1020 PH -------------------------------------------------------------------------------- Alternative 1 Fri Dec 15, 2006 11:26:55 Page 9-1 JA6539 - 75 -Unit Residential Project TIS City of Tustin Post 2020 PM Alternative 1 With Project ---------------------------------------------------------- Threshold Report (Future Alternative) Threshold Criteria (Ops LOS >- *](Plan LOS >- *) (Delay >- 60.0001 (V/C >- 1.0001 Intersection Movement LOS Delay V/C 0 1 Red Hill i Walnut Na TH XXX3= 1.040 M 1 Red Hill 4 Walnut NS RT XXXXXX 1.040 * 1 Red Hill 4 Walnut RB LT XXID= 1.040 * 1 Red Hill 4 Walnut SB LT XXXXXX 1.040 0 1 Red Rill 4 Walnut WB TH XXX)= 1.040 Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Post 2020 PM Alternative 1 Fri Dec 15, 2006 11:26:55 Page 10-1 JA6539 - 75 -Unit Residential Project TIS City of Tust'_^ Post 2020 PM Alternative 1 With Project -------------------------------------------------------------------------------- Level Of Service Computation Report ICU 1(Loss as Cycle Length •) Method (Base Volume Alternative) w#rrarwaar.trrrrw#r#*awr*wr*rrwRrwrw�*rrrrrr*r*#rrrwrrr#r**a*rr,r�wrrrwr##rrrr#r#r Intersection O1 Red Hill S Walnut ♦rrrwrrrarrr#rrrwwrrrrrrrrrwr#rwr#rrw#rrrtrrrrwrwww##rrwwrwwrwwawrwwwwr#rww#waar Cycle (sec): 100 Critical Vol./Cap-(X): 1.030 Loss Time (sec)= 5 (Y+R-4.0 sec) Average Delay (sec/veh): xxxxxx Optimal Cycle: 180 Level Of Service: F •rwrwrrrwrrrrrwarrrwwwwrrrwrwaw♦rwrrwrrrwrwrrwrrwrarrwrrrw♦wrrrwwwawwrrrw#rrw#wr Street Name: Red Hill Ave Walnut Ave Approach: North Bound South Bound Bast Bound west Bound Movements L - T - R L - T - R L - T - R L - T - R ------------ I --------------- 11 --------------- --------------- 11---------------� Control: Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 O 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 2 1 0 1 0 2 1 0 1 0 1 1 0 2 0 2 0 1 ------------ I --------------- --------------- --------------- 11---------------� Volume Module: Base Vol: 285 1900 280 147 780 126 390 458 118 370 804 166 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Doe: 28S 1900 280 147 780 126 390 458 118 370 804 166 User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 285 1900 280 147 780 126 390 458 118 370 804 166 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 285 1900 280 147 780 126 390 458 118 370 604 166 PCB Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Vol.: 28S 1900 280 147 780 126 390 458 118 370 804 166 ------------ --------------- --------------- --------------- -------------- Saturation Flow Module: Sat/Lane: 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 i.00 1.00 1.00 1.00 1.00 1.00 Lanes: 1.00 2.61 0.39 1.00 2.58 0.42 1.00 1.59 0.41 2.00 2.00 1.00 Final Sat.: 1700 4445 655 1700 4391 709 1700 2703 697 3400 3400 1700 ------------ I --------------- --------------- --------------- ---------------� Capacity Analysis Module: Vol/Sat: 0.17 0.43 0.43 0.09 0.18 0.18 0.23 0.17 0.17 0.11 0.24 0.10 Crit Moves: www• #rr# rrr# rrr# ♦arrrrwrrrrrrrwwrwrrrrw#rrwrrrrrrr#rrwrwa•rrrr•••••#w#rrrtrrawwww##ww#r#rrr#•rrw Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN. CA (O CD Post 2020 PM Alternative 1 Fri Dec 15 2006 11:26:55 CDO --------------------------------------------------------------------Page-11-1--- E JA6539 - 75 -Unit Residential Project TIS � = City of Tustin 0 Post 2020 PM Alternative 1 With Project 0 =3 -------------------------------------------------------------------------------- -++ Z Level Of Service Computation Report � p ICU Moss as Cycle Length 4) Method (Future Volume Alternative) rr#r#r#ww###tr#t#wlwrlw#wlrtw#wt##ttt++#+ttwtwrltt###:#wwwrrwr###r#•w########### W O Intersection 81 Red Hill 4 Walnut ♦#rrr#f##rwttwrwrr##wft##t!r#####w##w##rwr#tr###rtww!#!!########rrt#trtwf##!##tt I (� Cycle (sec): 100 Critical Vol./Cap.(X)i 1.038 -� Loss Time (sec): 5 (Y+R-4.0 sec) Average Delay (sec/veh)1 xxxxxx Optimal Cycle: 180 Level Of Service: F w##r###t#twt#ttlww!!t!!r!!#lwwt##wr#tw#rtt#t#tw##wtt####r#twt#wwltt!###!w#!#t#!r Street Name: Red Hill Ave Walnut Ave Approach: North Bound South Bound Bast Bound West Bound Movements L- T- R L- T- R L- T- R L- T- R ------------ I --------------- 1I --------------- 1J --------------- 11---------------� Controls Protected Protected Protected Protected Rights: Include Include Include Include Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0 Lanes: 1 0 2 1 0 1 0 2 1 0 1 O 1 1 0 2 0 2 0 1 --------------��--------------- ��--------------- �j--------------- Volume Module:� Base Vol: 285 1900 280 147 780 126 390 458 118 370 804 166 Growth Adis 1.00 l.00 1.o0 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 285 1900 280 147 780 126 390 458 118 370 804 166 Added Vol: 4 0 0 4 2 2 8 1 1 0 4 O PasserByvols 0 0 0 0 0 0 O 0 0 0 0 0 Initial Fut: 289.1900 260 151 782 128 398 459 119 370 808 166 User Adis 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adis 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 289 1900 280 151 782 128 398 459 119 370 808 166 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Reduced Vol: 289 1900 280 151 782 128 398 459 119 370 808 166 PC2 Adis 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 MLF Adis 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Final Vol.: 289 1900 280 151 782 128 398 459 119 370 808 166 -----'I I) i1--------------- Saturation Flow Module:� Sat/Lanes 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 Adjustment: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Lanese 1.00 2.61 0.39 1.00 2.58 0.42 1.00 1.59 0.41 ,2.00 2.00 1.00 Ficial Sat.: 1700 4445 655 1700 4383 717 1700 2700 700 3400 3400 1700 --- Ij-------------- II --------------fl ----- Capacity Analysis Nodule=� Vol/Sat: 0.17 0.43 0.43 0.09 0.18 0.18 0.23 0.17 0.17 0.11 0.24 0.10 Crit Moves: ++#+ ++++ t### wtrw +##•tw##r!#r#t###f##r#t#ltwttt#tt#tttttt♦tt##wtrlrr#w#!t*###twttrltw#t##wi4##w#t Post 2020 PM Alternative 1 Fri Dec 15, 2006 11:26:55 Page 12-1 JA6539 - 75 -Unit Residential Project TIS City of Tustin Post 2020 PM Alternative 1 With Project -------------------------------------------------------------------------------- Level Of Service Computation Report 2000 HCH Unsignalized Method (Base Volume Alternative) wr#t##rtr+t!!#rltttlt##tt!###tttltw#t!wltt#!!#tt#rww!!A#!#!t!#wwtwwtrt##tt#ttttw Intersection *2 Driveway on Red Hill #w#wt####twlww#!###r#+l++tt+##r###w!♦#!wt#wwtltr##tw######wr:##trr+t#w###w##ttrt Average Delay (sec/veh): 0.0 Worst Case Level Of Service: ( 0.01 ##r#tt+tt#w•tr#r#rrr###rtr##r#r#trrw##w######rrw#rrr#w!##wr#w##rw#r##wr#rr##rr#w Approach, North Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- --------------- --------------- --------------- Controlo Stop Sign Stop Sign Uncontrolled Uncontrolled Rights: Include Include Include Include Lanes, 0 1 2 0 0 0 0 2 1 0 0 0 .11 0 0 0 0 0 0 0 -------------- --------------- --------------- --------------- Volume Module,� Base Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Growth Adis 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Initial Roe: 0 0 O 0 0 0 0 0 0 0 0 0 User Adis 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 PHF Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 PHF Volume: O 0 0 0 0 0 0 0 0 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Final Vol.: 0 0 0 0 0 0 0 0 0 0 0 0 ------------ --------------- --------------- --------------- ---------------) Critical Gap Modules Critical Gp: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 FollowUpTia: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ------------ --------------- --------------- --------------- ---------------� Capacity Modules Cnflict Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Potent Cap.: 0 0 0 0 0 0 0 0 0 0 0 0 Move Cap.: 1 1 1 1 1 1 1 1 1 1 1 1 Volume/Cap: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ------------ I --------------- --------------- --------------- ---------------� Level Of Service Module: 2Way95th0: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Control Del: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 LOS by Move: Movements IT - LTR - RT LT - LTR - RT LT - LTR - RT LT - LTR - RT Shared Cap.s 0 0 0 0 0 0 0 0 0 0 0 0 SharedQueue: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Shrd ConDels 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Shared LOS: ApproachDel: 0.0 0.0 0.0 0.0 ApproachLOS: Note: Queue reported is the number of cars per lane. ##tlww!#rrw###i«##r##fltt##tt##rw#rrttt•#r####tr###� Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA X CD O CD O 0 Z C1 O O O --+� -4 C� GJ W Post 2020 PM Alternative 1 Fri Dec 15, 2006 11:26:55 Page 13-1 JA6539 - 75 -Unit Residential Project TIS City of Tustin Post 2020 PM Alternative 1 With Project ------------------------------------------------------ Level Of Service Computation Report 2000 HCH Unsignalized Method (Future Volume Alternative) AAAlAAAA#A#AltfAAfilAAAli!#AiAAiAiliiAilAAAliilAAlfAiliiAfii�AifiA!!RlitiiAitAAAA Intersection #2 Driveway on Red Hill AAiiAfiAAtAAAlAAAAtAii•iAiAiAAAiiili!liii#AA!lAitiifi!!AliAAlAAAiAAti!liiAAAiAii Average Delay (sec/veh)s 7.2 Worst Case Level Of Services A[ 9.01 itAfii!liAiAAiA!#A#iAAiifAAtAAAfilAitfAAA#l•AAAtAAAi4AfAlAlAiiA!!A!♦AlfiAtiAiAii Approach: Worth Bound South Bound East Bound West Bound Movements L - T - R L - T - R L - T- R L - T - R ------------ --------- Controls Stop Sign Stop Sign Uncontrolled Uncontrolled Rights: Include Include Include include Lanes: 0 1 2 0 0 0 0 2 1 0 0 0 1! 0 0 0 0 0 0 O ------------ --------------- --------------- --------------- ---------------� Volume Module: Base Vols 0 0 0 0 0 0 0 0 0 0 0 0 Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 0 0 0 0 0 0 0 0 0 0 0 0 Added Vol: 7 3 0 0 0 11 7 0 7 0 0 0 PasserByVols 0 0 0 0 0 0 0 0 0 0 0 0 Initial Fut: 7 3 0 0 0 11 7 0 7 0 0 O User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PRY Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volumes 7 3 0 0 0 11 7 0 7 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Final Vol.s 7 3 0 0 0 11 7 0 7 0 0 0 Critical Gap Modules Critical Gp s 7.1 6.5 xxxaoc xxxxx xxxx 6.2 4.1 xxxx xxx= xxxxx xxxx xxxxx FollowUpTim: 3.5 4.0 xxxxx xxxxx xxxx 3.3 2.2 xxxx xwooc xxxxx xxxx xxxxx --------------------------- 11 --------------- --------------- ---------------� Capacity Modules Cnflict Volt 18 18 xxxxx xxxx xxxx 0 0 xxxx x300M xxxx xxxx xxXocx Potent Cap.s 1002 881 xxxxx xxxx xxxx 900 900 xxxx XZXXX xxxx xxxx xxx=c Move Cap . s 984 $74 xxxxx xxxx xxxx 900 900 xxxx 300ocx xxxx xxxx X== Voluse/Cap: 0.01 0.00 xxxx x== xxxx 0.01 0.01 xxxx xxn xxxx xxxx xxxx ----11--------------- ----•---------- -------------- Level Of Service Module:� 2Way95thQs xxxx 0.0 xxxxx xxxx xxxx xxxxx 0.0 xxxx xxxxx xxxx xxxx xxx= Control Del:xxxxx 9.1 xxxxx xxxxx xxxx xxxxx 9.0 xxxx xxxxx xxxxx xxxx xxxxx LOS by Move: * A • A A # A • i A A i Movements LT - LTR - RT LT - LTR - RT LT - LTR - RT LT - LTR - RT Shared Cap.: 969 xxxx xxxxx xxxx xxxx 900 xxxx xxxx XXXXX xxxx xxxx xXcxx SharedQueue: 0.0 xxxx xxxxx xxxxx xxxx 0.0 xxxxx xxxx xxxxx xxxxx xxxx xxx= Shrd ConDels 8.7 xxxx xxxxx xxxxx xxxx 9.0 xxxxx xxxx xxxxx xxxxx xxxx xxxxx Shared LOS: A i • i A A • ! ApproachDel: 8.8 9.0 XJCK3= 3000= ApproachL03: A A ! # Notes Queue reported is the number of cars per lane. Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN. CA Post 2020 PM Alternative 1 Fri Dec 15, 2006 11:26:55 Page 14-1 JASS39 - 75 -Unit Residential Project TIS City of Tustin Post 2020 PM Alternative 1 With Project --------------------------------------7----------------------------------------- Level Of Service Computation Report 2000 KCM Unsignalised Method (Base Volume Alternative) AAAAAi•AifilRiiiAAAiA AiiAfitiAAAAAiiii#i!lAAtAiiA♦iAiAiiAA4iilfAAA#AAlAlAAAAlAA! Intersection #3 Driveway on Walnut ltAAfAAiAlAAA*AiAAAAAAAAiiAiAtAAlAA!!Af#!AlAAAAiiAfAAlfitAflAAlAAlAAiAlilAfAiAAA Average Delay (sec/veh)s 0.0 Worst Case Level Of Service: [ 0.01 #lliAAAAAlfAiAilAiAAAAAA•♦A!lAiAAlA#!!###!i!A!A!!!!A!!AA!!!#A#A!lAAAA#!!fA#!#A!! Approach: Borth Bound South Bound East Bound West Bound Movement: L - T - R L - T - R L - T - R L - T - R ------------ --------------- --------------- --------------- --------------- Controls -- -Control: Stop Sign Stop Sign Uncontrolled Uncontrolled Rights Include Include Include Include Lanes : 0 0 0 0 0 1 0 0 0 1 1 0 2 0 0 0 0 1 1 0 ------------ ---------------11--------------- --------------- ---------------� Volume Module: Base Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Growth Adjs 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Initial Bse: 0 0 0 0 0 0 0 0 0 0 0 0 User Adj: 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 PHF Adjs 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 PHP Volume: 0 0 0 0 0 0 0 0 0 0 0 0 Reduct Vols 0 0 O 0 0 0 0 0 0 0 0 0 Final Vol.s 0 0 0 0 0 0 0 0 0 0 0 0 ---------------- --------------- --------------- ---------------� Critical Gap Module: Critical Gps 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 FollowUpTims 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ------------'--------------- --------------- --------------- Capacity Module: ) Cnflict Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Potent Cap.: 0 0 0 0 0 0 0 0 0 0 0 0 Move Cap.: 1 1 1 1 1 1 1 1 1 1 1 1 Volume/Caps 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -----------------��---------------��---------------��-------------- Level Of ) Service Modules 2Way95thQs 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Control Del: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 LOS by Move: Movement: LT - LTR - RT LT - LTR - RT LT - LTR - RT LT - LTR - RT Shared Cap.: 0 0 0 0 0 0 0 0 0 0 0 0 SharedQueue: 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Shrd ConDel: 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Shared LOSS ApproachDel: 0.0 0.0 0.0 0.0 ApproachLOSs Note: Queue reported is the number of cars per lane. AA#A##AAAIAAlAiiAlAi#AAlitAAiAiAi#!!!#!!lAAiilAiAAAi Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN. CA CC) Cn CD Post 2020 PM alternative 1 Tue Dec 12, 2006 15:40:55 Page 13-1 (D O -------------------------------------------------------------------------------- IJA6539 - 75 -Unit Residential Project TIS = City of Tustin O O Post 2020 PM Alternative 1 With Project O:3 -------------------------------------------------------------------------------- h z Level Of Service Computation Report � O 2000 HCM Unsignalized Method (Future Volume Alternative) w*iw#R#i*#www##4#w*w!#ww,*ww*w******Rww*lwwAAAlw!*!Awllwwwww!#wwA*RwAAw*Aw*f#*ww C+0 O Intersection #2 Driveway on Red Hill wwlwwR!**#Rw*AwwwA!#AwAwwwAww!*!#!*##w!#w#*!•wAwww*www#wfAwAlw!!!w#wR#wwww#!w•A# : (� Average Delay (sec/veh): 0.8 Worst Case Level Of Service: F( 87.41 .� #*#!Aw**#*lwww#www#www*#wwR#wR!!lwwwww*!wlwRwwlww•!!rw#wwlw#!ww*!wR*w*##*ww*w!!w Approach: North Bound South Bound East Bound West Hound Movements L - T - R L - T - R L - T - R L - T - R ------------ ---------------+--------------- --------------- -------------- Control: Uncontrolled Uncontrolled stop sign Stop Sign -I Rights: Include Include Include Include Lanes: 1 0 1 1 0 1 0 1 1 0 0 0 11 0 0 0 0 1 0 0 -------------------- --------------- --------------- --------------- Volume Module� Base Vol: 13 2456 0 0 1053 9 4 0 7 0 0 O Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Initial Bse: 13 2456 0 0 1053 9 4 0 7 0 0 0 Added Vol: 15 0 0 0 0 11 7 0 10 0 0 0 PasserByVol: 0 0 0 0 0 0 0 0 0 0 0 0 initial Fut: 28 2456 O 0 1053 20 11 0 17 0 0 0 User Adjs 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 PHF Volume: 28 2456 0 0 1053 20 li 0 17 0 0 0 Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0 Final Vol.: 28 2456 0 0 1053 20 11 0 17 O 0 0 Critical Gap Module: Critical Gp: 4.1 xxxx xxxxx xxxxx xxxx xxxxx 6.8 xxxx 6.9 xxxxx xxxx xxxxx FollowUpTim: 2.2 xxxx xxxxx xxxxx xxxx xxxxx 3.5 xxxx 3.3 xxxxx xxxx xxxxx --------------- 11 --------------- ��-•----------- --------------- Capacity Modules� Cnflict Vol: 1073 xxxx xxxxx xxxx xxxx xxxxx 2347 xxxx 537 xxxx xxxx xxxxx Potent Cap.: 657 xxxx xxxxx xxxx xxxx xxxxx 31 xxxx 494 xxxx xxxx xxxxx Move Cap.: 657 xxxx xxxxx xxxx xxxx xxxxx 30 xxxx 494 xxxx xxxx xxxxx Volume/Caps 0.04 xxxx xxxx xxxx xxx3c xxxx 0.37 xxxx 0.03 xxxx xxxx xxxx ------------I --------------- 11 --------------- --------------- -------- - Level Of Service Module: ) 2Way95thQ: 0.1 xxxx xxxxx xxxx xxxx xxxxx xxxx xxxx xxxxx xxxx xxxx xxxxx Control Del: 10.7 xxxx xxxxx xxxxx xxxx xx30oc xxxxx xxxx xxxxx xxxxx xxxx xxxxx LOS by Move: B ! * ! * A * ! w * A w Movement: IT - LTR - RT LT - LTR - RT LT - LTR - RT LT - LTR - RT Shared Cap.: xxxx xxxx xxxxx xxxx xxxx xxxxx xxxx 70 xxxxx xxxx xxxx xxxxx SharedQueue:xxxxx xxxx xxxxx xxxxx xxxx xxxxx xxxxx 1.5 xxx= xxxxx xxxx xxxxx Shrd ConDel:xxxxx xxxx xxxxx xxxxx xxxx xxxxx xxxxx 81.4 xxxxx xxxxx xxxx xxxxx Shared LOS: ! * * w A A * F .ApproachDel: xxxxxx xxxxxx 87.4 ApproachLOS s • # �ocxxxx F • wwwfAAw#wi!!wR#w#w+#!w♦4*wwww#R#RwwRw#wR!#wA*lwRw*ww#lwwwlwlww#RAw#wwwR#w!w#wi*# Notes Queue reported is the number of cars per lane. Post 2020 PM Alternative 1 Tue Dec 12, 2006 15:40:56 Page 14-1 -------------------------------------------------------------------------------- JA6539 - 75 -Unit Residential Project TIS City of Tustin Post 2020 PM Alternative 1 With Project ------------------------------------------------------------------------------ Base Queue Report (cars) -------------------------------------------------------------------------------- Northbound Southbound Eastbound Westbound Node Intersection L -- T -- R L -- T -- R L -- T -- R L -- T -- R 62 (2way95thQ]: 0.1 xxxx xxxx xxxx xxxx xxxx 0.5 0.5 0.5 xxxx xxxx xxxx Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ ORITSU, TUSTIN, CA Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KATZ OKITSU, TUSTIN, CA X CD 0 O CQ `� (D 0 .� Z 40 O O h —4 � W r2. Post 2020 PM Alternative 1 Fri Dec 15 2006 11:26,55 ---------------------------------------------------------------------=�-17-1--- JA6539 - 75 -Unit Residential Project TIS City of Tustin Post 2020 PM Alternative 1 With Project ------ Future Queue Report (cars) -------------------------------------------------------------- Northbound southbound Eastbound Westbound Node Intersection L -- T -- R L -- T -- R L -- T -- R L -- T -- R 92 (2Way95thQ): 0.0 0.0 xxxx xxxx 0.0 0.0 0.0 xxxx xxxx ,Hoot xxxx xxxx 83 (2Way95thQ)r xxxx xxxx xxxx 0.0 xxxx xxxx xxxx xxxx xxxx xxxx xxxx xxxx Traffix 7.8.0715 (c) 2006 Dowling Assoc. Licensed to KRTZ OKITSU, TUSTIN, CA A p di -k- r y,C,i":*�'�,;..-.f...:'..-�'..�'�...d Int's:+xor ,. s Y eft _ oc IQ mOEM & Associates Ci of �'ustin Tr tci rem �prd TraxsMij io-pkxxen Red Hilflalrtut Residential Piafect Trak Study Resolution No., 07-31 Page 148 of 163 THRESHOLDS OF SIGNIFICANCE A project will normally have a significant adverse impact on traffic and circulation if it results in any of the following conditions: • An increase in traffic that is substantial in relation to the existing traffic load and capacity of the street system (i.e., results in a substantial increase in either the number of the vehicle trips, the volume to capacity ratio on roads, or congestion at intersections); or, • An increase in the level of service standard established by the Orange County Transportation Authority for designated roads or highways. • An increase in the number of the peak hour trips over and above a residential project in conformance with the General Plan land use designation.. To understand how well a roadway or intersection is handling traffic, several concepts have been devised. The first is a qualitative measure, referred to as Level of Service, which evaluates a roadway's operation based on observations. A LOS "A" is an optimal traffic condition, while a LOS 'T' represents service congestion. A second, more quantitative measure, referred to as Volume to Capacity Ratio (V/Q, is the ratio of an intersecti(ni's or roadway's traffic volumes to its design capacity. The relationship between the LOS and V/C Ratio 4-tre summarized below in Table C-1. TABLE C-1 DEFINITIONS OF LEVEL OF SERVICE Level of service Definitions LOS ICU Range (V/1C Ratio) Description A Less than 0.60 Free flowing traffic conditions, no congestion. B 0.60 to less than 0.70 Generally free from congestion. All vehicles may clear signal in a single cycle. C 0.70 to less than 0.80 light congestion with occasional back-ups at critical approaches. D 0.80 to less than 0.90 Congestion at critical approaches. E 0.90 to less than 1.0 Moderate to severe congestion during peak period. Severe congestion. F 1.00 or greater Source: Blodgert/Baylosis Associates, 2000 Katz, Okitsu & Associates Traffic Ergman and Transpwatwx PImmrs City of Tustin Red Hrl1/Walnut Residential Prkut �'i�t�c �tua�i eso u i n o. 7-31 Page 149 of 163 DEFINITIONS OF LEVEL OF SERVICE FOR SIGNALIZED INTERSECTIONS LEVEL OF SERVICE DEFINITIONS FOR SIGNALIZED INTERSECTIONS (Source: City of Los Angeles Traffic Studies Policies and Procedures, November 1993) Level of Volume/Capacity Service Ratio Definition A 0.000 - 0.600 EXCELLENT. No vehicle waits longer than one Red light and no approach phase is fully used. B 0.601- 0.700 VERY GOOD. An occasional approach phase is PP fully utilized; many drivers begin to feel somewhat restricted within groups of vehicles. C 0.701— 0.800 GOOD. may Occasionally, Y , drivers have to wait through more than one red light; backups may Y develop behind turning vehicles. D 0.801— 0.900 FAIR. Delays may be substantial during portions of the rush hours, but enough lower volume periods occur to permit clearing of developing lines, preventing excessive backups. E 0.901-1.00 POOR. Represents the most vehicles that intersection approaches can accommodate; may be long lines of waiting vehicles through several signal cycles. F Greater than 1.000 FAILURE. Backups from nearby intersections or on cross streets may restrict or prevent movement of vehicles out of the intersection approaches. Tremendous delays with continuously increasing queue lengths. Katz, Okitsu & Associates City of Tustin Traft Engineers and Transportation Mannas Red Hill/Walnut Residential Project Traffic Study Resolution No. 07-31 Page 150 of 163 • = - : : r , s r9jeco e an, . r { r. i • i : + : Y• S ' t 4 i r • } w r • � .' s 1 f: ,1 Katz, OIdtsu ,Ms=iates i City of Tustin • • Tic EAWwmyard Trmporratibn Pl�rcr:: • • .. � Red Hila�nut Resident" Pro ject Traffic Study • - � � Resolution No. 07-31 • Page 151 of 163 r+ 1 , I 1 1 1a) CD CQ Cot) 1 f CD O - I O11 �� Z �' ls. I .2' 1 r If.fi� _" _ r 1 1. _. .._ ... = '� _.t •- - -• - `r ___ ._. _-.:S if -1 i ~ 1 •� 1. F� _..... _ _._ ,_... , ....._.^ 1 --' '_' • --- ._ -' ' �'4 t 1t .L�--._ _.. -4 7111 LJ � �•�...«r._ 1 '1' � .� '� / ! -L ( 7 � ' � 'r- �• . '�, i ; �. �, i irk , .'{--._ - ,� ' . '� I I I I � f r IS.� -.. f _ r-"- lT . j. � .� _T• l'•� � 'j'_ ---_t! •+� 11 -( -'1-. �^+..1 p wvn_-. --�� 1-_u (__.._ � _ �:� ! �� r.r,r..ij rr t._'!' t� :'L._...-" ' �••.. 1 i'V (III I � I Ii 1 ( - 1 { 11 _✓ - _•.!1 _ i : r_.. � —� �._'i • I +.� 1 I' _.1-... �.o;l, r_._ r• •1 •',,_-.r- r._..e`• r 1. J �' r 'rt �--1-- 'J ._ .. — ..,_. a 1 ,FIS j� 1 � 1' ' I.j I 1 / r r _ -.. ;_ • ; ��_ ' _._::_.- !'-- �- ��--- + -. -'•� _ =.-1._ 1i'. ; ; -. #1_:�- - �.� ..--`----_ � -~'• ''; i ' ; i ,'i � � � ' f i.! II :: ` • �«._-�; y -- =� �'_ ! ►� ... _ - = Y_. -`... �-r ' �- �..a: fes- __- ... 1 _�-. !-•--.� .I }^:. * `, h��•.. t n7 _ F_t 1 1 ( 1pel 1 ' ! �:�. -_. �- .± 1 }: , I ! 1 y3 . a . ' ' r"- �_ ! _ , ''I 1 r t r� L a _ __ .�-- <• .' _ _ _' _ _ - _' _ --. _ . _ _ *i i i I y.� '_• n i } rr '� , .i "�'f 1 1 i f i `. �` k; j r—' r• _ -- - "'�� � � `! �i� 1 � •� .l �1 � -1 ._. _- ._.� I 'L:.�- � •� f it } ,� I � •.�� Ir..} .-rn ' , ,�.. _ -. ._ f � : 1' i+.i:+ !2 _ _ =.p.. -4 .. �. �_�4 _ j1 ...�.»•Y__�� .:':�..r ..:j -.-A _ mil i. __�.: C�'.. _.1 ���.__:l�.i�.T_;��.T _-_.�. 1-�_'�. .. ;_.~, d' .�..�•LL:�'.YS ,_C _1'v�..w_r, 1�.. 't, f �.. _-_._-�' .._ .___ _.. _. _.._ _.. ._ ... ...- �_-_.�_�__. - I.-.__�-..� _-._ ..-_.... .-.__. r _.. .._._. ._ .... _..-. -_- _... ...� �.._.._...- _. _ RED HILL AVENUE \ 0 30 120 I 1 � 15 60 ",OF Katz, Okitsu do Associates >ExistingConditions I� - ,.a 09.07.2006 Conceptual Site Pian wid) Revised Townbomes Rea Hill Town o m e s KTGY PROLIP, AMC. A a a N I IV a 6 7 U a a PLANNING 1 "v"� CALIFORNIA 08614I•l/i/ VAN tl.NI-.».TustinI CatiforniaowzmNAti W z 7� �J F- D z J 3t 1 I1 ' n ! �i '•�L.� --'If-• ----._ �._ _._ L- J _ -c.�-. __ 71 f .._ _ 1 - � -. t~ '� ` ___ ._.�.. �Y` f" t + ....._S'... .: ...._ :__. � �' 1 � 1 1 � ' 1 � ! '. ._ , _ ` �^. • ',� � ; 1� I : ._ -'r � tNi � .... ►� g..-.:. .....i � 1 r1F } 1 I a! 4 � ,�� t� - ...-M i ._. -i ._ � ' � i--- � ., .. .. i ! -':j I � ! -•_i':- -- a� � � I -� A� � ; — t ,: t ! ;- 1 ./ ► t , + I f ( A' N ! ! ' s �-- : • li I I ( M �I;tt-- { -- �'. a�`. •• " r , -��.L-r•�.�+1-- '•y�i;�-- ,; `' E �- *. -i_Gt:-�: �14 �4+ ��+� : E r�:�.:r"Y•.... n��:�•; t �J ; •-`) ; 1 �' � (_ �� 1� 1 1 il•� ..._.• i• t _ T '.� f. � �\ •` `�/ �i. � ..:L:�Ci���._-.....i; �• �'• et 1 i i t .i , {`�'j�'.----}'•'••-• _ - ••-�-`'Y• -._.. i �1- - 1.._Z 1 r- r_.? -+r'; -- -:r � �•M: � j,,.- r' _. .. � s,_.-_.. .�..�.. 1�.....�._ 11.._....:! 1 .. ( :t ! F_ �t ;1 t + � 1.� � . I .' � I '� ' i ; . (� �� • �. 'F � � fig ` � 1...-•"+.. _ fir•--.....�._...��» _..7 '+. _'�•�'t---- � 1 1 ��. j�.{ I •r � f�_.s::. _ p � ; I , �.—.� t_..� i � � �, � � j._ .$Ly..(! I � :. I � �': � � i ---^ � � 1'• J ��•�. a � 1. _�. ' �. _._ _ ••-y� �;�-_.. a � . _ I _ r., l.___ �- 4t �: ____..:._._i � ! _..__i w � '1- � _..:_ _-..- 1 . j : •- � �} L' .�: !a - �`!{j r�. i tet. 1 /7 -I, �• }' �. i 1 - ��j ^i r •IM "`I _.' , �! 1 r �r i 1 r� 1 -- 11, •r t I �' i t Ar• ! 1 i r .— .. •1 4 1 � � � � 1: , = i �'� .. !'' ; � S j 1-` i ... I i la I.— ��. � �-;.r-._... r~� '1� - t ' '•ta., �• ; ; r i . t :.: �) !. I -. ..T .�, .�._• Z7".. •i_ _ -` �a. — - - ,�.�...�. fgna'S. 1.T's^_.i.._ _ .. ...,..r.r �•a -_ '1 Wit` -_)__ , _ _.�:.a.. 1.•_-...� •c1 I - _ `_.._ ----. .... __..._r..____.- �-----•-----..._._.--. _..---......_ - _. ...... .tea"+ __ _.. ........ ..r,... _ ._ .. ... _._ .---- I ••, t1'/ I MIAMI. a o RED HILL AVENUE a Katz, Okitsu & Associates lernative I .+'O 9.P.2006 w0 0 0 �--4 1 0)w w -..x Conceptual Site Pian WIG Revised Town omes B,eb Hit[ T 0 w n b o m e s Tustin, California 0 30 120 15 60 KTGY GROUP, INC. ANGNITRCTYwR PLANNING 1 1 6 X 6 L L a 0 Y IA YINIL CALI/OANIA 08�14 CCI -anti /Ax It11i m "I•AI" fro ALL MINING f Exhibit 3 Shade and Shadow Study Resolution No. 07-3 Page 154 of 163 X CD C/) 0 C q:) 0= =3 C -n Z U1 0 0 -4 SunCal - Red Hill, 0.1 C KTC3Y NO. 20051051.00 Existing Shadow - December 21st -12:00 PM SbaDow stubs ReaHill Town Homes Tustin, california 0 $Zi KTGY GROUP. T a a a L &AL rl Al 0 0 0 �CD cc Cn cn 0 E 0) 0 0 -� z �0 0• W o w 07 SunCal - Red HiN, LLC KTGY NO. 20051061.00 Existing Shadow - December 21 st - 9:00 AM Sbaaow stubN RebHill Town Homes Tustin, California 0 KTGY GROUP. 1140. •4erltaCTVaa •LAMM$IN* �a• I N a, a 1\ 1, (♦ A� 1 • • a a 1 IMM 11,114-2146 ♦an IMM s �N•a1N nua II;a sawlw w 10 CD �0 cQ = LID OM ��� V, Z 40 O O T� ; V/W W " SunCal - Red Hill, LLC KTGY NO. 20061061.00 n 0 Proposed Shadow - December 21 st -12:00 PM SbaDow stuV ReaHiff Town Homes Tustin, California KTGY GROUP. 1»C. •A�M11�_stY�� /t��MIN• .�s IToo a wittwaL• •0Y to 16 • 1■/. i •l1/ •••1• •f•/ • 1060 *{/•9/0• pan IM"1 000-01" 110 IM CD CQ Cn CD 0 --.%. C CO 0 0 :3 �h Z -..x 0 C) W C) 4 W 0 SunCal - Red Hill, LLC KTGY NO. 20051051.00 11 Proposed Shadow - December 21 st - 9:00 AM RebHill Town Homes THstiry California 11 KTGY GFRO JP. 1«C. •.OMIT{itY.. •►. ww,w. 1-1 721 Exhibit 4 OCTA Comment Letter and City Response Resolution No. 07-31 Page 159 of 163 MAR -07-2007 17:02 OCTA 2FL PLANNING 7145605794 P.02/02 MR OCTA APPIL1ATED AGENCIES Orange County TranSN 018 ft Lodi Tt,1115"POR: 661 Au" &rete Auttro* kv Free. way Emetgencxs Consolidiitod TrdpmMliort &NkV Agency coag. 0sto) Management Agency Snft*0 Authority Ibr Abndbned Vehickm March 7, 2007 Minoo Ashabi, Associate Planner Community Development Department City of Tustin 300 Centennial Way Tustin, California 92780 Subject: Initial Study for the Red Hilt Town Homes 4 es Dear Ms. Ashabi: The Orange County Transportation Authority (OCTA) has reviewed the above mentioned document. The following comment is provided for your consideration. Tran it OCTA currently has two bus routes, Route 66 on Route 7 Walnut Avenue and 1 on Red Hill Avenue, that run adjacent to project. 1 the proposed p ject. Although OCTA does not nt) curreY have a stop in the project limits it is recommended that a bus turnout be laced o p n the north side of Walnut Avenue, northwest of the Intersection of Walnut Avenue and Red Hill Avenue. If a bus turnout were to b this intersection,e placed at OCTA would relocate the existing opposing side o stop on the 0 pP g f Red Hill Avenue to the new location which would serve the surrounding area more efficiently. v If you have any questions regardingthis transmittal, I, please contact me at(714) 500-5883 or via e-mail at clarwood octa. net. � If you have specific questions related to Stops and Zones design, at(714)� � Please contact Bill BatorY 580* -5912 or via e-mail at bbator Y@octa. net. Sincerely, 4 : Charles Larwood Section Manager, Corridor Studies C: Bill Batory, OCTA Resolution No. 07-31 55o South MD1, �P 0w C4w'Y Tf�'''�°'014ffw -4utl or;�ty et 0. scar° 14184 / OMW / Calr�ibmi� ssq )584 / �71415f►�-OCTA r�2871 Page 160 of 163 TOTAL P-02 March 8, 2007 OCTA 550 South Main Street P.O. Box 14184, Orange, CA 92863-1584 Attn: Charles Larwood SUBJECT: COMMENT FOR RED HILL TOWN HOMES INITIAL STUDY Dear Mr. Larwood, Thank you for your comment received on March 7, 2007, regarding a recommended bus turnout on the north side of Walnut Avenue, northwest of the Walnut Avenue and Rcd Hill Avenue intersection. As noted in the public notice, the proposed condominium project is scheduled for public hearings at the March 13, 2007, Planning Commission meeting, and March 20, 2007, City Council meeting. The project proposes the redevelopment of an existing apartment complex with new condominium units by a private entity. Staff is recommending a ten foot wide dedication along Red Hili Avenue and Walnut Avenue for future roadway widening. While; the Red Hill Avenue widening would be considered in the near future, the Walnut Avenue widening would require land acquisition and a long range plan. When the plans for these widening projects move forward, we will be preparing additional environmental documents and consider your recommendation for a bus turnout. At this time, no public roadway construction would be required due to the scope of the project. Please contact me at 714/573-3126, if you have any questions. Sincerely, Minoo Ashabi Associate Planner cc: Elizabeth Binsack Dana Ogdon Terry Lutz Katy Lee SACdd\MINOO\Red Hill Condos\OCTA response.doc Resolution No. 07-31 Page 161 of 163 Exhibit B of Resolution No. 07-31 Mitigation Monitoring Report Resolution No. 07-31 Page 162 of 163 Mitigation Monitoring Report Exhibit B of Resolution No. 07-31 Tentative Tract Map 17080 Noise: • Roof ceiling construction shall be roofing on 1/2 inch plywood. Batt insulation shall be provided in joist spaces and the interior ceiling shall be finished with one layer of 5/8 inch gypsum board. • All exterior walls shall be 2 x 4 studs at 16 inches on center with batt insulation between studs. Exterior walls shall be plaster with 5/8 inch gypsum board on the interior. • All southeast and southwest facing windows and glass doors shall be glazed with STC 32 glazing with either 1/4 inch laminated glass or dual pane assembly with 1/2 inch air space. In either case, a test report must be provided at the time of installation to ensure compliance with the minimum requirements. The report shall be prepared in an independent, accredited testing laboratory in accordance with ASTM E-90. • All entry doors shall be 1-3/4 inch solid core door with weather stripping seals on the sides and top. No glazing shall be permitted for the entry doors. • Since meeting the minimum levels of interior noise standard would require closed windows and doors, the structures shall be equipped with ventilation or an air- conditioning system to provide a habitable interior environment. • Balconies six feet in depth along Walnut Avenue and first units along Red Hill Avenue shall be designed with 42 inch high solid railings designed compatible with the proposed architecture. Public Services: • The pool access gates need to be equipped with a knox box for emergency access. • Landscaping should be designed with surveillance opportunities for residents and police personnel in patrol vehicles. • Security devices such as double locking deadbolts, strike plates, with 1-1/2 inch screws and pin locks on windows and sliders shall be- installed minimizing the potential for criminals to access the units. Traffic: • Access - to and from the site to Red Hill Avenue should be available with completion of the project. The left turn egress from the project site may be prohibited in the future if determined necessary by the City's Traffic Engineer. Resolution No. 07-31 Page 163 of 163