Loading...
HomeMy WebLinkAbout07 AWARD CONSTRUCTION CONTRACT FOR THE LEGACY PARK IMPROVEMENTS PROJECTDocusign Envelope ID: B2942A1C-7706-82A5-815E-075EA3096335 MEETING DATE TO: FROM: SUBJECT: SUMMARY: Agenda Item 7 AGENDA REPORT Reviewed: City Manager a`LS Finance Director 6 MAY 19, 2026 ALDO E. SCHINDLER, CITY MANAGER MICHAEL GRISSO, DIRECTOR OF PUBLIC WORKS AWARD CONSTRUCTION CONTRACT FOR THE LEGACY PARK IMPROVEMENTS PROJECT Staff is requesting the City Council award a construction contract to the lowest responsive/responsible bidder for the Legacy Park Improvements Project. RECOMMENDATION: It is recommended that the City Council: 1. Award a construction contract to the lowest responsive/responsible bidder, Superb Engineering in the amount of $625,150.04 for the Legacy Park Improvements Project; and 2. Authorize the remaining $76,149.96 of State Appropriation funding to the project contingency; and 3. Authorize the Mayor and the City Clerk to execute the contract documents on behalf of the City. FISCAL IMPACT: Funding for this project was sponsored by Assembly Member Cottie Petrie -Norris. The Fiscal Year 2023/24 California State Budget included an appropriation in the amount of $750,000 for the Legacy Park Improvements Project. Of the grant amount, $22,000 has been spent on pre -construction activities, and the remaining appropriation of $728,000 is available for the construction phase. Construction expenses include: • Construction Contract................................................................... $625,150.04 • Remaining Design Costs................................................................$26,700.00 • Contingency....................................................................................$76,149.96 • Total Budget Remaining...............................................................$728,000.00 Docusign Envelope ID: B2942A1C-7706-82A5-815E-075EA3096335 City Council Agenda Report Legacy Park Improvements Project May 19, 2026 Page 2 CORRELATION TO THE STRATEGIC PLAN: This project contributes to the fulfillment of the City's Strategic Plan Goal B, Public Safety and Protection of Assets, Strategy 5: Create and implement a plan to protect the City's public assets. Specifically, the project implements Strategy 5a, which among other items, is for the improvement of public facilities. BACKGROUND AND DISCUSSION: Legacy Park serves as both open public park space and a stormwater detention basin. While the basin itself accommodates stormwater flows during rain events, adjacent and upland areas of the park are indirectly affected by runoff and storm related conditions, including sediment migration and periodic saturation. Over time, these conditions have resulted in vegetation loss and exposed bare soil in areas outside of the active detention basin. The project will restore vegetative cover in impacted areas outside of the detention basin through a targeted replanting plan. Plant materials were selected for suitability in variable moisture conditions commonly associated with stormwater-adjacent landscapes. The planting design emphasizes soil stabilization, erosion control, and improved site conditions while minimizing long-term maintenance requirements. Additionally, the project adds infrastructure in support of public art installations and park beautification efforts. This project was formally bid on March 19, 2026, resulting in eight (8) bids being received electronically and publicly opened on April 30, 2026. Bid results are summarized as follows: • Superb Engineering................................................................ $625,150.04 • Marina Landscape, Inc........................................................... $686,419.40 • Mariposa Landscapes, Inc ...................................................... $792,581.49 • SGD Enterprises..................................................................... $844,994.50 • Kormex Construction, Inc ....................................................... $886,846.00 • Greenfield Landscaping and Maintenance, Inc ...................... $912,156.60 • KASA Construction, Inc .......................................................... $1,015,728.00 • David 011is Landscape Development ...................................... $1,145,970.00 Staff reviewed references, State Contractor's License, and registration with the Department of Industrial Relations, and have determined Superb Engineering meets the City's requirements and is appropriate for the subject project. Staff is recommending the City Council award the construction contract to the lowest responsive/responsible bidder, Superb Engineering, for the Legacy Park Improvements Project. Docusign Envelope ID: B2942A1C-7706-82A5-815E-075EA3096335 City Council Agenda Report Legacy Park Improvements Project May 19, 2026 Page 3 Michael Grisso Director of Public Works