HomeMy WebLinkAboutCC RES 26-35Docusign Envelope ID: 8F2E232B-56DB-8756-83FC-A03C6CC4D1C6
RESOLUTION NO. 26-35
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUSTIN,
CALIFORNIA, ADOPTING A LIST OF PROJECTS FOR FISCAL YEAR 2026-27
FUNDED BY SB 1: THE ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017
WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017
(Chapter 5, Statutes of 2017) was passed by the Legislature and signed into law by the
Governor in April 2017 to address the significant multi -modal transportation funding
shortfalls statewide; and
WHEREAS, SB 1 includes accountability and transparency provisions that will
ensure the residents of the City are aware of the projects proposed for funding in our
community and which projects have been completed each fiscal year; and
WHEREAS, the City must adopt by resolution a list of all projects proposed to receive
fiscal year funding from the Road Maintenance and Rehabilitation Account (RMRA), created
by SB 1, which must include a description and the location of each proposed project, a
proposed schedule for the project's completion, and the estimated useful life of the
improvement; and
WHEREAS, the City will receive an estimated $2,254,278 in RMRA funding in Fiscal
Year 2026-27 from SB 1; and
WHEREAS, this is the ninth year in which the City is receiving SB 1 funding and will
enable the City to continue essential road maintenance and rehabilitation projects, safety
improvements, and increasing access and mobility options for the traveling public that would
not have otherwise been possible without SB 1; and
WHEREAS, the City used a Pavement Management Plan (PMP) and Capital
Improvement Program to develop the SB 1 project list to ensure revenues are being used
on the most high -priority and cost-effective projects that also meet priorities for
transportation investment; and
WHEREAS, the funding from SB 1 will enable the City to maintain and rehabilitate
8.6 miles of roadway this fiscal year; and
WHEREAS, the 2023 California Statewide Local Streets and Roads Needs
Assessment found that the City's streets and roads are in good condition, and this revenue
will help us maintain the current condition over the next decade; and
WHEREAS, the City's PMP has been developed to assist City personnel by providing
current data on the City's street network and to develop cost-effective maintenance
strategies to maintain a desirable level of pavement performance on a network scale, while
optimizing the expenditure of limited fiscal resources; and
Resolution 26-35
Page 1 of 3
Docusign Envelope ID: 8F2E232B-56DB-8756-83FC-A03C6CC4D1C6
WHEREAS, the City's weighted pavement condition index (PCI) for the entire
network is 84; and
WHEREAS, system sustainability can only be achieved through proactive scheduling
and the implementation of cost-efficient pavement applications; and
WHEREAS, restoring roads before they fail reduces construction costs and
successive years of collecting pavement condition data has shown that it is far more
economical to preserve roads than to delay repairs; and
WHEREAS, the SB 1 project list and overall investment in our local streets and roads
infrastructure with a focus on basic maintenance and safety, investing in complete streets
infrastructure, and using cutting -edge technology, materials and practices, will have
significant positive co -benefits statewide.
NOW, THEREFORE, BE IT RESOLVED that:
1. The foregoing recitals are true and correct; and
2. The newly proposed project listed on the attached Exhibit A will be funded in part
or solely with Fiscal Year 2026-27 Road Maintenance and Rehabilitation Account
revenues; and
3. The previously proposed and adopted projects listed on the attached Exhibit A may
also utilize Fiscal Year 2026-27 Road Maintenance and Rehabilitation Account
revenues in their delivery. With the re -listing of these projects in the adopted fiscal
year resolution, the City is reaffirming to the public and the State its intent to fund
these projects with Road Maintenance and Rehabilitation Account revenues.
PASSED, APPROVED AND ADOPTED at a regular meeting of the City Council of the City
of Tustin held on the 16t" day of June 2026.
AUSTIN LUMBARD,
Mayor
ATTEST:
ERICA N. YASUDA,
City Clerk
Resolution 26-35
Page 2 of 3
Docusign Envelope ID: 8F2E232B-56DB-8756-83FC-A03C6CC4D1C6
APPROVED AS TO FORM:
DAVID E. KENDIG,
City Attorney
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) SS
CITY OF TUSTIN )
I, Erica N. Yasuda, City Clerk and ex-officio Clerk of the City Council of the City of Tustin,
California, do hereby certify that the whole number of the members of the City Council of
the City of Tustin is five; that the above and foregoing Resolution No. 26-35 was duly passed
and adopted at a regular meeting of the Tustin City Council, held on the 16th day of June
2026, by the following vote:
COUNCILMEMBER AYES: Lumbard, Schnell, Fink, Nielsen (4)
COUNCILMEMBER NOES: (0)
COUNCILMEMBER ABSTAINED: (0)
COUNCILMEMBER ABSENT: Gallagher (1)
COUNCILMEMBER RECUSED: (0)
fvi(. N. Uas4x, Gf� Cb
ERICA N. YASUDA,
City Clerk
Resolution 26-35
Page 3of3
Docusign Envelope ID: 8F2E232B-56DB-8756-83FC-A03C6CC4D1C6
Exhibit A City of Tustin
Senate Bill (SB) 1 Local Streets and Roads Program List of Previously Proposed / Re -listed and Newly Listed Projects for FY 2026-27
Project Ti6e
PrOectT a
Descri i
Location
Components
Prior' $taWe
Est. Start
Est Completion
Est. Useful Life
State Assembly District
State$.net. District
Est. Total Project Cost
FY 26-27 Annual Pavement Maintenance and
Road Maintenance&
Repave/resurface 8S miles of road,
Various streets within the
Engineering
Nev,
712026
3/2027
10
73
37
3,500,000
Sidewalk Repair Project (Zone 1)
Rehabilitation
Including localized removal and repair
Clty's Pavement
of asphalt concrete failure areas,
Management Zone 1,
repair of sidewalk and curb & gutter,
generally bounded by Santa
construction of curb ramps to be
ADA compliant, cold plane existing
Clara to the north, Yorba St to
the west, Irvine Blvd to the
Construction
Nev,
6/2027
12/2027
asphalt, construction of asphalt
south, and the City limit.
concrete overlay, slurry seal, traffic
signal detector loops, and traffic
striping. The pre -construction phase
for Me project includes the engineering
design and preparation of the plans,
specir—tions, bid documents, and
cost estimate for the project.
Jamboree Road Rehabilitation (Interstate 5 to
Road Maintenance &
Removal and deep lift repairs of
I-5 to Portals Parkway
Construction
Nev,
3/2027
12/2028
20
73
37
2,600,000
Portda Parkway),
Rehabilitation
asphalt concrete pavement failure
areas, cold plane, construction of
asphalt concrete resurfacing, traffic
loops, and traffic striping. The pre -
construction phase for the project
includes the engineering design and
preparation of the plans,
specifications, bid documents, and
cost estimate for the project.
Pro ecl Tide
Pro "t
Descri Ion
Location
Com onents
Prior Status
Est. Start
Est Com letion
Est. Useful Life r
State Assembl District
State Senate District
Est. Total Pro ect Cost
FY 25-26 Annual Pavement Maintenance and
Road Maintenance&
Repave/resudace 3.5 miles of road,
Varous streets within City's
Engineering
Canned Over
712025
312026
10
73
37
1,700,000
Sidewalk Repair Project(Zone 7)
Rehabilitation
including localized removal and repair
Pavement Management Zone
of asphalt concrete failure areas,
7, generally hounded by
repair of sidewalk and curb &gutter,
Edinger Ave to the north,
construction of curb ramps to be
Nawporl Ave to the west,
Construction
Carried Over
6/2026
12/2026
ADA compliant, cold plane existing
Barren. Pkwy to the south,
asphalt, construction of asphalt
and Tustin.
concrete overlay, slurry seal, traffic
signal detector loops, and traffic
striping. The pre -construction phase
for the project includes the engineering
design and preparation of the plans,
specifications, bid documents, and
cost estimate for the project.
Main Street Improvements Project
Complete Streets
Installation of raised landscaped
Main Street between Newport
Consimction
Cabled Over
11/2025
12/2026
20
73
37
7,452,089
Components
medians, narrowing of curb -to -cur,
Ave and El Camino Real
street width, traffic striping with
addition of buffered Class II bike lanes
and shances, enhanced parkway
landscaping, widening of sidewalks,
construction of library driveway to
align efih Tustin Plaza drivaway,
installation of street furniture, and
installation of a gateway arch sign
spanning the street. In -pavement
lighted crosswalk to be installed on
Main Street at library driveway.
Jamboree Road Rehabilitation Project
Road Maintenance &
Removal and deep lift repairs of
Banance Padeway to SCRRA
Engineering
Canned Over
07/2023
03/2026
20
73
37
2,600,000
Rehabilitation
asphalt concrete pavement failure
Railroad
areas, cold plane, construction of
asphalt concrete resurfacing, traffic
loops, and traffic striping. The pre-
Construction
Carried Over
06/2026
06/2027
onstruction phase for the project
includes the engineering design and
preparation of the plans,
specificiations, bitl documents and
cost estimate for the project.
Red HIII Avenue Rehabllltatlon Project
Road Maintenance &
Repave/resurface 2.5 miles of road,
Previously listed location was
Engineering
Carried Over
01/2026
03R027
20
73
37
9,400,000
Rehabilitation
including localized removal and repair
Walnut Ave to San Juan St.
of asphalt concrete pavement failure
The project location is being
repair of sidewalk and curb&
expanded to the limits of
gutter, reconstruction of curb ramps to
Sycamore Ave and Bryan
be ADA compliant, cold plane existing
Ave
asphalt, construction of asphalt
concrete overlay, traffic signal detector
loops, and traffic striping, which will
include enhancements for Class 11
bike lanes. Additionally, new pavement
striping and high -visibility yellow
crose,valk'M major intersections will
Construction
Carried Over
07/2027
1212021
be added.
Docusign Envelope ID: 8F2E232B-56DB-8756-83FC-A03C6CC4D1C6
Exhibit A City of Tustin
Senate Bill (SB) 1 Local Streets and Roads Program List of Previously Proposed / Re -listed and Newly Listed Projects for FY 2026-27
Project Ti6e
PrOectT a
Descri i
Location
Components
Prior' $taWe
Est. Start
Est Completion
Est. Useful Life
State Assembly District
State$.net. District
Est. Total Project Cost
FY 26-27 Annual Pavement Maintenance and
Road Maintenance&
Repave/resurface 8S miles of road,
Various streets within the
Engineering
Nev,
712026
3/2027
10
73
37
3,500,000
Sidewalk Repair Project (Zone 1)
Rehabilitation
Including localized removal and repair
Clty's Pavement
of asphalt concrete failure areas,
Management Zone 1,
repair of sidewalk and curb & gutter,
generally bounded by Santa
construction of curb ramps to be
ADA compliant, cold plane existing
Clara to the north, Yorba St to
the west, Irvine Blvd to the
Construction
Nev,
6/2027
12/2027
asphalt, construction of asphalt
south, and the City limit.
concrete overlay, slurry seal, traffic
signal detector loops, and traffic
striping. The pre -construction phase
for Me project includes the engineering
design and preparation of the plans,
specir—tions, bid documents, and
cost estimate for the project.
Jamboree Road Rehabilitation (Interstate 5 to
Road Maintenance &
Removal and deep lift repairs of
I-5 to Portals Parkway
Construction
Nev,
3/2027
12/2028
20
73
37
2,600,000
Portda Parkway),
Rehabilitation
asphalt concrete pavement failure
areas, cold plane, construction of
asphalt concrete resurfacing, traffic
loops, and traffic striping. The pre -
construction phase for the project
includes the engineering design and
preparation of the plans,
specifications, bid documents, and
cost estimate for the project.
Pro ecl Tide
Pro "t
Descri Ion
Location
Com onents
Prior Status
Est. Start
Est Com letion
Est. Useful Life r
State Assembl District
State Senate District
Est. Total Pro ect Cost
FY 25-26 Annual Pavement Maintenance and
Road Maintenance&
Repave/resudace 3.5 miles of road,
Varous streets within City's
Engineering
Canned Over
712025
312026
10
73
37
1,700,000
Sidewalk Repair Project(Zone 7)
Rehabilitation
including localized removal and repair
Pavement Management Zone
of asphalt concrete failure areas,
7, generally hounded by
repair of sidewalk and curb &gutter,
Edinger Ave to the north,
construction of curb ramps to be
Nawporl Ave to the west,
Construction
Carried Over
6/2026
12/2026
ADA compliant, cold plane existing
Barren. Pkwy to the south,
asphalt, construction of asphalt
and Tustin.
concrete overlay, slurry seal, traffic
signal detector loops, and traffic
striping. The pre -construction phase
for the project includes the engineering
design and preparation of the plans,
specifications, bid documents, and
cost estimate for the project.
Main Street Improvements Project
Complete Streets
Installation of raised landscaped
Main Street between Newport
Consimction
Cabled Over
11/2025
12/2026
20
73
37
7,452,089
Components
medians, narrowing of curb -to -cur,
Ave and El Camino Real
street width, traffic striping with
addition of buffered Class II bike lanes
and shances, enhanced parkway
landscaping, widening of sidewalks,
construction of library driveway to
align efih Tustin Plaza drivaway,
installation of street furniture, and
installation of a gateway arch sign
spanning the street. In -pavement
lighted crosswalk to be installed on
Main Street at library driveway.
Jamboree Road Rehabilitation Project
Road Maintenance &
Removal and deep lift repairs of
Banance Padeway to SCRRA
Engineering
Canned Over
07/2023
03/2026
20
73
37
2,600,000
Rehabilitation
asphalt concrete pavement failure
Railroad
areas, cold plane, construction of
asphalt concrete resurfacing, traffic
loops, and traffic striping. The pre-
Construction
Carried Over
06/2026
06/2027
onstruction phase for the project
includes the engineering design and
preparation of the plans,
specificiations, bitl documents and
cost estimate for the project.
Red HIII Avenue Rehabllltatlon Project
Road Maintenance &
Repave/resurface 2.5 miles of road,
Previously listed location was
Engineering
Carried Over
01/2026
03R027
20
73
37
9,400,000
Rehabilitation
including localized removal and repair
Walnut Ave to San Juan St.
of asphalt concrete pavement failure
The project location is being
repair of sidewalk and curb&
expanded to the limits of
gutter, reconstruction of curb ramps to
Sycamore Ave and Bryan
be ADA compliant, cold plane existing
Ave
asphalt, construction of asphalt
concrete overlay, traffic signal detector
loops, and traffic striping, which will
include enhancements for Class 11
bike lanes. Additionally, new pavement
striping and high -visibility yellow
crose,valk'M major intersections will
Construction
Carried Over
07/2027
1212021
be added.