Loading...
HomeMy WebLinkAboutCC RES 26-35Docusign Envelope ID: 8F2E232B-56DB-8756-83FC-A03C6CC4D1C6 RESOLUTION NO. 26-35 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUSTIN, CALIFORNIA, ADOPTING A LIST OF PROJECTS FOR FISCAL YEAR 2026-27 FUNDED BY SB 1: THE ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017 WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5, Statutes of 2017) was passed by the Legislature and signed into law by the Governor in April 2017 to address the significant multi -modal transportation funding shortfalls statewide; and WHEREAS, SB 1 includes accountability and transparency provisions that will ensure the residents of the City are aware of the projects proposed for funding in our community and which projects have been completed each fiscal year; and WHEREAS, the City must adopt by resolution a list of all projects proposed to receive fiscal year funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1, which must include a description and the location of each proposed project, a proposed schedule for the project's completion, and the estimated useful life of the improvement; and WHEREAS, the City will receive an estimated $2,254,278 in RMRA funding in Fiscal Year 2026-27 from SB 1; and WHEREAS, this is the ninth year in which the City is receiving SB 1 funding and will enable the City to continue essential road maintenance and rehabilitation projects, safety improvements, and increasing access and mobility options for the traveling public that would not have otherwise been possible without SB 1; and WHEREAS, the City used a Pavement Management Plan (PMP) and Capital Improvement Program to develop the SB 1 project list to ensure revenues are being used on the most high -priority and cost-effective projects that also meet priorities for transportation investment; and WHEREAS, the funding from SB 1 will enable the City to maintain and rehabilitate 8.6 miles of roadway this fiscal year; and WHEREAS, the 2023 California Statewide Local Streets and Roads Needs Assessment found that the City's streets and roads are in good condition, and this revenue will help us maintain the current condition over the next decade; and WHEREAS, the City's PMP has been developed to assist City personnel by providing current data on the City's street network and to develop cost-effective maintenance strategies to maintain a desirable level of pavement performance on a network scale, while optimizing the expenditure of limited fiscal resources; and Resolution 26-35 Page 1 of 3 Docusign Envelope ID: 8F2E232B-56DB-8756-83FC-A03C6CC4D1C6 WHEREAS, the City's weighted pavement condition index (PCI) for the entire network is 84; and WHEREAS, system sustainability can only be achieved through proactive scheduling and the implementation of cost-efficient pavement applications; and WHEREAS, restoring roads before they fail reduces construction costs and successive years of collecting pavement condition data has shown that it is far more economical to preserve roads than to delay repairs; and WHEREAS, the SB 1 project list and overall investment in our local streets and roads infrastructure with a focus on basic maintenance and safety, investing in complete streets infrastructure, and using cutting -edge technology, materials and practices, will have significant positive co -benefits statewide. NOW, THEREFORE, BE IT RESOLVED that: 1. The foregoing recitals are true and correct; and 2. The newly proposed project listed on the attached Exhibit A will be funded in part or solely with Fiscal Year 2026-27 Road Maintenance and Rehabilitation Account revenues; and 3. The previously proposed and adopted projects listed on the attached Exhibit A may also utilize Fiscal Year 2026-27 Road Maintenance and Rehabilitation Account revenues in their delivery. With the re -listing of these projects in the adopted fiscal year resolution, the City is reaffirming to the public and the State its intent to fund these projects with Road Maintenance and Rehabilitation Account revenues. PASSED, APPROVED AND ADOPTED at a regular meeting of the City Council of the City of Tustin held on the 16t" day of June 2026. AUSTIN LUMBARD, Mayor ATTEST: ERICA N. YASUDA, City Clerk Resolution 26-35 Page 2 of 3 Docusign Envelope ID: 8F2E232B-56DB-8756-83FC-A03C6CC4D1C6 APPROVED AS TO FORM: DAVID E. KENDIG, City Attorney STATE OF CALIFORNIA ) COUNTY OF ORANGE ) SS CITY OF TUSTIN ) I, Erica N. Yasuda, City Clerk and ex-officio Clerk of the City Council of the City of Tustin, California, do hereby certify that the whole number of the members of the City Council of the City of Tustin is five; that the above and foregoing Resolution No. 26-35 was duly passed and adopted at a regular meeting of the Tustin City Council, held on the 16th day of June 2026, by the following vote: COUNCILMEMBER AYES: Lumbard, Schnell, Fink, Nielsen (4) COUNCILMEMBER NOES: (0) COUNCILMEMBER ABSTAINED: (0) COUNCILMEMBER ABSENT: Gallagher (1) COUNCILMEMBER RECUSED: (0) fvi(. N. Uas4x, Gf� Cb ERICA N. YASUDA, City Clerk Resolution 26-35 Page 3of3 Docusign Envelope ID: 8F2E232B-56DB-8756-83FC-A03C6CC4D1C6 Exhibit A City of Tustin Senate Bill (SB) 1 Local Streets and Roads Program List of Previously Proposed / Re -listed and Newly Listed Projects for FY 2026-27 Project Ti6e PrOectT a Descri i Location Components Prior' $taWe Est. Start Est Completion Est. Useful Life State Assembly District State$.net. District Est. Total Project Cost FY 26-27 Annual Pavement Maintenance and Road Maintenance& Repave/resurface 8S miles of road, Various streets within the Engineering Nev, 712026 3/2027 10 73 37 3,500,000 Sidewalk Repair Project (Zone 1) Rehabilitation Including localized removal and repair Clty's Pavement of asphalt concrete failure areas, Management Zone 1, repair of sidewalk and curb & gutter, generally bounded by Santa construction of curb ramps to be ADA compliant, cold plane existing Clara to the north, Yorba St to the west, Irvine Blvd to the Construction Nev, 6/2027 12/2027 asphalt, construction of asphalt south, and the City limit. concrete overlay, slurry seal, traffic signal detector loops, and traffic striping. The pre -construction phase for Me project includes the engineering design and preparation of the plans, specir—tions, bid documents, and cost estimate for the project. Jamboree Road Rehabilitation (Interstate 5 to Road Maintenance & Removal and deep lift repairs of I-5 to Portals Parkway Construction Nev, 3/2027 12/2028 20 73 37 2,600,000 Portda Parkway), Rehabilitation asphalt concrete pavement failure areas, cold plane, construction of asphalt concrete resurfacing, traffic loops, and traffic striping. The pre - construction phase for the project includes the engineering design and preparation of the plans, specifications, bid documents, and cost estimate for the project. Pro ecl Tide Pro "t Descri Ion Location Com onents Prior Status Est. Start Est Com letion Est. Useful Life r State Assembl District State Senate District Est. Total Pro ect Cost FY 25-26 Annual Pavement Maintenance and Road Maintenance& Repave/resudace 3.5 miles of road, Varous streets within City's Engineering Canned Over 712025 312026 10 73 37 1,700,000 Sidewalk Repair Project(Zone 7) Rehabilitation including localized removal and repair Pavement Management Zone of asphalt concrete failure areas, 7, generally hounded by repair of sidewalk and curb &gutter, Edinger Ave to the north, construction of curb ramps to be Nawporl Ave to the west, Construction Carried Over 6/2026 12/2026 ADA compliant, cold plane existing Barren. Pkwy to the south, asphalt, construction of asphalt and Tustin. concrete overlay, slurry seal, traffic signal detector loops, and traffic striping. The pre -construction phase for the project includes the engineering design and preparation of the plans, specifications, bid documents, and cost estimate for the project. Main Street Improvements Project Complete Streets Installation of raised landscaped Main Street between Newport Consimction Cabled Over 11/2025 12/2026 20 73 37 7,452,089 Components medians, narrowing of curb -to -cur, Ave and El Camino Real street width, traffic striping with addition of buffered Class II bike lanes and shances, enhanced parkway landscaping, widening of sidewalks, construction of library driveway to align efih Tustin Plaza drivaway, installation of street furniture, and installation of a gateway arch sign spanning the street. In -pavement lighted crosswalk to be installed on Main Street at library driveway. Jamboree Road Rehabilitation Project Road Maintenance & Removal and deep lift repairs of Banance Padeway to SCRRA Engineering Canned Over 07/2023 03/2026 20 73 37 2,600,000 Rehabilitation asphalt concrete pavement failure Railroad areas, cold plane, construction of asphalt concrete resurfacing, traffic loops, and traffic striping. The pre- Construction Carried Over 06/2026 06/2027 onstruction phase for the project includes the engineering design and preparation of the plans, specificiations, bitl documents and cost estimate for the project. Red HIII Avenue Rehabllltatlon Project Road Maintenance & Repave/resurface 2.5 miles of road, Previously listed location was Engineering Carried Over 01/2026 03R027 20 73 37 9,400,000 Rehabilitation including localized removal and repair Walnut Ave to San Juan St. of asphalt concrete pavement failure The project location is being repair of sidewalk and curb& expanded to the limits of gutter, reconstruction of curb ramps to Sycamore Ave and Bryan be ADA compliant, cold plane existing Ave asphalt, construction of asphalt concrete overlay, traffic signal detector loops, and traffic striping, which will include enhancements for Class 11 bike lanes. Additionally, new pavement striping and high -visibility yellow crose,valk'M major intersections will Construction Carried Over 07/2027 1212021 be added. Docusign Envelope ID: 8F2E232B-56DB-8756-83FC-A03C6CC4D1C6 Exhibit A City of Tustin Senate Bill (SB) 1 Local Streets and Roads Program List of Previously Proposed / Re -listed and Newly Listed Projects for FY 2026-27 Project Ti6e PrOectT a Descri i Location Components Prior' $taWe Est. Start Est Completion Est. Useful Life State Assembly District State$.net. District Est. Total Project Cost FY 26-27 Annual Pavement Maintenance and Road Maintenance& Repave/resurface 8S miles of road, Various streets within the Engineering Nev, 712026 3/2027 10 73 37 3,500,000 Sidewalk Repair Project (Zone 1) Rehabilitation Including localized removal and repair Clty's Pavement of asphalt concrete failure areas, Management Zone 1, repair of sidewalk and curb & gutter, generally bounded by Santa construction of curb ramps to be ADA compliant, cold plane existing Clara to the north, Yorba St to the west, Irvine Blvd to the Construction Nev, 6/2027 12/2027 asphalt, construction of asphalt south, and the City limit. concrete overlay, slurry seal, traffic signal detector loops, and traffic striping. The pre -construction phase for Me project includes the engineering design and preparation of the plans, specir—tions, bid documents, and cost estimate for the project. Jamboree Road Rehabilitation (Interstate 5 to Road Maintenance & Removal and deep lift repairs of I-5 to Portals Parkway Construction Nev, 3/2027 12/2028 20 73 37 2,600,000 Portda Parkway), Rehabilitation asphalt concrete pavement failure areas, cold plane, construction of asphalt concrete resurfacing, traffic loops, and traffic striping. The pre - construction phase for the project includes the engineering design and preparation of the plans, specifications, bid documents, and cost estimate for the project. Pro ecl Tide Pro "t Descri Ion Location Com onents Prior Status Est. Start Est Com letion Est. Useful Life r State Assembl District State Senate District Est. Total Pro ect Cost FY 25-26 Annual Pavement Maintenance and Road Maintenance& Repave/resudace 3.5 miles of road, Varous streets within City's Engineering Canned Over 712025 312026 10 73 37 1,700,000 Sidewalk Repair Project(Zone 7) Rehabilitation including localized removal and repair Pavement Management Zone of asphalt concrete failure areas, 7, generally hounded by repair of sidewalk and curb &gutter, Edinger Ave to the north, construction of curb ramps to be Nawporl Ave to the west, Construction Carried Over 6/2026 12/2026 ADA compliant, cold plane existing Barren. Pkwy to the south, asphalt, construction of asphalt and Tustin. concrete overlay, slurry seal, traffic signal detector loops, and traffic striping. The pre -construction phase for the project includes the engineering design and preparation of the plans, specifications, bid documents, and cost estimate for the project. Main Street Improvements Project Complete Streets Installation of raised landscaped Main Street between Newport Consimction Cabled Over 11/2025 12/2026 20 73 37 7,452,089 Components medians, narrowing of curb -to -cur, Ave and El Camino Real street width, traffic striping with addition of buffered Class II bike lanes and shances, enhanced parkway landscaping, widening of sidewalks, construction of library driveway to align efih Tustin Plaza drivaway, installation of street furniture, and installation of a gateway arch sign spanning the street. In -pavement lighted crosswalk to be installed on Main Street at library driveway. Jamboree Road Rehabilitation Project Road Maintenance & Removal and deep lift repairs of Banance Padeway to SCRRA Engineering Canned Over 07/2023 03/2026 20 73 37 2,600,000 Rehabilitation asphalt concrete pavement failure Railroad areas, cold plane, construction of asphalt concrete resurfacing, traffic loops, and traffic striping. The pre- Construction Carried Over 06/2026 06/2027 onstruction phase for the project includes the engineering design and preparation of the plans, specificiations, bitl documents and cost estimate for the project. Red HIII Avenue Rehabllltatlon Project Road Maintenance & Repave/resurface 2.5 miles of road, Previously listed location was Engineering Carried Over 01/2026 03R027 20 73 37 9,400,000 Rehabilitation including localized removal and repair Walnut Ave to San Juan St. of asphalt concrete pavement failure The project location is being repair of sidewalk and curb& expanded to the limits of gutter, reconstruction of curb ramps to Sycamore Ave and Bryan be ADA compliant, cold plane existing Ave asphalt, construction of asphalt concrete overlay, traffic signal detector loops, and traffic striping, which will include enhancements for Class 11 bike lanes. Additionally, new pavement striping and high -visibility yellow crose,valk'M major intersections will Construction Carried Over 07/2027 1212021 be added.