Loading...
HomeMy WebLinkAbout06 AWARD CONSTRUCTION CONTRACT MAIN STREET WELL NO. 3 AND NEWPORT WELL NO. 3 Agenda Item_______ Reviewed: AGENDA REPORT City Manager_______ Finance Director_______ MEETING DATE:OCTOBER 20, 2026 TO:ALDO E. SCHINDLER, CITY MANAGER FROM:MICHAEL GRISSO, DIRECTOR OF PUBLIC WORKS SUBJECT:AWARD CONSTRUCTION CONTRACT FOR THE MAIN STREET WELL NO. 3 AND NEWPORT WELL NO. 3 IMPROVEMENTS PROJECT SUMMARY: Staff recommends the City Council award a construction contract to T.E. Roberts Inc. the lowest responsive/responsible bidder for the Main Street Well No. 3 and Newport Well No. 3 Improvements Project. RECOMMENDATION: It is recommended that the City Council award a construction contract in the amount of $1,350,700.00 for the Main Street Well No. 3 and Newport Well No. 3 Improvements Project to T.E. Roberts Inc. as the lowest responsive and responsible bidder, and authorize the Mayor and the City Clerk to execute the contract documents on behalf of the City. FISCAL IMPACT: This project is fully fundedin the Fiscal Year 2026-2027 Water Enterprise Capital Improvement Budget, which includes fundsfrom the Water Capital Fund and the 2024 Water Revenue Bond Fund. CORRELATION TO THE STRATEGIC PLAN: The project supports the City's Strategic Plan Goal B: Public Safety and Protection of Assets, specifically Strategy 5, by protecting critical water infrastructure through continued capital investment and rehabilitation of existing municipal water wells. The project also supports Goal C: Financial Strength, Strategy 5, by addressing long-term maintenance needs that help ensure a reliable municipal water system. City Council AgendaReport AwardConstructionContractfor the Main Street Well No. 3 and Newport Well No. 3 Improvements Project October20, 2026 Page 2 BACKGROUND AND DISCUSSION: The City's municipal groundwater wells are critical components of the water production system and provide a reliable local water supply for the community. As part of the City's ongoing Well Rehabilitation Program, Main Street Well No. 3 and Newport Well No. 3 have been identified for rehabilitation based on their age, operating history, and the need to maintain long-term reliability and production capacity. The rehabilitation work generally includes removal and inspection of the existing pumps and motors, downhole video inspection of the wells, rehabilitation or replacement of pumping equipment based on inspection findings, installation of new flow meters andmotor-operated valves, electrical and instrumentation upgrades, well testing and development, and associated site improvements. The work also includes startup, testing, and commissioning to return both wells to reliable operation. Formal bids were submitted electronically and publicly opened on September 18, 2026. The City received one (1) bid from T.E. Roberts Inc. in the amount of $1,350,700.00, which included$303,200.00 in optional additive items. Additive items may be required based on an analysis of well condition during disassembly. Additive items are at the direction of the City Engineer and will be invoiced bytheunit pricing provided in the bid and only if approved in writing. Staff have reviewed T.E. Roberts Inc.'s bid for responsiveness, including the bid schedule and required bid documents, and verified the contractor's license, Department of Industrial Relations registration, and references. Staff determined that T.E. Roberts Inc. meets the City's requirements and is appropriate for the subject project. _____________________ Michael Grisso Director of Public Works Attachment: 1.Location Map