SUMMARY:
Staff is requesting the City Council award a construction contract to the lowest
responsive/responsible bidder for the El Camino Real and Auto Center Drive Signal
Improvement Project.
RECOMMENDATION:
It is recommended that the City Council
1.Award a construction contract to the lowest responsive/responsible bidder, PTM General
Engineering Services, Inc. in the amount of $126,666.00for the El Camino Real and
Auto Center Drive Signal Improvement Project; and
2.Authorize the Mayor and the City Clerk to execute the contract documents on behalf of
the City.
FISCAL IMPACT:
The Fiscal Year 2026-2027 Capital Improvement Program Budgetincludes appropriations
of $128,000 in Measure M2 Fairshare funding for the City’s portion of the project and
$125,000 in General Fund – Capital Improvement Program funding to account for Costco’s
portion of the project. The Engineer's estimate for project design, construction, engineering
support, and inspection services is $253,000.
On February 3, 2026, the City Council approved a Cost-Sharing Agreement with Costco,
under which Costco will reimburse the City for fifty (50)percent of the actual project costs,
up to a maximum reimbursement of $125,000.
City Council AgendaReport
Award Construction Contract for the El Camino Real and Auto Center Drive Signal
Improvements Project
October 20, 2026
Page 2
The overall construction expenses are itemized below:
Construction Contract .................................................................. $126,666.00
Contingency (10%) ......................................................................... $12,666.00
Construction Support and Geotechnical Services........................... $20,000.00
TOTAL CONSTRUCTION COSTS............................................... $159,332.00
CORRELATION TO THE STRATEGIC PLAN:
This item contributes to the fulfillment of the City’s Strategic Plan Goal B: Public Safety and
Protection of Assets, specifically addressing Strategy 5, which among other items, is to
ensure continuous maintenance and improvements of public facilities to ensure Tustin is a
safe and well-maintained community.
BACKGROUND AND DISCUSSION:
The intersection of El Camino Real and Auto Center Drive has experienced an increase in
traffic collisions in recent years. The intersection serves as the primary access point to the
Costco Wholesale store (Costco) located at 2655 El Camino Real and currently operates
with permissive-protected left-turn phasing for the eastbound and westbound approaches
on El Camino Real.
In 2022, Costco completed construction of a fueling station at the northeast corner of the
intersection, resulting in additional vehicle activity in the area. Staff reviewed Conditional
Use Permit (CUP) 2019-00018 and the off-site improvements associated with the Costco
Fueling Expansion Project to determine whether additional traffic improvements were
warranted due to the proximity of the new fueling station. As part of this review, staff
engaged Costco to participate in a traffic signal warrant study and to contribute towards
any resulting improvements.
Costco retained a traffic engineering consultant to evaluate the intersection. The consultant
determined that traffic generated by the Costco fueling station accounts for approximately
10 percent of the total intersection traffic volume and that the intersection currently operates
at an acceptable level of service. The evaluation also concluded that left-turn queuing is
not the primary contributing factor to the reported collisions. However, based on the
documented collision history, the consultant confirmed that a protected left-turn signal
phase is warranted in accordance with the California Manual on Uniform Traffic Control
Devices.
Based on current traffic volumes and documented collision history, staff supported the
finding that converting the eastbound and westbound approaches on El Camino Real to
protected-only left-turn phasing would improve intersection safety. Providing a dedicated
protected left-turn phase will reduce conflicts between left-turning vehicles, opposing
through traffic, and pedestrians.
City Council AgendaReport
Award Construction Contract for the El Camino Real and Auto Center Drive Signal
Improvements Project
October 20, 2026
Page 3
uary 3, 2026, the City Council approved a Cost-Sharing Agreement with Costco to
On Febr
implement the traffic signal modifications necessary to provide protected-only left-turn
phasing for the eastbound and westbound approaches on El Camino Real at Auto Center
Drive.
On August 4, 2026, the City Council approved the plans and specifications and authorized
the advertisement for bids. The project includes installation of new protected left-turn signal
indications, replacement of the existing traffic signal pole at the northwest corner of the
intersection, and construction of ADA-compliant curb ramp improvements.
Formal bids were submitted electronically and publicly opened on September 9, 2026.
Fourteen (14) bids were received and are summarized as follows:
•Select Electric, Inc. (Bid Withdrawal) ...................................... $ 86,166.00
•PTM General Engineering Services, Inc. ................................ $ 126,666.00
•Bear Electrical Solutions, LLC ................................................ $ 133,350.00
•Ferreira Construction Company .............................................. $ 138,275.00
•California Professional Engineering, Inc. ................................ $ 149,787.00
•Elecnor Belco Electric, Inc. ..................................................... $ 158,307.00
•Calpromax Engineering, Inc. .................................................. $ 167,000.00
•Crosstown Electrical & Data, Inc. ........................................... $ 168,295.00
•Traffic Loops Crackfilling, Inc.................................................. $ 172,600.00
•DBX, Inc. ................................................................................ $ 181,500.00
•Global Road Sealing, Inc. ....................................................... $ 203,000.00
•Developers General Contracting, Inc. ..................................... $ 208,100.00
•Universal Wiring Corp ............................................................. $ 216,390.00
•Servitek Electric, Inc. .............................................................. $ 221,839.00
Following bid opening, the apparent low bidder, Select Electric, Inc., submitted a timely
written request to withdraw its bid due to a material clerical error. Staff reviewed and
accepted the withdrawal in accordance with applicable public contracting requirements.
Accordingly, PTM General Engineering Services, Inc. represents the apparent low bidder.
Staff reviewed PTM General Engineering Services, Inc.'s bid for responsiveness, including
the bid schedule and required bid documents, and verified the contractor's license,
Department of Industrial Relations registration, and references. Staff determined that PTM
General Engineering Services, Inc. meets the City's requirements and is appropriate for the
subject project.
Staffrecommends that the City Council award the construction contract to the lowest
responsive/responsible bidder, PTM General Engineering Services, Inc., for the El Camino
Real and Auto Center Drive Signal Improvement Project.
City Council AgendaReport
Award Construction Contract for the El Camino Real and Auto Center Drive Signal
Improvements Project
October20, 2026
Page 4
Michael Grisso
Director of Public Works
Attachment:
1.Location Map