HomeMy WebLinkAbout10 APPROVE CONSULTANT SERVICES AGREEMENT FOR ENGINEERING DESIGN SERVICES FOR RED HILL AVE REHAB Agenda Item_______ Reviewed: AGENDA REPORT City Manager_______ Finance Director_______ MEETING DATE:OCTOBER 20, 2026 TO:ALDO E. SCHINDLER, CITY MANAGER FROM:MICHAEL GRISSO, DIRECTOR OF PUBLIC WORKS SUBJECT:APPROVE CONSULTANT SERVICES AGREEMENT FOR ENGINEERING DESIGN SERVICES FOR RED HILL AVENUE REHABILITATIONPROJECT SUMMARY: Staff is recommending the City Council approve a Consultant Services Agreement with BKF Engineers forengineeringdesignservices for the Red Hill AvenueRehabilitation Projectfrom Bryan Avenue to Sycamore Avenue. RECOMMENDATION: hat the City Council: 1.Approve the Consultant Services Agreement with BKF Engineersfor Engineering Design Services and authorize theCity Managerto execute the Agreement on behalf of the City; and 2.Appropriate $176,000.00from Senate Bill 1 project funding currently included in the Capital Improvement Budget as planned for Fiscal Year2027-2028. FISCAL IMPACT: The project ispartially funded inthe Fiscal Year 2026-2027Capital Improvement Program Budget, whichhas allocated $600,000 for design services. The proposed Consultant Services Agreement includes a not-to-exceed total compensation amount of $775,429.78. To fully fund the design portion of this project,staff recommends appropriation of $176,000.00 in Senate Bill 1 funds that are currently programmed forcontinuation of this projecttheFiscal Year 2027-2028. CORRELATION TO THE STRATEGIC PLAN: Rehabilitation of roadways and repair of sidewalks contributes to the fulfillment of the City’s Strategic Plan Goal B: Public Safety and Protection of Assets. Specifically, the project City Council AgendaReport Approve Consultant Services Agreement for Engineering Design Services for Red Hill Avenue Rehabilitation Project October 20, 2026 Page 2 implements Strategy #5, which among other items, is to ensure continuous maintenance and improvement of transportation facilities. BACKGROUND AND DISCUSSION: Red Hill Avenue is a regionally significant principal arterial corridor, providing access for residents, commuters, businesses, and regional travelers between Interstate 5 and communities to the north, south, east and west. Within the project limits between Bryan Avenue and Sycamore Avenue, Red Hill Avenue is generally a divided six-lane roadway supporting high traffic volumes, with average daily traffic ranging from 9,300 to 34,600 vehicles. Existing bicycle facilities are discontinuous within the project corridor. The Red Hill Avenue Rehabilitation Project was recently awarded a $7,000,000 federal Surface Transportation Block Grant through the Southern California Association of Governments, administered by the Orange County Transportation Authority, to fund construction of the project. The proposed Consultant Services Agreement will provide the engineering design services necessary to advance the project to construction. The overall project scope includes pavement rehabilitation and resurfacing on Red Hill Avenue between Bryan Avenue and Sycamore Avenue as warranted, continuous Class II bike lanes, ADA improvements including curb ramp upgrades,drainage, utility cover adjustments,traffic signal/detection modifications, lighting evaluation, water quality management, potential median modifications, replacement of pavement markers, signing and striping,and other corridor improvements identified through final design. Staff developed a Request for Proposals (RFP) solicitation containing requirements and a scope of services detailing the need for professional engineering consulting services for the preparation of Plans, Specifications, and Engineer’s Estimate. The RFP was published on July 6, 2026, on the City's electronic public procurement platform, OpenGov, and distributed directly to known consultants/firms providing these services. The RFP submission deadline was August 24, 2026, and the process yielded eight (8) proposals, with all qualifying for further review. The proposals were evaluated by a panel consisting of staff from the City's Public Works Department in accordance with the evaluation criteria identified in the RFP. Based on the initial proposal evaluations, the four highest-ranked firms were invited to participate in interviews: 1. BKF Engineers 2. Onward Engineering 3. Dokken Engineering 4. Harris and Associates City Council AgendaReport Approve Consultant Services Agreementfor Engineering Design Services for Red Hill Avenue Rehabilitation Project October 20, 2026 Page 3 Following the interviews and completion of reference checks, the evaluation panel finalized the consultant rankings based on the following criteria: •Qualification and Experience of Firm •Approach and Work Plan •Qualifications and Experience of the project manager and other key individuals •Schedule of Delivery •Reference Checks BKF Engineerswas ranked as the top-rated proposer based on the proposal evaluation, interview, and reference checks. The evaluation panel determined that BKFdemonstrated the strongest understanding of the City's project objectives, including pavement rehabilitation, a constrained Class II bicycle facility design, federal-aid/Caltrans requirements, constructability/QA-QC, and preparation of a bid-ready Plans, Specifications, and Engineer’s Estimate package. BKFalso demonstrated extensive experience delivering similar roadway rehabilitation projects for local agencies,and a project team familiar with the corridor through their recently completed topographic survey. Their proposed costs are within the City's budgetary expectations. Based on these factors,staff is recommending theapproval of the proposed Consultant Services Agreement with BKF Engineersforthe engineering design servicesfor the Red Hill AvenueRehabilitation Project. _____________________ Michael Grisso Director of Public Works Attachment: 1.Consultant Service Agreement C I T Y O F T U S T I N 300 Centennial Way Tustin, California 92780 R E Q U E S T F O R P R O P O S A L S for Professional Consulting Services for the Engineering Design Services for Red Hill Avenue Rehabilitation between Sycamore Avenue and Bryan Avenue (CIP No. 70261) July 2026 PROPOSAL SUBMITTALS: Responses to the Request for Proposal (RFP) are to be submitted to: Kyra Tao (Principal Transportation Engineer Public Works Department) City of Tustin 300 Centennial Way Tustin, California 92780 no later than 4:00 P. M. on August 17, 2026. The proposal shall be submitted electronically via Open Gov. Proposals received in OpenGov after the specified time will not be accepted. Questions regarding this request will be limited to written form and shall be submitted via OpenGov. Verbal inquiries will not be accepted. The fee proposal shall be uploaded as a separate file from the main proposal in OpenGov. INDEX SECTION PAGE I. Introduction/Project Description #2 II. Schedule of Events #2 III. Instructions to Proposers #2 IV. Scope of Work #4 V. Proposal Requirements #15 VI. General Requirements #19 VII. Consultant Evaluation & Selection Process #21 VIII. Administration/Contract Requirements #22 ATTACHMENTS Attachment A – Sample Consultant Services Agreement Attachment B – Non-Collusion Affidavit Attachment C – Non-Lobbying Certification Attachment D – Non-Discrimination Certification Attachment E – Debarment / Suspension Certification Attachment F – Bucknam Inspection Report Attachment G – CADD and PDF of Current Design C ITY OF T USTIN Engineering Design Services for Red Hill AvenueImprovements(CIP No. 70261) –RFP (2026)Page 2 I. INTRODUCTION / PROJECT DESCRIPTION The City of Tustin is seeking professional engineering consulting services for the preparation of Plans, Specifications, and Estimate (PS&E) for the rehabilitation of Red Hill Avenue between Bryan Avenue and Sycamore Avenue. The project generally consists of pavement rehabilitation, ADA curb ramp improvements, traffic signal detection modifications, utility adjustments, signing and striping modifications, and implementation of new Class II bicycle lanes throughout the project corridor. Approximately thirty percent (30%) design has been prepared by City staff, including AutoCAD base files (Attachment G). The selected consultant shall review, validate, refine, and complete the design through final PS&E. II. SCHEDULE OF EVENTS July 6, 2026 Issuance of Request for Proposals July 20, 2026 Deadline for questions in OpenGov August 17, 2026 Proposals due in OpenGov September 16, 2026 Interview (if necessary) September 18, 2026 Selection process October 6, 2026 City Council Approval of Consultant Contract (est. date) October 20, 2026 Issuance of Notice to Proceed (est. date) Note: Subject to change at the discretion of the City. III. INSTRUCTIONS TO PROPOSERS A. CITY RESPONSIBILITIES The City will provide information in its possession relevant to preparation of required information in this RFP. The City will provide only the staff assistance and documentation specifically referred to herein. B. PROPOSER RESPONSIBILITIES Point of Contact: The selected proposer will assume responsibilities for all services in its proposal. The selected proposer shall identify a sole point of contact with the greatest knowledge concerning the required service operations and contractual matters, including payment of all charges resulting from the Agreement. Contact information such as email and phone number must be included into the proposal. Evidence of Financial Capacity: Proposer may be requested to submit its most recent audited financial statement, evidencing proposer’s financial capacity to fully perform the required services, including provision of equipment and personnel expenses over a ninety (90) day period. If said financial statement does not reflect full ninety (90) day operational capacity, proposer may include a letter of credit as evidence of supplemental capacity. C ITY OF T USTIN Engineering Design Services for Red Hill AvenueImprovements(CIP No. 70261) –RFP (2026)Page 3 C. REQUEST FOR INFORMATION OR CLARIFICATION All questions or requested clarifications shall be made only in writing to the Q&A section located in OpenGOV no fewer than five (5) calendar days prior to the date and time set for opening of proposals. No verbal requests or responses will be accepted. Significant interpretations or clarifications will be addressed via addenda to this RFP. D. ADDENDA Any changes in RFP from the date of release to date of submittal will result in an addendum or amendment. Notification of such addendum or amendment shall be posted on OpenGOV. Addenda shall become part of the agreement documents. E. LICENSES AND PERMITS The selected proposer shall be required to obtain a City of Tustin Business license within ten (10) business days of selection and must provide a copy to the City’s project manager or designee prior to commencing any work in Tustin. Additionally, Proposer will be responsible for obtaining any licenses/permits required by the Scope of Work. F. PRE-PROPOSAL MEETING Should a pre-proposal meeting be scheduled, the date, time, and location is identified on the cover page of this RFP. The meeting will include discussion of the project scope and a question-and-answer session. It is highly recommended that the Proposer’s key team members attend this meeting. Significant interpretations or clarifications will be addressed via addenda to this RFP, as described above in “Section D: Addenda.” G. CITY RIGHT TO REJECT The City reserves the right to reject any or all proposals submitted and no representation is made hereby that any contract will be awarded pursuant to this RFP or otherwise. The City reserves the right to accept or reject the combined or separate components of this proposal in part or in its entirety or to waive any minor inconsistency, informality or technical defect in the proposal. The City reserves the right to reject, replace, and approve any and all subconsultants. All subconsultant(s) shall be identified in response to this RFP. Subconsultants shall be the responsibility of the successful proposer and the City shall assume no liability of such subconsultants. H. PROTEST PROCEDURES Only respondents who have actually submitted a proposal may file a “protest” to an RFP with the City’s Public Works Department. In order for a Proposer’s protest to be considered valid, the protest must: C ITY OF T USTIN Engineering Design Services for Red Hill AvenueImprovements(CIP No. 70261) –RFP (2026)Page 4 1. Be filed in writing before 5:00 p.m. of the 5th business day following the posting of RFP Results/Notice of Intent to Award on the City’s online bidding system; 2. Clearly identify the specific irregularity or accusation; 3. Clearly identify the specific City staff determination or recommendation being protested; 4. Specify, in detail, the grounds of the protest and the facts supporting the protest; and 5. Include all relevant, supporting documentation with the protest at time of filing. If the protest does not comply with each of these requirements, it will be rejected as invalid. If the protest is valid, the City’s City Engineer or designated City staff member, shall review the basis of the protest and all relevant information. The decision from the City Engineer or his/her designee, is final and no further appeals will be considered. IV. SCOPE OF WORK A. PROJECT DESCRIPTION The City of Tustin is seeking professional engineering consulting services for the preparation of Plans, Specifications, and Engineer’s Estimate (PS&E) for the Red Hill Avenue (Bryan Avenue to Sycamore Avenue) rehabilitation and improvement project. The Consultant shall prepare a streamlined, bid-ready PS&E package appropriate for a 1.25-mile arterial rehabilitation project, preparing an efficient, concise, and bid-ready PS&E package while maintaining full compliance with City standards and federal funding requirements. The project generally includes, but is not limited to, the following improvements: Pavement rehabilitation or reconstruction ADA curb ramp upgrades Design and implementation of new Class II bicycle lanes throughout the corridor, including lane reconfiguration, pavement marking modifications, signing, green conflict markings where appropriate, evaluation of lane transitions at intersections, and modifications to traffic signal detection, pavement markings, and associated roadway features necessary to accommodate the new bicycle facilities. Utility adjustments Traffic signal detection modifications, pavement markings, and signing necessary to accommodate the proposed roadway improvements and new bicycle facilities. The City will retain responsibility for: NEPA clearance Federal authorization (E-76) ROW certification coordination with Caltrans Traffic Control Plans (TCP) to be prepared by contractor The Consultant shall provide all supporting design documents necessary for the City to complete these processes. C ITY OF T USTIN Engineering Design Services for Red Hill AvenueImprovements(CIP No. 70261) –RFP (2026)Page 5 B. PROJECT MANAGEMENT AND COORDINATION The Consultant shall be fully responsible for the overall management and coordination for the project, which may include, but is not limited to project development team meetings, liaison with affected agencies, and utility companies. Prepare progress report and schedule, securing permits for all field studies and any other required permits from other agencies. Services shall include but are not limited to: Project kickoff meeting with City staff Preparation of project schedule Monthly coordination meetings Coordination with City departments and outside agencies Progress reporting and budget monitoring Deliverables: Project schedule Monthly progress reports Meeting agendas and summaries C. RECORDS RESEARCH AND EXISTING CONDITIONS Research all information pertinent to the project including, but not limited to existing field condition, as-built plans and record drawings, right-of-way data and all future improvement plans adjacent to or affecting the project site. The selected Consultant shall identify all existing and proposed facilities within the project limits and potential conflicts. Research shall include: Existing roadway plans and as-built drawings Existing traffic signal plans Storm drain maps Utility records Right-of-way maps Pavement management data Previous studies affecting the corridor The Consultant shall identify potential constraints affecting the design. The City has completed a topographic survey for the project corridor and will make the available survey files available to prospective consultants during the proposal period. Proposers shall review the available survey information in preparing their proposals and determine whether supplemental survey or field verification is necessary to complete the design. Any anticipated supplemental survey shall be identified in the proposal and included in the Consultant's fee. Unless specifically identified in the proposal, the City will C ITY OF T USTIN Engineering Design Services for Red Hill AvenueImprovements(CIP No. 70261) –RFP (2026)Page 6 assume the Consultant considers the City-provided survey sufficient to complete the design based on the information reasonably available during the proposal period. The Consultant shall also review the City-prepared preliminary design and AutoCAD files during proposal preparation and include in its proposal any additional effort it believes is necessary to validate, supplement, or refine the preliminary design. Deliverables: Existing conditions memorandum D. WATER QUALITY AND LID The Consultant shall prepare a Water Quality Management Plan (WQMP) in accordance with Orange County MS4 requirements. The Consultant shall: Evaluate Low Impact Development (LID) strategies Perform infiltration feasibility analysis Coordinate with the City regarding BMP selection Prepare any required water quality documentation and incorporate BMP modifications, if required by the proposed improvements. Deliverables: Preliminary WQMP Final WQMP Water quality calculations BMP construction details E. TRAFFIC ENGINEERING Tasks shall include: Signing and striping design Design of new Class II bicycle facilities. Pedestrian crossing improvements. Evaluation of existing traffic signal detection affected by the proposed lane configuration and preparation of modifications necessary to maintain proper signal operation. Preparation of traffic signal modification plans limited to pavement loop detector replacement, relocation, and associated striping revisions, where required. Review and modify signalized intersection pavement markings, stop bars, lane use arrows, bicycle lane transitions, and conflict area markings to ensure consistency with the proposed lane configuration and applicable City and California MUTCD standards. Deliverables: Traffic design plans C ITY OF T USTIN Engineering Design Services for Red Hill AvenueImprovements(CIP No. 70261) –RFP (2026)Page 7 F. ADA COMPLIANCE The Consultant shall review and evaluate Attachment F – Bucknam Report and incorporate appropriate mitigation measures for all identified areas requiring rehabilitation into the project design. Verify field conditions for locations where curb ramp improvements are proposed. G. PRELIMINARY ENGINEERING (30% DESIGN) City-prepared preliminary design documents (approximately 30% complete) for the project, including AutoCAD roadway plan files, topographic survey, preliminary project limits, preliminary pavement rehabilitation recommendations, and preliminary ADA evaluations. The Consultant shall utilize these City-prepared documents as the basis for advancing the design and shall update the AutoCAD files throughout the design process. The Consultant shall perform an independent engineering review of the City's preliminary design and shall not assume the preliminary design is complete or error free. Acceptance or use of the City's preliminary design shall not relieve the Consultant of its professional responsibility for the final design. The Consultant shall validate, refine, supplement, and complete the design as necessary to produce a complete, coordinated, and bid-ready PS&E package. This phase is intended to define the scope, identify constraints, confirm design assumptions, and provide a basis for City review and cost validation. Tasks shall include, but are not limited to: Establishing horizontal and vertical project limits for pavement rehabilitation, including identification of treatment strategies (e.g., grind and overlay, full-depth reclamation, reconstruction). Evaluate the existing roadway cross section and verify existing roadway geometry, including travel lane widths, Class II bicycle lanes, turn lanes, medians, sidewalks, and transition areas. Develop preliminary typical sections and confirm that the proposed lane configuration complies with applicable City standards, the Caltrans Highway Design Manual, and current bicycle facility design guidance. Evaluating the impacts of the proposed lane reconfiguration on intersections, traffic signal detection, signing and striping, utility covers, drainage, bus stops, and driveway access, and incorporating necessary modifications into the design. Evaluating existing transit stop locations and identifying modifications necessary to maintain ADA accessibility and compatibility with the proposed bicycle facilities. Evaluating driveway connections and tie-ins to ensure compatibility with the proposed roadway improvements and ADA requirements. Verifying pavement recommendations, grind limits, reconstruction limits, and localized digouts. Identifying locations requiring ADA improvements in compliance with Americans with Disabilities Act, including curb ramps, detectable warning surfaces, and pedestrian access routes. Preparing conceptual layouts for curb ramp upgrades, including preliminary grading and drainage considerations. C ITY OF T USTIN Engineering Design Services for Red Hill AvenueImprovements(CIP No. 70261) –RFP (2026)Page 8 Incorporating bicycle facility improvements consistent with applicable local and state guidelines, including lane reconfigurations or striping enhancements where feasible (including bike lane extension and green paint treatment). Evaluating bicycle lane transitions at intersections and project termini to provide a safe and continuous bicycle facility. Developing preliminary signing and striping concepts in accordance with California Manual on Uniform Traffic Control Devices. Identifying existing pavement markings requiring removal and developing proposed pavement marking layouts consistent with the new lane configuration. Identifying utility conflicts, drainage issues, and right-of-way constraints based on available information. Evaluating the location of utility covers, pull boxes, and similar appurtenances relative to the proposed travel lanes and bicycle facilities, and identifying adjustments where necessary. Evaluating drainage impacts resulting from roadway modifications and identifying any drainage improvements or adjustments necessary to maintain existing drainage patterns. Coordinating with the City to confirm design criteria, standards, and assumptions. Consultant shall coordinate with all affected utilities and prepare and maintain a Utility Conflict Matrix identifying utility owner, facility, conflict, proposed resolution, responsible party, and anticipated schedule. Provide a brief Basis of Design memorandum summarizing key engineering decisions, assumptions, and rationale (~5 to 10 pages). Identify intersections requiring traffic signal modifications due to pavement rehabilitation, lane reconfiguration, or new bicycle facilities. The evaluation shall include vehicle detection, stop bar locations, lane assignments, signing and striping, and any other traffic signal features affected by the proposed improvements. Plans shall include the following but not limited to: 1. Title Sheet o Project limits o CIP o Funding (placeholder for federal) o Location map (no separate sheet) 2. General Notes + Abbreviations + Legend o Construction notes o Applicable standards (Greenbook, CA MUTCD, City) o Abbreviations & symbols o Measurement/payment notes (if needed) Quantity / Summary Tables 3. Typical Sections o Standard arterial section o Any variation (bike lane, median, transitions) o Keep to 1–2 sheets max C ITY OF T USTIN Engineering Design Services for Red Hill AvenueImprovements(CIP No. 70261) –RFP (2026)Page 9 4. Layout (Plan Sheets) o Up to 10 sheets o Limits of work o Pavement rehab limits (grind/overlay vs reconstruction) o Spot repairs o Utility adjustments (lumped) o Curb ramp locations o Striping removal 5. ADA / Pedestrian Details & construction details Details shall Include: o Curb ramp layouts (dimensioned if needed) o Detectable warning details o Standard details reference o Pavement sections o Utility adjustment details o Minor concrete details o Tie-ins 6. Signing & Striping o Full striping layout o Sign locations + schedule o Legends & notes o Bike lane treatments (green zones) 7. Landscape & Irrigation (IF APPLICABLE) Only if impacted: o Restoration areas o Irrigation adjustments o Controller/line impacts (if any) Deliverables: 30% design plans (PDF format), including: o Title sheet and project layout o Preliminary plan sheets showing limits of work o Typical sections o Demolition and Disposition Plans o Concept striping layout o Bike lane strategy (including green treatment locations) o Detail Sheets Preliminary engineer’s opinion of probable construction cost (with assumptions and contingencies clearly identified) Preparing draft project specifications tailored to the project (conforming to 2024 Green Book Standards). Basis of Design Memorandum C ITY OF T USTIN Engineering Design Services for Red Hill AvenueImprovements(CIP No. 70261) –RFP (2026)Page 10 H. INTERMEDIATE ENGINEERING (60% DESIGN) The Consultant shall refine the design and prepare 60% plans incorporating City review comments and advancing all design elements to a level suitable for detailed review and inter-agency coordination. Tasks shall include, but are not limited to: Incorporating and responding to all City comments from the 30% submittal. Advancing geometric design, including lane configurations, transitions, and tie- ins. Developing detailed curb ramp layouts with grading, spot elevations, and ADA- compliant slopes and landings (if applicable). Refining pavement structural sections based on geotechnical recommendations (if available). Advancing signing and striping plans, including striping layouts, legends, and sign schedules. All known utility conflicts shall be resolved in the design or clearly accounted for in the plans and specifications. Coordinating with utility providers to address potential conflicts. Developing preliminary traffic control concepts for construction staging. The Consultant shall NOT prepare Traffic Control Plans; however, the Consultant shall: o Define construction constraints (lane closure limitations, hours, sequencing assumptions) o Identify critical staging considerations impacting design o Provide sufficient notes/specifications for contractor-prepared TCP Advancing drainage considerations, including identification of necessary improvements or adjustments. Performing internal quality control review prior to submittal. Complete the design of all required traffic signal modifications associated with the roadway improvements, including updates to vehicle detection, pavement markings, signal plans, and related appurtenances necessary to maintain proper traffic signal operation. Deliverables: 60% design plans (PDF format), including: o Updated plan sheets with refined design details o ADA curb ramp detail sheets (if applicable) o Developed striping plans with lane configurations o Preliminary sign locations Updated engineer’s opinion of probable construction cost Comment response matrix addressing 30% review comments Advancing draft project specifications based on comments provided and/or towards final version (conforming to 2024 Green Book Standards). Consultant shall define design intent and constraints but shall not dictate contractor means and methods unless necessary for public safety or project performance. C ITY OF T USTIN Engineering Design Services for Red Hill AvenueImprovements(CIP No. 70261) –RFP (2026)Page 11 Bid items shall be clearly measurable and constructable, consistent with plan callouts and specifications, and free of overlap or double payment potential. Utility Conflict Matrix (updated) I. FINAL PLANS, SPECIFICATIONS AND ESTIMATE (PS&E) The Consultant shall prepare complete, bid-ready Plans, Specifications, and Estimate (PS&E) documents suitable for advertisement and construction. 90% Submittal The 90% submittal shall represent a near-final set of documents suitable for comprehensive City review. No new design elements, scope changes, or major revisions shall be introduced at the 90% submittal unless specifically requested by the City. Tasks shall include: Incorporating all previous comments and finalizing design elements. Completing all plan details, notes, and callouts. Finalizing quantity calculations and construction bid item breakdowns. Conducting a formal internal QA/QC review and documenting the process. Finalizing project specifications (conforming to 2024 Green Book Standards). Deliverables: 90% plans (PDF format) Finalized project specifications (conforming to 2024 Green Book Standards) with bid definition clearly defined Engineer’s opinion of probable construction cost (including breakdown of all lump sum bid items) Detailed quantity calculations (in spreadsheet format) QA/QC documentation and checklist Fully dimensioned striping plans Complete sign schedule All markings tied to stationing or limits 100% Submittal (Final PS&E) The Consultant shall incorporate all final City comments and deliver signed, sealed, and complete PS&E documents. Tasks shall include: Addressing all 90% review comments to the City’s satisfaction. Finalizing all contract documents for bidding and construction. Ensuring consistency between plans, specifications, and estimate. Deliverables: Signed and sealed final plans (PDF and native format) C ITY OF T USTIN Engineering Design Services for Red Hill AvenueImprovements(CIP No. 70261) –RFP (2026)Page 12 Final project specifications (conforming to 2024 Green Book Standards). Final engineer’s opinion of probable construction cost Final quantity calculations Final bid schedule Final, bid-ready signing and striping plans A complete PS&E package shall be considered acceptable when: No major scope gaps identified during bid phase Less than 10 RFIs related to design ambiguity No conflicting bid items vs plans/specs Quantities independently reproducible within ±5% Constructability issues minimized (no major redesign during construction) Applicable Standards and Requirements All work shall conform to the latest editions of the following, as applicable: City of Tustin design standards, specifications, and standard plans Standard Specifications for Public Works Construction California Manual on Uniform Traffic Control Devices Americans with Disabilities Act and current accessibility guidelines J. CONSTRUCTABILITY REVIEW The Consultant shall conduct a formal constructability review required at 60% and refined at 90%. The review shall evaluate: Construction staging Traffic control impacts Utility conflicts Construction sequencing Contractor access Deliverables: Constructability Review Memorandum K. DESIGN QUALITY ASSURANCE / QUALITY CONTROL The Consultant shall implement a Design Quality Management Plan (DQMP). Internal reviews shall include: Independent design check Quantity verification Utility coordination verification ADA compliance verification Constructability review C ITY OF T USTIN Engineering Design Services for Red Hill AvenueImprovements(CIP No. 70261) –RFP (2026)Page 13 At the 60% and 90% milestones, the Consultant shall submit a QA/QC Certification Package including: 1. QA/QC checklist 2. Independent design check certification 3. Constructability review memorandum 4. Quantity verification documentation 5. Utility conflict verification L. BID SUPPORT Consultant shall assist during bid advertisement. Tasks include: Responding to contractor RFIs Preparing addenda if necessary Attending pre-bid meeting if requested M. CONSTRUCTION SUPPORT Consultant shall provide limited support during construction. Tasks include: Attend preconstruction meeting Respond to RFIs Review shop drawings and substitution requests related to the design Assist with design clarifications N. RECORD DRAWINGS Upon completion of construction, the Consultant shall prepare record drawings based on field-marked plans. Deliverables: As-built drawings in AutoCAD Final PDF plan set O. DESIGN RESPONSIBILITY The Consultant shall be responsible for the accuracy and completeness of all plans, specifications, estimates, and supporting documents prepared under this Agreement. Consultant shall deliver a clean, advertisement-ready package: Plans (PDF + CAD) Specifications (Word + PDF) Bid schedule (Excel) Engineer’s estimate Quantity backup C ITY OF T USTIN Engineering Design Services for Red Hill AvenueImprovements(CIP No. 70261) –RFP (2026)Page 14 Plans shall include: Title Sheet General Notes / Abbreviations / Legend / Quantity / Summary Tables Typical Sections Utility Adjustment Summary + disposition info Layout (Plan Sheets) ADA / Pedestrian Details / Construction Details Signing & Striping Landscape & Irrigation (if needed) Specs WQMP / Water Quality (if applicable) The Consultant shall correct, at no additional cost to the City, any errors, omissions, or deficiencies in the design documents identified during the design, bidding, or construction phases. Corrections shall be completed promptly to avoid delays to the project. DESIGN PS&E SCHEDULE Task ResponsibilityTargetNotes NPT City Oct 2026 30% Design Consultant March 2027 Substantial PS&E 60% PS&E ROW Certification City/Consultant/Caltrans ROW Sep 2027 (ROW Check-In #1)with Caltrans 90% PS&E Substantially City/Consultant/Caltrans ROW Dec 2027 (ROW Check-In #2)Complete PS&E Final PS&E City June 2028 Final PS&E P. CLIENT PROVIDED DOCUMENTS AND INFORMATION The City will provide available documents and information in its possession for the Consultant’s use, including but not limited to: Existing topographic survey data AutoCAD Civil 3D survey files City-prepared 30% roadway plan files Available record drawings, as-built plans, right-of-way information, utility records, traffic signal plans City standard specifications template Available project background information needed to support NEPA, E-76, and right-of-way certification. C ITY OF T USTIN Engineering Design Services for Red Hill AvenueImprovements(CIP No. 70261) –RFP (2026)Page 15 The City will retain responsibility for NEPA clearance, federal authorization, and right-of- way certification coordination with Caltrans. The Consultant shall provide supporting design documentation necessary for the City to complete those processes. Q. ROW CERTIFICATION SUPPORT The City will be responsible for ROW Certification and coordination with Caltrans. The Consultant shall support the City’s ROW Certification process by providing accurate and complete design information at the 60% milestone to allow the City to initiate ROW certification. At a minimum, the Consultant shall ensure the following at 60%: o All improvements are clearly shown within existing right-of-way limits o No permanent or temporary right-of-way impacts are introduced without prior City approval o Utility conflicts are identified and reflected in the plans o ADA improvements are fully depicted within existing right-of-way o Design limits and tie-ins are clearly defined o The 60% submittal shall be considered incomplete if the information necessary for the City to initiate ROW certification is not adequately provided. o The project is anticipated to be constructed entirely within existing right-of- way. Any proposed deviation from this assumption must be identified by the Consultant at the 30% design stage. V. PROPOSAL REQUIREMENTS Although the City requires no specific format, this section is intended to provide guidelines to the consultant regarding features that the City will look for and expect to be included in the proposal. A. CONTENT & FORMAT The City requests that proposals submitted be organized and presented in a neat and logical format and are relevant to these services. Consultant’s proposals shall be clear, accurate, and comprehensive. Excessive or irrelevant material will not be favorably received. The Proposal shall be limited to a maximum of 15 double-sided pages (excluding front and back covers, section dividers and attachments such as resumes, forms). Font size shall be minimum 11-point Arial. Proposal exhibits shall be maximum 11” x 17”. The purpose of these restrictions is to minimize the costs of proposal preparation and to ensure that the response to the RFP is fully relevant to the project. The proposal should include the following: Page numbering, Approach and understanding of the work to be performed, C ITY OF T USTIN Engineering Design Services for Red Hill AvenueImprovements(CIP No. 70261) –RFP (2026)Page 16 Team Organization including an organization diagram and time commitment of key staff, Statement of Qualifications including descriptions of similar projects by key staff to be assigned during the term of the contract, Brief resumes of key staff, Schedule of Hourly Rates and fees uploaded as a separate file from the main proposal in OpenGov, Three references of agencies previously contracted with, providing the same or similar services. B. APPROACH A description of the firm’s approach and work program to meet the City’s objectives shall be included. It should explain the technical approach, methodology, and specific tasks and activities that will be performed to address the specific issues and work items. Consultants should clearly identify any assumptions regarding the City- prepared preliminary design, survey, or existing information that materially affect their proposed scope or fee. Information shall include: Progress Reporting: Consultant will supervise, coordinate, monitor and review the project for conformance with standards, policies, and procedures. Monthly progress reports will also be provided to document the progress of the project. Progress reports must align with invoices. The City may reject invoices not supported by an acceptable progress report. Failure to provide an acceptable progress report may result in delayed or withheld payment. Progress report should include: o Work completed by task o Percentage complete by task vs. budget o Updated schedule with critical path o Budget status (hours used vs. planned) o Upcoming work (next 30 days) o Issues / risks impacting scope, schedule, or budget Project Controls: Consultant shall prepare a detailed project schedule (MS Project or equivalent) within 2 weeks of Notice to Proceed. The schedule shall identify all tasks, milestones, and critical path and shall be updated monthly throughout the project duration. Describe the firm’s ability to control costs and provide accurate and timely invoices through internal control measures; to monitor and stay within budget; to monitor schedule and review times and describe the techniques used to complete projects within the proposed time frames. Proposal Certifications a. Non-Collusion Affidavit (Attachment B) b. Non-Lobbying Certification (Attachment C) C ITY OF T USTIN Engineering Design Services for Red Hill AvenueImprovements(CIP No. 70261) –RFP (2026)Page 17 c. Non-Discrimination Certification (Attachment D) d. Debarment and Suspension Certification (Attachment E) Quality Assurance/Quality Control (QA/QC): Describe the firm’s QA/QC processes that will be adhered to during the term of the agreement. Consultant must implement and maintain QA/QC procedures to ensure project’s products accuracy, and to ensure that the City's quality goals are met. Consultant shall perform a formal constructability review at the 90% design stage and provide written certification that plans are coordinated and buildable. Subconsultant Control: All subconsultants shall be identified in proposal. City written approval will be required for any changes Implementation Phase: A project kickoff meeting will be conducted within 2-3 weeks of Notice to Proceed to confirm the Scope of Services and design parameters. Status meetings will be conducted throughout the duration of the project to track the overall project and facilitate the flow of information between the City and consultant. Deliverables Matrix: the proposal shall include a deliverables matrix that identifies: o All anticipated deliverables by task o Submittal milestones: 30%, 60%, 90% and 100%. o Format (PDF, CAD, Word, etc…) o Responsible team member C. TEAM ORGANIZATION The purpose of this section is to describe the organization of the project team including subconsultants and key staff. A project manager and an alternate project manager who will be the prime contact and be responsible for coordinating all activities with the City should be included. An organization diagram shall be submitted showing all key team members and illustrating the relationship between the City, the project manager, key staff, and subconsultants. There also should be a brief description of the role and responsibilities of all key staff and subconsultants identified in the team organization also should be included. D. STATEMENT OF QUALIFICATIONS The information provided in this section should describe the qualifications of the firm and key staff in performing projects within the past five years that are similar in scope and size to demonstrate competence to perform these services. The projects listed should be those that the key staff named for this project were responsible for performing. Information shall include: C ITY OF T USTIN Engineering Design Services for Red Hill AvenueImprovements(CIP No. 70261) –RFP (2026)Page 18 Names of key staff that participated on named projects and their specific responsibilities. The client’s name, contact person, addresses, and telephone numbers. A brief description of type and extent of services provided. Completion dates (estimated, if not yet completed). Total costs of the projects. There should be included in the section brief resumes of key personnel who will provide these services demonstrating their qualifications and experience. Resumes should highlight education, relevant experience, licenses, and specific responsibilities for services described. E. FEDERAL FUNDING REQUIREMENTS Failure to comply to the following guidelines may result in termination and/or ineligibility for federal reimbursement. 1. Federal Aid Contract Provisions: Proposers are advised that this project is federally funded and they shall comply with all federal requirements in the Agreement, including but not limited to 2 CFR Part 200 (Uniform Guidance), NEPA support documentation, Audit cooperation (Caltrans, FHWA, etc..). 2. Caltrans Attachments: Please reference Caltrans Local Assistance Procedure Manual, Consultant Selection, Chapter 10, for further instructions and guidelines pertaining to the completion of these forms:https://dot.ca.gov/-/media/dot- media/programs/local-assistance/documents/lapm/ch10.pdf F. FEE PROPOSAL Compensation for services provided shall be based upon the consultant’s detailed fee proposal to furnish the services detailed in their proposal. A Fee Proposal shall be submitted in a separate file from the main proposal in OpenGov. A work program together with a breakdown of labor hours by employee billing classification together with the cost of non-labor and subconsultant services shall be included with the fee proposal. The labor breakdown shall be compiled based upon a listing of work tasks that correlates with the consultant’s defined scope of work for the project proposal. This information will be used by the City staff to evaluate the reasonableness of the fee proposal and may be used in negotiating the final fee amounts for the contract agreement. Fees will not be used to determine the ranking of the consultants. C ITY OF T USTIN Engineering Design Services for Red Hill AvenueImprovements(CIP No. 70261) –RFP (2026)Page 19 The City will negotiate the final fee with the top ranked consultant. Reimbursable expenses shall not be allowed unless negotiated prior to a contract. Price escalations during the contract term are disfavored and will not be allowed unless negotiated prior to execution of contract. Although no public meetings are anticipated, the fee proposal shall include a unit cost for a public meeting (eg, $/public meeting) in the event a meeting will be required. The consultant shall prepare progress billings, reflective of the project schedule and the scope of work completed, by line item and description. G. ASSUMPTIONS AND EXCEPTIONS The proposal shall clearly identify any assumptions, exclusions, or exceptions to the Scope of Work, schedule, Consultant Services Agreement, or requirements of this RFP. If no assumptions or exceptions are taken, the proposal shall include a statement to that effect. The City reserves the right to accept, reject, or negotiate any proposed assumptions or exceptions. Undisclosed assumptions may not be considered during contract negotiation. Assumptions or exceptions that materially affect scope, schedule, or cost may result in reduced evaluation scoring. H. STATEMENT OF OFFER & SIGNATURE The Proposal shall contain a statement that the proposals are a firm offer for a 90-day period and signed by an individual authorized to act on behalf of the firm. VI. GENERAL REQUIREMENTS A. INSURANCE REQUIREMENTS The consultant shall furnish proof of the required insurance coverage prior to execution of the agreement. If the proposer is unable or unwilling to comply with any of the insurance requirements set forth in this RFP, the proposer shall clearly identify the specific exception and provide a proposed alternative for the City's consideration. The minimum insurance coverage and limits set forth herein shall be maintained for the duration of the project unless otherwise approved in writing by the City. These minimum levels of coverage are required to be maintained for the duration of the project: 1. General Liability and Automobile Liability Coverage - $1,000,000 per occurrence for bodily injury and property damage. If Commercial General Liability Insurance or other form with a general limit is used, either the general aggregate limit shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit. C ITY OF T USTIN Engineering Design Services for Red Hill AvenueImprovements(CIP No. 70261) –RFP (2026)Page 20 2. Professional Liability Coverage - $1,000,000 per occurrence (note: A “claims made” policy is acceptable).If consultant provides “claims made” coverage, consultant shall also agree in writing to either: a. Purchase Tail Insurance in the amount required by the resulting agreement to cover claims made within five years of completion of consultant’s services under the agreement. b. Maintain professional liability insurance coverage with the same carrier, or with an equivalent carrier in the amount required by the resulting agreement five years after completion of consultant’s services under this agreement. The consultant shall provide written evidence of either form by executing the attached letter agreement (Attachment B) on consultant letterhead. 3. Worker’s Compensation Coverage -State statutory limits. Deductibles, Self-Insurance Retentions, or Similar Forms of Coverage Limitations or Modifications, must be declared to and approved by the City of Tustin. The consultant is encouraged to contact its insurance carriers during the proposal stage to ensure that the insurance requirements can be met if selected for negotiation of a contract agreement. The City shall be named as Additional Insured and no policy may be modified or cancelled prior to thirty (30) days written notice. Certificates of insurance and insurer endorsements evidencing the required insurance shall be provided. B. STANDARD FORM OF AGREEMENT The consultant will enter into an agreement with the City based upon the contents of the RFP and the consultant’s proposal. The City’s standard form of agreement is included as Attachment A. The consultant shall carefully review the agreement and insurance requirements and include with the proposal a description of any exceptions requested to the standard contract. If there are no exceptions, a statement to that effect shall be included in the proposal. C. DISCLAIMER This RFP does not commit the City to award a contract, or to pay any costs incurred in the preparation of the proposal. The City reserves the right to extend the due date for the proposal, to accept or reject any or all proposals received as a result of this request, to negotiate with any qualified consultant, or to cancel this RFP in part or in its entirety. The City may require the selected consultant to participate in negotiations C ITY OF T USTIN Engineering Design Services for Red Hill AvenueImprovements(CIP No. 70261) –RFP (2026)Page 21 and to submit such technical, fee, or other revisions of their proposals as may result from negotiations. D. ASSIGNED REPRESENTATIVES The City will assign a representative responsible to administer the contract, and to assist the consultant in obtaining information. The consultant also shall assign a responsible representative (project manager) and an alternate, who shall be identified in the proposal. The consultant’s representative will remain in responsible charge of the consultant’s duties from the notice-to-proceed through project completion. If the consultant’s primary representative should be unable to continue with the project, then the alternative representative identified in the proposal shall become the project manager. The City’s representative shall first approve any substitution of representatives or subconsultants identified in the proposal in writing. The City reserves the right to review and approve/disapprove all key staff and subconsultant substitution or removal and may consider such changes not approved to be a breach of contract. E. CITY BUSINESS LICENSE A city business license will be required of the consultant and any subconsultants for services under this agreement. VII. CONSULTANT EVALUATION & SELECTION PROCESS The City’s consultant evaluation and selection process is based upon Qualifications Based Selection (QBS) for professional services. The following criteria will be used in evaluating the proposals using a point value system (100 points) based upon the weighting indicated below: a. Qualification and Experience of Firm (20 points) Evaluation may include, but is not limited to: Demonstrated experience with similar projects in scope, complexity, and funding source; Successful delivery of projects for public agencies; Familiarity with applicable City, Caltrans, OCTA, or other agency requirements; Availability of in-house resources necessary to complete the work. b. Approach and Work Plan (including project controls and QA/QC processes) (30 points) Evaluation may include, but is not limited to: Demonstrated understanding of the project objectives and challenges; Completeness and practicality of the proposed work plan and methodology; Effectiveness of project controls, including schedule management, progress reporting, and coordination procedures; Adequacy of the consultant's quality assurance and quality control processes; C ITY OF T USTIN Engineering Design Services for Red Hill AvenueImprovements(CIP No. 70261) –RFP (2026)Page 22 Identification of assumptions, constraints, and proposed strategies to address project risks. c. Qualifications and Experience of the project manager and other key individuals (30 points) Evaluation may include, but is not limited to: Relevant experience and technical expertise of the proposed project manager and key staff; Successful delivery of similar projects; Demonstrated ability to manage scope, schedule, budget, and stakeholder coordination; Appropriateness of staff assignments and level of involvement in the project. d. Schedule of Delivery (10 points) Evaluation may include, but is not limited to: Reasonableness and completeness of the proposed schedule; Ability to meet the City's desired project timeline; Identification of critical milestones and strategies to address potential schedule impacts. e. Reference Checks (10 points) Evaluation may include, but is not limited to: Overall satisfaction of previous clients; Quality and timeliness of work performed; Responsiveness and communication throughout the project; Ability to manage scope, schedule, and budget; Willingness of the reference agency to work with the consultant again. The City may elect to interview a short list of qualified firms or to interview only the top-rated firm based upon the proposals submitted for the project. The City staff will negotiate a contract with the best qualified firm for the desired consulting services. Should the City staff be unable to negotiate a satisfactory contract with the firm considered to be the most qualified, negotiations with that firm shall be formally terminated. Negotiations will then be undertaken with the next most qualified firm. Failing accord with the second most qualified firm, the City staff will terminate negotiations and continue the negotiation process with the next most qualified firms in order of their evaluation ranking until an agreement is reached and a firm is selected and an agreement is executed. Additional information related to the consultant selection process will be made available in the future once the City has executed this contract. Please refrain from making any verbal inquires or requests for a formal debriefing related to the subject RFP until the City of Tustin completes the ongoing contract process. VIII. ADMINISTRATIVE / CONTRACT REQUIREMENTS A. THE CITY OF TUSTIN’S RIGHTS TO PROPOSALS All proposals, upon submission to the City of Tustin shall become its property for use as deemed appropriate. By submitting a proposal, the offer covenants not to make any C ITY OF T USTIN Engineering Design Services for Red Hill AvenueImprovements(CIP No. 70261) –RFP (2026)Page 23 claim for or have any right to damages because of any misinterpretation or misunderstanding of the specification, or because of any misinformation or lack of information. The City of Tustin has the following prerogatives with regard to proposals submitted: to accept or reject any or all proposals; to correct any arithmetic errors in any or all proposals submitted; to utilize any or all the ideas from proposals submitted; to change the proposal’s due date upon appropriate notification; to adopt any or all of an offeror’s proposal; and to negotiate modifications to the scope and fee with selected offeror prior to contract award. p p p p ATTACHMENT 1 BIDDERS QUESTIONS AND ANSWERS ENGINEERING DESIGN SERVICES FOR RED HILL AVENUE REHABILITATION (CIP NO. 70261) Q1 - Can the City please confirm whether the page limit is 15 pages total, or 15 double sided pages (30 total pages)? A - 30 total pages. Q2 - Has a DBE participation goal been established for this procurement? A - DBE goal is currently suspended and not required for this project. Q3 - Section V. E.1. identifies the Project is Federally Funded. Will you identify the funding mechanism? Section V.E.2, references Caltrans LAPM - What Caltrans forms are required for the Proposal? Is the Cost Proposal required to be prepared using Exhibit 10-H1? A - The project is anticipated to utilize Federal Surface Transportation Block Grant (STBG) funding administered through Caltrans Local Assistance. Consultants shall comply with applicable federal and Caltrans Local Assistance requirements. The Cost Proposal shall be submitted as a separate file in OpenGov using Caltrans Local Assistance Exhibit 10-H or Exhibit 10-H1, as applicable. The Cost Proposal will not be considered during the qualifications-based evaluation and will only be used during fee negotiations with the highest-ranked consultant. Other Caltrans contract execution forms will be required from the selected consultant after selection, as applicable. Q4 - Is there a DBE % requirement for the Project? A - DBE goal is currently suspended and not required for this project. Q5 - Are any Caltrans forms required to be submitted with the consultant's proposal? A - The Cost Proposal shall be submitted as a separate file in OpenGov using Caltrans Local Assistance Exhibit 10-H or Exhibit 10-H1, as applicable. The Cost Proposal will not be considered during the qualifications-based evaluation and will only be used during fee negotiations with the highest-ranked consultant. Other Caltrans contract execution forms will be required from the selected consultant after selection, as applicable. Q6 - Are Certificates of Insurance required to be submitted with the consultant's proposal? A - No. Certificates of Insurance are not required with the proposal. The selected consultant shall provide evidence of the required insurance coverage prior to execution of the Consultant Services Agreement, as specified in Section VI of the RFP. Q7 - Can the City please provide the following files missing from the 30% Plan Set Drawings: - Plan Sheet - CL and Parcel Redhill Rehab - CL RW Red Hill South/Topo - Red Hill Rehab/Topo - Red Hill South A - The City has reviewed the request and will upload the available files to OpenGov via addendum for all prospective consultants. Q8 - What is the City's budget for this project? A - The City has established sufficient funding for the design services. Consultant selection will be conducted using Qualifications-Based Selection (QBS). Fee proposals will not be used to rank consultants and will be evaluated only during negotiations with the highest-ranked firm. Q9 - Can font within graphics, captions, and sidebars be smaller than 11 pt font if reasonably legible. A - Yes Q10 - How recent is the survey information that is in the existing topographic survey data and AutoCAD Civil 3D survey files that the City will provide for the Consultant's use? A - The topographic survey was completed in the past six years or so and represents the most current survey information available to the City. The survey files provided are intended to support completion of the final PS&E. As stated in the RFP, consultants are expected to review the available survey information during proposal preparation and include any anticipated supplemental survey or field verification in their proposal, if deemed necessary. Q11 - The RFP states that City-prepared preliminary design documents include preliminary pavement rehabilitation recommendations. Does the City anticipate that consultants will include geotechnical and pavement investigation services for this project? A - The Consultant shall include pavement engineering services necessary to evaluate existing pavement conditions and recommend the final pavement rehabilitation strategy. The City has not completed a final geotechnical/pavement investigation for this project. If the Consultant determines additional pavement investigation or geotechnical work is necessary to support the final design, such services shall be included in the proposal. Q12 - Please provide all plan sheet-referenced files (e.g., topographic survey, X_Topo_Red Hill_South.dwg) so that we may adequately determine how much additional topographic survey will be needed for the proposed improvements. A - The City will upload all available referenced files through OpenGov via addendum. Q13 - The Bucknam report includes locations outside the project limits. Should the scope of work include areas outside the project limits (Sycamore to Bryan)? A - The design scope is limited to the project limits between Bryan Avenue and Sycamore Avenue. The Bucknam Report is provided as reference information. Only deficiencies located within the project limits are intended to be incorporated into the project unless otherwise directed by the City. Q14 - Please confirm whether a pavement/geotechnical investigation is to be provided by the Consultant as part of the scope of work, or if the City will provide a geotechnical report. A - The City has not prepared a final geotechnical report for this project. The Consultant shall include any pavement engineering and geotechnical services necessary to support the recommended pavement rehabilitation design and final PS&E. Q15 - The 30% plans generally indicate a pavement rehabilitation method of cold milling. Are Consultants expected to independently assess pavement conditions and identify the recommended pavement rehabilitation along the corridor? A - The City's preliminary recommendations included in the 30% design are provided as a starting point for design. The Consultant shall independently evaluate the existing pavement conditions, review the City's preliminary recommendations, and recommend the final pavement rehabilitation strategy as part of the design. Q16 - Please confirm that the required traffic signal modification plans are limited to loop detector replacement and relocation, or if additional upgrades and modifications may be required to complement the lane reconfigurations. A - Traffic signal modifications are anticipated to be limited to vehicle detection adjustments (including loop detector replacement or relocation, where required) necessary to accommodate the proposed roadway improvements. No signal timing, controller, or operational upgrades are currently anticipated. Q17 - Please confirm that the six-lane divided roadway configuration is to be maintained and that the addition of Class II bike lanes is to be accommodated within the existing roadway cross- section using narrowed travel lanes consistent with the recommendations in the Red Hill Avenue Specific Plan. A - Correct. The existing six-lane divided roadway configuration is anticipated to remain. The proposed Class II bicycle lanes are expected to be accommodated within the existing roadway width through lane reconfiguration, including evaluation of raised center median narrowing where appropriate. Final lane configurations will be confirmed during design. Q18 - Please confirm whether Consultants should prepare the cost proposal using the Caltrans LAPM Exhibit 10-H cost proposal format, incorporating the audited Indirect Cost Rate (ICR). A - The Cost Proposal shall be prepared using Caltrans Local Assistance Exhibit 10-H or Exhibit 10-H1, as applicable, including the Consultant's audited Indirect Cost Rate (ICR), if applicable. The Cost Proposal shall be submitted separately from the Technical Proposal in OpenGov and will not be used during the qualifications-based evaluation. It will only be reviewed during fee negotiations with the highest-ranked consultant. Q19 - The RFP assumes construction will occur entirely within the existing right-of-way. If ADA ramp or driveway retrofits, or other elements, cannot fit within the existing right-of-way, is right-of-way acquisition and/or temporary construction easements (TCEs) a City responsibility and outside the Consultant's scope? A - No. The project is intended to be designed and constructed entirely within the existing public right-of-way. The Consultant shall prepare the design to avoid the need for permanent right-of- way acquisition or Temporary Construction Easements (TCEs). If the Consultant identifies a location where improvements cannot reasonably be accommodated within the existing public right-of-way, the Consultant shall promptly notify the City and evaluate alternative design solutions to remain within the existing right-of-way. Acquisition of additional right-of-way or TCEs is not anticipated as part of this project. Q20 - So that fees are comparable across proposers, can the City specify assumptions for bid and construction support (e.g., number of RFIs, submittals/shop drawing reviews, construction duration, and meetings), or should these be carried as budget allowances? A - Consultants shall propose the level of effort they determine appropriate based on the scope of services described in the RFP and their professional judgment. Construction support services shall be based on the anticipated scope identified in the RFP. The City will evaluate the proposed scope and negotiate a final level of effort with the highest-ranked consultant, if necessary. Q21 - Since proposals are to be submitted electronically via OpenGov, please confirm how the 15 double-sided page limit will be applied. Specifically, should the limit be interpreted as 30 PDF pages (excluding front and back covers, section dividers, resumes, and forms), and does each 11" x 17" exhibit count as one page or two pages? In addition, please confirm whether the required organization chart, deliverables matrix, and project schedule are included in the page limit. A - Proposal should be limited to a max of 30 pages. The cover letter, table of contents, front and back covers, and section dividers are excluded from the page count. All project qualifications should be included in the main body of the proposal. 11x17 exhibit counts as one page. Q22 - Please provide the referenced Letter Agreement (Attachment B) associated with professional liability coverage. A - The reference to "Attachment B" is incorrect. The RFP is hereby revised to remove the reference to Attachment B. If the selected consultant provides claims-made professional liability coverage, written evidence of compliance with the insurance requirement shall be submitted on the Consultant's letterhead prior to execution of the Consultant Services Agreement. PREPARED FOR THE CITY OF TUSTIN August 24, 2026 PROPOSAL TO PROVIDE Engineering Design 4675 MacArthur Court, Suite 400 Services for Red Hill Newport Beach, CA 92660 Avenue Rehabilitation between Sycamore Avenue and www.bkf.com Bryan Avenue (CIP No. 70261) Proposal No. P26001496-001 FIRM DETAILS August 24, 2026 Legal Name BKF Engineers City of Tustin Firm Ownership Type Attn: Kyra Tao, Principal Transportation Engineer C-Corporation 300 Centennial Way Tustin, CA 92780 Year Firm Established 1915 RE:Proposal for Engineering Design Services for Red Hill Avenue California Department of Improvements (CIP No. 70261) - RFP (2026) Industrial Relations (DIR) No. 1000002096 Dear Ms. Tao, BKF Engineers (BKF) is pleased to submit our proposal to provide professional 4675 MacArthur Court engineering design services for the Red Hill Avenue Road Rehabilitation Project Suite 400 from Sycamore Avenue to Bryan Avenue. We understand the City of Tustin (City) Newport Beach, CA 92660 949.526.8460 Project Manager arterial corridor rehabilitation project. Roger Chung, PE, QSD/P, CFM, ENV SP, F.ASCE BKF brings extensive experience delivering roadway rehabilitation and complete 949.526.8457 streets projects across California, with a strong focus on high-quality, constructible rchung@bkf.com Americans with Disabilities Act (ADA) curb ramp upgrades, multimodal Authorized Signature Sheila Amparo, PE improvements, utility coordination, and Caltrans permitting—all key elements Principal-in-Charge of this project. 949.526.8478 samparo@bkf.com rigorous QA/QC to ensure a clear, coordinated, and advertisement-ready deliverable. Statements This proposal constitutes a and design quality, supporting successful delivery with minimal Requests for Information (RFIs) and streamlined construction. on behalf of BKF Engineers. BKF is able to meet the Sincerely, BKF Engineers upon request. Addendum Acknowledgment » Sheila Amparo, PE Roger Chung, PE, QSD/P, CFM, ENV SP, F.ASCE Principal-in-Charge Project Manager • PLANNING • ENGINEERING • CONSTRUCTION MANAGEMENT • SURVEYING 2 CONTENTSCONTENTS SECTION 1. Firm Overview 4 SECTION 2. Executive Summary and Understanding 5 SECTION 3. Project Controls and Methods 12 SECTION 4. Schedule 14 SECTION 5. Scope of Work 15 SECTION 6. Team Organization 20 SECTION 7. 26 SECTION 8. References 30 SECTION 9. Assumptions and Exceptions 30 APPENDIX A. Resumes A-1 APPENDIX B. Required Forms B-1 City of Tustin, Red Hill Avenue Rehabilitation | 3 01 SECTION 1. Firm Overview BKF FIRM PROFILE Since 1915, BKF has been a trusted leader in engineering, planning, surveying, and construction management services across the Western United States. With spanning the transportation, water, government, and land development markets. Our transportation team is committed to designing and delivering innovative and resilient transportation infrastructure, through all project phases, that enhances 850+ mobility, safety, and quality of life. EMPLOYEES access, and system performance across all modes of travel. Our work includes neighborhood streets, urban corridors, active transportation facilities, transit and rail interfaces, airport related facilities, highways, bridges, parking structures, and supporting infrastructure tied to land development and public facilities. We FOUNDED IN deliver projects through all phases, from planning and design to construction, with a clear understanding of funding requirements, regulatory processes, 1915 constructability, and long-term operations and maintenance needs. BKF brings extensive experience navigating complex regulatory, environmental, and funding environments. Our teams regularly coordinate with Caltrans, other state and local departments of transportation, local jurisdictions, counties, Self Help Counties, regional transportation agencies, and rail operators to support permitting, approvals, and funding authorizations that move projects forward. 200 Services PROFESSIONAL ENGINEERS AND » Transportation Planning and Early » SURVEYORS Project DevelopmentIntelligent Transportation Systems (ITS) » Grant Strategy and Funding Administration» » Environmental Compliance Handling Design and Documentation» Design Surveys, Right of Way Engineering, » Local Assistance Procedures and and Mapping Funding Authorization» Construction Staking and » Caltrans Coordination and Permit SupportAsset Management » Project Development and Delivery including » Utility Locating, Coordination, and 20 OFFICE » Encroachment Permits» Program and Project Management LOCATIONS » Federal Aid Compliance and Audit Support» Construction Management and » Buellton » Salinas » Pavement Rehabilitation and MaintenanceContract Administration » Modesto » San Diego » ADA and PROWAG » Resident Engineering and Inspection » Newport » San Francisco Beach » San Jose Accessibility Improvements» Constructability Review and » Oakland » San Luis » Complete Streets and Active TransportationIssue Resolution » Pleasanton Obispo » Bridge And Structural Engineering for » Environmental Construction Monitoring » Portland» San Rafael » Redwood City » Santa Barbara Transportation Infrastructure» Labor Compliance » Riverside » Santa Rosa » Grade Separations, Rail, Transit, and » SWPPP Compliance and Inspection » Roseville » Thousand Oaks Freight Systems(QSP/QSD) » Sacramento » Walnut Creek City of Tustin, Red Hill Avenue Rehabilitation | 4 02 SECTION 2. Executive Summary and Understanding appurtenances observed within the project area Project Understanding include catch basins, streetlights, manholes, valves, The City plans to add new Class II bike lanes and and utility vaults. Existing bus stops were also noted rehabilitate the existing pavement along Red Hill throughout the project corridor. Avenue from Sycamore Avenue to Bryan Avenue Proposed Project Improvements consultant to provide comprehensive design and We understand the primary purpose of the project construction support services associated with these is to rehabilitate the existing pavement and provide improvements. The design phase is anticipated to Class II bike lanes throughout the project limits. take place from October 2026 to June 2028, with Additional improvements are anticipated to include: construction likely beginning in the summer of 2028. » Reconstructing existing curb ramps to Existing Conditions be ADA-compliant; Red Hill Avenue from Sycamore Avenue to Bryan » Reconstructing damaged concrete curbs, gutters, Avenue is designated as a Major Arterial per the City sidewalk, and driveways; » Adjusting utilities and replacing damaged utility boxes, as needed; and The roadway consists of six travel lanes and a mix of raised and striped medians, and crosses » Interstate 5 Freeway (I-5). Surrounding land uses are mainly residential and commercial, and the The improvements will need to be permitted through posted speed limit is 40 mph. On-street parking is Caltrans, and we will support the City with all federal not allowed throughout most of the project limits and funding requirements. the only existing bike lanes are near the freeway. Based on the RFP, the project delivery milestones are as follows: between Sycamore Avenue and Walnut Avenue » Preliminary Engineering (30% Design): and between San Juan Street and Bryan Avenue appears to be in “good” to “fair” condition, which is Existing Conditions Memorandum, initial utility Management Plan (PMP) indicating Pavement report, Basis of Design Memorandum, 30% Condition Index (PCI) ratings of between 87 and 100. The existing pavement between Walnut Avenue and San Juan Street appears to be in “fair” to “poor” » Intermediate Engineering (60% Design): 60% condition, which is also consistent with the PMP with PCI ratings between 74 and 59. constructability review » Final PS&E (90% Design): The existing curb, gutter, and sidewalk improvements appear to be in poor condition with Caltrans permitting, formal constructability review evidence of previous repair work. About a quarter of the curb ramps within the project limits appear to be » Final PS&E (100% Design): ADA-compliant; however, there are nine locations that will require upgrades. Existing underground utilities within the project limits consist of water, sewer, storm drain, street lighting/electrical, gas, and telecommunications facilities. Surface utility City of Tustin, Red Hill Avenue Rehabilitation | 5 SECTION 2. EXECUTIVE SUMMARY AND UNDERSTANDING Key Areas of FocusNew Bicycle Facilities A thorough understanding of the critical project Designing new bikeways on existing streets begins considerations associated with the proposed with identifying the project goals and design improvements is essential to successful project standards. We will then analyze the project limits delivery. Following our site visit and review of to determine available width and if there are any the available project documentation, we have locations which may be particularly challenging. Typical sections will be developed and special be considered in the project development process zones (such as intersections, driveways, and bus construction. These key areas are highlighted on the Key Areas of Focus exhibit shown on page 9. operating space and alert drivers to expect crossing bicycle movements. Pavement Rehabilitation Strategy Providing an economical pavement design is Based on the existing conditions, there will be two typical sections for the project as shown on budget. We have partnered with Earth Mechanics, page 10. For segments with existing 14-foot-wide Inc. (EMI) to provide pavement design services. EMI raised medians, the curb-to-curb width is 35 feet. will analyze the extent and severity of pavement Therefore, the pavement section will likely consist distress with visual inspections, pavement corings, of 10-foot travel lanes and a 5-foot bike lane, unless the medians are completely reconstructed. We can also evaluate reconstructing the existing median to reduce its width, but our assumption is that this will FWD is required to permit the improvements be too costly. The segments with painted medians be reduced to 10 feet, which allows the #1 and #2 treatment will be grind and overlay, with some areas lanes to be widened to 11 feet. We will prepare a requiring localized pavement repairs. technical memorandum to compare the advantages, disadvantages, and cost of the alternatives studied and submit it to the City to review and select the preferred alternative. Pavement coring, visual distress surveys, and FWD testing will provide critical data for developing economical pavement rehabilitation recommendations. Maintaining bicycle connectivity between I-5 and El Camino Real is a primary project objective and a key focus of the proposed improvements. City of Tustin, Red Hill Avenue Rehabilitation | 6 SECTION 2. EXECUTIVE SUMMARY AND UNDERSTANDING It appears Class II bike lanes can be provided many facilities into compliance with current ADA throughout the project limits, except for the standards as the project budget allows. As part of eastbound direction between the I-5 and El Camino Real (refer to concept plan on page 11). In this curb ramps throughout the project limits. We will also identify locations where there Class II bike lane without widening the road, which are potential tripping hazards and where the we assume the City will not want to do. Therefore, clear path of travel is less than required due to we have proposed a Class III lane with sharrows in an existing obstruction (such as a utility) and the right-turn lane. Even though the posted speed provide sidewalk pop-outs if R/W is available. is 40 mph, this is allowed per California Streets and We are intimately familiar with the latest ADA Highways Code 891.9.(a) and CA-MUTCD 9E.9(14) standards and best practices, and will identify the which allow Class III bike lanes in turn lanes at ADA issues and properly address them with the project improvements. Class II bike lane. Finally, based on our preliminary concept design, the available lane transition (taper) length between I-5 and El Camino Real is constrained and currently supports a 35 mph design speed. Given the existing 40 mph posted speed limit, this segment will or mitigation measures necessary to support the proposed improvements. Providing early construction cost estimates will help maximize the amount of concrete repairs that can be made with this project within the available project budget. Value Engineering Knowing the estimated construction costs early is critical to understanding if the project requires value engineering due to the available budget. Alternatively, if the project is under budget, then We will evaluate all existing curb ramps for ADA more improvements can be incorporated, such as compliance and provide details for repairs. correcting localized drainage issues. Therefore, we will provide a comprehensive estimate of probable ADA Compliance and Concrete Repairs construction costs at the 30% level with itemized bid items. We will establish unit costs using recent bid corridors fully ADA accessible and have revised the will be continuously updated with each plan revision, and Self Evaluation - Public Rights-of-Way. We will and an updated estimate will be provided with all perform our own evaluation of existing sidewalks submittals to provide the City with accurate project costs throughout the design. and provide recommendations that will bring as City of Tustin, Red Hill Avenue Rehabilitation | 7 SECTION 2. EXECUTIVE SUMMARY AND UNDERSTANDING Having worked on numerous projects within Orange Caltrans Permitting County, we are familiar with these utility companies The proposed improvements cross the Caltrans and will work closely with them to address and R/W, so several encroachment permits will be required. For preliminary engineering, an we will ensure all correspondence is in accordance encroachment permit will be required for our with Caltrans LAPM which is required for the R/W An encroachment permit for construction will also be required for the proposed improvements. Our team is very familiar with the encroachment permit diligently obtain all required permits. Utility coordination is critical to project success, and our team will work closely with utility providers to relocations. Early and continuous coordination with Caltrans will Mitigating Construction Impacts to the help streamline permit approvals to help maintain the project schedule. Surrounding Community Federal Funding Support and commercial developments, it is critical Since the project is federally funded, a Caltrans Request for Authorization to Proceed (E-76) with Construction is required. We will assist the which require safe vehicular and pedestrian access City with this process by providing supporting documents, coordinating with the Caltrans working hours, construction phasing requirements, District Local Assistance Engineer (DLAE), and preparing the required bid package to meet all and emergency access requirements. Caltrans Local Assistance Procedures Manual We understand that managing, building consensus, (LAPM) requirements. and obtaining project approvals and permits are often more challenging than preparing the actual Utility Coordination design documents. Ensuring these processes Utility coordination is a key component of are managed allows projects to be delivered on successfully delivering these roadway improvements. Based on our research, the potential utility philosophy integrates the following key components: Fiber, Charter, Crown Castle, OCSD, East Orange developing coordinated design documents; and County Water District, IRWD, Kinder Morgan, Level validating implementation. 3, MCI, Metropolitan Water District, and SCG. City of Tustin, Red Hill Avenue Rehabilitation | 8 Key Areas of Focus The pavement report will evaluate Damaged or uplifted sidewalks, All existing curb ramps will be evaluated existing conditions and provide several driveways, curbs, gutters, and cross for ADA compliance and non-compliant pavement rehabilitation alternatives that ramps will be replaced. can accommodate the project budget.repaired. UTT DR GREEN VALLEY DR RED HILL AVENUE WESTFALL RD EMERYWOOD RD DEVONSHIRE AVE Areas with localized drainage issues will We will diligently work to process all phasing requirements which will minimize required Caltrans Encroachment Permits. allows.disruption to adjacent residences and businesses. SECTION 2. EXECUTIVE SUMMARYAND UNDERSTANDING Proposed Typical Sections narrowing the existing median to provide wider travel lanes. 8’5’10’10’10’14’10’10’10’5’8’ SWBikeTravel Travel Travel ExistingTravel Travel Travel BikeSW LaneLaneLaneLaneLanscapedLaneLaneLaneLane Landscaped R/WR/W Median Median 35’35’ TCTCTCTC RED HILL AVENUE RED HILL AVENUE Raised Median Typical Section 8’-18’ 8’5’10’11’11’10’11’11’10’5’ varies SW Travel SWBikeTravel Travel CenterTravel Travel Travel Bike Lane LaneLaneLaneLaneLaneLaneLaneLane R/W R/W 84’ TCTC RED HILL AVENUE RED HILL AVENUE Painted Median Typical Section City of Tustin, Red Hill Avenue Rehabilitation | 10 Concept Plan (I-5 to El Camino Real) RED HILL AVENUE (40 MPH POSTED) LANE TRANSITIONS (TAPERS) IN BOTH DIRECTIONS CAN ACCOMMODATE A 35 MPH DESIGN SPEED (L=300', OFFSET=14') SINCE THE POSTED SPEED IS 40 MPH, THIS SEGMENT WILL REQUIRED FURTHER STUDY DURING FINAL DESIGN TO EVALUATE ROADWAY OPERATIONS AND IDENTIFY ANY MODIFICATIONS OR MITIGATION MEASURES NECESSARY TO SUPPORT THE PROPOSED IMPROVEMENTS. 03 SECTION 3. Project Controls and Methods Progress Reports and Monthly Invoicing. BKF Component 1: Managing the Process will prepare progress reports indicating current Project Management. As Project Manager, Roger tasks, outstanding items, schedule monitoring, and Chung, PE, will be responsible for the day-to-day future anticipated meetings. The progress reports management of the project design team, including will be prepared and submitted monthly to the City the technical management of the project. Project Manager. Project Work Program. Additionally, BKF will collect, review and compile invoices from the design team on a monthly basis Amparo, PE and Project Manager, Roger Chung, PE, will develop a detailed project work program that invoice. Invoices will delineate the current percent complete by task which along with the project deliver the Project. We intend for this work program to be a living document that we update regularly to and deliverables are in agreement. BKF will develop the agenda and invite project team Critical Considerations. Throughout Red Hill members and stakeholders and administer Avenue, there are locations where existing features (non-compliant curb ramps and driveways) will require design/reconstruction. In these instances, communication conduits, invoicing, and establish the Project Team will identify these locations future PDT meetings. BKF will prepare meeting to ensure the objectives and standards for the minutes and distribute to all in attendance for improvements are adequately addressed. This early review and concurrence. Our team will continue establishment and agreement with the City will allow to attend Project Development Meetings the Project Team to focus on project components throughout the design. Project Schedule. Our proposed schedule on page Risk assessment is 14 is consistent with the timing outlined in the RFP, key to managing the overall construction budget. showing a general overview of the sequence of Our experience in managing unknowns early on activities, task durations, and overall timeframes for ensures the project stays on schedule. the project. This schedule will serve as the guide to conducting and monitoring work progress and will Caltrans and Utility Company Coordination. be updated throughout the project activities required Processing the improvements through Caltrans and coordinating any utility adjustments or relocations required schedule. Please note, the proposed with the utility companies in the area will be critical project schedule assumes timely reviews and responses from all agencies and utility companies. public infrastructure projects has taught the value If required approvals, permits, or coordination of having clear direct communication and being responses are delayed, the project timeline may accessible at all times during critical project stages. need to be adjusted accordingly. Any schedule We believe our working relationships with Caltrans impacts resulting from delayed agency feedback and utility companies in the area will allow us to will be communicated promptly, along with revised streamline the process by minimizing costly lags milestones as necessary. in communication. City of Tustin, Red Hill Avenue Rehabilitation | 12 SECTION 3. PROJECT CONTROLSAND METHODS Technology. BKF implements the latest technology Component 3: Developing Coordinated to develop designs including AutoCAD Civil 3D. We Design Documents also have specialized simulation software to assist City Coordination. The communication conduit in the design of infrastructure including AutoTurn, with the City will be with Roger Chung, Project StormCAD, WaterCAD, SewerCAD, HEC HMS, and Manager. This single point of contact eliminates HEC RAS. For preparation of illustrative exhibits, we possible misunderstandings and duplication of have Adobe Illustrator, Photoshop, and InDesign. All technical challenges while developing the design in applications suite. Component 4: Validating Implementation agencies to ensure collaboration and obtain Internal QA/QC and Constructability Reviews. Project approvals. BKF will complete an internal review of all project Subconsultant Management and Coordination. documents. Under direct communication with We will proactively manage and coordinate with Roger, QA/QC Manager, Chris Bretall, PE, ENV EMI to ensure their work is fully integrated with the SP, will check the documents for errors, perform a overall project objectives, schedule, and budget. Our constructability review, ensure our documents are team will monitor their progress, identify and resolve coordinated with other disciplines, and suggest potential issues early, and ensure all technical work alternatives for cost savings. During this period, products are delivered on time and meet project all team members are required to review not only scope and quality standards. This collaborative minimize risks, and provide the City with a seamless intent is consistent among the team members. This and well-coordinated project team. procedure is summarized below. Outstanding Issues Matrix. BKF will track all outstanding design and program issues in a matrix to facilitate discussions with the City and internal team. This matrix tracks design issues, costs, and the schedule. QUALITY ASSURANCE/QUALITY CONTROL PROJECT 30% 100% 60%90% INITIATION SUBMITTAL SUBMITTAL SUBMITTALSUBMITTAL QA/QC PROCESSINTERNAL REVIEWINTERDISCIPLINARY REVIEW »QA/QC protocol established at »Each team lead conducts »Each team lead conducts project initiationinternal reviewinterdisciplinary review »QA/QC maintained/documented »Team shares comments »Incorporate resolved comments »Team resolution meeting throughout project lifespan »Incorporate resolved comments City of Tustin, Red Hill Avenue Rehabilitation | 13 SECTION 4. Schedule 05 SECTION 5. Scope of Work As part of the Request for Proposal, the City has provided a detailed Scope of Work in section IV of the RFP. » state: “No exceptions to the Scope of Work.” » CLARIFICATION PROVIDED and Below is our concurrence or deviation from the Scope of Work provided by the City: A. Project Description: No exceptions to the Scope of Work. B. Project Management and Coordination: CLARIFICATION PROVIDED. C. Records Research and Existing Conditions: CLARIFICATION PROVIDED. D. Water Quality and LID: CLARIFICATION PROVIDED. E. No exceptions to the Scope of Work. F. ADA Compliance: CLARIFICATION PROVIDED. G. Preliminary Engineering (30% Design): CLARIFICATION PROVIDED. H. Intermediate Design (60% Design): CLARIFICATION PROVIDED. I. CLARIFICATION PROVIDED. J. Constructability Review: No exceptions to the Scope of Work. K. Design Quality Assurance/Quality Control: No exceptions to the Scope of Work. L. Bid Support: CLARIFICATION PROVIDED. M. Construction Support: CLARIFICATION PROVIDED. N. Record Drawings: No exceptions to the Scope of Work. O. Design Responsibility: No exceptions to the Scope of Work. B Project Management and Coordination: » Standard Encroachment Permit CLARIFICATION. Potholing and utility locating are Application (TR-0100) excluded from utility coordination services. » We assume the only agency permits required are for Review Process (TR-0416) » Encroachment Permit Application be outside of the existing railroad R/W west of the Checklist (TR-0402) » Encroachment Permit Application Checklist – is included in task G. “Preliminary Engineering (30% Design)”. An encroachment permit for construction » Letter of Authorization » Improvement Plans Caltrans will require the documents shown to » the right. Since this is a pavement rehabilitation Optional item O.2) project, we assume that all other documents such » Materials Report as a DEER, SWPPP, SWDR, DSDD, etc. are not » Environmental Document (Provided by City) required, and therefore, not included in our proposal. » City of Tustin, Red Hill Avenue Rehabilitation | 15 SECTION 5. SCOPE OF WORK C Records Research and Existing Conditions G Preliminary Engineering (30% Design) CLARIFICATION. The design will be based on CLARIFICATION. We assume separate landscaping the topographic and mapping drawing provided and irrigation plans are not required. Any repairs to by the City. We will provide supplemental design-impacted landscaping and irrigation improvement level topographic surveying for the nine curb ramps will be handled with a general construction note on Key Areas of Focus exhibit using the Improvement Plans. Additionally, we assume the existing medians will remain protected in place. D Water Quality and LID Review Available Geotechnical and Pavement Information CLARIFICATION. Based on our review of the Our team will review any available geotechnical project, the project is not changing the roadway information provided by the City including alignment and grade, and no additional impervious investigation and compaction reports, as- areas are created. Therefore, a WQMP will built plans, subgrade information, and past not be required. rehabilitation activities. F ADA Compliance Geotechnical Investigation CLARIFICATION. Per the RFP, BKF will incorporate Our team will conduct a visual condition survey of the pavement distress repairs shown in RFP the existing pavement surface along the roadway. Attachment F into the plans. We will also provide We will observe and document the type and degree 1”=5” details for new ADA compliant curb ramps. of pavement distress. Following the pavement visual condition survey, we will prepare a boring curb return with a smart level and tape measure to location plan and mark the locations with white paint Key Areas on the street. We will notify Underground Service of Focus exhibit (page 9), we have preliminarily Alert (USA) for utility clearance 48-hours prior to the drilling. and are included in our base scope. We have also provided an optional item for up to eight Encroachment permits will be obtained from additional ramps, if necessary. This optional work Caltrans and the City of Tustin. We propose to drill 14 borings (5-foot depth) within the project limits. preparation required. The borings will be spaced at 500-foot intervals in a staggered pattern. Core samples of existing The Key Areas of Focus pavement sections will be collected at every boring non-compliant driveways based on our preliminary to collect information on existing pavement. The proposed approximate boring depths will be raised is generally only eight feet wide, improvements will need to be made on private property to make collect bulk soil samples for laboratory testing. each driveway ADA compliant. Since the City does Rapid-set concrete will be used to replace asphalt not want to obtain any Temporary Construction that is removed by excavations. Easements, we are excluding these from the proposal. The only improvements that will be made Additionally, we propose utilizing FWD testing to existing driveways will be the pavement distress since Caltrans requires this testing for rehabilitation repairs shown in RFP Attachment F, assuming they projects. We will supervise FWD testing along the can be made within public R/W.roadway segment in accordance with Caltrans Test Method 356 (Method A). FWD testing will be used to evaluate in-place pavement structural response and support pavement rehabilitation design. City of Tustin, Red Hill Avenue Rehabilitation | 16 SECTION 5. SCOPE OF WORK Soil Laboratory Testing provided within Caltrans R/W. Field logs of the boreholes will be reviewed to select representative soil samples for laboratory testing. » Scope does not include recommendations for Soil laboratory tests will be conducted in general retaining walls, sound walls, RCBs/culverts, accordance with American Society for Testing and Materials (ASTM) standards or California Test » Boring locations will be patched with rapid set methods. Anticipated laboratory tests include: concrete with black dye to replace asphalt that is R-value, #200 wash, moisture, in-situ density, and removed by excavations; no hot mix/sawcut repair. Atterberg Limits. Preliminary Engineering through Final G/H/I Report Preparation PS&E Pavement Memo: Based on the R-value, FWD CLARIFICATION. BKF agrees with the Scope of Services. However, provided below is a list of plan we will develop pavement rehabilitation and sheets anticipated to be prepared for the project. reconstruction design recommendations. We will prepare a geotechnical memorandum to SHEET ANTICIPATED PLAN SHEETS COUNT for pavement rehabilitation, and earthwork recommendations. We will address any comments Title Sheet1 Sheet Typical Sections, Notes, and Details2 Sheets geotechnical memorandum. 3 Sheets Double-Stacked) Materials Report: For Pavement recommendations Street Improvement Plans (Plan Only, 3 Sheets required within Caltrans R/W, we will prepare a separate Materials Report to facilitate the Caltrans Construction Details (2 curb ramps/5 Sheets submittal and review process. We will address any sheet; assume 9 curb ramps) comments received during Caltrans review and Striping and Signing Plans 3 Sheets ASSUMPTIONS Anticipated Project Sheet Count17 Sheets » between 8:30 a.m. to 4:30 p.m. on weekdays. ASSUMPTIONS » Utility adjustments will be shown on the » No investigation of hazardous materials. If Demolition Plans. hazardous materials are encountered during the » our work and notify the City. narrow the existing raised medians. However, our scope and fee assume the existing raised » Environmental clearance for accomplishing the Archaeological, cultural, and biological reviews or sheets), and landscaping/irrigation design will be studies, if required, will be performed by others. » No encroachment permit fee is reconstruct them. assumed for the City. » Proposed loop detectors will be shown on the » City of Tustin, Red Hill Avenue Rehabilitation | 17 SECTION 5. SCOPE OF WORK applicable City of Tustin and Caltrans standard L Bid Support plans and design guidelines to address anticipated CLARIFICATION. We have assumed the following construction staging, ramp closures, bicycle accommodations, and associated detours. for Bid Support services: » Respond to Requests for Anticipated construction staging will include (10 Information (RFIs) (3 Max) sheets assumed): » Prepare Addenda (3 max) » Stage 1: Curb Ramp, Driveway, and Associated Improvements M Construction Support » Stage 2A: Outside Lane Pavement Improvements CLARIFICATION. We have assumed the following » Stage 2B: Inside Lane Pavement Improvements for Construction Support services: » Stage 2C: Intersection Pavement and » Remaining Improvements » Respond to RFIs (10 max) We will coordinate with the City and Caltrans during » including coordination regarding proposed ramp closures, detour routes, allowable lane widths, work O Optional Items one consolidated round of Caltrans comments. O.1 Additional Curb Ramps Caltrans R/W are excluded from this scope and we do not anticipate the need for a TMP or lane closure charts so these are also excluded. ramps without truncated domes which makes them O.3 are non-compliant. This option task is to perform TIs will be provided at up to six segments based additional curb ramps. include vehicle class and vehicle direction. The vehicle class will be separated based on axle O.2 Caltrans R/W buses, or passenger vehicles. Then, using Caltrans Per the RFP, our understanding is that the City ESAL factors, we will determine the appropriate (or the Contractor) will be responsible for the design-life TI calculations for each segment. The required for the Caltrans Encroachment Permit for and will include the truck axle breakdown (TAB) construction. This optional item is for BKF to provide counts, equivalent wheel load (EWL), and other required calculations. activities within the Caltrans R/W along Red Hill Avenue at the Santa Ana Freeway (I-5) interchange, will be developed and implemented in accordance with the CA MUTCD, the WATCHBOOK and City of Tustin, Red Hill Avenue Rehabilitation | 18 SECTION 5. SCOPE OF WORK PROJECT DELIVERABLES Project Management and CoordinationProject Schedule (PDF), Monthly Progress Reports (PDF), Meeting Agendas and Summaries (PDF), Caltrans Encroachment Permit (PDF) Records Research and Existing ConditionsExisting Conditions Memorandum (PDF), Additional Field Survey Data (DWG), Draft Geotechnical/Pavement Preliminary Engineering (30% Design) Estimate of Probable Construction Costs with Design Memorandum (PDF); Final Geotechnical/ Pavement Report (PDF) Intermediate Engineering (60% Design) of Probable Construction Costs with Backup (PDF), of Probable Construction Costs with Backup (PDF), QC Review Package Estimate of Probable Construction Costs with Coordination File (PDF) Bid SupportRFIs (PDF) and Bid Addenda (PDF) Construction SupportRFIs (PDF), Shop Drawings/Submittal Reviews (PDF) Record Drawings City of Tustin, Red Hill Avenue Rehabilitation | 19 06 SECTION 6. Team Organization The project team has been thoughtfully structured to provide clear leadership, accountability, and seamless coordination with the City throughout the duration of the project. BKF has designated a Project Manager and Deputy Project Manager responsible for overseeing all project activities, managing communication, and Project Manager, Roger Chung, PE, QSD/P, CFM, ENV SP, F.ASCE, will serve as the primary point of contact, with PE, survey, ensuring all technical aspects are fully integrated. The organization diagram shown below illustrates the relationship between the City, project leadership, key personnel, and supporting subconsultants, >>DETAILED RESUMES can be found in Appendix A. LEGEND Organizational Chart BKF EARTH MECHANICS (EMI) KEY STAFF QA/QC MANAGERPRINCIPAL-IN-CHARGE Chris Bretall, PE, ENV SP Sheila Amparo, PE PROJECT MANAGER Roger Chung, PE, QSD/P, CFM, ENV SP, F.ASCE DEPUTY PROJECT MANAGER PROJECT SUPPORT TEAM CIVIL LEADTRAFFIC LEADSURVEY LEAD Joe Nelson, PLS PROJECT ENGINEERTRAFFIC DEPUTY LEADSURVEY DEPUTY LEAD Ron Ver, PLS DESIGN ENGINEERTRAFFIC PROJECT ENGINEERPROJECT SURVEYOR DRAINAGE LEADTRAFFIC DESIGN ENGINEERGEOTECHNICAL/PAVEMENT ENGINEERING LEAD Dan Villines, PE, QSD Mina Salama GEOTECHNICAL/ PAVEMENT ENGINEER City of Tustin, Red Hill Avenue Rehabilitation | 20 SECTION 6. TEAM ORGANIZATION KEY STAFF ROLES ROLES/RESPONSIBILITIES Time BKF Engineers Commitment Sheila Amparo, PE 10% Principal-in-Charge Roger Chung, PE, QSD/P, CFM, ENV SP, F.ASCE 50% Jeff Wilkerson, PE 50% Chris Bretall, PE, ENV SP 10% QA/QC Manager Jonathan Delgado, PE 50% Tony Salas, PE (WA, CO) 50% Bryan Fujimoto, EIT 50% Dan Villines, PE, QSD 20% Earth Mechanics, Inc. Alahesh Thurairajah, PE, GE, BC.GE 50% PROJECT MANAGER SPOTLIGHT ROGER CHUNG, PE, QSD/P, CFM, ENV SP, F.ASCE Project Manager Roger Chung serves as Project Manager, bringing extensive experience delivering roadway rehabilitation and infrastructure projects for California agencies. He leads multidisciplinary teams to deliver clear, coordinated, and delivery, including coordination, schedule, budget, and quality control. His experience spans pavement rehabilitation, ADA improvements, multimodal design, and utility coordination, with a proactive approach that minimizes risk Our goal is to deliver a and keeps projects on track. clear, coordinated, and constructible PS&E package that minimizes risk and WQMP and regulatory requirements into the design. He emphasizes clear supports a smooth transition communication, consistent reporting, and strong coordination to deliver high- from design to construction. quality, bid-ready documents. City of Tustin, Red Hill Avenue Rehabilitation | 21 Sheila Amparo, PERoger Chung, PE, QSD/P, Principal-in-Charge CFM, ENV SP, F.ASCE Project Manager Sheila Amparo, PE, is a seasoned civil engineer with Roger Chung, PE, QSD/P, over 26 years of experience CFM, ENV SP, F.ASCE, has specializing in roadway design, more than 27 years of civil grading, and award-winning engineering experience with highway and bridge projects for expertise in roadway rehabilitation, municipal agencies. Sheila has led multidisciplinary hydrology, hydraulic and structural analysis for teams through complex transportation infrastructure the preparation of drainage studies, drainage master plans and the preparation of design plans, leveraged to meet project requirements. in the roadway improvement and pavement rehabilitation projects in Orange, Riverside, and San Bernardino Counties. Professional Civil Engineer CA No. 78003 » Professional Civil Engineer, CA No. 65388 26 years of experience » BS, Civil Engineering, California State Plan Developer/Practitioner No. 20600 Polytechnic University, Pomona » No. US-19-11182 Relevant Experience » Envision Sustainability Harvard/Michelson Intersection Professional, No. 43157 Improvements, City of Irvine, CA. Project Manager. 27 years of experience City of » BS, Civil Engineering, University of Irvine, CA. Project Manager. California, Irvine » BS, Environmental Engineering, University Seal Beach 1st Street Rehabilitation of California, Irvine Coast Highway, City of Seal Beach, CA. Relevant Experience Principal-in-Charge. Rancho Palos Verdes Rehabilitation, City of Los Alisos Boulevard/Muirlands Boulevard Rancho Palos Verdes, CA. Project Manager. Intersection Improvements, City of Lake Costa Mesa Roadway Improvements, City of Forest, CA. Project Manager. Costa Mesa, CA. Project Manager. Willow Avenue Corridor Improvement, City of Los Alisos Boulevard/Muirlands Boulevard Long Beach, CA. Project Manager. Intersection Improvements, City of Lake Wardlow Avenue Pavement Rehabilitation Forest, CA. Hydraulics/Hydrology Lead. Project, City of Long Beach, CA. Yorba Linda Blvd Improvements, City of Project Manager. Yorba Linda, CA. Hydraulics/Hydrology Lead. City of Tustin, Red Hill Avenue Rehabilitation | 22 SECTION 6. TEAM ORGANIZATION Chris Bretall, PE Deputy Project Manager QA/QC Manager Chris Bretall, PE, is a Senior extensive civil engineering Project Manager specializing experience supporting both in transportation engineering public and private clients, with 40 years of industry with a strong focus on municipal experience. Chris brings a deep transportation projects. He has led understanding of the technical, regulatory, and logistical aspects of transportation design development, and delivered plans, design, ensuring projects are executed smoothly size and complexity. Known for his hands-on design approach and exceptional organizational skills, multidisciplinary teams and fosters productive he consistently delivers high-quality projects on relationships with government agencies, contractors, schedule and within budget.and stakeholders. Professional Civil Engineer CA No. 63466Professional Civil Engineer, CA No. 41824 27 years of experience40 years of experience » MS, Civil Engineering, University of BS, Civil Engineering, California State California, IrvineUniversity, Fullerton » BS, Civil Engineering, University of Relevant Experience California, Irvine City of Relevant Experience Irvine, CA. QA/QC. Wardlow Road Pavement Project, City of Project, City of Irvine, CA. Project Manager. Long Beach, CA. QA/QC. Rancho Palos Verdes Drive East Seal Beach 1st Street Rehabilitation Guardrails, City of Rancho Palos Verdes, CA. Project Manager. Coast Highway, City of Seal Beach, CA. Project Manager. Chino Bridge along Euclid Avenue, City of Chino, CA. Team Member. Yorba Linda Boulevard Improvements, City of Yorba Linda, CA. QA/QC. Long Beach Safer Willow Street: Corridor Improvements Project, City of Long Beach, Los Alisos Boulevard/Muirlands Boulevard CA. Deputy Project Manager. Intersection Improvements, City of Lake Forest, CA. QA/QC. City of Tustin, Red Hill Avenue Rehabilitation | 23 SECTION 6. TEAM ORGANIZATION Jonathan Delgado, PE Brian Fujimoto, EIT Civil Lead Jonathan Delgado, PE, has Brian Fujimoto, EIT, is over 12 years of experience experienced in public works in transportation engineering, transportation with a career specializing in managing focus on supporting successful and delivering on Intelligent roadway and infrastructure Transportation Systems (ITS), projects from concept to construction. He possesses advanced Civil 3D design capabilities and striping projects. Jonathan has prepared and is experienced in developing roadway plans, Control Devices (CA MUTCD) and Caltrans, while communication, problem-solving, and the ability to coordinate with multidisciplinary teams and public project completion. His skills include ITS Master agencies to keep projects on schedule and within Plan development, signal timing optimization budget. Valued for his technical expertise and collaborative mindset, Brian brings a structured, detail-oriented approach to infrastructure throughout all project phases.development while maintaining strong regulatory and agency compliance standards throughout project delivery. Professional Civil Engineer CA No. 91490 12 years of experience Engineer-in-Training, CA No. XE104363 BS, Civil Engineering, University of 28 years of experience California, Irvine BS, Civil Engineering, California State Relevant Experience University, Long Beach Long Beach Safer Willow Street: Corridor Relevant Experience Improvements Project. Team Member. Los Alisos Boulevard/Muirlands Boulevard City of Intersection Improvements, City of Lake Monterey Park, CA. Project Engineer. Forest, CA. Project Engineer. ITS Master Plan, City of Industry, CA. Deputy Project Manager. Communication and Network System (Phase 2), City of Redondo Beach, CA. Katella Avenue Signal Network Extension Project Engineer. Project, City of Orange, CA. Deputy Project Manager. Alton Parkway Extension, Orange County Public Works and City of Lake Forest, Irvine, CA. Project Engineer. Program Phases I, II, IIB, and III, Various, CA. Project Engineer. Apple Valley Road Realignment and Widening, Town of Apple Valley, CA. Design Engineer. City of Tustin, Red Hill Avenue Rehabilitation | 24 SECTION 6. TEAM ORGANIZATION Dan Villines, PE, QSDAlahesh Thurairajah, PE, Drainage Lead GE, BC.GE Geotechnical/Pavement Lead Dan Villines, PE, QSD, Alahesh Thurairajah, professional civil engineering PE, GE, BC.GE, is a experience in the technical geotechnical principal with 16 years of experience delivering experience includes hydrology, transportation projects across California, including hydraulic, and structural analyses for the preparation pavement design, seismic analysis, and foundation engineering, providing practical, constructible During his career, he has designed open channel delivery for roadway rehabilitation projects. diversions for water conservation, stormwater » Registered Professional Civil Engineer, CA, No. 81439 basin facilities. » Registered Professional Geotechnical Professional Civil Engineer CA No. 55210 Engineer, CA, No. GE 3123 16 years of experience 35 years of experience BS, Civil Engineering, California Polytechnic BS, Civil Engineering, California Polytechnic State University, Pomona State University, Pomona Relevant Experience Relevant Experience Safe Willow Street Corridor Improvements City of Project, City of Long Beach, CA. Irvine, CA. Lead Drainage Engineer. Geotechnical Principal. Safe Willow Street Corridor Improvements Wardlow Road Pavement Rehabilitation Project, City of Long Beach, CA. Project, City of Long Beach, CA. Water Quality Lead. Geotechnical Principal. Harvard/Michelson Intersection OC Loop O, P, & Q – Coyote Creek Channel, Improvements, City of Irvine, CA. Drainage Orange County and Los Angeles County, CA. and Water Quality Lead. Geotechnical Project Manager. Jamboree/Main Intersection Enhancements, Intersection Improvements, City of San City of Irvine, CA. Drainage and Gabriel, CA. Geotechnical Project Manager. Water Quality Lead. Long Beach Boulevard Street Improvements Pico Rivera Regional Bikeway, City of Pico Rivera CA. Drainage and Water Quality Lead. Willow Street, City of Long Beach, CA. Chino Basin Storm Water Recharge Geotechnical Principal. Facilities, San Bernardino County, CA. Project Manager. Arches Low-Flow Diversion Project, City of Newport Beach, CA. Project Manager. City of Tustin, Red Hill Avenue Rehabilitation | 25 07 SECTION 7. BKF has extensive experience delivering roadway rehabilitation projects for California public agencies successfully completed similar projects involving pavement rehabilitation, ADA upgrades, multimodal streamlined plans that meet City standards, Greenbook requirements, and Caltrans Local Assistance development, supported by strong project leadership and a rigorous QA/QC process. This ensures accurate, fully coordinated deliverables that transition smoothly into construction. See below for our selected relevant experience. BKF served as the prime consultant, providing Wardlow Road Pavement Project civil engineering services for the Wardlow Road Client City of Long Beach Pavement Rehabilitation Project in the City of »Sheila Amparo Long Beach. Spanning approximately 1.2 miles (Project Manager \[PM\]) from Stevely Avenue to Norwalk Boulevard, the » project focused on evaluating and rehabilitating the Manager) »Chris Bretall (QA/QC) sidewalks, curbs and gutters, and driveways, to address lifecycle deterioration and enhance roadway »EMI (Geotech) functionality. A comprehensive geotechnical analysis ContactDavid Lew, Civil Engineer was conducted to assess pavement conditions and 333 W Ocean Boulevard develop recommended rehabilitation alternatives. Long Beach, CA 90802 BKF evaluated these results and worked closely 562.570.7513 Completion 6/2025 durable pavement rehabilitation strategy that Date balanced performance and budget considerations. Total Cost$1.8M In addition to pavement rehabilitation, the project bike lanes with concrete curb barriers for increased cyclist protection. This improvement aligned with included preparing preliminary designs, utility coordination, stakeholder engagement, and the contractor bidding. Through strategic planning and close collaboration with the City of Long Beach, BKF delivered a well-integrated roadway rehabilitation project that improved safety, mobility, and long-term infrastructure sustainability. City of Tustin, Red Hill Avenue Rehabilitation | 26 SECTION 7. STATEMENT OF QUALIFICATIONS Long Beach Safer Willow Street: Rancho Palos Verdes Drive East Corridor Improvements Project Client City of Rancho Palos Verdes Client City of Long Beach » Roger Chung (PIC/PM) » Sheila Amparo (PM) » » » Kevin Wakayama (PE) » Kevin Wakayama » Joe Nelson (Survey) (Project Engineer \[PE\]) ContactDiego Ascencio, Assistant » Dan Villines (Water Quality Lead) Engineer » EMI (Geotech) 30940 Hawthorne Boulevard ContactThana Sathees, Civil Engineer Rancho Palos Verdes, CA 90275 411 W. Ocean Boulevard 310.544.5252 Long Beach, CA 90802 Completion 562.570.7513 In Progress Date Completion In Progress Total Cost$3.5M Date Total Cost$25M rehabilitation engineering services in Rancho Palos BKF provided design services for a two-mile Verdes, addressing pavement degradation, drainage multimodal corridor along Willow Street between the Terminal Island Freeway (State Route 103) The project included six miles of pavement and Atlantic Avenue. Improvements included resurfacing, replacement of damaged curbs, raised crosswalks, median islands to restrict left gutters, and sidewalks, ADA compliance upgrades, turns, protected bike lanes, bus boarding islands, and drainage enhancements to improve roadway curb extensions, ADA-compliant curb ramps, performance and safety. coordination, drainage and stormwater design, The design incorporated Low Impact Development (LID) features consistent with Green Streets guidelines to support water quality and stormwater management. Through close coordination with the City of Long Beach and stakeholders, BKF delivered construction-ready documents supporting a safer, more connected corridor. City of Tustin, Red Hill Avenue Rehabilitation | 27 SECTION 7. STATEMENT OF QUALIFICATIONS Costa Mesa Roadway Improvements Client City of Costa Mesa Client City of Irvine Roger Chung (PM)» Sheila Amparo (PM) » Chris Bretall (QA/QC) ContactRamin Nikoui, Assistant Engineer » Dan Villines (Lead) 77 Fair Drive Drainage Engineer) Costa Mesa, CA 92626 ContactTran Tran, PE, TE, Former Senior 714.754.5184 Transportation Engineer, City of Completion Irvine 8/2023 Date 505 Forest Avenue Laguna Beach, CA 92651 Total Cost$250K 949.497.0741 Completion In Progress Date Total Cost$2.8M BKF provided comprehensive survey and engineering services to provide two pedestrian crossings at the intersection of Newport Boulevard and Industrial Way in the City of Costa Mesa, and multimodal mobility. The project included Project consists of two phases: (1) Project Report conceptual and preliminary design, stakeholder engagement, coordination with City of Newport environmental studies, evaluating alternatives, identifying a preferred option, and advancing the for construction. BKF worked closely with the City approved alternative through design and preparation and delivered an integrated roadway solution that improved pedestrian safety, enhanced circulation Remington intersection is unique, with Trabuco and supported long term infrastructure performance. Road divided by the 60-foot-wide Central Irvine Channel and Remington Street crossing in two stages. Similar to the nearby signalized intersections at Monroe and Yale, the City determined that a The project also includes improvements within the Irvine Channel, including extension of the existing reinforced concrete box culvert, reconstruction of the inlet transition structure, and construction of a longitudinal wall. BKF is performing hydraulic developing the encroachment permit package for Orange County approval. City of Tustin, Red Hill Avenue Rehabilitation | 28 SECTION 7. STATEMENT OF QUALIFICATIONS signage updates. Drainage considerations were West 19th Street Bulb-out Improvements at Wallace Avenue and Placentia Avenue conveyance and avoid impacts to existing storm Client City of Costa Mesa drain systems. In addition to design, BKF provided Roger Chung (PM) ContactRamin Nikoui, Assistant supported plan review and comment resolution, Engineer and assisted during bidding. Construction-phase 77 Fair Drive support services included responding to requests Costa Mesa, CA 92626 for information, reviewing submittals, and providing 714.754.5184 engineering support to facilitate successful Completion project delivery. 10/2023 Date Total Cost$150K BKF provided comprehensive engineering services for the design and implementation of curb extension (bulb-out) improvements along West 19th Street at Wallace Avenue and Placentia Avenue in the City of Costa Mesa. These improvements were developed to enhance pedestrian safety, improve intersection along this corridor. and base mapping to support design development, along with detailed civil and transportation engineering design for the curb extensions, roadway team evaluated existing site constraints, including R/W limitations, utilities, drainage patterns, and ADA compliance requirements, to develop a context- sensitive design that integrates seamlessly with the surrounding infrastructure. curb and gutter reconstruction, sidewalk improvements, ADA-compliant curb ramps, City of Tustin, Red Hill Avenue Rehabilitation | 29 08 SECTION 8. References AgencyContact InformationProject Details Thana Sathees Civil Engineer Long Beach Safer Willow Street: City of Long Beach 411 W. Ocean Boulevard Corridor Improvements Project In Progress Long Beach, CA 90802 562.570.7513 Diego Ascencio Assistant Engineer Rancho Palos Verdes Palos Verdes City of Rancho Palos 30940 Hawthorne Boulevard Drive East Verdes In Progress Rancho Palos Verdes, CA 90275 310.544.5252 Ramin Nikoui Assistant Engineer Costa Mesa Roadway Improvements City of Costa Mesa 77 Fair Drive 08/2023 Costa Mesa, CA 92626 714.754.5184 SECTION 9. 09 Assumptions and Exceptions BKF has reviewed the Consultant Services Agreement as well as the insurance requirements and has no exceptions or assumptions. Our proposal is fully responsive to all stated requirements. end of our proposal, in Appendix B. City of Tustin, Red Hill Avenue Rehabilitation | 30 APPENDIX A. KEY STAFF RESUMES APPENDIX A. Resumes NAMEFIRMROLEPAGE Sheila Amparo, PE BKFPrincipal-in-Charge A-2 Chris Bretall, PE, ENV SP BKFQA/QC Manager A-4 Roger Chung, PE, QSD/P, BKFProject Manager A-6 CFM, ENV SP, F.ASCE BKFDeputy Project Manager A-8 Jonathan Delgado, PE BKF A-10 Tony Salas, PE (WA, CO)BKF A-12 Bryan Fujimoto, EIT BKFCivil Lead A-14 Dan Villines, PE, QSD BKFDrainage Lead A-16 Alahesh Geotechnical/Pavement EMI A-18 Thurairajah, PE, GE, BC.GE Engineering Lead City of Tustin, Red Hill Avenue Rehabilitation | A-1 SECTION A. KEY STAFF RESUMES Tifjmb!Bnqbsp-!QF Principal-in-Charge Sheila Amparo, PE, brings more than 26 years of civil engineering experience in roadway design, grading, and highway/bridge projects with municipal agencies, including the Cities of Redondo Beach, Long Beach, Lake Forest, and Pico Rivera, having served in roles including project engineer, design manager, project manager, and principal-in-charge. In her role as Principal-in-Charge, she will provide executive oversight and guidance to the project team, ensuring that design objectives are met with BKF clarity and consistency. Sheila will remain available to allocate resources 26 years of experience and support as needed, while maintaining overall accountability for project delivery and client satisfaction. Areas of Expertise RELEVANT PROJECTS upgraded lighting, and improved Roadway geometry and multimodal design Willow Street Pavement leadership Project, City of Long Beach, Wardlow Road Pavement Program management CA. Project Manager. As Project, City of Long Beach, and agency Project Manager, Sheila was coordination CA. Principal-in-Charge/ responsible for the preparation Signing, striping and Project Manager. Sheila was responsible for this 1.8- estimates. She coordinated mile roadway rehabilitation with Caltrans for improvements project with bikeway and ADA Professional Civil within Caltrans right of way, Engineer, CA No. 78003 improvements. Roadway provided design coordination rehabilitation included cold mill Education for pavement rehabilitation with and overlay with geofabric. The BS, Civil Engineering, the City, and conducted cost bikeway was separated from California State analysis for improvements to Polytechnic University, stay within budget. Pomona, CA plastic bikeway separator curbs. Awards Willow Street Corridor Pico Rivera Improvements Project, City Signal, City of Irvine, CA. Regional Bikeway. of Long Beach, CA. Project Project Manager. Sheila ACEC California, Manager/Principal-in-Charge. prepared project reports Commendation Award Sheila provided design ACEC California 2025 services for a 2-mile multimodal Engineering Excellence environmental studies for the enhancement along Willow Awards Street between the Terminal Balch Park Road Bridge the intersection. She prepared Replacement. APWA Island Freeway (103) and 2019 Project of the Year Atlantic Avenue. The project Traver Canal Bridge includes raised crosswalks, Replacement. APWA raised median islands to retaining walls within the Central 2018 Project of the Year omit left turn movements at Irvine Channel. non-signalized intersections, protected bike lanes, new bus Residential Resurfacing boarding islands, bulb-outs, Phases I, II, III and IV, City ADA-compliant curb ramps, of South Gate, CA. Project Manager. Sheila served as City of Tustin, Red Hill Avenue Rehabilitation | A-2 SECTION A. KEY STAFF RESUMES Tifjmb!Bnqbsp-!QF!|!SFTVNF!QBHF!3 Project Manager for the pavement rehabilitation as well as replacement of ADA-compliant curb project. She led the design and preparation of and the design team and coordinated project the replacement of ADA-compliant curb ramps. Country Hills Pavement Rehabilitation & Water Connection, City of Brea, CA. Project project design to submit for construction. East Frontage Road Pavement Rehabilitation, and estimates for the pavement rehabilitation City of South Gate, CA. Project Manager. BKF and water main improvements. The Country Hills was procured by the City of South Gate to provide Subdivision experienced multiple water breakage civil engineering and land surveying services for and pavement failures due to 60-year-old water pavement rehabilitation along Southern Avenue mains that were corroded. She tested soil for and East Frontage Road, spanning approximately corrosivity to ensure the proper pipe materials were used for the replaced water main lines. The Way. Sheila led project delivery, overseeing project rehabilitated the pavements, upgraded scope, schedule, budget, and coordination with curb ramps to be ADA-compliant, and replaced the City and utility agencies. The project included the sidewalk. Sheila provided general civil and pavement grinding and overlay, ADA upgrades at surveying services and utility coordination. Altura Pavement Rehabilitation Project, City of Buena Park, CA. Project Manager. Sheila rehabilitation. Chino Hills Parkway Pavement Rehabilitation for the Altura Blvd Rehabilitation Project. As Project, City of Chino Hills, CA. Project Manager. Sheila was the Project Manager on the 2.8-mile cold mill and overlay roadway rehabilitation. The the segment of Altura Blvd between Descanso scope included ADA improvements along the Avenue and Artesia Boulevard for the 2020 corridor. She conducted video detection upgrades construction cycle. Project improvements and coordination with neighboring municipalities included pavement rehabilitation, curb, gutter, cross gutter, and sidewalk replacement and the assessment of pavement conditions, identifying installation of ADA-compliant curb ramps. areas ranging from fair to very poor due to age Jamboree/Barranca Intersection Improvements, City of Irvine, CA. Project Bartley Avenue Rehabilitation Project, City of Santa Fe Springs, CA. Project Manager. Sheila eliminate relocation needs. She led composite utility documentation and relocation needs, served as design leader for roadway widening design to stay within the construction budget. The and property owners. Sheila led coordination project consisted of annual roadway rehabilitation from the On-Call.entire design team and prepared roadway plans depicting pavement replacement and Rosecrans Pavement Rehabilitation Project, rehabilitation. The project was a task order from City of Santa Fe Springs, CA. Project Manager. the City of Irvine On-Call CIP. Sheila was the Project Manager for the pavement rehabilitation project. The scope included curb, gutter, cross gutter, and sidewalk replacement, City of Tustin, Red Hill Avenue Rehabilitation | A-3 SECTION A. KEY STAFF RESUMES Disjt!Csfubmm-!QF-!FOW!TQ QA/QC Manager Chris Bretall, PE, ENV SP, is a Senior Project Manager specializing in transportation engineering with 40 years of industry experience. Chris brings a deep understanding of the technical, regulatory, and logistical aspects of transportation design, ensuring projects are executed smoothly productive relationships with government agencies, contractors, and BKF stakeholders. His focus on clear communication and strategic problem- 40 years of experience Areas of Expertise RELEVANT PROJECTS curb extensions, pavement resurfacing/reconstruction, Independent QA/QC Avenue 64 Complete Streets Reviews concrete bus pads and Green Project, City of Pasadena, CA. Design Standards & Infrastructure (bioswales, Project Manager. The Avenue Regulatory Compliance drywells, porous pavement). 64 Complete Streets Project in Technical Risk The project requires the City of Pasadena is located Assessment & coordination with several City at the intersection of Avenue 64 Mitigation of Los Angeles departments/ and Burleigh Drive, and in the Transportation Project agencies, including Los Angeles pre-project condition consists Delivery Oversight Department of Transportation, of expansive pavement area, City of Los Angeles Bureau unsafe driveway movements Professional Civil of Street Lighting, Bureau of into an active intersection, Engineer, CA No. 41824 Street Services, Los Angeles high rates of speed, and Department of Water and Education Power, and coordination BS, Civil Engineering, The project improves safety, California State with Los Angeles County provides protected driveways, University, Fullerton Department of Public Works. improves drainage conditions; Artesia Great Boulevard through the implementation of Project, City of Long Beach, complete street elements such CA. Project Manager. Chris was as roundabouts, bulb outs, responsible for the construction median islands, crosswalks, support of 3.5 miles of complete and landscaping. street improvements along Artesia Boulevard within the Avalon Boulevard Complete City of Long Beach. The project Streets, City of Los Angeles goals met were to transform Bureau of Engineering. Project Artesia Boulevard from a Manager. Chris served as busy vehicular arterial to a sustainable complete streets to improve 6.3 miles of Avalon enhancing pedestrian safety Boulevard incorporating both along the business districts. The complete streets and Vision project improvements include Zero Safety Elements. The operations improvements project includes sidewalk improvements, ADA ramps, City of Tustin, Red Hill Avenue Rehabilitation | A-4 SECTION A. KEY STAFF RESUMES Disjt!Csfubmm-!QF-!FOW!TQ!|!SFTVNF!QBHF!3 Clarita, CA. Project Manager Chris served corridor, active transportation improvements as Project Manager for the widening and including vision zero elements for bicycles and rehabilitation of 0.5 mile of a two-lane roadway to a four-lane facility. The project included bridge including sustainable landscaping and irrigation, pedestrian lighting, and crosswalk enhancements.improvements, and extensive coordination with the various utilities impacted by the project. University Drive Widening Project Report/Environmental Document (PR/ED) conformed to FHWA/Caltrans design standards. and PS&E, City of Irvine, CA. Project Manager. Chris served as Project Manager overseeing all University Drive Widening Project aspects of the design team. The project is for Report/Environmental Document (PR/ED) the widening of University Drive from Ridgeline and PS&E, City of Irvine, CA. Project Manager. Drive to the Interstate 405 southbound on-ramp Chris served as Project Manager overseeing all to provide a third through lane in the eastbound aspects of the design team. The project is for the widening of University Drive from Ridgeline underground and open channel drainage, Drive to the I-405 southbound on-ramp to bicycle and pedestrian trail design, signing and provide a third through lane in the eastbound acquisition, utility coordination, environmental underground and open channel drainage, bicycle mitigation, permitting, and bid documents.and pedestrian trail design, signing and striping, West Texas Complete Streets Project, City coordination, environmental mitigation, permitting, Project Manager. Chris was and bid documents. responsible for the Preliminary Design (Project Approval/Environmental Document (PA/ED) of Birch Street/State College Intersection approximately one mile of street improvements Widening (PS&E), City of Brea, CA. Project that includes bicycle, and pedestrian and motor Manager. Chris served as Project Manager vehicle safety features and enhancements, responsible for this project that added left turn such as a Class IV bike lane, widened sidewalk, lanes to provide dual left turn movements in the raised median in certain portions of the corridor, eastbound and westbound directions on Birch and extended the length of the southbound dual pedestrian crossing with a rectangular rapid left turn lanes on State College. The project also added right turn lanes for eastbound, westbound, 1180 Fourth Street Sidewalk Rehabilitation, replaced the raised median curbs. Right-of-way City of San Francisco, CA. Project Manager acquisition was also required. Chris served as Project Manager responsible for the preparation of a concept report and design documents for the rehabilitation of sidewalk on all four sides of the building at 1180 Fourth Street in San Francisco, California. Through the Major and Minor Street Encroachment Permit processes, the project requires coordination/approval from the City Department of Public Works and the City ADA Representative. Magic Mountain Parkway (SR 126), Geometric Approval Drawings and PS&E, City of Santa City of Tustin, Red Hill Avenue Rehabilitation | A-5 SECTION A. KEY STAFF RESUMES Sphfs!Divoh-!QF-!RTE0RTQ-!DGN-!FOW!TQ-!G/BTDF Project Manager Roger Chung, PE, QSD/QSP, CFM, ENV SP, F.ASCE, has more than 26 years of civil engineering experience with expertise in hydrology, hydraulics, and ecological restoration for wetland and marsh environments. His work includes the preparation of drainage studies, been involved in the hydraulic analysis and design of numerous water BKF 26 years of experience Riverside, Orange, Los Angeles, San Diego, Kern, and Ventura Counties. RELEVANT PROJECTS 100% level submittals; and Professional Civil processing of the plans and Jamboree Road and Interstate Engineer, CA No. 65388 their supporting studies with the 5 Interchange Widening, Orange County Flood Control Cities of Irvine and Tustin, CA. Pollution Prevention District (OCFCD) for the portion Task Lead. Roger led a task for Plan Developer (QSD) of the Project that would impact and Practitioner (QSP) hydrology and drainage studies, the existing Atwood Channel #20600 that is owned by OCFCD. plans, storm drain plans, Manager #US-19- water quality management Rosecrans Avenue Grade 11182, Association plans, and stormwater Separation, City of Santa Fe of State Floodplain pollution prevention plans for Managers Springs, CA. Task Manager. the widening improvements Envision Sustainability Roger was responsible for the along Jamboree Road at the Professional (ENV SP) preparation of plans, reports, Interstate 5 Freeway. #43157 and supporting technical studies Education for the storm drain and water Tustin Avenue and Rose Drive BS, Environmental quality portions of a multi-million Grade Separation Project, Engineering, University dollar grade separation project Orange County, CA. Task Lead. of California, Irvine that will elevate Rosecrans Roger managed a drainage BS, Civil Engineering, Avenue over the existing task for the preparation of University of California, railroad tracks in the City of plans, reports, and supporting Irvine Santa Fe Springs, California. technical studies for the storm drain and water quality portions development of an integrated drainage and Standard Urban Separation project. Services Stormwater Mitigation Plan included the completion of the (SUSMP), the design of plans for a 65% level submittal, stormwater conveyances, a draft 100% level submittal, and the design of LID Best Management Practices (BMPs). incorporation of the Tustin/ Plans for the project call for Rose Grade Separation Quality the construction of a roadway Management System Manual overpass for Rosecrans Avenue (QMS Manual) procedures; with connecting retaining walls. Existing street intersections that comments at 65% and draft City of Tustin, Red Hill Avenue Rehabilitation | A-6 SECTION A. KEY STAFF RESUMES Sphfs!Divoh-!QF-!RTE0RTQ-!DGN-!FOW!TQ-!G/BTDF!|!SFTVNF!QBHF!3 City requirements to safeguard water quality as a part of the overall project.during construction Culver Drive/University Drive Intersection State Route 91 Corridor Improvement Improvement Project, City of Irvine, CA. Project, Riverside County, CA. Task Lead. Project Manager. Roger prepared the water Roger led a task and provided engineering quality management plan for the PA/ED and consulting services to the State Road 91 Freeway Corridor Improvement Project design team. Responsibilities included hydrology and hydraulic Transportation Mitigation (NITM) List of analysis of all existing culverts and storm drain Improvements. The project provided capacity enhancements to the intersection that are across the State Road 91 alignment. The purpose intended to accommodate future growth in of the analyses was to verify the adequacy or the NITM areas. Roger also provided Quality Assurance and Improvement Project, City of Irvine, CA. Project Control (QA/QC) review services of the Storm Manager. Roger prepared the water quality Water Data Report prepared for a portion of the corridor improvements. phases of the project. The project realigned the median to increase the left turn pocket length on Cactus Avenue Widening, City of Rialto, CA. Task Lead. Roger led a drainage and water includes widening Alton Parkway eastbound west quality task for the widening of Cactus Avenue between Foothill Boulevard and Etiwanda Avenue in the City of Rialto. The project involves widening Penmar Lane Drainage Improvements, City of the roadway approximately 26 feet on the west Pomona, CA. Project Manager. Roger managed side of Cactus Avenue to an ultimate width of 72 feet and the installation of curb and gutter documents; and provide R/W services and as- along the west side. Responsibilities included needed construction management services preparing a SWPPP including NOI application for for drainage improvements along Penmar the construction phase and a WQMP document Lane (Palomares Street to Eleanor Street). consistent with NPDES regulations for the Improvement plans will include construction of a drainage conveyance system and pavement site visit, the only drainage structures within rehabilitation, details for private driveway and project limits are “Bubble Up” catch basins at the intersection of Cactus Avenue and Foothill site improvements and slope grading beyond right of way, and intersection grid details. Plans and recommend non-structural and structural will include erosion control and stormwater pollution prevention BMPs in accordance with existing catch basins. City of Tustin, Red Hill Avenue Rehabilitation | A-7 SECTION A. KEY STAFF RESUMES Deputy Project Manager supporting both public and private clients, with a strong focus on municipal transportation projects. He has led project management complexity. Known for his hands-on design approach and exceptional BKF 26 years of experience his technical expertise to develop innovative solutions to complex engineering challenges. Professional Civil RELEVANT PROJECTS drainage and driver comfort, Engineer, CA No. 63466 longitudinal grade break and Irvine Avenue Pavement crown lines were adjusted by Education Rehabilitation, Cities of providing additional leveling BS, Civil Engineering, Newport Beach and Costa University of California, course pavement. Mesa, CA. Project Manager. Irvine Jamboree Pavement MS, Civil Engineering, design services for pavement Rehabilitation and Reclaimed University of California, rehabilitation and pedestrian Irvine Water Conversion, City and cyclist safety improvements of Newport Beach, CA. along Irvine Avenue from 16th Street to Santiago Drive. engineering design for new Mariners Elementary School reclaiming water improvements is located within the project and pavement rehabilitation limits, and Newport Harbor of Jamboree Road from East High School is adjacent to the project limits. Sidewalk repairs Road/Ford Road. Preliminary and ADA-compliant curb ramps engineering included were constructed to provide developing a conceptual design improved safety to school for the proposed reclaimed children and pedestrians. An water improvements and accelerated schedule was preparation of a pavement required to help ensure the report and preliminary estimates improvements are completed to identify the pavement before the next school year. rehabilitation improvements that could be constructed within between the bike lane and the travel lane will be added from 17th Street to Dover Drive/19th the reclaimed water system improvements, new median safety. To mitigate the existing abrupt grade breaks at median and construction of a new noses and steep existing ARHM over AC leveling course cross slopes and to improve pavement section, localized City of Tustin, Red Hill Avenue Rehabilitation | A-8 SECTION A. KEY STAFF RESUMES |!SFTVNF!QBHF!3 AC pavement repairs, repair of damaged curb, improvements that could be constructed within gutter, sidewalk, and non-ADA compliant curb ramps and driveways, utility adjustments and included cold milling and construction of a relocations, drainage improvements, landscaping new ARHM over AC leveling course pavement and irrigation improvements, and signing and section, localized AC pavement repairs, repair of striping improvements.damaged curb, gutter, sidewalk, cross gutters and non-ADA compliant curb ramps and driveways, Bison, San Joaquin Hills, and San Nicholas utility adjustments and relocations, new median Pavement Rehabilitation, City of Newport and drainage improvement along Spyglass Hill Beach, CA. Road, and signing and striping improvements. design for the rehabilitation of Bison Avenue A Caltrans Encroachment Permit for temporary (Jamboree Road to Bayswater), San Joaquin Hills Road (Jamboree Road to MacArthur Boulevard), and San Nicolas Drive (Newport along Bristol Street North. Center Drive to Avocado Avenue). Preliminary engineering included preparation of a pavement Fairview Road and Wilson Street Intersection report and preliminary estimates to identify the Improvements, City of Costa Mesa, CA. pavement rehabilitation improvements that design for the roadway improvements along Wilson Street from Columbia Drive to Newport and construction of a new ARHM over AC Boulevard. The project involved widening leveling course pavement section, localized both sides of Wilson Street in order to provide AC pavement repairs, repair of damaged curb, additional through lanes in both directions gutter, sidewalk, and non-ADA compliant curb throughout the project limits. Services included ramps and driveways, utility adjustments and relocations, reconstruction median noses outside mapping. The scope of the improvements of the crosswalks, and signing and striping included new asphalt pavement, curb and improvements. A Caltrans Encroachment Permit gutter, sidewalk, driveways, a bus turnout, ADA compliant curb ramps, drainage improvements, utility relocations, private property improvements, within state R/W along Bison Avenue. Bristol Street North and Spyglass Hill Road Pavement Rehabilitation, City of Newport legal descriptions, plats, and a programming Beach, CA. cost estimate were prepared for the parcels design for the rehabilitation of Bristol Street North where R/W acquisition that was required for the (Campus Drive to Jamboree Road) and Spyglass project improvements. Hill Road (San Joaquin Hills Road to San Miguel Drive). Preliminary engineering included preparation of a pavement report and preliminary estimates to identify the pavement rehabilitation City of Tustin, Red Hill Avenue Rehabilitation | A-9 SECTION A. KEY STAFF RESUMES Kpobuibo!Efmhbep-!QF Jonathan Delgado, PE, has over 13 years of experience in transportation engineering, specializing in managing and delivering on Intelligent with agency standards, such as the California Manual on Uniform BKF include ITS Master Plan development, signal timing optimization using 13 years of experience closely with clients throughout all project phases. Additionally, Jonathan Areas of Expertise provides construction support services, including RFI responses and ITS design plans and contractor shop drawing reviews. Dedicated to improving transportation master plan reports systems through innovative solutions and collaboration, he actively Signal design plans engages with industry professionals to stay current on best practices and Signing and striping emerging technologies. plans RELEVANT PROJECTS signals were also coordinated Reviewing and optimized along this route. Los Alisos Boulevard transportation-related plans and studies included attending meetings Synchronization Program AutoCAD, Civil 3D, with OCTA and the local (RTSSP), Orange County MicroStation, Synchro, agencies. He also completed Transportation Authority Microsoft Project (OCTA), Cities of Aliso Viejo, Laguna Hills, Lake Forest, New improvements included review Mission Viejo, and Rancho new signal cabinets, signal Fluent in Spanish Santa Margarita, CA. Deputy Project Manager. As part cable, ethernet switches, radar of Project P funding, OCTA Professional Engineer, detection, loop detection, commissioned a project CA No. C91490 pedestrian heads, pedestrian to install new signal and push buttons, and closed-circuit communications improvements television (CCTV) cameras. Control Technician, CA along the Los Alisos Boulevard He was also involved in the Corridor. The project limits construction support process, Education included Los Alisos Boulevard/ ensuring the vendors delivered BS, Civil Engineering, Melinda Road from Santa their equipment on time and University of California, Margarita Parkway to Paseo De Irvine, CA installed correctly. Valencia, Paseo De Valencia from Los Alisos Boulevard to Katella Avenue Signal Laguna Hills Drive, Laguna OCTEC, Member Network Extension Project, Hills Drive/Aliso Viejo Parkway Institute of City of Orange, CA. Deputy Transportation from Paseo De Valencia to Project Manager. This project Engineers (ITE) Aliso Creek Road, and Aliso Southern California Creek Road from Aliso Viejo Section, Co-Scribe Parkway to El Toro Road. The (2018 to present) cable and wireless radios along City of Tustin, Red Hill Avenue Rehabilitation | A-10 SECTION A. KEY STAFF RESUMES Kpobuibo!Efmhbep-!QF!|!SFTVNF!QBHF!3 Katella Avenue from Tustin Street to Wanda Road and along Wanda Road/Santiago Boulevard from Finally, he completed the project description Katella Avenue to Robinhood Place. In addition, for environmental coordination for Caltrans to new signal cabinets, signal controllers, battery approve the project and continue providing back-up systems, loops, and Emergency Vehicle Cathedral City with HSIP grant funding. Preemptions (EVPs) were installed at various Bolsa Avenue and 17th Street Signing and signals on the corridors. Jonathan prepared the Striping, City of Huntington Beach, CA. Deputy Project Manager. The City of Huntington Beach wanted new signing and striping to be installed attended meetings and coordinated with the city along Bolsa Avenue from Bolsa Chica Street to Springdale Street, and on 17th Street from Hamilton Avenue Complete Streets, City of Main Street to Palm Avenue. New signage Huntington Beach, CA. Deputy Project Manager. was installed to prevent vehicles from parking. As part of this project, new signing and striping New bike lanes with green pavement were also was installed along Hamilton Avenue from Magnolia Street to Brookhurst Street. New attending meetings with the city to understand curbs, ADA pedestrian ramps, and medians their needs and aligning the plans with the were installed, along with a new Rectangular Rapid Flashing Beacon (RRFB) system at the the new signing and striping on the plans intersection of Hamilton Avenue and Polynesian and reviewed the plans that were drafted by Lane. This RRFB system would enable students other team members. at Edison High School to safely cross the roadway once the pedestrian push button was activated. Jonathan was responsible for the design of the RRFB system, delegating the drafting work to other members of the team and reviewing their work prior to submitting it to the for the three phases of the project. Each phase closure during construction. Improvement Program (HSIP) Cycle 9 Project at 10 Locations, City of Cathedral City, CA. Project Engineer. As part of this project, multiple signal and communications equipment. New signal cabinets, signal controllers, signal mast arm poles, signal heads, video detection cameras with dilemma zones, and wireless radios were installed at signalized intersections along Vista Chino, Date Palm Drive, Landau Boulevard, Dinah Shore Drive, and Gerald Ford Drive. existing signal and communications equipment City of Tustin, Red Hill Avenue Rehabilitation | A-11 SECTION A. KEY STAFF RESUMES Upoz!Tbmbt-!QF!)XB-!DP* Tony Salas, PE (WA, CO), is a well-rounded engineer who understands engineering design for Caltrans and local agencies. His experience is composed of pavement delineation design, signing, overhead sign design, BKF tolling, Middle-Mile Broadband Network, ramp metering, roadway lighting, 15 years of experience street lighting, and photometric analysis. Furthermore, he has general Areas of Expertise Caltrans distance analysis. RELEVANT PROJECTS Hollister Avenue High- Signal improvements Intensity Activated Crosswalk Roadway lighting (HAWK) Signal, County of Signal Improvements, City and estimates (PS&E) Santa Barbara, CA. Project of Soledad, CA. Task Lead. As Design-build projects Manager. The HAWK signal part of a road diet, the city is will provide a safer way for Photometric analysis looking to add bike lanes and pedestrians to cross Hollister Avenue. The project includes Professional Civil survey and mapping for ramp Engineer, WA No. redesign, utility coordination, 20101200 vehicle detection and vehicle Southern California Edison Professional Civil heads. The design consists of Engineer, CO No. (SCE) coordination for new converting from vehicle loops PE.0057443 service pedestal and meter, to video detection on all legs of and signing and striping. Education the intersection, and relocation BS, Civil Engineering, of vehicle heads to line up to emphasis in include managing client Transportation, communications, budget, and As part of an on-call contract, California State scheduling, as well as providing Tony was the lead on this task Polytechnic University, design oversight for signing, Pomona, CA striping, and the HAWK signal. included managing the design and production team for the Ortega Hill – North Jameson Institute of Transportation Lane Bike Path Lighting, Engineers (ITE) County of Santa Barbara, CA. Project Manager. This Engineering Council (OCTEC) and assist with the development the extension of an existing bicycle path in Montecito. BKF assessed current lighting and presented to the city based conditions along the existing bike path and proposed City of Tustin, Red Hill Avenue Rehabilitation | A-12 SECTION A. KEY STAFF RESUMES Upoz!Tbmbt-!QF!)XB-!DP*!|!SFTVNF!QBHF!3 extension area to design an enhanced lighting Highway Safety Improvement Program (HSIP) system that improves safety and visibility for City of users while minimizing light spill and reducing Indio, CA. Task Manager. Tony led the design of disturbance to adjacent residential areas. The assessment involved detailed measurements of 15 signalized intersections and development environmental light across the site to determine factors such as optimal spacing for new light related accidents. The design implemented advanced dilemma zone detection systems and and another managed by the county, requiring extensive coordination with both agencies. BKF recommended upgrading to new LED luminaires Construction (SSPWC); assisted the city with closely matching the design of the existing Caltrans Local Assistance procedures; and successfully received E-76 for construction. between old and new lights while meeting Highway Safety Improvement Program (HSIP) City of included project management for the lighting Indio, CA. Task Manager. Tony led the design of along the bicycle path. He supervised technical work including photometric analysis, voltage drop 14 signalized intersections and development calculations, and plan design and development, and coordinated with SCE and the lighting vendor throughout the design process. implemented advanced dilemma zone detection Interstate 10/Cherry Valley Interchange, City of system, new controllers, and updated signal Calimesa, CA. Task Lead. This project develops the SSPWC and city template; assisted the city the existing diamond interchange to a diverging with Caltrans Local Assistance procedures; and diamond interchange (DDI) at the Interstate 10/successfully received E-76 for construction. Cherry Valley Interchange, which is a major thoroughfare of the south end of the City of Calimesa and the City of Beaumont. BKF is leading design of all roadway, retaining wall and this complex major interchange reconstruction. Tony is the task lead for the design of signing, engineering design support and interdisciplinary design coordination. He manages the production handling, detours, signing, and striping to ensure compliance with CA MUTCD and other applicable local standards. City of Tustin, Red Hill Avenue Rehabilitation | A-13 SECTION A. KEY STAFF RESUMES Csjbo!Gvkjnpup-!FJU Brian Fujimoto, EIT, is experienced in public works transportation with a career focus on supporting successful roadway and infrastructure projects from concept to construction. He possesses advanced Civil 3D design capabilities and is experienced in developing roadway plans, estimates, with multidisciplinary teams and public agencies to keep projects on BKF schedule and within budget. Valued for his technical expertise and 28 years of experience collaborative mindset, Brian brings a structured, detail-oriented approach to infrastructure development while maintaining strong regulatory and Areas of Expertise agency compliance standards throughout project delivery. Public works RELEVANT PROJECTS concrete bridge barriers, and transportation modify the curb returns to Technical Los Alisos Boulevard/ documentation accommodate the omitted Muirlands Boulevard Project coordination sidewalks, upgrade the ramps Intersection Improvements, Technical project to ADA compliant curb ramps. City of Lake Forest, CA. Project management Without widening the Muirlands Engineer. The intersection Regulatory compliance Blvd Bridge, and with the Los of Los Alisos Boulevard and Alisos Intermediate School and Muirlands Boulevard is within El Toro Park on the upstream Engineer-in-Training, a residential and community/ CA No. XE104363 side of the Muirlands Bridge regional park area, with Los over the Los Alisos Creek, Education the Project will construct two a Major Arterial and Muirlands BS, Civil Engineering, bicycle/pedestrian bridges, California State Boulevard as a Primary one on each side of Muirlands University, Long Beach Arterial. With Muirlands being Boulevard to provide a safe heavily travelled and used passage for the community. as an alternate route to the Interstate 5 Freeway during performing the 100% QA/QC peak hours, the City saw the of the plans and preparing the need and intends to construct Division of the State Architect second left turn lanes for all (DSA) submittal. legs of the intersection. In order to accommodate the dual left lanes for the Los Signal Communication and Alisos Boulevard/Muirlands Network System (Phase Boulevard Intersection 2), City of Redondo Beach, Improvements Project. CA. Project Engineer. The The existing Muirlands Signal Communications and Boulevard Bridge will be Network System (Phase 2) project is to increase multimodal sidewalks on both sides, modify mobility and upgrade aged the striping, upgrade the bridge signal infrastructure at 20 barriers to MASH compliant City of Tustin, Red Hill Avenue Rehabilitation | A-14 SECTION A. KEY STAFF RESUMES Csjbo!Gvkjnpup-!FJU!|!SFTVNF!QBHF!3 signalized intersections along Catalina Avenue documents and coordination with the drainage, and Prospect Avenue. The project includes teams to stay on schedule and budget. He worked directly with the City of Irvine, the City operations and safety conditions, signal timings of Lake Forest, Orange County Public Works, for conformance to latest standards; to assess and the US Department of the Navy to address multiple alternatives for feasibility; and to solicit design comments, incorporate agency standards, stakeholder feedback.and secure necessary approvals. Brian also Intersection improvements are expected to RFIs, evaluating contractor material submittals, include the replacement of signal infrastructure and verifying that grading, stormwater, and and the addition of video detection systems, roadway elements were built according to plan. interconnect capabilities, new curb ramps and bulb-outs to ensure ADA accessibility, Apple Valley Road Realignment and Widening, civil improvements to accommodate signal Town of Apple Valley, CA. Design Engineer. infrastructure and pedestrian maneuverability, Brian was responsible for the design of the 2.7 review and as-needed adjustment of signal miles of Apple Valley Road (Yucca Loma Road to Bear Valley Road). Tasks included roadway markings, and signage, and the exploration of design, storm drain improvements, landscape intersections along with a potential road diet signing and striping, stage construction, and R/W mapping. The major challenge of this project reviewing the roadway design for the curb was that the project widened approximately 15 return bulb-outs and pavement limits for 11 feet into the front yards of 150 private residential intersections, which included 56 curb ramps.properties. For each parcel, Brian developed Alton Parkway Extension, Orange County proposed roadway widening would impact each Public Works and City of Lake Forest, Irvine, owner. A second major challenge was that the CA. Project Engineer. Brian served as Project Engineer for both portions of the Alton Parkway ten feet higher than the other. Brian solved extension projects, which totaled 2.1 miles. the steep driveway join issues by designing Project 1 - Irvine Blvd. to Commercentre Dr. a vertically split road, where one side of the (Client: OC Public Works) roadway is higher and later tapers down to equal Project 2 - Commercentre Dr. to Towne Centre grade at the intersections. The project involved Dr. (Client: City of Lake Forest) coordination with up to 15 utility agencies, the Town of Apple Valley, San Bernardino Association Brian managed the technical development of Governments, adjacent developers, and the and multi-disciplinary coordination required to deliver a new 6-lane arterial roadway through an undeveloped corridor, where he provided oversight for the Alton Parkway roadway design, utility coordination, and environmental compliance to ensure the project met all City of Irvine, County, and regulatory requirements. Brian was in charge of the preparation and review of construction City of Tustin, Red Hill Avenue Rehabilitation | A-15 SECTION A. KEY STAFF RESUMES Ebo!Wjmmjoft-!QF experience includes hydraulic and structural analyses for the preparation facilities. Dan has performed plan-check services for public agencies to verify hydrology and hydraulic design considerations. He has extensive BKF knowledge of computer based hydraulic models for both open canal and 35 years of experience hydraulic conveyance systems. Dan has been involved in the structural analysis, design, and construction of several hydraulic based projects in Professional Civil Southern California. Engineer, CA No. 55210 Education RELEVANT PROJECTS BS, Civil Engineering, with new and replaced California Polytechnic impervious surfaces. Signal, City of Irvine, CA. University, Pomona Dan assessed impacts to a Tustin Avenue/Rose Drive Grade Separation Project, Hydrology and associated with the intersection Orange County Transportation Hydraulic Technical improvements and performed Authority (OCTA), Orange Group pre- and post-project hydraulic County, CA. Dan prepared American Society of analyses of the channel system. Civil Engineers (ASCE) plans, reports, and supporting He obtained approvals and technical studies for the an Encroachment Permit from storm drain and water quality the Orange County Flood components of the project, Control District, developed including 65%, draft 100%, improvements to the local storm drain system, and assisted with implementation of for the proposed channel and System procedures and comment resolution and processed plans and supporting PR/ED for Jamboree/Main studies with the Orange Intersection Enhancements, County Flood Control District City of Irvine, CA. Dan evaluated hydrologic changes Atwood Channel. to watersheds tributary to nine Jamboree Road and Interstate project and developed an in- 5 Interchange Widening, kind approach that provided Cities of Irvine and Tustin, stormwater treatment through CA. Dan was responsible for a single structural BMP. He water quality, drainage, and prepared the Preliminary Water Quality Management Plan plans associated with widening (P-WQMP) and delineated and City of Tustin, Red Hill Avenue Rehabilitation | A-16 SECTION A. KEY STAFF RESUMES Ebo!Wjmmjoft-!QF!|!SFTVNF!QBHF!3 Jamboree Road at Interstate 5. He prepared a Drainage Systems Analysis and Design, Three Storm Water Data Report for Caltrans watersheds Arch Bay Community Services District. Dan was and a WQMP for City watersheds, incorporating responsible for analysis and design of storm LID BMPs consistent with Green Streets drain and water quality improvements in Laguna guidelines, including two bioswale facilities Beach. He oversaw hydrologic and hydraulic within Caltrans R/W.analyses, preparation of a Drainage Master Plan Herndon Avenue Widening, City of Fresno, documents for facilities including detention CA. Dan performed a hydrology study for and debris basins, storm drains, water quality the proposed bridge and roadway widening facilities, and pump stations. He also presented improvements and developed a drainage project updates to District Board Members and management plan to mitigate impacts to Executive Directors. existing facilities. He prepared a drainage report documenting existing and post-project Fullerton Road Grade Separation, City of conditions, integrated stormwater quality Industry, CA. Dan supervised preparation of technical studies for the storm drain and water the drainage facilities.quality portions of this $140 million grade separation project. The project lowers Fullerton City of Irvine, CA. Dan includes a six-lane roadway underpass, retaining walls, and a new railroad bridge. drainage study of watersheds tributary to existing collection points. He also supervised preparation Downey Lakewood Florence Intersection Improvement Project, City of Downey, CA. Dan obtained Los Angeles County as-built storm drain Santa Ana RWQCB NPDES Permit through plans and assessed project impacts to existing Green Streets evaluations.drainage patterns and facilities. He developed a Cactus Avenue Widening, City of Rialto, the intersection improvements, evaluated utility CA. Dan provided drainage and water quality impacts associated with new drainage facilities, services for widening Cactus Avenue between Foothill Boulevard and Etiwanda Avenue. His responsibilities included preparing a SWPPP and NOI application for construction and a Order No. 1, Orange County Transportation post-construction WQMP consistent with Authority, Orange County, CA. NPDES regulations. He also investigated and recommended structural and non-structural BMP alternatives for existing catch basins. City of Tustin, Red Hill Avenue Rehabilitation | A-17 SECTION A. KEY STAFF RESUMES Bmbifti!Uivsbjsbkbi-!QF-!HF-!CD/HF Alahesh Thurairajah, PE, GE, BC.GE, is a geotechnical principal and project manager with 16 years of experience working on California transportation projects, including substantial work in Orange County for OCTA, Orange County, and local agencies. He has provided geotechnical design and construction recommendations per Caltrans procedures for more than 400 bridges, over 500 standard and non-standard retaining walls, and more than 300 miles of roadway. His technical expertise EMI includes deep and shallow foundations for bridges, retaining walls, and 16 years of experience drainage structures; probabilistic seismic hazard evaluation; liquefaction, seismic settlement, and lateral spreading evaluations; static and pseudo- static slope stability analyses; pavement structural section evaluation and Professional Geotechnical Engineer, for corridor rehabilitation projects. CA No. GE3123 Professional Civil RELEVANT PROJECTS roadway serviceability and Engineer, CA No. 81439 improve ride quality. Alahesh Wardlow Road Pavement Geotechnical Engineer, Rehabilitation Project, laboratory testing, and review ASCE City of Long Beach, CA. of pavement rehabilitation Geotechnical Principal. This Education recommendations prepared by roadway rehabilitation project MS, Civil Engineering, University of California, focused on restoring pavement technical oversight and QA/QC Los Angeles condition, improving ride quality, for the pavement evaluation BS, Civil Engineering, and extending service life California State memorandum, supporting along Wardlow Road. Alahesh Polytechnic University, clear, implementation-ready Pomona recommendations for a heavily laboratory testing, and review traveled arterial corridor. of pavement rehabilitation recommendations prepared by OC Loop O, P, & Q – Coyote Creek Channel, Orange technical oversight and QA/QC County Transportation Authority for the pavement evaluation (OCTA), Orange County and memorandum, supporting Los Angeles County, CA. implementation-focused Geotechnical Project Manager. rehabilitation recommendations This active transportation project for an active urban corridor. closed a major bikeway gap through new trail improvements, Long Beach Boulevard retaining structures, bridge Street Improvements elements, and pavement sections. Alahesh prepared Highway and Willow Street, a preliminary foundation City of Long Beach, CA. report for type selection, Geotechnical Principal. This urban corridor improvement investigations, and developed project involved pavement recommendations for retaining rehabilitation to restore City of Tustin, Red Hill Avenue Rehabilitation | A-18 SECTION A. KEY STAFF RESUMES Bmbifti!Uivsbjsbkbi-!QF-!HF-!CD/HF!|!SFTVNF!QBHF!3 walls, foundations, and pavement structural sections in expansive soils. His work supported through close coordination with the design multimodal corridor delivery with practical team and reviewers. geotechnical guidance for constructability and long-term performance. Improvements Project, City of Jurupa Valley, Intersection Improvements, City of San CA. Geotechnical Principal. This complete Gabriel, CA. Geotechnical Project Manager. streets project included new sidewalks, curb and The project proposes improvements to three gutter improvements, pavement rehabilitation, intersections: Valley Boulevard and New Avenue, San Gabriel Boulevard and Valley Boulevard, and Alahesh provided executive technical Valley Boulevard and Del Mar Avenue. These improvements are part of the State Route 710 rehabilitation recommendations and reviewed North Mobility Improvement Projects (MIPs). The proposed improvements include widening and constructability. His involvement supported intersections, adding additional turning lanes, a coordinated design approach for multimodal and installing Class II Bike lanes. The goal of improvements and pavement restoration in an the project is to provide congestion relief at the 3 active local agency corridor. intersections. Reviewed the existing information Valley Boulevard Widening, City of Menifee, and prepared a Geotechnical Evaluation Report. CA. Geotechnical Project Manager. This Safe Willow Street Corridor Improvements roadway improvement project involved Project, City of Long Beach, CA. Geotechnical pavement rehabilitation, roadway widening, Principal. This corridor improvement project medians, and curb ramps to support ADA included evaluation of existing pavement compliance along Valley Boulevard. Alahesh testing, and development of pavement testing and developed recommendations for rehabilitation alternatives and construction pavement structural sections, excavations, cut recommendations. Alahesh provided executive- the geotechnical report providing design and testing, and review of the pavement evaluation construction recommendations to support corridor memorandum, supporting practical rehabilitation improvement and implementation. recommendations for a heavily traveled Telegraph Road Widening Project, County urban corridor. of Ventura, Santa Paula, CA. Geotechnical State Route 55 Improvement Project Project Manager. This corridor improvement between Interstate 405 and Interstate 5, project widened Telegraph Road from two lanes OCTA, Orange County, CA. Geotechnical Task to four lanes and included Class II bike lanes, Leader. This major Orange County freeway sidewalks, curb ramps, curbs, and gutters to improvement project included widening, improve multimodal mobility and cyclist safety. retaining walls, overhead signs, roadway laboratory testing program and prepared the pavement structural sections. Alahesh managed geotechnical memorandum providing pavement testing, evaluated liquefaction and seismic work supported the design team with subsurface settlement, and developed recommendations information directly relevant to pavement for bridges, retaining walls, roadway features, rehabilitation, active transportation improvements, and embankments. He prepared foundation and corridor drainage considerations. reports and geotechnical design documentation in compliance with Caltrans standards City of Tustin, Red Hill Avenue Rehabilitation | A-19 APPENDIX B. REQUIRED FORMS APPENDIX B. Required Forms FORMPAGE Attachment B, Non-Collusion B-2 B-3 Attachment D, Non-Discrimination B-4 B-6 City of Tustin, Red Hill Avenue Rehabilitation | B-1 APPENDIX B. REQUIRED FORMS City of Tustin, Red Hill Avenue Rehabilitation | B-2 APPENDIX B. REQUIRED FORMS CITYOFTUSTIN ATTACHMENT C NON-LOBBYINGCERTIFICATION The prospective participant certifies, by signing andsubmitting this bid or proposal, to the best of his or her knowledge and belief, that: (1)NoFederal appropriated funds have beenpaid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Memberof Congress, anofficeroremployee of Congress, or an employee of a Member of Congress in connection with theawarding of anyFederal contract, themaking of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of anyFederalcontract, grant, loan, or cooperative agreement. (2)If anyfunds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attemptingto influence anofficer or employee of anyFederalagency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form-LLL, "Disclosure of Lobbying Activities," in conformance with its instructions. Thiscertificationis a materialrepresentation of fact upon whichreliancewasplacedwhenthistransaction was made or entered into.Submission of this certification is a prerequisite for making or entering into this transaction imposed by Section 1352, Title 31, U.S. Code.Any person who fails tofile therequired certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure. The prospective participant also agrees by submitting his or her bid or proposal that he or she shall require that the language of thiscertification be included inalllowertiersubcontracts,whichexceed $100,000 andthatallsuch subrecipients shallcertifyand disclose accordingly. Signed: Title: Firm: Date: THISFORMMUSTBECOMPLETEDANDINCLUDEDWITHTHEPROPOSAL. PROPOSALSTHATDONOTCONTAINTHISFORMWILLBECONSIDEREDNONRESPONSIVE. City of Tustin, Red Hill Avenue Rehabilitation | B-3 APPENDIX B. REQUIRED FORMS CITY OF TUSTIN ATTACHMENT D NON-DISCRIMINATION CERTIFICATION The undersigned consultant or corporate officer, during the performance of this contract, certifies as follows: 1. The Consultant shall not discriminate against any employee or applicant for employment because of race, color, religion, sex, or national origin. The Consultant shall take affirmative action to ensure that applicants are employed, and that employees are treated during employment without, regard to their race, color, religion, sex, or national origin. Such action shall include, but not be limited to, the following: employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The Consultant agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided setting forth the provisions of this nondiscrimination clause. 2. The Consultant shall, in all solicitations or advertisements for employees placed by or on behalf of the Consultant, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, or national origin. 3. The Consultant shall send to each labor union or representative of workers with which he/she has a collective bargaining agreement or other contract or understanding, a notice to be provided advising the said labor union or workers’ representatives of the Consultant’s commitments under this section, and shall post copies of the notice in conspicuous places available to employees and applicants for employment. 4. To the extent required by Executive Order 14173 (“Ending Illegal Discrimination and Restoring Merit-Based Opportunity,” effective January 21, 2025) or any applicable federal contract terms, the Consultant further certifies that it does not operate any programs promoting diversity, equity, and inclusion (DEI) that violate any applicable Federal anti-discrimination laws. The Consultant acknowledges that a false certification may give rise to liability under the False Claims Act (31 U.S.C. § 3729 et seq.). 5. The Consultant certifies that it complies in all respects with all applicable Federal anti-discrimination laws, including but not limited to Title VII of the Civil Rights Act of 1964 (42 U.S.C. § 2000e et seq.), the Age Discrimination in Employment Act of 1967 (29 U.S.C. § 621 et seq.), the Americans with Disabilities Act of 1990 (42 U.S.C. § 12101 et seq.), and Title VI of the Civil Rights Act of 1964 (42 U.S.C. § 2000d et seq.), as applicable to this contract. The Consultant further certifies compliance with Section 503 of the Rehabilitation Act of 1973, as amended (29 U.S.C. § 793; 41 C.F.R. Part 60-741), and the Vietnam Era Veterans’ Readjustment Assistance Act of 1974, as amended (38 U.S.C. § 4212; 41 C.F.R. Part 60-300) (“VEVRAA”), which impose both non-discrimination requirements and affirmative action obligations with respect to qualified individuals with disabilities and protected veterans, respectively, to the extent the Consultant is subject to those requirements based on contract value and workforce size. 6. The Consultant shall comply with the California Fair Employment and Housing Act (FEHA), (California Government Code §§ 12900–12999), which prohibits discrimination and harassment in employment on the basis of any protected characteristic defined in Government Code sections 12926 City of Tustin, Red Hill Avenue Rehabilitation | B-4 APPENDIX B. REQUIRED FORMS CITYOFTUSTIN and 12926.1, including race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, genetic information, marital status, sex, gender, gender identity, gender expression, age (40 and over), sexual orientation, military and veteran status, and any other characteristic protected by California law. FEHA applies to public and private employers with five or more employees (and to all employers for harassment claims) and is enforced by the California Civil Rights Department. FEHA applies independently of federal requirements and is unaffected by any changes to federal executive orders. This obligation also encompasses California Labor Code § 1735, which expressly incorporates FEHA’s protected categories by reference and applies those non- discrimination obligations specifically to contractors on public works; violations of § 1735 are subject to the public works penalty and debarment provisions of Labor Code Chapter 1 (Part 7, Division 2), which are in addition to and independent of any civil remedies available under FEHA. 7.The Consultant shall include the provisions of the above paragraphs to the extent applicable based on funding source and contract valueor other applicable requirements, in every subcontract or purchase order for work performed under this contract, so that such provisions shall be binding upon each subcontractor or vendor. The Consultant is responsible for ensuring compliance by subconsultants and suppliers. Signed: Title: Firm: Date: THISFORMMUSTBECOMPLETEDANDINCLUDEDWITHTHEPROPOSAL. PROPOSALSTHATDONOTCONTAINTHISFORMWILLBECONSIDEREDNONRESPONSIVE. City of Tustin, Red Hill Avenue Rehabilitation | B-5 APPENDIX B. REQUIRED FORMS CITY OF TUSTIN ATTACHMENT E CERTIFICATE REGARDING DEBARMENT, SUSPENSION, INEGIBILITY AND VOLUNTARY EXCLUSION This certification is required by the regulations implementing Executive Order 12549, as amended, Debarment and Suspension, 2 CFR Part 180, Subpart C, Responsibilities of Participants Regarding Transactions with Other Persons. . (Before completing certification, read instructions which are an integral part of certification) 1.Pursuant to 2 CFR 180.335, the prospective primary participant, (i.e., grantee) certifies to the best of its knowledge and belief, that it and its principals: a.Are not presently excluded or disqualified; b.Have not been convicted within the preceding three years of any of the offenses listed in 2 CFR 180.800(a) or had a civil judgment rendered against them for one of those offenses within that time period. c.Are not presently indicted for or otherwise criminally or civilly charged by a government entity (Federal, State or local) with commission of any of the offenses listed in 2 CFR 180.800(a); and d.Have not had one or more public transactions (Federal, State or local) terminated within the preceding three years for cause or default. 2.Where the prospective primary participant is unable to certify to any of the statements in this certification, such prospective participant shall attach an explanation to this proposal. Consultant Name and Title of Official Authorized to Certify On Behalf of the Consultant Date THIS FORM MUST BE COMPLETED AND INCLUDED WITH THE PROPOSAL. PROPOSALS THAT DO NOT CONTAIN THIS FORM WILL BE CONSIDERED NONRESPONSIVE. City of Tustin, Red Hill Avenue Rehabilitation | B-6 APPENDIX B. REQUIRED FORMS CITY OF TUSTIN INSTRUCTION FOR CERTIFICATION 1. By signing and submitting this proposal, the prospective recipient of Federal assistance funds is providing the certification as set out below. 2. The certification in this clause is a material representation of fact upon which reliance was placed when this transaction was entered into. If it is later determined that the prospective recipient of Federal assistance funds knowingly rendered an erroneous certification, in addition to other remedies available to the Federal Government, the Department of Labor (DOL) may pursue available remedies, including suspension and/or debarment. 3. The prospective recipient of Federal assistance funds shall provide immediate written notice to the person to which this proposal is submitted if at any time the prospective recipient of Federal assistance funds learns that its certification was erroneous whom submitted or has become erroneous by reason of changed circumstances. 4. The terms “covered transaction”, “debarment”, “suspension”, “disqualified,” “ineligible”, “lower tier covered transaction”, “participant”, “person”, “primary covered transaction”, “principal”, “proposal”, and “voluntarily excluded”, as used in this cause, have the meanings set out in the Definitions and Coverage sections of rules implementing Executive Order 12549. You may contact the person to whom this proposal is submitted for assistance in obtaining a copy of those regulations. 5. The prospective recipient of Federal assistance funds agrees by submitting this proposal that, should the proposed covered transaction be entered into, it shall not knowingly enter into any lower tier covered transaction with a person who is debarred, suspended, disqualified, declared ineligible, or voluntarily excluded from participation in this covered transaction, unless authorized by the DOL. 6. The prospective recipient of Federal assistance funds agrees by submitting this proposal, that it will include the clause title “Certification Regarding Debarment, Suspension, Ineligible, or voluntarily excluded from the covered transaction” unless it knows that the certification is erroneous. 7. Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render in good faith the certification required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings. 8. Except for transactions authorized under paragraph 5 of these instructions, if a participant in a covered transaction knowingly enters into a lower tier covered transaction with a person who is suspended, debarred, ineligible, or voluntary excluded from participation in this transaction, in addition to other remedies available to the Federal Government, the DOL may pursue available remedies, including suspension and/or debarment. City of Tustin, Red Hill Avenue Rehabilitation | B-7