RESOLUTION NO. 80-112
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUSTIN,
CALIFORNIA, APPROVING PLANS AND SPECIFICATIONS FOR
PROJECT I - MEDIAN CONSTRUCTION AT MAIN AND BRYAN, IRRIGATION AND LANDSCAPE
PROJECT II- TRAFFIC SIGNAL CONDUIT ON NEWPORT AVE., LAGUNA RD. TO IRVINE~ BLVD.
PROJECT III CENTER MEDIAN IRRIGAT. ION AND LANDSCAPE ON NEWPORT AVE., MCFADDEN
AVE. TO IRVINE BLVD.
WHEREAS, it is the intention of the City Council of the City of TUstin,
California to construct Project I- Median Construction at Main and Bryan,
irrigation and landscape. Project .!I - Traffic signal conduit on Newport
Ave., Laguna Rd. to Irvine Blvd. Project III - Center median irrigation
and landscape on Newport Ave.., McFadden Ave. to Irvine Blvd.
WHEREAS, the City Engineer has presented plans and specifications for
the construction of said work;
NOW THEREFORE, BE IT RESOLVED that the plans and specifications presented
by the .City Engineer be and are hereby, ap.proved as the plans and specifications
for Project I - Median construction at Main and Bryan, irrigation and landscape
Pro. ject II-.--Traffic Signal conduit on Newport Ave., Laguna Rd. to Irvine Blvd.
_Project III - Center median irrigation and landscape on Newport Ave., McFadden
Ave. to Irvine Blvd.
BE IT FURTHER RESOLVED that the City Clerk is hereby authorized and
directed to advertise as required by law for~J~receipt of sealed bids or
proposals for the doing of the work specified in the aforesaid plans and
specifications which said advertisement shall be substantially in the following
words and figures, to-wit'
"NOTICE TO CONTRACTORS"
SEALED PROPOSALS will be received at the office of the Ctty
Clerk, Tustin City Hall, ..300 Centennial Way, Tustin, California, until
ll:O0 A. M. on the 20th' day of November, 1980, at which time they will
be publicly opened and read, for performing work as follows:
Pr_oject I - Median construction at Main and Bryan,
irrigation and landscape
Pr. oject II- Traffic signal conduit on Newport Ave.,
Laguna Rd. to Irvine Blvd.
_Project II I Center median irrigation and 1 andscape
on Newport Ave., McFadden Ave. to Irvine
Blvd.
Bids are required for the entire work described herein-
A-1
8
lO
16
18
.19
~0
~?
28
~0
PROJECT. I
Item No.
Unit
Quantity
Description
·
13.
14.
15.
16.
17.
18.
19.
20.
Lin.ft.
Lump sum
374
1
32.1
74
1463
22
2
1
1
1
i1
Limn. ft.
Ton
Ton
Sq. ft.
Lin.ft.
each
each
Lump sum
Lump sum
Lump sum
PROJECT I I
Lin.ft.
1373
Lin. ft.
79
Lin. ft.
Lin. rft.
Lin.. ft.
Lin. ft.
each
each
45
342
216
:164
14
7
PROJECT I I I
Sawcut
' .
removals, disposals and reloca-
tions
Type A curb and gutter
Asphalt concrete base course
Asphalt concrete overl ay
4" thick embossedI concrete
4" PVC pipe
adjust water valve box
adjust sanitary sewer M.H.
traffic striping
irrigation system & related work
Landscape & related work
l" rigid meta'l conduit (open
trench)
l" rigid metal condbi t( tunnel
under curb )
1½" rigid meta,t conduit (bore)
2" rigid metal conduit(bore)
2½" rigid metal conduit (bore)
3" ri gid metal conduit (bore)
No. 3½ pull box
No. 5 pull box
21. Lin. ft. 3145
22. Sq. ft. 9827
23. Lump sum 1
24. Lump sum. 1
4" thick x l' wide concrete mow
strip.
4" thick embossed concrete
Irrigation system & related
work
Landscape and related work
The foregoing quantities are approximate only, being given as a basis for
the comparison of bids, and the City of 'T'ustin does not, expressly or by
implication, agree that the actual amount of work will correspond therewith,
but reserves the right to .increase or decrease the amount of any class or port-
ion of the work, or to omit portions of the work as may be deemed necessary
or advisable by the Engineer.
Plans, specifications and proposal forms to be used for bidding on this ....
project can only be obtained by prospective bidders at the office of the City-
Clerk, Tustin City Hall, 300 Centennial Way, Tustin, California 92680, upon.
payment of $10.00 per set which anlount shall be non-refundable.
-
Plans and specifications will only be mailed out upon payment of $15.00
per set which amount shall be non-refundable.
A-2
8
lO
~0
~6
~0
In conformance with Section 37931 of the Government Code, all bids shall
be presented under sealed cover on the proposal form provided and accompanied
by one of the following forms of bidders' security.
a. Cash.
b. ~ashier's check made paYable to the City of Tustin.
c. Certified check made pavable to the Cityof Tustin.
d. Bidder's bond executed Lb~v an accredited surety insurer,
made ~ay. ab]e to the Ci~ty of Tustin.
The security shall be in an amount equal to at least ten percent (lO~)
of the amount of the bid. A bid shall not be considered unless one'of the
forms of bidder's security is enclosed therewith.
A Surety Bond for payment of labor and materials will be' required in the
amount of fift.v (50%) of the estimated total contract price and a Faithful
Performance~.Bo'ru:lin the amount of one hundred percent (100%) of the estimated
total contract price in the form attached to the contract documents. Said bonds
shall be issued by a Surety Company rated grade A or better and Class IX or
better by the latest edition of Best's Key Rating Guide.
City of Tustin reserves the right to reject any or all bids, and/or waive
any informality on a bid. No bidder may withdraw his bid for a period of
thirty (30) days after the date set for the opening thereof.
The contract will be awarded to the lowest qualified bidder.
Provsisions of the State Contract Act are not applicable, and prospective
bidders will not be required to be prequalified.
All work to be done under the direct supervision of the City Engineer
City of Tustin. '
All work to be paid for at t.he. unit prices bid from appropriated monies.
A-3
6
8
9
10
11
15
16
.17
18
19
20
21
24
Z8
29
~0
The City Council of the City of Tustin has obtained
from the Director of Industrial Relations the general prevailing rate ,
of per'diem wages and the general prevailing rate for legal holiday
and overime work in the locality in which the work is to be performed
·
for each craft or type of work needed and a copy of the same is on file
in the office of the ~...i.t.]y Clerk.
Not less than said prevailing rates shall be paid to workers
employed on this public works contract as required by Labor Code Sections
1771 and 1774 of the State of California.
PASSED AND ADOPTED by the Cq~ty Council of the City of Tustin
California, this 20th day of October, 1980.
ATTEST'
CIT~ CLERK
MAYOR
PUBLISH TUSTiN NEWS:
Oc'tober 30, 1980
November 6, 1980
A-4
5
8
9
10
11
lZ
14
16
18
19
~0
21
28
~0
'i
STATE OF CALIFORNIA)
COUNTY OF ORANGE ) SS
CITY OF TUSTIN )
MARY E WYNN, City Clerk and ex-officio Clerk of the City Council of
.the Ci~:y of Tustin, California, does hereby certify that the whole
number of the members of the City Council of the City of Tustin is five;
that the above and fore[Ioing Resolution No. 8o-112 was duly and reqularly
introduced, read, passed and adopted at a regular meeting of the'~.City·
Council held' on the 20th day of October ,1980.
AYES
NOES"
ABSENT'
COUNCILMEN'saltarelli, Ed~a..?.,. Sha. rp, Hoesterey, Kennedy
COUNC I LMEN' None
COUNCILMEN'None
City Clerk, City 'bf '?us~in, CAl~.~orni'a ".
A-5
m m m ' , m ~ m ''m 'm/m mm~'
mm m m m m m 'm m' m 'm ~mmmmm '