Loading...
HomeMy WebLinkAboutB ST S 515 07/24/1995Go'Ty"'� � ' Community Development Department July 24, 1995 City of Tustin 300 Centennial Way Tustin, CA 92680 b. The proposed work does not adversely affect the character of the District or Designated Cultural Resources within the District. C. The. proposed work is harmonious with existing surroundings. The extent of harmony shall be evaluated in terms of appropriateness of materials, scale, size, height, placement and use of a new building or structure in relationship to existing buildings and structures and the surrounding setting. Director (714)573-3106 Planning & Zoning Info. (714) 573-3140 CERTIFICATE OF APPROPRIATENESS 515 SOUTH 11B11 STREET Building (714)573-3131 RE -ROOFING OF A NONCONTRIBUTING RESIDENTIAL GARAGE (714) 573-3132 Housing In accordance with Ordinance No. 1001 which was adopted (714) 573-3117 June 20, 1988 by the Tustin City Council, the Community Code Enforcement Development Director has the authority to approve, (714) 573-3134 approve with conditions or deny Certification of Appropriateness for improvements requiring a City Business License (714) 573-3144 building permit for property located within a Cultural Resource District. Inspection Requests (714)573-3141 The following findings are required before a .Certificate Graffiti Hot Line of Appropriateness is issued: (714) 573-3111 a. The proposed work conforms to the Municipal Code FAX Machine and design standards which may be established from (714) 573-3113 time to time by the Cultural Resources Committee. b. The proposed work does not adversely affect the character of the District or Designated Cultural Resources within the District. C. The. proposed work is harmonious with existing surroundings. The extent of harmony shall be evaluated in terms of appropriateness of materials, scale, size, height, placement and use of a new building or structure in relationship to existing buildings and structures and the surrounding setting. Certificate of 515 South "B" July 24, 1995 Page 2 Appropriateness Street The Community Development Director has reviewed the re -roofing proposal for the flat roof of the subject residential garage and has determined that the proposal is in conformance with the above requirements. The proposed rock/built-up roofing material is similar in appearance to the existing material and is appropriate for the subject garage building. Furthermore, the garage is at the rear of the subject property and is not visible from the public right-of-way. The proposed work is hereby approved, subject to the following conditions: 1. Prior to the start of any roofing work, the applicant shall obtain a building permit and pay all applicable plan check and permit fees. 2. Any replacement or repair of an existing feature of the roof (ie. facia, gutters, downspout, roof vents, chimneys) shall match the existing materials, finish and colors of the existing structure. Christine A. P4ingleton Assistant Cit Manager CAS:sr:515SOB.COA