Loading...
HomeMy WebLinkAbout6TH ST W 415 07/24/1997J ��iS►(®4j Community Development Department 300 Centennial Way Tustin, CA 92780 (714) 573-3100 CERTIFICATE OF APPROPRIATENESS 415 WEST SIXTH STREET CONSTRUCTION OF A RAISED REAR PORCH JULY 24, 1997 In accordance with Ordinance No. 1001 which was adopted June 20, 1988 by the Tustin City Council, the Community Development Director has the authority to approve, approve with conditions or deny Certification of Appropriateness for improvements requiring a City building permit for property located within a Cultural Resource District. The following findings are required before a Certificate of Appropriateness is issued: a. The proposed work conforms to the Municipal Code and design standards which may be established from time to time by the Cultural Resources Committee. b. The proposed work does not adversely affect the character of the District or Designated Cultural Resources within the District. C. The proposed work is harmonious with existing surroundings. The extent of harmony shall be evaluated in terms of appropriateness of materials, scale, size, height, placement and use of a new building or structure in relationship to existing buildings and structures and the surrounding setting. Certificate of Appropriateness 415 West Sixth Street July 24, 1997 The Community Development Department has reviewed the submittal for the raised porch in the rear of the residence and has determined that the proposal is in conformance with the above requirements. A Certificate of Appropriateness was originally approved on April 2, 1993, to allow construction of such a porch, and the proposal seeks only minor modifications to that approval. The proposed work is hereby approved, subject to the following conditions: 1. Prior to issuance of a building permit, payment shall be made of all applicable Building plan check and permit fees. 2. All colors and materials of the proposed construction shall be consistent with those of the existing residential structure. 3. If the applicant desires to install roofing material on the proposed patio cover, the roofing materials shall be harmonious and consistent with the existing residential structure. All proper permits shall be secured from the Building Department prior to installation of said roofing material. Elizabeth A. Binsack Director of Community Development EAB:BE:br:415W6TH.COA