Loading...
HomeMy WebLinkAboutEL CAMINO REAL 180 02/27/1997GMTV O vs�(� Community Development Department February 27, 1997 CERTIFICATE OF APPROPRIATENESS 180 EL CAMINO REAL DETACHED ENTRY STRUCTURE City of Tustin 300 Centennial Way Tustin, CA 92780 (714) 573-3100 In accordance with Ordinance No. 1001 which was adopted June 20, 1988 by the Tustin City Council, the Community Development Director has the authority to approve, approve with conditions or deny Certification of Appropriateness for improvements requiring a City building permit for property located within a Cultural Resource District. The following findings are required before a Certificate of Appropriateness is issued: a. The proposed work conforms to the Municipal Code and design standards which may be established from time to time by the Cultural Resources Committee. b. The proposed work does not adversely affect the character of the District or Designated Cultural Resources within the District. C. The proposed work is harmonious with existing surroundings. The extent of harmony shall be evaluated in terms of appropriateness of materials, scale, size, height, placement and use of a new building or structure in relationship to existing buildings and structures and the surrounding setting. Certificate of Appropriateness 180 E1 Camino Real February 27, 1997 The Community Development Department has reviewed the proposed plans for a detached entry structure in conjunction with a restaurant and tea house use and has determined that the proposal is in conformance with the above requirements. The proposed design, materials and colors are similar in appearance to the elements included on the, exterior elevations of the existing structure and is appropriate for the subject building. The proposed work is hereby approved, subject to the following conditions: 1. Prior to.the start of any construction, the applicant shall obtain a building permit and pay all applicable plan check and permit fees. 2. The stucco color and wooden support posts shall be painted to match the color and texture of the main structure. 3. A separate sign permit shall be submitted for review and approval of the Community Development Department. Elizabeth A. Binsack Community Development Director EAB:SJP:180ELCam.COA