Loading...
HomeMy WebLinkAboutEL CAMINO REAL 445 04/19/2005Community Development Department �S�&LT&SA�" __ City of Tustin APRIL 19, 2005 300 Centennial Way Tustin, CA 92780 CERTIFICATE OF APPROPRIATENESS 714.573.3100 445 El Camino Real REROOF OF A NON -RATED COMMERCIAL STRUCTURE In accordance with Ordinance No. 1001 which was adopted June 20, 1988, by the Tustin City Council, the Community Development Director has the authority to approve, approve with conditions, or deny Certificates of Appropriateness for improvements requiring a City building permit for property located within a Cultural Resource District. The proposed project includes the removal of the existing roofing materials on the flat portion of the roof at 445 Ell Camino Real, and replacement with 4 ply, "Hot Mop" liquid roofing material. The existing building is a "non -rated" structure per the Tustin Historical Resources Survey Report.. The Community Development Department finds and determines as follows: A. The proposed work conforms to the Municipal Code and any applicable design standards in that in accordance with TCC Section 8103 (m) the proposed roof is a class `B" covering assembly. B. The proposed work does not adversely affect the character of the District or Designated Cultural Resources within the District in that the proposed roof replaces the roofing materials on the existing flat portion of the roof with new similar roofing materials which are to the appropriate to the existing buildin . C. The proposed work is harmonious with existing surroundings in that the proposed roof material is consistent with the style of the existing roof and appropriate .for the building. The proposed roofing material will be installed on the flat portion of the roof and will not be visible from the public street. The proposed work is hereby approved, subject to the following conditions: Prior to the start of any work, the applicant shall obtain a building permit and pay all applicable plan check and permit fees. 2. Any replacement or repair of any existing features surrounding the roof shall match the existing materials, finish, and colors of the existing structure. 3. The roof materials are to be removed and replaced on the flat portion of the roof only. Elizabeth A. Binsack-I Community Development Director