Loading...
HomeMy WebLinkAbout3RD ST W 335 09/12/2008t, Uo �,:� Development Department C le of Appropriateness The proposed work Involves improvement to stnfctur ) that Ware ht luded In the Cfty S of Tustin Historical Resources SyneY RetZorY Q Nps u�� M Yes, Stnrcture(sl Style: ���,'i ���,.��/44� 25;! RE -ROOFING PERMIT APPLICATIQN S QU ESTION NA6RS,dance wrtn Orumance No, 1001, the Community Development Department Iinft and determines ;hat The propos w .huik conforms to the Municipal Code and established design PLEASE ANSWER THE FOLLOWING QUESTIONS standards. J app:icable, The proposed work does not adversely affect the character of the district or Designated Cultural Resources within the district. JOB ADDRESS: 33 S w- 3 ` /ysT�� The proposed work is harmonious with existing surroundings M forms of eppwpnaieness of materials, scale, size, height, placement, and use of a now binding or structure in relationship to exlsWtg buildings and structures and the 1. Does this application constitute any change in type surrounding setting. of rpglerial from existing construction?YES _ NO is • • • • Appro,,:,; ., - — Date:6Q J • • •• /// •••e• 2. Indicate type o1•e%sting railing material Ccrn.� o 3. Answgr the following que%tions ( for new roof) • • • 4 eTppe of material jR_ Ld•r�,�,p. 9 � �s� b.•"VanufatUrVIname and, model 0C ORFS 30 c.••fiesting approval age4yname and approval number I (ICI3O report#) C"C/IV ) J." Height ofgaterial pei�gaare foot ..... ..... 4. I�ew roofing•rYfiM%al to be installed as follows: (check one) *000 a. Over existing roofing material YES _NO _ b. Installing new underlay material YES NO _ I f answer to "a" is yes, proceed to following questions. 5. Is the additional weight on roof structure more than 4 psf? (assuming existing material is 3 pfs or less such as wood shakes, shingles and composition shingles) YES NO,,,J� 6. Is a new built up roofing material to be applied over existing roofing in a commercial building? YES_NO,Z 7. If the answer to question No. 5 or 6 is yes, then provide the following: a. A drawing which shows roof slope and the framing of all rafters and roof support members. b. Size, span, and location of all supporting roof rafters and shear walls. c. Engineering calculations justifying the structure for additional weight. d. Drawing and calculations signed by California registered civil engineer, structural engineer or architect. NOTE: 1. Effective October 1, 2005, reroofing of flat roof greater that 2000 sq/ft or more than 50% of the total roof area, shall comply with the cop !_J_ requirements of the State of California Title 24 Energy Efficiency Standards.- InitialA- 2. All new roofing material shall be class B or better per City of Tustin Ordinance number 8103 (f). Except in high fire hazard zone as determined by Orange C. unty Fire Authority and Planning Division where a minimum Class A is required. Initial! Submitted b.Cr Date: Signature: Plan Checker —T Date ME