Loading...
HomeMy WebLinkAboutMAIN ST W 695 05/12/11lity of Tusl.in Comm, Oe t r rtisl,n !i9 f 'i)r:d,ro} �eve(�Sn�c�rn��t`htirtment 1,%; en'ticale of Appropriateness Address:v �. ItI4-zN c�%n Proposed Work: —L2C_ - 2 co rr o DNC. y TAe Pn*o ed work irwolves imDrevemeM to struct fele) a, • yah, khcluded In the CITY of Tustin Hisfonpl Resources S "— Re ort YES L�1p rL N Yes. shueturap) StYW.. 2 A N f -S urv!,etL. W Rating: RE -ROOFING PERMIT APPW&*T4AM6, ordinance fvo, toga, tfnecon,muniy Development oepanmam randa QUESTIONNAIRE""" The ptoposed work cordomhe to the Municipal Code and astablisned design ,. /" standards, it applicable, u PLEASE ANSWER THE FOLLOWING QUESTIONS Tne Proposed work does not adversely affect the character of the W"dc,W hgnated Cultural Resources within trio disfoct. Proposed work is hamhoNous with existing surroundings in terms at JOB ADDRESS: q ►-VI appropriateness ofmaterisls, wale. 1W -1 .1luclure In slze,height.plxement,andw.a fe to ealsW,g hWldfngs end structures and the 1. Does this application constitute any change in type surrounding seninp of material from existing construction? App- 2. pp..2. Indicate type of existing roofing material — _ , Ccmq 3. Answer the following questions ( for new roof) a. b. C. d. Type of material G'i S S R Tr-kD MA Tr-t-il bt c Manufacturer's name and model - Testing approval agency name and approval number I (►CBO report #) '-- Weight of material per square foot I :5�- 4. New roofing material to be installed as follows: (check one) a. Over existing roofing material YES _NOX b. Installing new underlay material YES �/ NO — I f answer to "a" is yes, proceed to following questions. J� 5. Is the additional weight on roof structure more than 4 psf? (assuming existing material is 3 pfs or less such as wood shakes, shingles and composition shingles) � 6. Is a new built up roofing material to be applied over existing roofing in a commercial building? YES YES NO NO 7. If the answer to question No. 5 or 6 is yes, then provide the following: a. A drawing which shows roof slope and the framing of all rafters and roof support members. b. Size, span, and location of all supporting roof rafters and shear walls. c. Engineering calculations justifying the structure for additional weight, d, Drawing and calculations signed by California registered civil engineer, structural engineer or architect. NOTE: 1. Effective October 1, 2006, reproofing an existing flat roof greater that 2000 sq/ft or more than 50% of the total roof area, requires the compliance with the cool roof requirements of the State of California Title 24 Energy Efficiency Standards.- Initial ------- 2. All new roofing material shall be class B or better per City of Tustin Ordinance number8103 (Q. Except in high fire hazard zone as determined by Orange County Fire Authority and Planning Division where a minimum Class A is required_ Initial ------- Submitted by:,____.___�01���c��3e Date: — � 1� 2-0) 1 Signature: — — 4 - Plan C ec e ate 1-01221 Coil III nnlily l)c>velgpme'lt (.)ep,ulrllF.nt Gity Of Tustin 11;222 I:)c?l Arno Av.�rx,t> March 20, 1992 Tustin, CA 92680 (714) 5448890 FAX (714) 832082.5 Thomas M. Knybel, 695 West Main Street Tustin, CA 92680 SUBJECT: CERTIFICATE OF APPROPRIATENESS FOR THE RE -ROOFING OF A NON-CONTRIBUTING RF,SIDERCE AT 695 WEST MAIN STREET Dear Sir: In accordance with Ordinance No. 1001 which was adopted June 2.0, 1988 by the Tustin City Council, the Community Development Director has the authority to approve, approve with conditions or deny Certification of Appropriateness for improvements requiring a City building permit for property located within a Cultural Resource District. The following findings are required bef.�'.�= � Certificate of Appropriateness is issued: a. The proposed work conforms to the Municipal Code and design standards which may be established from time to time by the Cultural Pesources Committee. b. The proposed work does not adversely affect the character of the District or Designated Cultural Resources within the District. C. The proposed work is harmonious with existing surroundings. The extent of harmony shall be evaluated in terms of appropriateness of materials, scale, size, height, placement and use of a new building or structure in relationship to existing buildings and structures and the surrounding setting. The Community Development Director has reviewed the after -the -fact re -roof for the above-mentioned residence and has determined t1 -at the proposed fiberglass composition shingle roofing is n conformance with the above requirements. The proposed r, of material is consistent with existing conditions and is appropriate for the residence. 0 Thomas M. Knyt,c:l March 20, 1993 Page 2 Because the work was begun prior to obtaining d building permit, a stop -work order was issued, and penalty fees will be assessed when the permit is pulled. The re -roofing is hereby approved subject to the following condition: Prior to the continuation of any roofing work, the applicant shall obtain a building permit and pay all applicable plan check and permit fees, including penalty fees pursuant to Section 304(e) of the Uniform Administrative Code. Should you have any questions regarding this matter please feel free to contact me at (714) 544-8890, extension. 277. Sincerely, Christine A. Shingleton Assistant city Manager Jco-'�t 4'tA' Scott Reekstin Assistant Planner CAS:SR:kd/knybel.coa