Loading...
HomeMy WebLinkAboutZA 94-013/AA 94-001 1 ZONING ADMINISTRATOR ACTION 94-013 ADMINISTRATIVE ADJUSTMENT 94-001 NOVEMBER 7, 1994 2 3 The Zoning Administrator of the ci ty of Tustin does 4 hereby resolve as follows: 5 I. 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 The Zoning Administrator finds and determines as follows: A. That a proper application, Administrative Adjustment 94-001, was filed by California Pacific Homes to authorize a ten percent (10%) decrease of the required five (5) foot wide side yard setback, to 4-feet, six-inches (4'- 6") for an existing structure located at 10854 Churchill Place. B. That a public meeting was duly called, noticed and held for said application on November 7, 1994 by the Zoning Administrator. C. That pursuant to section 3 . 13 of the East Tustin Specific Plan, the requested administrative adjustment is intended for a special circumstance of hardship, and is not applicable to the entire subdivision site development standards as evidenced by the following: 1. The subject structure is existing as part of a finished phase within the tract, and is privately owned. 2. A hardship would be caused if the building were required to be moved six- inches to meet the five-foot side yard setback as it would be costly and disruptive to the neighborhood. 3 . At this time no other residential structures in the Tract 14748 have been reported to be encroaching into the five- foot side yard setback, therefore, the request does not apply to the site development standards for the entire tract. D. That the proposed project is categorically exempt (Class 5) pursuant to the California Environmental Quality Act 15305. Zoning Administrator Action 94-013 Administrative Adjustment 94-001 1 November 7, 1994 Page 2 2 3 II · The Zoning Administrator hereby approves Administrative Adjustment 94-001 authorizing a ten 4 percent ( 10%) decrease of the required five ( 5) foot wide side yard setback, to 4-feet, six-inches 5 (4'-6") for an existing structure located at 10854 Churchill Place, subject to the conditions 6 contained in Exhibit A, attached hereto. 7 PASSED Zoning 8 1994. 9 10 11 AND ADOPTED at a regular meeting of the Tustin Administrator, held on the 7th day of November, 12 CHRISTINE SH Zoning Admin' 13 // 14 4J~--./ f~"./ BARBARA REYES 15 Recording Secretary 16 STATE OF CALIFORNIA COUNTY OF ORANGE 17 CITY OF TUSTIN 18 I, BARBARA REYES, the undersigned, hereby certify that I am the Recording Secretary of the Zoning Administrator of 19 the City of Tustin, California; that Zoning Administrator Action No. 94-013 was duly passed and adopted at a 20 regular meeting of the Tustin Zoning Administrator, held on the 7th day of November, 1994. 21 22 ~7A/~/ // 23 'BARBARA REYE~ Recording Secretary 24 25 26 27 28 EXHIBIT A ZONING ADMINISTRATOR ACTION 94-013 CONDITIONS OF APPROVAL ADMINISTRATIVE ADJUSTMENT 94-001 NOVEMBER 7, 1994 GENERAL (1) 1.1 The proposed project shall substantially conform with the project as approved by the Zoning Administrator on November 7, 1994, on file with the Community Development Department as herein modif ied or as modif ied by the Director of Community Development in accordance with this Exhibit. The Community Development Department Director may make minor modifications to the project if such modifications are consistent with applicable Code provisions. (1) 1.2 The applicant shall sign and return an Agreement to Conditions Imposed form within two weeks of Zoning Administrator approval of the subject request. (1) 1.3 The applicant and property owner shall hold harmless and defend the City of Tustin for all claims and liabilities arising out of the City's approval of the entitlement process for this project. (1) 1.4 All conditions contained in Resolution No. 2938 approving Vesting Tentative Map 14381 and Resolution No. 2937 authorizing Conditional Use Permit 91-17, and all development standards contained in the East Tustin Specific Plan pertaining to the subject property shall remain in effect unless an appropriate application is made to the city for any variance to the development standards. PLAN SUBMITTAL (1) 2.1 Applicant shall submit for plan check three (3) sets of revised precise grading plans within two (2) weeks of Zoning Administrator approval, or project shall become null and void. SOURCE CODES (1) STANDARD CONDITION (3) UNIFORM BUILDING CODE/S (5) RESPONSIBLE AGENCY (7) PC/CC POLICY *** EXCEPTION (2) CEQA MITIGATION (4) DESIGN REVIEW (6) LANDSCAPING GUIDELINES Exhibit A Zoning Administrator Action 94-013 Administrator Adjustment 94-001 Page 2 FEES 3.1 At plan check, applicant shall pay all applicable plan check fees. (1) 3.2 Within 48 hours of approval of the subject project, the applicant shall deliver to the Community Development Department, a cashiers check payable to the COUNTY CLERK, in the amount of $25.00 to enable the City to file with the County Clerk, the appropriate environmental documentation pursuant to the California Environmental Quality Act. If within such 48 hours period, the applicant has not delivered to the Community Development Department the above noted check, the approval for the project granted herein shall be considered automatically null and void.